Records from 2002 to 2026. Most recent: inspection, 11 August 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 31
11 August 2026
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8461392
16 July 2025
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8190922
29 January 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8072121
18 July 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7961459
25 August 2023
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7780935
25 July 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7751469
22 September 2022
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7564327
7 April 2022
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7426731
25 January 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7388353
27 July 2021
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7269583
6 August 2020
Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7025962
23 July 2019
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6755000
15 January 2019
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6610020
8 August 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6504774
8 May 2017
DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6139479
19 July 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5949270
7 January 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5793840
8 May 2012
COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4304778
20 July 2011
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4109087
23 February 2011
Hull Examination · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3954287
23 March 2010
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3701418
8 April 2009
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3449552
10 April 2008
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3181292
4 March 2008
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3158773
12 April 2007
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2879870
21 March 2006
Deficiency Check · Annual Inspection · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2606619
13 April 2005
Periodic Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2333331
17 May 2004
Periodic Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2070198
22 March 2004
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2029302
22 April 2003
Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1778443
17 April 2002
Hull Examination · Plan Review "T" Boat · Simplified Stability Test · Initial Certification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1605741
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 July 2023
Resolved
The equipment required for lifefloats and buoyant apparatus must meet the following specifications: the painter must: (i) Be of at least 30.5 meters (100 feet) in length, but not less than 3 times the distance between the deck where the life float or buoyant apparatus it serves is stowed and the lowest load waterline of the vessel. The name of the vessel must be marked or painted in clearly legible letters on each life float paddle. The number of persons capacity must be marked or painted in clearly legible letters and numbers on each side of the bow of each rescue boat. Vessel's painter and vessel's name on paddles was found
to be wasted. Life float did not have persons capacity marked on each side.
46CFR180.175(f)(3)(i)
46CFR185.604(g)
46CFR185.604(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2023
Resolved 25 August 2023
Resolution: Vessel owner set photographic evidence of corrected deficiencies to the satisfaction of the CG Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 July 2023
Resolved
Each ring buoy shall be fitted with four beckets located at equidistant points about the body of the buoy. The ring life buoy beckets were found to be wasted.
46CFR160.050-4(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2023
Resolved 25 August 2023
Resolution: Vessel owner set photographic evidence of corrected deficiencies to the satisfaction of the CG Marine Inspector.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 July 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. Vessels first aid kit container is not watertight.
46CFR184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2023
Resolved 25 August 2023
Resolution: Vessel owner set photographic evidence of corrected deficiencies to the satisfaction of the CG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 April 2022
Resolved
46 CFR 181.420(a)(3)- A pre-engineered fixed gas fire extinguishing system must automatically shut down all engines that draw intake air from within the protected space. The emergency generator is not tied into the fireboy system.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 April 2022
Resolution: Generator now shuts down when fireboy is activated and is able to start utilizing the overide function to the satisfaction of the attending CG Marine Inspectoe.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 7 April 2022
Resolved
46 CFR 184.402 - Except as otherwise provided in this section every vessel must be fitted with a magnetic compass designed for marine use, to be mounted at the primary operating station. Except on vessels limited to daytime operations, the compass must be illuminated. Vessel did not have a magnetic compass.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 April 2022
Resolution: Installed ,agnetic compass at operating station as required.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 April 2022
Resolved
46 CFR 185.700 - Each survival craft on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times while the vessel is underway. The life float's external protective covering requires repair due to multiple slices through it.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 September 2022
Resolution: Owner replaced 10 person life float with a new one.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 July 2021
Resolved
Each life float must be fitted with a lifeline, pandants, two paddles, a painter, and a light. Vessel had rotten paddles and the waterlight battery was expired.
46 CFR 180.175(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 28 September 2021
Resolution: Owner sent photos of new life float paddles and waterlight battery.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 July 2021
Resolved
For a life float-Approved under approval series 160.027 or other standard specified by the Commandant. SOLAS tape on life float was no longer reflective and needs to be replaced.
46 CFR 180.200(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 28 September 2021
Resolution: Owner submitted photos of repaired life float retro.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 27 July 2021
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate high water level. Vessel bilge alarm light did not work when alarm was energized.
46 CFR 182.530(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 28 September 2021
Resolution: Owner replaced high bilge alarm.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 July 2021
Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all engines that draw intake air from within the protected space. The emergency generator is not tied into the fireboy system. Correct by next fire company annual servicing.
46 CFR 181.420(a)(3)
Action required: 705 - Other - as specified
Resolved 5 October 2021
Resolution: Witnessed satisfactory test of fire boy shut down on generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 August 2020
Resolved
Ensure that a vessel of at least 26 ft in length has a visual and audable alarm at operating station to indicate a high water level in each of normally unmanned spaces.
Vessel has inoperable float switch on fwd bilge hi water and inoperable light and alarm for aft bilge pump in generator space. 46 CFR 182.530
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2020
Resolution: O/O provided resolution evidence via email of repairs and light operation.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 August 2018
Resolved
Lfe flaot worn, repair/replace.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 August 2018
Resolved 29 August 2018
Resolution: Received via email PICS of repaired Life Float.
Engineering › Lubricating Oil Storage/Transfer System › Gauge
Issued 8 May 2017
Resolved
Vessel's stbd main diesel engine's oil pressure gauge indicated high oil pressure and additionally alarmed the low oil pressure alarm when backing off throttles. Provide service report attesting to proper operation of stbd mde and/or gauge.
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 17 May 2017
Resolution: Owner/operator installed manual gauge and demonstrated proper operation of manual guage.
Lifesaving › Lifefloat › Retroreflective Material
Issued 8 May 2017
Resolved
Retro on life float not proper type. Ensure SOLAS approved retro is on life float.
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 17 May 2017
Resolution: Owner/operator used proper retroflective tape.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 8 May 2017
Resolved
Child life jackets not properly seperated from adult. Ensure child's lifejackets are seperated from adult PFD's.
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 17 May 2017
Resolution: Owner/operator properly divided life jackets
Fire Fighting › Fixed Halon Fire Extinguishing System › Quantity of Halon
Issued 8 May 2017
Resolved
Vessel has 500 cu ft fireboay installed in engine compartment and is required to have a 600 cu ft. system.
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 21 June 2017
Resolution: Owner/operator installed a 600 cf HFC 227 model.
Lifesaving › Lifefloat › Retroreflective Material
Issued 19 July 2016
Resolved
Add Retro-reflective tape to the bottom of lifefloat as required in 46 CFR 160.010-4(p)
Due 3 August 2016
Resolved 22 July 2016
Resolution: Verified via electronic photograph that O/Op added SOLAS retro-reflective tape as required to vessels lifefloat
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 8 May 2012
Resolved
Current Certificate of Documentation not o/b vessel. Provide & maintain current certificate as required.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2012
Resolution: Current Certificate of Documentation faxed to this office and copy maintained o/b the vessel.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 8 May 2012
Resolved
Means to manually activate Fire boy not available. Install a means to activate Fire Boy from operating station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 June 2012
Resolved 12 June 2012
Resolution: Manual pull station installed at the operating station to the satisfaction of the CG marine inspector.
Accommodation/Occupational Safety › Ventilation › General
Issued 8 May 2012
Resolved
Means to secure ventillation to engine room not available. Fabricate a means to secure ventialltion to the satisfaction of the CG marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 24 May 2012
Resolution: Vessel owner fabricated a menas to secure ventilation to the satisfaction of the CG marine inspector.
Lifesaving › Lifefloat › Float-free Link
Issued 21 March 2006
Resolved
Properly install weak link assembly on life float.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2006
Resolution: Operator properly installed weak link on life float.
Engineering › Fuel Oil Service System › Hose
Issued 21 March 2006
Resolved
Provide double clamp on generator fuel hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2006
Resolution: Operator provided a double clamp on the fuel line.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 21 March 2006
Resolved
Provide double clamp on engine exhaust.
Action required: 705 - Other - as specified
Due 30 April 2006
Resolved 13 April 2006
Resolution: Operator provided a second hose clamp on engine exhaust.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 21 March 2006
Resolved
Provide a tether on deck hatch.
Action required: 705 - Other - as specified
Due 30 April 2006
Resolved 13 April 2006
Resolution: Operator provided a tether on deck hatch.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 21 March 2006
Resolved
Provide proof of generator being connected to the fixed fire fighting system.
Action required: 705 - Other - as specified
Due 30 April 2006
Resolved 8 June 2006
Resolution: Generator connected to fixed fire extinguishing system and performed operational test of system in presence of marine inspector.
Lifesaving › Buoyant Apparatus
Issued 22 April 2003
Resolved
Replace float-free link on life float
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2003
Resolution: Installed 200 ft sea painter to lifefloat iaw BALNS Policy ltr SPV 99-10