Inspection history · 45
17 April 2026
Damage Survey · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8354250
2 December 2025
Internal Structural Exam · Deficiency Check · In-Service Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8296384
2 October 2025
Deficiency Check · COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8239827
12 May 2025
Damage Survey · Deficiency Check · Administrative Inspection · Plan Review "T" Boat · Examination of Repairs
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8132989
30 April 2025
Damage Survey · Examination of Repairs
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8123822
30 April 2025
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8128682
26 March 2025
Damage Survey
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8100430
10 January 2025
Examination of Repairs · In-Service Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8074982
27 December 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8051824
18 January 2024
Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7851612
5 December 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7834060
13 December 2022
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7606060
12 January 2022
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7379005
14 December 2021
DAPI Audit · Annual Inspection · Plan Review "T" Boat · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7361818
26 April 2021
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7182940
31 March 2021
Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7166288
30 March 2021
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7166856
9 December 2020
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7109867
13 November 2020
In-Service Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7084375
5 October 2020
COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7070229
25 February 2020
Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6896953
26 June 2019
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6727627
8 May 2019
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6679506
7 May 2019
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6679676
30 April 2019
Deficiency Check · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6649713
31 July 2018
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6496265
22 February 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6415142
25 April 2017
Annual Inspection · Administrative Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6132046
17 March 2016
DAPI Audit · Drydock Exam · In-Service Inspection · Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5835794
7 January 2016
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5792876
24 August 2015
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5225116
8 August 2014
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4965031
13 July 2012
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4382684
15 December 2010
Simplified Stability Test · Deficiency Check · Hull Examination · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3911201
14 April 2009
Hull Examination
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 3452891
15 July 2008
COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3292055
26 September 2007
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3068004
18 September 2007
Re-Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3061203
14 September 2006
Annual Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2765142
9 August 2005
Re-Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 2465081
19 April 2005
Hull Examination
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2339599
14 September 2004
Re-Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2195474
8 September 2003
Type not recorded
No type recorded · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1899962
14 July 2003
Initial Certification · Hull Examination
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1846274
26 January 2001
Plan Review "T" Boat
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1384730
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 April 2026
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 April 2026
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 October 2025
Resolved
Provide one 10:B-C portable fire extinguisher at the operating station and one 2-A portable fire extinguisher in the interior accommodation space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2025
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 2 October 2025
Resolved
Provide two additional red hand flares or two orange smoke signals so there are a total of 12 distress signals on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 2 October 2025
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 2 October 2025
Resolved
Provide current paper copies of the NOAA - Navigation Chart for the operating area or install a Class B chart plotter with a minimum screen size of 7.8" x 7.8".
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 17 October 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 October 2025
Resolved
Attach a 3' to 6' lanyard with corrosion resistant clip to the floating water light for the ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 17 October 2025
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 October 2025
Resolved
Label the remote fuel shutoff location in letters at least 1" high.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2025
Resolved 17 October 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 May 2025
Resolved
Received report that while departing the dock, the vessel's main boom struck another moored vessel and snapped the boom approx 2/3 of its length measured from the mainmast. Provide repair proposal and complete repairs prior to raising the mainsail with passengers on board.
Action required: 705 - Other - as specified
Resolved 16 June 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 May 2025
Resolved
Provide a satisfactory third-party rigging survey prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 May 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 May 2025
Resolved
Conduct sea trials with sails raised prior to raising the mainsail with passengers on board.
Action required: 705 - Other - as specified
Resolved 16 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 April 2025
Resolved
Received notification that the vessel's engine would not restart post sunset sail (captain shut engine down while sails were raised). Identify issue and prove proper operation of engine prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 April 2025
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 March 2025
Resolved
Whenever damage to hull or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space. Vessel reported grounding while transiting through soft bottom channel at 2 knots. Vessel shall be made available for inspection prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2025
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 December 2024
Resolved
Provide an audible alarm for the vessel's pre-engineered fixed gas fire extinguishing system (Fireboy).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2025
Resolved 28 January 2025
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 27 December 2024
Resolved
Provide random chemical testing enrollment information and a crew sharing agreement for any crewmember not covered under the company's random chemical testing program.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2025
Resolved 7 January 2025
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 27 December 2024
Resolved
Provide logs for crew training and abandon ship, man overboard, and fire fighting drills for each crewmember.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2025
Resolved 7 January 2025
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 5 December 2023
Resolved
The hydrostatic release on the EPIRB expired in March 2023. Provide a new hydrostatic release.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 December 2023
Resolution: Vessel rep replaced the hydrostatic release on 05DEC23 and marked it to expire in two years.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 December 2023
Resolved
Provide records indicating that the portable fire extinguishers have been inspected within the previous 12 months.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 January 2024
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 5 December 2023
Resolved
Provide adequate and up to date excerpts of the following nautical publications for the vessel's operating area:
-U.S. Coast Pilot
-Coast Guard Light List
-Tide Tables
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 January 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 December 2023
Resolved
Provide a copy of the vessel's Sail Rigging Preventative Maintenance Plan and store on board for reference by individuals required to conduct rigging inspections.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 January 2024
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 December 2021
Resolved
The vessel's Stability Letter limits the sail area of the Mainsail, Foresail, and Jib to a total of 1213 square feet. The current Sail Plan, however, shows a total sail area of 1572 square feet. The vessel is restricted to no more than 1213 square feet of sail area and must submit an updated sail plan for this arrangement.
Action required: 705 - Other - as specified
Resolved 6 January 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 March 2021
Resolved
Loose connection in the circuit leading from the main engine’s breaker caused loss of propulsion.
Action required: 10 - Deficiency Rectified
Resolved 31 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 5 October 2020
Resolved
Provide a total of 6 hand red flare distress signals and 6 hand orange smoke distress signals as required for a limited coastwise route (or a total of 12 hand red flare distress signals approved in accordance with 46 CFR 160.021). 46 CFR 180.68
Action required: 10 - Deficiency Rectified
Resolved 5 October 2020
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 5 October 2020
Resolved
15 person life float is not serviceable and needs to be replaced. Vessel currently restricted to operating in warm water within 3 miles from shore and must carry a float free 406 MHz EPIRB. 46 CFR 180.200
Action required: 705 - Other - as specified
Resolved 26 April 2021
Resolution: Vessel restricted to operating in warm water within 3 miles from shore and must carry a float free 406 MHz EPIRB.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 February 2020
Resolved
Vessel's dagger board experienced damage from Marine Borers. Vessel required to drop dagger board to show extent of damage, remove impacted wood, and replace with good wood.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2020
Resolved 28 February 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 February 2020
Resolved
Cutless Bearing needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2020
Resolved 28 February 2020
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 25 February 2020
Resolved
[name withheld] and other forms of rot found on the overhead inside the cabin. Remove, arrest rot, and treat wood to prevent further damage.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2020
Resolved 28 February 2020
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 February 2020
Resolved
Vessel was mistakenly put on six year fastener pull cycle. Vessel required to submit a fastener pull plan on provided sheets within 30 days.
Action required: 705 - Other - as specified
Due 25 March 2020
Resolved 24 March 2021
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 30 April 2019
Resolved
Scaling rust on starboard side of fuel tank. Clean tank for re-inspection by local marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2019
Resolved 2 May 2019
Resolution: Tank cleaned and gauged, meets minimum thickness requirements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 April 2019
Resolved
Steering system component is impacting fuel tank vent piping. Prevent any future impact to fuel tank vent.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 2 May 2019
Resolution: Ventilation re-routed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 30 April 2019
Resolved
Replace SOLAS tape on ring buoy.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 2 May 2019
Resolution: Tape replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 30 April 2019
Resolved
Provide all items listed in 46 CRF 160.41 in First Aid Kit. Missing Ammonia Inhalant.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 2 May 2019
Resolution: Ammonia Inhalants replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 30 April 2019
Resolved
Mark life floats with vessel name, make all means to secure the vessel basket with non-permanent means and mount floating waterlight.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2019
Resolution: L/F's relabeled, floating waterlight mounted.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 30 April 2019
Resolved
Provide up to date paper publications, light list, coast pilot, tides.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2019
Resolution: Updated publications onboard
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 April 2019
Resolved
Replace whisker stay turnbuckles (syntheic line) on both Port and STBD side of bowsprit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 July 2019
Resolution: Received pictures of replaced turnbuckles.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 31 July 2018
Resolved
A space containing diesel machinery must be fitted with at least two ducts to furnish natural or powered supply and exhaust ventilation. Additionally, provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Owner operator shall submit plans for approval to local OCMI prior to making alterations.
Action required: 705 - Other - as specified
Due 29 September 2018
Resolved 11 September 2018
Resolution: Ventilation system installed so that vessel is able to secure ventilation for E/R at main deck.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 31 July 2018
Resolved
All floating waterlights attached to life boat must be operational. Waterlight onboard were inoperable. Repair or replace waterlight.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 September 2018
Resolution: Verified batteries were replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 31 July 2018
Resolved
All inspected sailing vessel owner/operators should have a written Preventive Maintenance Plan (PMP) that specifically addresses their vessel’s sail rigging equipment and components. It shall include, at minimum, A general description, examination maintenance schedule and inventory rigging component. All inspections and activity shall be documented and maintained with the plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 August 2018
Resolution: vessel submitted approved plan
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 31 July 2018
Resolved
Provide Sail plan that shows Masts, sail areas as well as the arrangement, dimensions, and connections of the standing rigging. The owner may submit specifications, sketches or line drawings provided the required information is adequately detailed and acceptable to the cognizant OCMI.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 August 2018
Resolution: vessel submitted approved plan
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 25 May 2017
Resolved
Install 4" rail courses in accordance with submitted plans.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 11 July 2017
Resolution: Rail courses installed.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 25 April 2017
Resolved
Prove proper operation of audible alarm for fixed gas fire system.
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 2 May 2017
Resolution: New fireboy head unit installed, operational test conducted, all sat.
Lifesaving › Lifefloat › Float-free Link
Issued 25 April 2017
Resolved
Provide proper float-free link for 10 person life float.
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 2 May 2017
Resolution: New float-free link installed for 10 person float.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 25 April 2017
Resolved
Properly mark/indicate stowage location for adult and child PFD's.
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 2 May 2017
Resolution: Stowage location of PFD's indicated on main deck.
Lifesaving › Lifebuoys › Size
Issued 25 April 2017
Resolved
Provide adequate size ring buoy with retro reflective tape (24").
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 2 May 2017
Resolution: New 24" ring buoy on board.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 25 April 2017
Resolved
Post emergency instructions list at operating station.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Posted emergency instructions list.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 April 2017
Resolved
Post all pages of COI (3 pages).
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: COI posted.
Communications › Radio Communications › VHF Radiotelephone
Issued 25 April 2017
Resolved
Provide GPS and MMSI number into VHF radio.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Integrated GPS and MMSI number into VHF radio
Communications › Alarms/Indicators › High Water Alarm
Issued 25 April 2017
Resolved
Provide audible and visual indication of bilge high level alarm for all installations (2).
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Audible and visual alarm porvided.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 25 April 2017
Resolved
Provide plans to OCMI for 4" deck courses prior to installation.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Plans provided.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 25 April 2017
Resolved
Provide means to secure ventilation to engine space.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Means provided to secure ventilation.
Sail Rigging › Stays/Shrouds › Wires
Issued 25 April 2017
Resolved
Provide rigging inventory to include installation date and rigging inspection program.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Inventory provided.
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 April 2017
Resolved
Mount batteries in corrosion resistant tray.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 May 2017
Resolution: Battery trays installed.
Engineering › Bilge Water Management System › Hose
Issued 4 April 2016
Resolved
Replace aft bilge line with nonmetallic material of adequate strength and rigidity.
Action required: 705 - Other - as specified
Due 18 April 2016
Resolved 11 April 2016
Resolution: Vessel replaced aft bilge line.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 4 April 2016
Resolved
Provide fire servicing certificate for Fire Boy
Action required: 705 - Other - as specified
Due 18 April 2016
Resolved 11 April 2016
Resolution: Vessel provided valid fire servicing certificate.
Lifesaving › Lifefloat › Float-free Link
Issued 4 April 2016
Resolved
Install float-free link and recoil painter on lifefloats.
Action required: 705 - Other - as specified
Due 18 April 2016
Resolved 11 April 2016
Resolution: Vessel attached lifefloats to vessel with appropriate float-free link.
Lifesaving › Hand Flares › Quantity
Issued 24 August 2015
Resolved
Vessel had four of twelve required distress signals onboard. Issued requirement to provide vessel with correct number of distress signals.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2015
Resolution: Vessel rep provided proof of purchase of additional distress signals.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 24 August 2015
Resolved
Vessel's FCC safety certificate was found to be expired, issued requirement to renew certificate as required by 47 CFR 13.
Action required: 705 - Other - as specified
Due 24 September 2015
Resolved 5 September 2015
Resolution: Vessel rep provided image of valid FCC safety certificate.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 24 August 2015
Resolved
Vessel did not have tide tables, lights list, or coast pilot onboard. Issued requirement to provide vessel with required publications.
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 25 August 2015
Resolution: Vessel rep provided proof of purchase of 2015 Eldridge.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 24 August 2015
Resolved
Vessel's 10 person lifefloat water light was inoperable and the max person's allowed was not legible. Issued requirement to repair light and re-label maximum persons.
Action required: 705 - Other - as specified
Due 7 September 2015
Resolved 31 August 2015
Resolution: Vessel rep re-labeled maximum persons and repair water light.
Lifesaving › Lifebuoys › Serviceable
Issued 8 August 2014
Resolved
Replace life ring. Ensure water light is fitted with corrosion resistant clip.
Action required: 705 - Other - as specified
Due 22 August 2014
Resolved 22 August 2014
Resolution: Recieved photographs from vessel rep showing new life ring installed.
Lifesaving › Lifefloat › Paddle
Issued 8 August 2014
Resolved
Provide two paddles for each life float. Total 04. Mark each paddle with vessel name.
Action required: 705 - Other - as specified
Due 22 August 2014
Resolved 22 August 2014
Resolution: Recieved photos from vessel rep showing 4 new paddles .
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 8 August 2014
Resolved
Provide documentation of fixed fire extinguishing system.
Action required: 705 - Other - as specified
Due 22 August 2014
Resolved 22 August 2014
Resolution: Recieved scaned image of reciept from servicing company showing that fixed fire extinguishing system was serviced.
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 13 July 2012
Resolved
Provide proof of enrollment in an approved drug & alcohol program or consortium
Due 27 July 2012
Resolved 30 July 2012
Resolution: Owner enrolled company in maritime consortium.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 July 2012
Resolved
Provide 1 waterlight as required.
Due 27 July 2012
Resolved 30 July 2012
Resolution: waterlight provided sat.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 13 July 2012
Resolved
Provide testing and certification for the fixed fire fighting system.
Due 27 July 2012
Resolved 30 July 2012
Resolution: Fixed system inspected sat.
Engineering › Steering Gear System › Fastener
Issued 14 June 2011
Resolved
Cotter pins holding steering arms to rudder shaft inadequate length for turning ends to hold in fastener hole. Refasten using cotter pins of suitable length.
Action required: 705 - Other - as specified
Due 14 July 2011
Resolved 25 July 2011
Resolution: Cotter pins are now of proper length and the ends are rolled over and secure.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 14 June 2011
Resolved
Insure all standing rigging screw pin shackles are proplerly siezed to prevent pin from loosening and falling out.
Action required: 705 - Other - as specified
Due 15 July 2011
Resolved 25 July 2011
Resolution: Examined all standing rigging screw pin shackles. All are properly siezed.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 14 June 2011
Resolved
Insure all dead eye blockes are properly fastened to chain plates with minimum of grade 5 galvy bolts of adequate length and size.
Action required: 705 - Other - as specified
Due 15 July 2011
Resolved 25 July 2011
Resolution: Examined the installation of all of the dead eye bolts. All were found to be of adequate length, size and grade 5.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 December 2010
Resolved
Loose wire in way of engine installation. Secure all loose wire in engine compartment.
Action required: 705 - Other - as specified
Due 15 July 2011
Resolved 16 June 2011
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 15 December 2010
Resolved
Remove all paints and thinners used durning maintenance period from vessel prior to carriage of passengers
Action required: 705 - Other - as specified
Due 17 June 2011
Resolved 16 June 2011
Communications › Radio Communications › EPIRB
Issued 15 December 2010
Resolved
Ensure proper installation and registration of EPIRB
Action required: 705 - Other - as specified
Due 17 June 2011
Resolved 16 June 2011
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 14 September 2006
Resolved
Provide annual servicing of fixed and portable fire extinguishers.
Action required: 705 - Other - as specified
Due 6 October 2006
Resolved 17 October 2006
Resolution: Extinguishers serviced.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 14 September 2006
Resolved
Reattach/install duct work to accomodate main engine air intake from outside engine space.
Action required: 705 - Other - as specified
Due 6 October 2006
Resolved 4 October 2006
Resolution: Attended vessel. Rigid hose has been installed to allow air intake from outside engine box.
Lifesaving › Hand Flares › Quantity
Issued 14 September 2006
Resolved
Provide 3 red flares.
Action required: 705 - Other - as specified
Due 6 October 2006
Resolved 4 October 2006
Resolution: Attended vessel. Flares are now on board.
Construction/Loadline › Penetrations › Bottom Plug
Issued 14 September 2006
Resolved
Cap off unused through hull fitting forward/port side.
Action required: 705 - Other - as specified
Due 6 October 2006
Resolved 4 October 2006
Resolution: Attended vessel. Unused through hull fitting has been properly capped off in addition to ball valve being in closed position.
Communications › Alarms/Indicators › High Water Alarm
Issued 9 August 2005
Resolved
PROVE PROPER OPERATION OF HIGH WATER BILGE ALARM.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 August 2005
Resolved 10 August 2005
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 9 August 2005
Resolved
MAKE AVAILABLE TWO (02) PORTABLE LIGHTS.
Action required: 705 - Other - as specified
Due 19 August 2005
Resolved 10 August 2005