Inspection history · 80
27 January 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1117452
20 November 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1109171
24 October 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1115013
24 July 1997
Letter of Compliance (Initial/Renewal)
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1371924
23 July 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1115225
4 June 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 773908
6 May 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1098833
22 October 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 762073
22 October 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 764487
14 October 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 850403
24 September 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1421199
23 September 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 198260
20 September 1996
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 198259
7 August 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1090704
7 August 1996
Letter of Compliance (Initial/Renewal)
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1363762
4 June 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2049
30 May 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1243838
11 April 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 84524
4 April 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1080672
26 March 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1078735
9 December 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 124164
18 November 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 177676
15 November 1995
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1184171
6 November 1995
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1191708
2 November 1995
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 881082
6 October 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 152925
29 September 1995
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 881139
17 August 1995
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 875257
1 August 1995
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1185629
21 June 1995
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1188897
6 June 1995
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 125123
17 March 1995
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 868667
27 September 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 870237
12 August 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 866332
16 June 1994
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 861325
11 May 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 868737
26 April 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1169727
11 April 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1170084
1 February 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 851706
24 January 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 859845
23 January 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1162022
21 December 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 852591
17 November 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1145947
15 September 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1148054
2 September 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1154281
30 August 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 22551
30 August 1993
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1153460
27 June 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1154407
3 June 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 833827
26 May 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1142706
8 March 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 837590
24 February 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1151076
31 December 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1135851
29 December 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1143092
27 October 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 935130
18 July 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1267430
11 July 1992
Re-Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1262167
29 April 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1259287
13 December 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1266676
1 November 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1243607
16 September 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 937974
6 August 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 934387
6 July 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 934538
13 May 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 940847
24 November 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 917618
23 November 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1226128
23 July 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1237371
19 December 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 909206
19 December 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1225293
15 July 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1338233
28 March 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 912086
4 November 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1021001
8 October 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1018327
7 September 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1317714
29 August 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1034922
29 July 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1003752
29 July 1987
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1034925
30 September 1986
Re-Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1008457
1 August 1985
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1291672
1 August 1985
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1291673
Accommodation/Occupational Safety
Issued 24 July 1997
Resolved
Provide documentation of ABS and/or CG approval of eight-man quarters module design and construction and approval for placement/installation on this rig.
Condition: Unknown
Due 24 July 1997
Resolved 24 July 1997
Engineering
Issued 24 July 1997
Resolved
Repair and prove proper operation of port pontoon oily water seperator (OWS).
Condition: Unknown
Due 15 September 1997
Resolved 3 September 1997
Lifesaving
Issued 24 July 1997
Resolved
Revise Hazardous Location Plan to reflect: a. change of location and classification of paint locker, b. addition of eight-man qtrs unit, c. classification of mud-pit room (Cl. I Div 2); indicate air locks between Cl1 Div. 1/unclassified areas in lower shale shaker area.
Condition: Unknown
Due 24 August 1997
Resolved 26 August 1997
Engineering
Issued 24 July 1997
Resolved
Replace diesel fuel transfer hose(s) or hydrostatically test existing hose(s) at 1.5 times the maximum discharge pressure of the contract supply boat's fuel transfer pump, but not less than 100 psi.
Condition: Unknown
Due 24 August 1997
Resolved 28 July 1997
Fire Fighting
Issued 24 July 1997
Resolved
Revise current Firefighting/Lifesaving Plan to reflect: a. addition of eight-man quarters module, b. addition of 25-man float-free liferaft installation, and c. change of location of paint locker.
Condition: Unknown
Due 15 September 1997
Resolved 9 September 1997
Lifesaving
Issued 24 July 1997
Resolved
Revise current Station Bill to reflect increase of manning and respective billets to 108 total persons.
Condition: Unknown
Due 15 September 1997
Resolved 15 September 1997
Documentation
Issued 6 May 1997
Resolved
Provide documentation from flag state (Panama), or ABS acting on behalf of Panama, that the vessel's Shipboard Oil Pollution Emergency Plan (SOPEP) has been reviewed and approved as meeting MARPOL Resolution 26.
Condition: Unknown
Due 6 May 1997
Resolved 6 May 1997
Navigation
Issued 7 August 1996
Resolved
Provide correct fog horn signal (two second blast, 18 seconds silence) per 33 CFR 67.10.
Condition: Unknown
Due 7 August 1996
Resolved 7 August 1996
Engineering
Issued 7 August 1996
Resolved
Repair Oily Water Separator (OWS) solenoid valve on port pontoon OWS and prove proper operation of same.
Condition: Unknown
Due 7 September 1996
Resolved 23 August 1996
Fire Fighting
Issued 7 August 1996
Resolved
Replace faulty Halon release siren in engine room located outside SCR room per Fire Protection Systems annual servicing report.
Condition: Unknown
Due 7 September 1996
Resolved 23 August 1996
Lifesaving
Issued 7 August 1996
Resolved
Install reflective tape meeting SOLAS requirements on all ring buoys (must be installed at four places equidistant around buoy).
Condition: Unknown
Due 7 September 1996
Resolved 23 August 1996
Lifesaving
Issued 7 August 1996
Resolved
Provide correct cylinder valve heads (with appropriate rupture discs/plugs)on all four breathing air cylinders on lifeboat No. 3; recharge all cylinders.
Condition: Unknown
Due 7 September 1996
Resolved 23 August 1996
Engineering
Issued 7 August 1996
Resolved
Make all unfired pressure vessels (UPVs) available for internal examinationand test pressure setting of respective pressure relief valves in presence of CG inspector. (Company to provide boroscope or other adequate means to conduct UPV internal examination).
Condition: Unknown
Due 7 August 1996
Resolved 7 August 1996
Navigation
Issued 7 August 1996
Resolved
Provide obstruction lights (white nav-aid lights) at all four corners of rig in accordance with 33 CFR 67.05: 60 flashes per minute (all four corners flashing in unison); correct bulbs in all lights.
Condition: Unknown
Due 7 August 1996
Resolved 7 August 1996
Lifesaving
Issued 7 August 1996
Resolved
Replace expired and/or deteriorated lifeboat water and provisions in lifeboat No. 3 (must have 3600 calories per person plus 14 ounces condensedmilk per person or 5000 calories per person (with milk substituted); 3 quarts water per person.
Condition: Unknown
Due 7 September 1996
Resolved 23 August 1996
Electrical
Issued 4 April 1996
Resolved
REMOVE PRESSURE TRANSMITTER FROM DOGHOUSE DEGASSER AREA OR REPLACE WITH TRANSMITTER APPROVED FOR HAZARDOUS AREAS BY AN INDEPENDENT LABORATORY ACCEPTED BY COMMANDANT USCG.
Condition: Unknown
Due 4 April 1996
Resolved 4 April 1996
Engineering
Issued 2 November 1995
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPERATOR AND 15PPM BILGE ALARM PRIOR TO PLACING INTO OPERATION.
Condition: Unknown
Due 2 November 1995
Resolved 2 November 1995
Documentation
Issued 2 November 1995
Resolved
PROVIDE A COPY OF NDT REPORT FOR HIGH STRESS CONNECTIONS AND VIDEO TAPE/DIVER'S REPORT FROM SEILODD OF 01AUG95 TO MSO NEW ORLEANS, LA. FOR REVIEW.
Condition: Unknown
Due 2 November 1995
Resolved 2 November 1995
Engineering
Issued 1 August 1995
Resolved
PROVE PROPER OPERATION OF #3 AUXILIARY BOILER AUTOMATION PRIOR TO PLACING IN SERVICE.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Engineering
Issued 1 August 1995
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR AND 15PPM BILGE ALARM PRIOR TO PLACING INTO OPERATION.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Documentation
Issued 1 August 1995
Resolved
PROVIDE [name withheld] WITH VHS FORMAT VIDEO TAPE AND DIVER'S REPORT FOR SEILOD OF 01AUG95.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Documentation
Issued 1 August 1995
Resolved
PROVIDE [name withheld] A COPY OF NDT REPORT FOR HIGH STRESS CONNECTIONS TAKEN IN CONJUNCTION WITH SEILOD OF 01AUG95.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Engineering
Issued 1 August 1995
Resolved
CONDUCT HYDROSTATIC TEST OF ALL AUXILIARY BOILERS IN THE PRESENCE OF A USCGMARINE INSPECTOR PRIOR TO PLACING INTO SERVICE.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Electrical
Issued 11 April 1994
Resolved
REPLACE ALL IEC 92-350 CABLE FOR VENTILATION AND FIRE DAMPER SHUT DOWN SYSTEM WITH APPROVED CABLE OR PROVE IEC 92-350 CABLE MEETS CG REQUIREMENTS.
Condition: Unknown
Due 11 April 1994
Resolved 11 April 1994
Unknown
Issued 2 September 1993
Resolved
PROVE ORIGINAL FORM CG 2692 REPORT OF MARINE ACCIDENT TO [name withheld] NOT LATER THAN 10SEP93.
Condition: Unknown
Due 29 September 1993
Resolved 29 September 1993
Construction/Loadline
Issued 2 September 1993
Resolved
MAKE PERMANENT REPAIRS IN WAY OF STBD 1EG HULL DAMAGE TO THE SATISFACTION OF THE ATTENDING ABS SURVEYOR AND PROVIDE COPY OF COMPLETED ABS REPORT TO [name withheld] PRIOR TO OPERATION.
Condition: Unknown
Due 29 September 1993
Resolved 29 September 1993
Fire Fighting
Issued 27 June 1993
Resolved
HYDROSTATICALLY TEST AT A DOT APPROVED FACILITY HALON CYLINDERS FH165- 005118 AND FS35-1046. REQUIREMENT MAY BE COMPLIED WITH VIA FAX/CORRESPONDENCE.
Condition: Unknown
Due 27 June 1993
Resolved 27 June 1993
Lifesaving
Issued 27 June 1993
Resolved
PROVIDE A NON-SKID SURFACE ON THE HELICOPTER DECK AS PER 46 CFR 108- 235(C)(3). MAY BE COMPLIED WITH VIA FAX/CORRESPONDENCE OF ABS STATEMENT OF ACCEPTANCE OR TO THE SATISFACTION OF AN ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 18 November 1993
Resolved 18 November 1993
Lifesaving
Issued 27 June 1993
Resolved
PROVIDE USCG APPROVED REFLECTIVE TAPE FOR LIFEBOATS 1 & 2 AND ALL LIFERING BUOYS. MAY BE COMPLIED WITH VIA FAX/CORRESPONDENCE, OR ACCEPTANCE BY AN ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 1 November 1993
Resolved 1 November 1993
Fire Fighting
Issued 27 June 1993
Resolved
SERVICE OR REPLACE SCR ROOM HALON CYCLINDER 053571 WITH AN APPROVED CYLINDER. MAY BE COMPLIED WITH VIA FAX/CORRESPONDENCE.
Condition: Unknown
Due 1 November 1993
Resolved 1 November 1993
Engineering
Issued 27 June 1993
Resolved
PROVE PROPER OPERATION OF ALL AUXILIARY BOILER SAFETY VALVES TO BE COMPLETED TO THE SATISFACTION OF ATTENDING COAST GUARD MARINE INSPECTOR. REQUIREMENT MAY BE COMPLIED WITH A SIGNED STATEMENT FROM OIM VIA FAX/CORRESPONDENCE.
Condition: Unknown
Due 1 November 1993
Resolved 1 November 1993
Fire Fighting
Issued 11 July 1992
Resolved
REVISE FIRE CONTROL PLAN TO SHOW ADDITION OF THIRD LIFEBOAT AND AS IS CONDITION ON BOARD AND SUBMIT TO [name withheld]._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Lifesaving
Issued 11 July 1992
Resolved
HYDROTEST ALL SCBA BOTTLES ON BOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
PROVIDE ONE B-V CO2 EXTINGUISHER IN ACCORDANCE WITH IMO 9.11.2.3 FOR HELO DECK.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
PROVIDE SIX (6) ADDITIONAL FOAM PORTABLE FIRE EXTINGUISHERS IN ACCORDANCE WITH IMO 9.5.22 FOR ENGINE ROOM.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
ALL DAY CHEMICAL PORTABLE FIRE EXTINGUISHERS TO HAVE CO2 CARTRIDGE REPLACEDOR HYDRO TESTED.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
THE FOLLOWING PORTABLE FIRE EXTINGUISHERS ARE TO BE HYDRO TESTED OR REPLACED: 13,16-18,21,22,32,34,38,39,41,42,48,49,51,55,60-62,65-71,78, AND 79. IF HYDRO-TESTED IT MUST BE COMPLETED AT US DOT APPROVED FACILITY.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
REPLACE OR HYDRO TEST HALON ACTVATOR BOTTLES AS PER OTFAC REPORT DATED JULY92.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
UPGRADE BULKHEAD BETWEEN SHALE SHAKER ROOM AND CEMENTING ROOM TO AN A-60 BULKHEAD, DUE TO INCREASED ENGINE SIZE IN CEMENTING ROOM, IAW IMO.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
PROVIDE TWO (2) PORTABLE FIRE EXTINGUISHERS OF AT LEAST 45 LITERS IN SIZE FOR THE CEMENTING ROOM IN ACCORDANCE WITH IMO.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Construction/Loadline
Issued 11 July 1992
Resolved
HAVE PLANS FOR SECONDARY BILGE SYSTEM AND MODIFICATIONS TO FRAME 27 SUBMITTED FOR APPROVAL TO USCG MARINE SAFETY CENTER.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Fire Fighting
Issued 11 July 1992
Resolved
SHOW PROPER OPERATION OF FOAM STORAGE TANK FOR HELO DECK.
Condition: Unknown
Due 11 July 1992
Resolved 11 July 1992
Accommodation/Occupational Safety
Issued 6 July 1991
Resolved
HYDROSTATICALLY TEST OR INTERNALLY EXAMINE THE FIVE FOLLOWING AIR RECEIVERS(TENSIONER BOTTLES) 81-146, 81-155, 81-168, 81-207, 81-208.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Accommodation/Occupational Safety
Issued 6 July 1991
Resolved
HYDROSTATICALLY TEST OR INTERNALLY EXAMINE BULK TANKS NUMBERS 81-174,81- 060,82-060,82-061,81-172,81-175.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Lifesaving
Issued 6 July 1991
Resolved
PROVIDE USCG APPROVED EMBARKATION LADDERS IN ACCORDANCE WITH 46 CFR 109.341FOR LIFEBOAT AND LIFERAFT STATIONS.
Condition: Unknown
Due 27 August 1991
Resolved 27 August 1991
Fire Fighting
Issued 6 July 1991
Resolved
PROVIDE ANNUAL TEST CERTIFICATE FOR FIRE FIGHTING FOAM ANALYSIS. MAY BE COMPLETED BY CORRESPONDENCE.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Fire Fighting
Issued 6 July 1991
Resolved
PROVIDE CERTIFICATION FOR REFILLING AND HYDROSTATIC TESTING OF ONE HALON BOTTLE FOR FIXED SYSTEM FOR SCR ROOM. MAY BE COMPLETED BY_x001C_ CORRESPONDENCE.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Fire Fighting
Issued 23 July 1990
Resolved
PROVIDE DOCUMENTATION ON THE SERVICING OF ALL PORTABLE, SEMI PORTABLE AND FIXED FIRE EXTINGUISHMENT SYSTEMS TO [name withheld].
Condition: Unknown
Due 23 July 1990
Resolved 23 July 1990
Lifesaving
Issued 23 July 1990
Resolved
PROVIDE DOCMENTATION ON THE SERVICING OF THE FOUR (4) REQUIRED DAVIT LANUCHED LIFE RAFTS TO [name withheld].
Condition: Unknown
Due 23 July 1990
Resolved 23 July 1990
Fire Fighting
Issued 15 July 1989
Resolved
HYDROSTATICALLY TEST AND STAMP ALL PORTABLE AND SEMI-PORTABLE CO2 CYLINDERSAT AN APPROVED FACILITY.
Condition: Unknown
Due 15 July 1989
Resolved 15 July 1989
Lifesaving
Issued 15 July 1989
Resolved
PROVIDE SERVICING/HYDRO INFORMATION FOR AIR BOTTLES ON SCOTT AIR PACKS (SCBA'S).
Condition: Unknown
Due 15 July 1989
Resolved 15 July 1989
Accommodation/Occupational Safety
Issued 15 July 1989
Resolved
HYDROSTATICALLY TEST OR INTERNALLY EXAMINE THE EIGHT FOLLOWING AIR RECEIVERS: #81030 (POD LINES), #81103 (GUIDE LINES), #81094 (TEN 3 & 4), #81166 (DSC), AND #'S 81207, 81208, 81168, 88146 (STAND-BYS).
Condition: Unknown
Due 15 July 1989
Resolved 15 July 1989