Records in 2001. Most recent: inspection, 27 February 2001.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Lifesaving
Issued 27 February 2001
No resolution recorded
PAINT AND CHEMICALS STORED IN IMPROPER SPACE CAUSING FIRE HAZARD. PROPERLYSTOW PAINT AND MATERIALS, NO OPEN CANS OF PAINT OR THINNER. REPAIR IN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Navigation
Issued 27 February 2001
Resolved
PROVIDE EMERGENCY STEERING INSTRUCTIONS ON BRIDGE PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Fire Fighting
Issued 27 February 2001
Resolved
UPDATE FIRE CONTROL PLAN TO SHOW SECOND FIREMANS OUTFIT. PRIOR TO DEPARTURE
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Construction/Loadline
Issued 27 February 2001
No resolution recorded
REPAIR WASTED OVERHEAD IN EMERGENCY FIRE PUMP SPACE OUTBOARD FWD TO SATISFACTION OF CLASS WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Engineering
Issued 27 February 2001
No resolution recorded
INSTALL CONTAINMENT AROUND LUBE OIL AND DIESEL OIL VENTS ON LIFEBOAT DECK STBD SIDE WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Construction/Loadline
Issued 27 February 2001
Resolved
FOREPEAK DECK HOLES PORT SIDE AFT ABOVE CHAIN LOCKER. REPAIR TO SATISFACTION OF CLASS PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Fire Fighting
Issued 27 February 2001
No resolution recorded
PROVIDE BOLTS AND GASKETS FOR INTERNATIONAL SHORE CONNECTION. PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001 — due date passed with no resolution recorded
Accommodation/Occupational Safety
Issued 27 February 2001
No resolution recorded
REPAIR/REPLACE WASTED HAND RAILS AND STEPS ON ALL 4 EXTERIOR LADDERS ON MAIN DECK TO SATISFACTION OF CLASS WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Fire Fighting
Issued 27 February 2001
Resolved
PROVIDE SPANNER WRENCHES ON ALL FIRE STATIONS PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Construction/Loadline
Issued 27 February 2001
No resolution recorded
CARGO HOLD HATCH WHEEL FASTENERS DAMAGED. REPAIR TO SATISFACTION OF CLASS WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Construction/Loadline
Issued 27 February 2001
No resolution recorded
WATERTIGHT DOOR TO BATTERY LOCKER WASTED. REPAIR TO SATISFACTION OF CLASS WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Fire Fighting
Issued 27 February 2001
Resolved
PROVIDE TENDING LINES FOR BOTH FIRE OUTFITS PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Fire Fighting
Issued 27 February 2001
Resolved
INSTALL PROPER VENT ON EMERGENCY FIRE PUMP FUEL OIL TANK PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Fire Fighting
Issued 27 February 2001
No resolution recorded
RECHARGE SPENT FIRE EXTINGUISHER AFT OF [name withheld] PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001 — due date passed with no resolution recorded
Fire Fighting
Issued 27 February 2001
No resolution recorded
REPAIR CRIMPED FUEL LINE FOR EMERGENCY FIRE PUMP WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Fire Fighting
Issued 27 February 2001
Resolved
INSTALL CAP ON FUEL OIL FILL ON EMERGENCY FIRE PUMP FUEL OIL TANK PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Construction/Loadline
Issued 27 February 2001
Resolved
REPAIR WASTED HATCH COAMING STRUCTURE CARGO HOLD #1 AND #2 TO SATISFACTION OF CLASS PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001
Electrical
Issued 27 February 2001
No resolution recorded
CLEAR GROUND FAULT ON 220/110 SWITCHBOARD WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Electrical
Issued 27 February 2001
No resolution recorded
REMOVE WOOD GRATING IN FRONT OF MAIN SWITCHBOARD, REPLACE WITH NON- CONDUCTIVE MATING WITHIN 30 DAYS.
Condition: Unknown
Due 27 March 2001 — due date passed with no resolution recorded
Fire Fighting
Issued 27 February 2001
No resolution recorded
CONDUCT SATISFACTORY FIRE DRILL PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001 — due date passed with no resolution recorded
Construction/Loadline
Issued 27 February 2001
Resolved
BULKHEAD HOLED BETWEEN ENGINE ROOM AND #2 HOLD PORT SIDE. REPAIR TO SATISFACTION OF CLASS PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 February 2001
Resolved 12 March 2001