Records from 2016 to 2026. Most recent: inspection, 22 July 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 51
22 July 2026
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8444264
9 April 2026
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8343400
15 September 2025
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8233364
25 June 2025
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8167426
21 April 2025
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8116078
11 March 2025
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8091592
4 February 2025
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8074634
12 December 2024
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 8046570
17 June 2024
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7934670
7 April 2024
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7891030
2 April 2024
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7888009
2 November 2023
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7819470
23 October 2023
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7813237
6 September 2023
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7786245
7 March 2023
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7648105
1 February 2023
PSC B · Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7629798
10 January 2023
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7619578
4 January 2023
In-Service Inspection
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7616422
7 November 2022
PSC A
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7590314
30 September 2022
Ballast Water Examination
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7569505
29 September 2022
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7568646
8 September 2022
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7566241
7 September 2022
PSC A · Ballast Water Examination
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7552628
22 July 2022
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7513402
18 July 2022
Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7510593
16 July 2022
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7511972
15 July 2022
In-Service Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7507752
12 July 2022
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7503697
13 May 2022
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7449062
1 April 2022
PSC B
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7421467
29 September 2021
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7323910
9 September 2021
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7307596
1 March 2021
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7148225
14 July 2020
PSC B
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7002966
30 March 2020
Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6934485
19 February 2020
Deficiency Check · PSC B
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6911650
3 January 2020
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 6882371
12 November 2019
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 6853806
7 November 2019
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6852075
15 October 2019
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 6839728
8 August 2019
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6776951
9 March 2019
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 6640265
6 March 2019
ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 6634648
18 July 2018
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6483236
12 March 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6369038
10 January 2018
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6335488
9 January 2018
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6334717
20 October 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6291553
20 March 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6107754
20 May 2016
NPV Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5881754
14 March 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5831255
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 April 2026
Resolved
Stairways and ladder shall be so arranged as to provide, from all accommodation spaces and from spaces in which the crew is normally employed, other than machinery spaces, ready means of escape to the open deck and thence to the lifeboats and life rafts, The ladder from the provision stores was missing, providing means of escape inaccessible. 74 SOLAS(1997)II-2/45.1
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 May 2026
Resolved 22 July 2026
Resolution: Class report recieved and found in compliance. Deficiency cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 9 April 2026
Resolved
Not less than one half of the total number of lifebuoys shall be provided with self igniting lights complying with the regulations of 31.2. Two lifebuoys in the vessels stern had nonfunctional lights attached. 74SOLAS(1997)III/7.1.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 May 2026
Resolved 22 July 2026
Resolution: Class report recieved and found in compliance. Deficiency cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 9 April 2026
Resolved
No less than two of these lifebuoys shall also be fitted with self activated smoke signals... and be capable of quick release from the navigation bridge, These buoys were rigged in a way that prevented quick release. 74 SOLAS(1997)III/7.1.3
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 May 2026
Resolved 9 April 2026
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 11 March 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
Limit switch on rescue boat davit is not operational.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 April 2025
Resolved 18 April 2025
Resolution: Vessel provided classification society report to the satisfaction of the reviewing PSCO.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 11 March 2025
Resolved
Two means of escape shall be provided from a machinery control room located within a machinery space, at least one of which will provide continuous fire shelter to a safe position outside the machinery space.
Wood blocks were observed preventing the emergency escape hatch from opening.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 13 March 2025
Resolved 13 March 2025
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 17 December 2024
Resolved
After any survey of the ship under regulations 7, 8, 9, or 10 has been completed, no change shall be made in the structural arrangements, mechanical, equipment ,and other items covered by the survey, without the sanction of the Administration. Vessel has modified its fuel oil piping from the fuel transfer pump to the purifier return line. using a plastic hose to connect the steel pipes.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 December 2024
Resolution: Class report received to the satisfaction of the reviewing PSCO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 17 December 2024
Resolved
The administration may permit the use of oil-level gauges with flat glasses and self-closing valves between the gauges and fuel tanks. Vessel has installed plastic hoses as sight glasses on its main engine service tank, setting tank, M.E. lube oil and aux lube oil tanks.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 December 2024
Resolution: Class report received and approved by the reviewing PSCO.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 12 December 2024
Resolved
The company should ensure that any non-conformity is reported, with its possible cause, if known. Vessel's fuel transfer pump experienced air lock, causing the crew to make modifications detailed in deficiency #1. The non-expected defect/non-conformity was not reported in accordance with the vessel's ISM manual, section 10. Additionally, deficiency #2 has been addressed previously by the USCG. Provide plan to ensure vessel compliance with its ISM manual.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 February 2025
Resolution: Class report received and approved by the reviewing PSCO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 April 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform to the provisions of the present regulations to ensure that the ship in all respects will fit to proceed to sea without danger to the ship or persons on board. The vessel incurred a controllable pitch propeller malfunction while departing its berthing in Fall River, MA. Effect sound repairs to the satisfaction of the U.S. Coast Guard, as well as the vessel's Classification Society, prior to movement.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 April 2024
Resolution: RINA attended vessel and submitted report to satisfaction of the Coast Guard; CG PSCO attended vessel and witnessed satisfactory operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 October 2023
Resolved
The machinery, boilers, and other pressure vessels, shall be of a design and construction adequate for the service for which they are intended. Vessel experienced undetermined issue preventing complete operation of main engine while attempting to depart.
74SOLAS(04)II-1/26.1
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 24 October 2023
Resolved 2 November 2023
Resolution: Issue was found to be low pressure on the hydraulic line to the CPP, preventing the CPP from pitching and thus preventing propulsion. Tech repaired, RINA Class Surveyor and PSCOs witnessed proper operation of the CPP.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 January 2023
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. CONTROLLABLE PITCH PROPELLER IS NOT 100% OPERABLE. 74 SOLAS(2014 CONS) I/11(a) ; 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 February 2023
Resolved 13 March 2023
Resolution: PSCO WITNESSED PROPER OPERATION OF CPP ON 1FEB23 (ACT 7629798); RINA SURVEY REPORT RECEIVED ON 13MAR23 REMOVING THE CONDITION OF CLASS. DEF CLEARED.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 January 2023
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. CONTROLLABLE PITCH PROPELLER IS CURRENTLY INOPERABLE. 74 SOLAS(2014 CONS) I/11(a) ; 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 January 2023
Resolution: RECEIVED RINA CLASS SURVEY REPORT ATTESTING TO THE PARTIAL REPAIR OF THE CPP. RE-ISSUED DEF W/ NEW DEF CODE OF 50 AC IN ACTIVITY 7619578.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 September 2022
Resolved
VESSEL DEPARTED >6 HOURS FROM THEIR LISTED DEPARTURE DATE/TIME ON THEIR NOTICE OF ARRIVAL (NOA). NOA STATED DEPARTURE DATE/TIME OF 02OCT2022 @ 2300 AS OF 30SEP2022 @ 1200. VESSEL HAD ALREADY DEPARTED THE FALL RIVER LINE PIER FACILITY AT THIS TIME.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 September 2022
Resolved 30 September 2022
Resolution: DEFICIENCY UNABLE TO BE RECTIFIED. ENFORCEMENT ACTIVITY TO FOLLOW.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 September 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2022
Resolved 30 September 2022
Resolution: DEFICIENCY CANNOT BE RECTIFIED, HOWEVER ENFORCEMENT ACTIONS TO FOLLOW.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 7 September 2022
Resolved
The normal equipment of every rescue boat shall consist of... a first -aid kit(outfit) in a waterproof case capable of being closed after use... and a searchlight with a horizontal + vertical sector of 6° and measured luminous intensity of 2,500cd which can work continously for not less than 3 hours. Rescue boat is missing first aid kit & searchlight.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2022
Resolved 8 September 2022
Resolution: Light installed.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 7 September 2022
Resolved
A alarm system complying with regulation 51 shall be provided for all important pressures, temperatures, and fluid levels and other essential parameters (periodicaly unattended machinery spaces). The main engine crankcase oil level sensor is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 September 2022
Resolved 29 September 2022
Resolution: New oil level sensor install and cleared by RINA Class Surveyor.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 18 July 2022
Resolved
Every company should develop, implement and maintain a Safety Management System with the following functional requirements:
.2 Instructions and procedures to ensure the safe operation of ships and protection of the environment in compliance with relevant international and flag state legislation. Maintenance of machinery is not being implemented in accordance with the company's procedures. The main diesel engine failed while underway resulting in a marine casualty. The vessel was improperly loaded with Packaged Dangerous Goods and no Dangerous Cargo Manifest OR equivalent was available or created. Deficiencies 2 thru 5 are objective evidence of non-conformities relevant to the ISM Code elements 7 & 10, an external audit is required.
74 SOLAS (2020) IX/3.1, ISM 1.4.2
Code 30, AC
Condition: Invalid
Action required: 30 - Ship detained
Due 18 July 2022
Resolved 22 July 2022
Resolution: External audit complete.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 July 2022
Resolved
Carriage of Dangerous Goods shall be in compliance with the IMDG Code. Vehicles flammable liquid powered, not meeting the conditions of special provision 961 shall be assigned class 9 and shall meet the following requirements; for flammable liquid power vehicles the fuel tanks shall be not more than one fourth full. Installed batteries shall be protected from damage and short circuit and accidental activation during transport. A spot check of two vehicles on deck noted fuel tanks were at one half full and batteries were operational & not protected from short circuit/activation. All vehicles to be inspected for compliance with IMDG. Objective evidence ISM Code 7.
74 SOLAS (2020) VII/3, IMDG 3.1.
Condition: Improper Installation
Action required: 30 - Ship detained
Due 18 July 2022
Resolved 22 July 2022
Resolution: Vehicles were properly re-stowed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 July 2022
Resolved
Machinery shall be of a design and construction adequate for the service for which they are intended. The vessel’s main diesel engine failed while transiting outbound Narragansett Bay, RI. Cylinder No. 7 overheated during the voyage. Follow-up inspection noted abnormal cooling water temperature for No. 3 cylinder and contaminated main diesel engine coolant water. Objective evidence ISM Code 10.1.
74 SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 July 2022
Resolved 22 July 2022
Resolution: No. 3&7 heads replaced; tested satisfactory.
12 - Dangerous Goods › N/A - No Subsystem › Dangerous goods / harmful substances in pack. form
Issued 18 July 2022
Resolved
Each ship carrying dangerous goods in packaged shall have a special list, manifest or stowage plan in accordance the IMDG Code. The vessel did not have a dangerous cargo manifest or stowage plan in accordance with the IMDG Code. Objective evidence ISM Code 7.
74 SOLAS (2020) VII/4.2
17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 18 July 2022
Resolved 22 July 2022
Resolution: Proper stowage plan effected & implimented.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 18 July 2022
Resolved
The company and ship shall comply with the requirements of the International Safety Management Code. The company should establish procedures to ensure that the ship is maintained in conformity with relevant rules, regulations, and additional requirements established by the company and ensure inspections are held at appropriate intervals. Vessel has multiple overdue maintenance items for the main diesel engine: Cylinder head checks No’s 1,2,5,6 are overdue by more than 6k hrs. Intake and Exhaust valve overhauls No’s 1, 5, 6 are overdue. Fuel injector testing on No’s 1,2,5,6 are overdue by appx 1.8k hrs.
74 SOLAS (2020) IX/3.1
ISM Code 10.2.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2022
Resolved 7 September 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2022
Resolved
Electrical installations shall ensure the safety of the crew and ship. There is a power strip installed below the crew made condensate drain of the A/C unit in the Engine Control Room.
Cite: 74 SOLAS (04) II-1/ 40.1.3 Action: 17 ac
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 May 2022
Resolved 13 May 2022
Resolution: Power strip was removed entirely from the area, and electrical hazards were rectified below the AC unit; condensation hose was reinforced and directed away from any potential elctrical hazards.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 1 April 2022
Resolved
The ship shall be fitted with an approved oil filtering equipment. The oily water seperator was taken apart and could not be inspected properly.
Cite: MARPOL 78 1/14.1 Action: 17 ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 1 April 2022
Resolved 3 April 2022
Resolution: OWS filter cleaned and system was re-assembled. crrew tested OWS and found fully operational. RINA submitted survey report outlining rectification
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2022
Resolved
Electrical installations shall ensure the safety of the crew and ship. There are dead end wires not properly secured behind the main electrical panel and the overhead of the steering gear room.
Cite: 74 SOLAS (04) II-1/40.1.3 Action: 16 ac
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2022
Resolved 13 May 2022
Resolution: Dead end wires IVO the main electrical panel and overhead in the steering gear room were secured and installed properly upon return to the vessel.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 1 April 2022
Resolved
The condition of equipment shall be maintained. The smoke detector in the engineering workshop was cracked and taped on.
Cite: 74 SOLAS (20) I/11 Action: 16 ac
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2022
Resolved 13 May 2022
Resolution: The smoke detector in the engineering workshop was replaced with a new, serviceable component.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 1 April 2022
Resolved
Escape routes shall be clear of obstacles. The emergency egress in engine control room was blocked by boxes.
Cite: 74 SOLAS (97) II-2/13.1.2 Action: 10 c
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 1 April 2022
Resolved 1 April 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 September 2021
Resolved
All electrical apparatus shall be so installed as to not cause injury when handled or touched in the normal manner. The boiler burner electrical control panel cover was found broken and inadequately repaired with duct tape.
74 SOLAS (04 CONS) II-1/45.1.3 50ac
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 29 September 2021
Resolution: Received Class Report from RINA attesting to the replacement of the broken boiler burner cover.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 February 2020
Resolved
Manually operated call port in engine control station was damaged during engine room repairs and is not capable of immediate operation
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 March 2020
Resolved 27 March 2020
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 19 February 2020
Resolved
Emergency generator did not start. Battery bank was discharged. Jumper wire was found installed on battery charging system.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 February 2020
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 6 March 2019
Resolved
Not less than 2 lifebuoys shall be provided with self activating smoke signals. Due to bad weather the vessel lost of of their smoke signals
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2019
Resolved 9 March 2019
Resolution: Replaced lost MOD Light/Smoke.