MAURY USCG vessel records
← All vessels

ISLAND QUEEN

Built
1983
Last inspected
28 October 2025
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 28 October 2025
…past their stated due date1
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDE6348
215205
Flag
UNITED STATES
Maury page id
psix-215205

Documentation record

Registered dimensions (L × B × D)85.0 ft × 26.0 ft × 5.1 ft
Registered tonnagegross 99 / net 30
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMEMPHIS, TN, UNITED STATES · built 1983
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMEMPHIS, TN
Endorsements, as the file codes themcw_un
DocumentationValid · issued 11 September 2025 · expires 31 October 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
30 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 17 inspections, each with its date, unit and type; 37 deficiencies with the resolution recorded against each, 1 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 17

28 October 2025 Annual Inspection · Vessel Attendance
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8215087
7 October 2025 In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8249419
15 July 2024 Annual Inspection · Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7959086
27 September 2023 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7799296
24 August 2023 Deficiency Check · Plan Review (Other than "T")
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7773249
25 May 2023 In-Service Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7680941
29 August 2022 Deficiency Check · COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7540449
29 December 2021 Drydock Exam
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7373408
1 December 2021 Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7459069
30 November 2021 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7359295
2 December 2020 MTSA Verification · Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7105312
11 December 2019 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6871771
9 July 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6744614
30 August 2017 COI Inspection · MTSA Verification · Examination of Repairs · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6255142
12 January 2017 Examination of Repairs · Inclining Experiment · Internal Structural Exam · Administrative Inspection · Drydock Exam · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6069955
14 April 2016 Damage Survey · Examination of Repairs
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5854327
8 February 2016 Annual Inspection · Deficiency Check
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5811683

Deficiency record · 37

02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 5 November 2025 Resolved
46 CFR 177.13-1. Each vessel must meet the applicable requirements in Subchapter S of this chapter. Bulkhead penetration in generator room, forward bulkhead centerline.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 5 November 2025
Resolved 5 November 2025
Resolution: Filled penetration with fire stop.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 5 November 2025 Resolved
46 CFR 120.432(a). Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew spaces located below the main deck. Generator room emergency lighting inoperable.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 November 2025
Resolved 5 November 2025
Resolution: Light bulb renewed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 November 2025 Resolved
46 CFR 176.25-50(b). At each inspection for certification and reinspection the marine inspector shall examine the bilges and other spaces to see that there is no accumulation of oil or other matter which might create a fire hazard. Generator room return fuel valve is leaking, centerline aft near overhead.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 November 2025
Resolved 5 November 2025
Resolution: Valve packing tightened.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 5 November 2025 Resolved
46 CFR 183.10-20(k). Junction boxes, connection boxes, and outlet boxes, for use in damp or wet locations shall be of watertight construction. Bilge alarm wiring in steering compartment is not in a watertight enclosure.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 November 2025
Resolved 5 November 2025
Resolution: Wires fixed into junction box correctly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 November 2025 Resolved
46 CFR 185.30-5(c). All life preservers and ring life buoys shall be marked with the vessel's name. Vessel name missing on several life rings.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2025
Resolved 10 November 2025
Resolution: Vessel name added to all life rings.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 5 November 2025 Resolved
46 CFR 176.25-50(a). At each initial and subsequent inspection for certification, reinspection and at . every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Chlorine tank is severely corroded and prone to leaks/structural failure. Must be renewed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 27 November 2025
Resolution: Chlorine tank renewed with approved installation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 5 November 2025 Resolved
46 CFR 182.20-5(b) Gauges to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in view of the operator. RPM Gauge for port main engine is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2026
Resolved 10 November 2025
Resolution: Gauge wiring repaired.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 November 2025 Resolved
46 CFR 181.15-10(c). L. Fire hose shall be 1% inches in diameter and 50 feet in length. Incorrect fire hose size, aft main deck
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2025
Resolved 10 November 2025
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 5 November 2025 No resolution recorded
46 CFR 119.455 (b)(3). Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the tank compartment, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the compartment and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Must install a remote valve actuator for fuel tank emergency shutoff valve.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 December 2025 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 October 2025 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] circuits added for new oven installation with out oversite. Make repairs or alterations in compliance with 46 CFR 115.700 and any other applicable laws and or regulations. ovens were installed in a passenger seating area withou oversight and must be removed prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2025
Resolution: Vessel removed oven that was previsouly installed while they werent carrying passengers. Oven was installled to provide support to crew during tall stacks event in Cincinatti, OH.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 7 October 2025 Resolved
Vessel found to be transporting +2000 gal of diesel fuel in unapproved plastic containers on an open deck. Remove diesel prior to movement.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 October 2025
Resolution: Vessel offloaded cargo into an approved mobile facility.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 September 2024 Resolved
Penetrations in boundaries for electrical cables, pipes, trunks, ducts etc. must be constructed to prevent passage of flame and smoke. Bulkhead penetrations in space forward of engine room is not sufficiently closed off. Vessel must ensure passage of smoke and flame through the bulkhead is prevented to the satisfaction of the local OCMI. 46 CFR 116.415
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 September 2024
Resolved 17 October 2024
Resolution: Vessel packed all bulkhead penetration openings with fire stop to ensure prevention of passage of smoke and flame.
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 9 September 2024 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. A second fuel supply line to engine room was found without a remote operation function to the valve. Vessel shall close valve and not use fuel supply line until a remote valve that meets regulation is installed. Vessel shall install valve NLT February 2025 to the satisfaction of the local OCMI. 46 CFR 119.455(b)(3)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 February 2025
Resolved 5 November 2025
Resolution: Valve was installed on second fuel supply line but does not offer remote capability. New deficiency entered on 05Nov2025 to install remote device. Valve remains closed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 August 2023 Resolved
System design and installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the Commandant. Vessel shall install and test the approved fixed fire suppression system IAW the manufacturers instructions/NFPA 2001 to the satisfaction of the attending Marine Inspector and the attending Certified Fire Inspection Company that is conducting the test prior to movement. 46 CFR 118.410(a)(3)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 September 2023
Resolution: Vessel shall install and test the fixed fire suppression system IAW the manufacturers instructions/NFPA 2001. Johnson Controls pressure tested the discharge piping, control piping, and all other applicable equipment. All SAT.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 24 August 2023 Resolved
The master shall conduct sufficient fire drills to make sure that each crew member is familiar with his or her duties in case of a fire. Once the Fixed Fire Suppression system is installed and tested to the satisfaction of the OCMI, the vessel shall conduct training and a fire drill with the crew to ensure crew is familiar with their duties prior to movement. 46 CFR 122.524(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 September 2023
Resolution: Vessel conducted training and fire drill demonstrating proficiency with new system. All SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 August 2023 Resolved
A fixed gas fire extinguishing system aboard a vessel must be approved by the Commandant, and be custom engineered to meet the requirements of this section. Vessel has approved plans from MSC Dated September 14th 2022. However, plans do not reflect current piping arrangement/diagram, location of suppression system, or current flow calculations. Vessel shall obtain approved drawings/plans for current installed Fixed Fire Suppression system to reflect approved system location, piping diagram, flow capacity, and all other additional requirements IAW ASTM/NFPA 2001, 46 CFR, and Fireboy System Manufacturers Instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 September 2023
Resolved 1 September 2023
Resolution: Vessel obtained satisfactory approved drawings and changing piping to galvanized inside and out to satisfy manufacturers requirements. All SAT.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 May 2023 Resolved
Vessels engineered fixed fire suppression system is undergoing modifications to meet regulations. Vessel owner shall submit plans to MSC for approval prior to completing modifications to the pipping system and moving the suppression systems cylinder to the adjacent space (Void #6). The pipping of the system shall be in accordance with the approved drawings at the time of inspection. Due August 25th 2023.
Action required: 705 - Other - as specified
Due 25 August 2023
Resolved 24 August 2023
Resolution: Vessel submitted plans to MSC but is still awaiting approval.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage comminuting and disinfecting system
Issued 29 August 2022 Resolved
The Commanding Officer, USCG Marine Safety Center, approves the design and construction of devices to be certified for installation and operation on board inspected vessels on the basis of tests and reports of inspection under the applicable marine engineering requirements in subchapter F of Title 46, Code of Federal Regulations, and under the applicable electrical engineering requirements in subchapter J of Title 46 Code of Federal Regulations.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 September 2022
Resolution: Cover to sewage tank has been secured properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 August 2022 Resolved
Except as otherwise provided in this paragraph all unfired pressure vessels shall be Coast Guard approved and installed to the satisfaction of the Officer in Charge, Marine Inspection. The requirements for design, construction and original testing of such approved unfired pressure vessels are in applicable regulations in Subchapter F (Marine Engineering) of this chapter. Information concerning the applicable regulations may be obtained from the Officer in Charge, Marine Inspector. 46 CFR 182.10.5(d), 46 CFR 54.15-10 two pressure vessels not subject to subchapter F are onboard servicable and do not have safety relief valves.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 September 2022
Resolution: Safety relief valves have been installed on both pressure vessels.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 29 August 2022 Resolved
An inspection for renewal of a certificate of inspection shall include an inspection of the structure. 46 CFR 176.05-109a) Repair hole in deck in forward part of galley/concession area.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 September 2022
Resolution: Hole has been repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 29 August 2022 Resolved
Lakes, bays, and sounds, and rivers routes. A vessel on a lakes, bays, and sounds, or rivers route must carry: (1) Three hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and (2) Three hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel had six non approved road flares onboard.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 September 2022
Resolution: Six CG approved hand red flare distress signals are onboard and not expired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 August 2022 Resolved
(a) An adult life jacket must be provided for each person carried on board a vessel. (b) In addition, a number of child-size life jackets equal to at least 10% of the number of persons permitted on board must be provided, or such greater number as necessary to provide a life jacket for each person being carried that is smaller than the lower size limit of the adult life jackets provided to meet this section, except that: (1) Child-size life jackets are not required if the vessel's Certificate of Inspection is endorsed for the carriage of adults only, or (2) When all “extended size” life preservers (those with a lower size limit for persons of 1,195 millimeters (47 inches) in height or weighing 20.4 kilograms (45 pounds)) are carried on board, a minimum of only 5% additional child size devices need be carried. (c) Except as allowed by paragraph (d) of this section, each life jacket must be approved in accordance with either §§ 160.002, 160.005, or 160.055 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.155 or 160.176. Vessel is restricted to carrying 201 adult passengers and 03 child passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2022
Resolution: Vessel has 350 adult and 35 child servicable lifejackets onboard.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 November 2021 Resolved
Fixed Fire Suppression System onboard is an engineered system (USCG approval # 162.161) and not a pre-engineered system. The storage cylinder is located inside the space protected (machinery) and is not capable of automatic operation by a heat actuator within the space. Not meeting 46 CFR 118.410(c).
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 24 August 2023
Resolution: Vessel has approved plans for new system and is awaiting plan approval from MSC for additonal changes. Cylinder is now relocated. However new restrictions are placed on the vessel. See new deficiencies in Activity #7773249.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 2 December 2020 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas or liquid, the temperature of which exceeds 150F, must be insulated where necessary to prevent injuries. The port and starboard generator set exhaust piping in the #2 void space is not suitably insulated and exceeds 150F. Install exhaust lagging and prove proper temperature readings during operation to the attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2020
Resolved 18 January 2021
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 December 2020 Resolved
If twist-on type of connectors are used, the connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration. The #1 void bilge high level alarm is wired using twist-on type connectors not housed w/in an enclosure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2020
Resolved 18 January 2021
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 2 December 2020 Resolved
Fire extinguishing equipment installed must be designed, constructed, installed, and maintained in a manner acceptable to the Commandant. The Port Side heat detector in the #2 void space above Port Side Generator was inoperable. Prove proper operation to attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2020
Resolved 18 January 2021
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 December 2020 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers and crew from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. The generator switchboard and main distribution panel had removed circuit breakers from the panels. Reinstall circuit breaker blanks or spares in all electrical distribution panels to the satisfaction of the attending CG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2020
Resolved 18 January 2021
Communications › Public Address System › Announcing Station
Issued 30 August 2017 Resolved
Reinstall PA system and conduct an operational test in the prescense of a Coast Guard Marine Inspector.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 October 2017
Resolution: Verified installation and conducted operational test. All sat.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 August 2017 Resolved
Weld aft deck railing to prevent passenger entrance to paddle wheel section the the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 October 2017
Resolution: Railing was properly re-installed to appropriate height and measurements.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 30 August 2017 Resolved
Install flame screen on fuel vent piping.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 October 2017
Resolution: Flame screen has been re-installed with a 30x30 mesh.
Communications › Radio Communications › VHF Radiotelephone
Issued 30 August 2017 Resolved
Provide operable 2nd VHF radio on navigation bridge.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 September 2017
Resolved 26 October 2017
Resolution: Verified radio installation and conducted operational test with SLMR. All sat.
Documentation › Markings/Placards › Capacity Marking
Issued 30 August 2017 Resolved
Install markings for maximum passengers permitted on the 3rd (100) and 2nd (200 combined).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 September 2017
Resolved 26 October 2017
Resolution: Passenger count signs have been installed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 May 2017 Resolved
Vessel has undergone modifications to the engine room (repower) and added 2 keel coolers. In addition, the vessel has changed from a wet exhaust to a dry exhaust system. The vessel also added approx. 800 lbs of fendering system on the bow. No credit DD/ISE will be given until the Marine Safety Center has approved the plans.
Action required: 705 - Other - as specified
Resolved 30 August 2017
Resolution: Required plans have been approved by MSC and reviewed by SLMR. Dry dock credit has been issued based on the inspection conducted by Sector NOLA.
Stability › Incline Test › General
Issued 1 May 2017 Resolved
Shipyard removed approx. 5-7 tons of fixed ballast without USCG being present. Vessel is to undergo a new incline test in the presence of the attending USCG marine inspecto with approved MSC incline procedures.
Action required: 705 - Other - as specified
Resolved 30 August 2017
Resolution: Ballast has been installed IAW approved stability test. Ballast was measured and counted with weight ticket to ensure proper install.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 1 May 2017 Resolved
Based on the above modifications, the CID of Sector NOLA now requires the engine room to meet subchapter "K" with regards to a fixed fire extinguishing system to protect the engine room. Vessel is to provide a plan to be submitted to Sector New Orleans to install a new fixed fire fighting system to protect the engineering space.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 August 2017
Resolution: A Pre-engineered system has been installed as approved by MSC. Local special consideration has been given for the automatic shutdown/deployment on the fire boy.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 1 May 2017 Resolved
Based on the above modifications, the CID of Sector NOLA now requires the engine room's strucutral fire protection (insulation) to be renewed. The owner/operator must submit a plan with a proposed timeline to replace all insulation throughout the engine room to meet 46 CFR 116.415 and NVIC 9-97 Change 1.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 August 2017
Resolution: Structural fire protection has been installed IAW plans.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 1 May 2017 Resolved
During the drydocking period, MIs observed all lifejackets being stowed on top of the heating/cooling ducts. Owner/Operator must replace and restow lifejackets in a suitable location and replace all lifejackets as directed by the attending MI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 August 2017
Resolution: Lifejackets stowage has been moved to lockers and are not kept above air ducts.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.