ISLAND INTREPID is a 1971 freight ship. The Coast Guard has recorded 99 inspections since 1985, most recently in February 2024, along with 238 deficiencies — 1 with no resolution recorded — and 20 operational controls.

Records from 1985 to 2024. Most recent: inspection, 29 February 2024.

Built
1971
Last inspected
29 February 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7033161 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
222128
Flag
ANTIGUA AND BARBUDA
—
Maury page id
psix-222128

Inspections, by type

…with no type recorded69
…past their stated due date1
Years with a record 25 calendar years (1985–2024)
The 99 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it2174 - Dead Weight, Ton
909 - Regulatory (Subpart C or D), Net Ton
1649 - Convention (Subpart B), Gross Ton
1649 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 99

29 February 2024 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7871980
1 September 2010 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3843821
9 March 2010 ISPS II Exam · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3692346
11 January 2010 MARPOL Annex V Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3661798
1 April 2009 Ballast Water Examination · ISPS III Exam · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3430750
11 February 2009 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3415955
3 December 2008 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3373209
22 October 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3349330
16 October 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3346023
15 August 2008 Ballast Water Examination · PII Safety Exam · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3299046
14 August 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3298165
13 August 2008 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3299105
24 January 2008 PI Safety Exam · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3135036
10 October 2007 ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3077048
14 September 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3057899
6 July 2007 In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2985409
29 June 2007 Administrative Inspection · ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2973387
3 March 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2881029
2 March 2007 NPV Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2880689
2 March 2007 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2880996
11 October 2006 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2798151
21 June 2006 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2686798
13 December 2005 ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2550413
10 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2386541
10 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2396319
12 May 2005 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2356112
27 April 2005 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2344245
30 March 2005 Ballast Water Examination · PI Safety Exam · MARPOL Annex I Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2322769
10 March 2005 ISPS I Exam · Random ISPS/MTSA/PSC
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 2307395
21 February 2005 ISPS I Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2296450
19 November 2004 Ballast Water Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2244199
9 July 2004 ISPS II Exam
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2127603
7 July 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2124721
8 April 2004 Re-Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2039839
6 January 2004 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1976184
17 December 2003 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1965500
8 October 2003 Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1923693
29 May 2003 Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1804654
27 May 2003 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1802069
2 April 2003 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1767302
5 February 2003 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1740108
16 October 2002 Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1690740
5 September 2002 Deficiency Check · Periodic Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1671213
1 December 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 210256
1 December 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 765585
9 October 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 293482
4 October 2000 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 282737
25 August 2000 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 281483
9 March 2000 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 39455
28 December 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 211761
28 December 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 769424
20 August 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 18717
22 July 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 430938
11 June 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 211210
11 June 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 763743
22 May 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 428899
20 June 1998 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 417016
8 May 1998 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 415636
26 January 1998 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 412216
10 April 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 402434
16 September 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 395500
6 September 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 395133
2 September 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 395325
26 August 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 394900
8 March 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 388893
8 February 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 387810
2 February 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 387379
7 July 1995 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 380500
15 June 1995 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 379674
10 June 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 367716
26 May 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 367186
29 April 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 690261
28 April 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 52135
1 April 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 649066
30 March 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 19193
28 October 1992 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 354479
17 December 1991 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 649065
12 December 1991 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 649064
12 December 1991 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 649067
4 September 1991 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 346410
17 October 1990 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 519379
14 September 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 339305
30 August 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 339040
21 August 1990 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 339107
16 February 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 464783
10 August 1989 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 331958
1 July 1989 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 520946
28 June 1989 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 506976
3 May 1989 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 517848
20 October 1988 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 502234
10 August 1988 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 522404
6 August 1988 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 324907
26 July 1988 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 324716
22 April 1988 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 533164
10 April 1988 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 506588
6 February 1988 Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 321170
6 March 1986 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 499877
14 August 1985 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 304176
10 January 1985 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 299775

Deficiency record · 238

Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 1 September 2010 No resolution recorded
The substandard conditions identified during each of the four detentions gives reasonable cause to believe that Mercator Ship Management, S.A. and the vessel's senior officers have failed to effectively and systematically implement the Safety Management System (SMS) as required by the International Safety Management (ISM) Code. See documents for letter to owner.
Action required: 705 - Other - as specified
Due 1 September 2010 — due date passed with no resolution recorded
Lifesaving › Visual Distress Signals (General) › Condition
Issued 9 March 2010 Resolved
ALDIS lamp is inoperable. Battery cannot keep a charge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 9 March 2010 Resolved
Rudder angle indicator in the steering compartment is off by 4-5deg.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 9 March 2010 Resolved
Vessel has 3 generators on board, 2 of which are inoperable. The vessel does not have an emergency source of power. The vessel cannot engage a secondary means of power if it were to lose the number 1 generator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Lifesaving › Rescue Boat Equipment › Boat-hook/Safety Boat-hook
Issued 9 March 2010 Resolved
Rescue boat does not have a boat hook.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Lifesaving › Rescue Boat Equipment › Electric Torch
Issued 9 March 2010 Resolved
Vessel does not have an electric torch or equivalent means of providing light.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Lifesaving › Rescue Boat Equipment › Rescue Quoit
Issued 9 March 2010 Resolved
Rescue boat is missing 1 rescue quoit.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 9 March 2010 Resolved
Rescue boat does not have a portable fire extinguisher.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Navigation › Piloting/Steering › Coast Guard Light List
Issued 9 March 2010 Resolved
Light list and sailing directions is not currently corrected.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 May 2010
Resolution: Vessel purchased new publications and has them up to date with the corrections.
Construction/Loadline › Structures › Air Pipe
Issued 9 March 2010 Resolved
Multiple airpipes around vessels deck are missing or have wasted flanges to cover the inlets to prevent water intrusion.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 4 May 2010
Resolution: All flanges and gaskets have been replaced.
Construction/Loadline › Structures › Door
Issued 9 March 2010 Resolved
Forward hatch to the bosun stores cannot be sealed and maintain weathertight integrity due to the hinges and dog be wasted and corroded to the point that it cannot be turned.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 9 March 2010 Resolved
Forward handrail for the ladder to the forepeak has wasted and parted from the deck.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Fire Fighting › Fire Pumps › Arrangement
Issued 9 March 2010 Resolved
Main fire pump is leaking at a continuous rate and quantity and is affecting the pressure due to a hole in the side of the pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 March 2010
Fire Fighting › International Shore Connection › Connection
Issued 11 January 2010 Resolved
The flange shall have a flat face on one side and on the other shall be permanently attached to a coupling that will fit the ship's hydrant and hose. The connection has a male fitting and so does the hydrant and hose, rendering the connection unable to work with either.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: International Shore Connection refitted to comply with regs.
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 11 January 2010 Resolved
All ship's shall carry at leats two fireman's outfited with breathing apparatus. One of the two required breathing apparatus was not working due a seal leak at the connection point with the air tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Fire Fighting › Emergency Fire Pumps › Capacity
Issued 11 January 2010 Resolved
Each of the required fire pumps shall have a capacity not less than 80 percent of the total required capacity divided by the number of required fire pumps-and shall in any event be capable of delivering at least the two required jets of water. The emergency firepump governor is not operational rendering the pump un-usable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Resolution: Vessel replaced Emergency fire pump and prime mover with new equipment approved by flag state.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 11 January 2010 Resolved
Mandatory minimum requirements for certification of chief engineer officers and second engineer officers on ships powered by main propulsion machinery of 3,000 KW propulsion power or more is STCW III/2. Second Engineer only has a qualification of III/1.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: Second Engineer onboard showed documentation attesting to attainment of III/2.
Stability › Weathertight Integrity › General
Issued 11 January 2010 Resolved
Hatchways closed by weathertight covers of steel or other equivalent material fitted with gaskets and clamping devices. Vessel must maintain material condition after the survey. Cargo Hatch cover missing clamping devices or devices are frozen rending them inoperational, several cracks and holes on Hatch covers and coamings where areas were severy corroded with no weathertight integrity.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: Modifications made to maintain watertight/weathertightness.
Communications › Internal Communications System › Portable Radios
Issued 11 January 2010 Resolved
Ships shall be fitted with two means of communicating orders from the bridge to the engine room. Ships only means of communication to the bridge is VHF handheld radios.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 January 2010
Stability › Weathertight Integrity › General
Issued 11 January 2010 Resolved
All access openings of enclosed superstructures shall be fitted with doors of steel so that the whole structure is of equivalent strenght. Wheathertight doors on main deck leading to superstructure from portside and forward to cargo deck are unable to close properly.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Engineering › Fuel Oil Service System › Hose
Issued 11 January 2010 Resolved
Oil lines shall be screened or otherwise suitably protected to avoid, as far as practicable, oil spray or oil leakages onto hot surfaces, into machinery air intakes, or other sources of ignition. The number of joints in such piping systems shall be kept to a minimum. Vessel E-gen fuel-oil line has improper temporary rubber hose clamp repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Stability › Weathertight Integrity › General
Issued 11 January 2010 Resolved
All access openings of enclosed superstructures shall be fitted with doors of steel so that the whole structure is of equivalent strenght. Door leading to paint locker unable to close and maintain weathertight integrity. Hole on watertight bulkhead adjacent to lower door hinge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 11 January 2010 Resolved
Fire detection systems shall be capable of automatically indicating the presence of fire and also its location. The alarm system shall operate both audible and visual signals at the main stations. Engine room fire detection system is inoperable and missing several of the detector heads.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: System repaired and tested.
Communications › Long Range Identification and Tracking (LRIT) › Transmission Unit
Issued 11 January 2010 Resolved
Vessel does not have evidence of LRIT compliance or conformance report onboard.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 January 2010
Construction/Loadline › Penetrations › Pipe Flange
Issued 11 January 2010 Resolved
Sounding pipe to #2 Diesel storage tank is missing threads and unable to close watertight.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 11 January 2010 Resolved
Sprinkler nozzle in paint locker warped, degrading ability to disperse water.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Construction/Loadline › Structures › Deck Plating
Issued 11 January 2010 Resolved
Top step from port side leading to forecastle is wasted unable to hold the weight of person.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: new stepladder fitted.
Deck/Cargo › Ballast › Vents
Issued 11 January 2010 Resolved
Goosenecks on deck for #2 and #3 Port Side ballast tanks wasted allowing direct water intake from weather deck.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2010
Resolution: Goosenecks refitted.
Engineering › Fuel Oil Service System › Filter
Issued 11 January 2010 Resolved
Oil lines shall be screened or otherwise suitably protected to avoid, as far as practicable, oil spray or oil leakages onto hot surfaces, into machinery air intakes, or other sources of ignition.Strainer assembly on Main Engine is leaking.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 January 2010
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 11 January 2010 Resolved
DUE TO THE SEVERETY AND AMOUNT OF DEFICIENCIES FOUND ONBOARD BY PSC OFFICERS, SECTOR MIAMI RECOMMENDS EXTERNAL ISM AUDIT. REPORT OF AUDIT TO BE SUBMITTED TO SECTOR MIAMI FOR REVIEW.
Due 10 February 2010
Resolved 12 March 2010
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 2 April 2009 Resolved
33U.S.C.1321(j)(5)(G)-The vessel owner/operator has not provided certification ensuring that response resources are capable of responding to the maximum extent practicable, to a worst case discharge. 33U.S.C.1321(j)(5)(D)(i)-Due to the publication of the tech amendments to 33 CFR Part 3, the COTP zone names need to be updated to reflect this amendment.
Due 2 May 2009
Resolved 4 September 2009
Resolution: Plan holder provided a signed certification statement and updated plan to reflect the new COTP zone names. Vessel issued Interim Operating Authorization expiring 9/4/2011.
Documentation › Certificates/Documents › International Air Pollution Prevention Certificate
Issued 11 March 2009 Resolved
An International Air Pollution Prevention Certificate shall be issued by the Administration. Vessel's IAPP Certificate is expired.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2009
Resolution: IAPP issued on 31Mar09. Certificate valid.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 11 March 2009 Resolved
Any ship of 400GT and above but less than 10,000GT shall be fitted with oil filtering equipment to ensure that any oily mixture discharged to the sea after passing the system has an oil content not exceeding 15ppm. Vessel's oily water separator is disassembled and non-operational.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2009
Resolution: New OWS installed on vessel. Examined and tested system. Operations normal.
Documentation › Logs/Records › Noise Survey Report
Issued 11 March 2009 Resolved
Every ship of 400GT and above other than an oil tanker shall complete entries in the Oil Record Book Part I, so that all entries in teh book appropriate to that operation are completed and any failure of the Oil Filtering Equipment shall be recorded in the Oil Record Book Part I. Vessel's Oil Record Book was completed with improper codes and no entries were made with reference to a failure of OWS
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2009
Resolution: Training was conducted on board to Master, Chief Engineer, and 2nd Engineer on 30Mar09. New oil record book has been ordered for vessel to prevent members from looking back at old entries and copy wrong codes.
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 11 March 2009 Resolved
The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel's Controllable Pitch Propeller (CPP) is not operating as manufactured and pitch can only be changed when RPM's are lowered from 680RPMs (Normal operating parameters) to 620RPMs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2009
Resolution: Flag State Attestation received stating pitch demonstrated satisfactorily to Surveyor. Maneuvering parameters now reset to 620 rpm.
Electrical › Lighting (service) › Lighting Fixture
Issued 11 March 2009 Resolved
All exposed metal parts of electrical machines or equip which are not intended to be 'live' but are liable to become 'live' under fault conditions shall be grounded; and all electrical apparatus shall be constructed and installed so that danger of injury in ordinary handling shall not exist. Open ended wiring on the air compressor & lights are missing covers with wiring exposed in engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2009
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 11 March 2009 Resolved
A cargo ship shall be provided with portable fire extinguishers. Brackets for installment are wasted and cannot properly mount extinguishers throughout the ship. Cite: SOLAS 60 Ch II Reg 65
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2009
Fire Fighting › Fire Main › Pressure
Issued 11 March 2009 Resolved
Fire main and water service pipes shall be sufficient for the effective distribution of 140 tons per hour from two pumps operating simultaneously. Fire pump does not provide adequate pressure and the fire main is wasted in numerous locations. Cite: SOLAS 60 Ch II Reg 56.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2009
Resolution: Vessel proved proper operation of main fire pump & fire main system.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 11 March 2009 Resolved
Seafarers serving on board required to be certificated in accordance with the convention shall provide documentary proof that an application for an endorsement has been submitted to the administration; Engineer Officer and company failed to provide proof of application for endorsement fromt eh administration for Rey Berdin, the Engineer Officer.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2009
Resolution: Vessel provided valid endorsement for Engineer Officer.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 11 March 2009 Resolved
Vessel shall comply with the applicable Safe Manning Certificate requirements of the Administration. Vessel failed to comply with the Safe Manning requirements by not providing a 2nd Engineer.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2009
Resolution: Vessel provided documents & certificates for 2nd Engineer.
Operations/Management › Vessel Safety Management › Company Verification/Review/Evaluation
Issued 11 March 2009 Resolved
BASED ON THE IDENTIFIED DEFICIENCIES AND THE CONDITIONS WITNESSED ON BOARD THE VESSEL BY [name withheld], SECTOR MIAMI RECOMENDS AN EXTERNAL ISM AUDIT. REPORT OF ISM AUDIT IS TO BE PROVIDED TO SECTOR MIAMI FOR REVIEW.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 May 2010
Documentation › Certificates/Documents › IOPP Certificate
Issued 11 March 2009 Resolved
The Administration shall fully guarantee the completeness and efficiency of the survey; Flag State surveyor completed survey for installation of new oil separating equipment, however did not update IOPP certificate to indicate changes/repairs made with referenceto MEPC approval type and throughput.
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 11 January 2010
Resolution: New IOPP issued.
Documentation › Certificates/Documents › IOPP Certificate
Issued 11 March 2009 Resolved
After any survey of the ship has been complete, no change shall be made without the sanction ofhte Administration; A surveyor attested to the repairs to oil separating equipment. However there is no evidence indicating the surveyor was appointed by Flag.
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 11 January 2010
Resolution: New IOPP issued.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 11 March 2009 Resolved
Each seafarer shall be required to understand and give orders in the working language of ship; Vessel's Chief Engineer is unable to demonstrate testing procedures for OWS because operating manual is in English (official language) and Chief Engineer cannot read & interpret in English.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2009
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 15 August 2008 Resolved
Replace/repair main engine cooling line where soft patched
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Deck/Cargo › Cargo Stowage › General
Issued 15 August 2008 Resolved
Renew all detered gaskets for all cargo hatch covers. Make available for USCG inspection when all hatch covers fully secured.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Replaced all gaskets for all cargo hatch covers.
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 15 August 2008 Resolved
Repair damaged chock on focsle, port side, of vessel
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: replaced chock on focsle,port side.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 15 August 2008 Resolved
Provide first aid kit with all proper equipment in it.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Lifesaving › Hand Flares › Not on Board
Issued 15 August 2008 Resolved
Vessel missing one rocket parachute flare. Provide a valid flare to meet the number requirements.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Electrical › Lighting (service) › Lighting Fixture
Issued 15 August 2008 Resolved
Provide globe for lighting in A/C room
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Installed globe in A/C room.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 August 2008 Resolved
Observed dead ended wires in A/C room. Provide proper closre /endings to wires
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 15 August 2008 Resolved
Replace housing for exposed wires on emergency lighting for stbd side liferaft station
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Replaced housing on emergency lighting for stbd liferaft station.
Construction/Loadline › Structures › Door
Issued 15 August 2008 Resolved
Replace wasted weather tight door for the CO2 room on stbd side of vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Fire Fighting › Fire Main › Condition
Issued 15 August 2008 Resolved
Provide missing bolts and washers for international shore connection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Fire Fighting › Fire Main › Condition
Issued 15 August 2008 Resolved
Repair holes and wasted parts of the fire main on port side near deck house.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 15 August 2008 Resolved
Provide up to date NOTAM on bridge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Def corrected
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 15 August 2008 Resolved
Replace missing anchor and recover anchor lost in salvage attempt.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Anchor replaced.
Accommodation/Occupational Safety › Ventilation › General
Issued 15 August 2008 Resolved
Replace or make repairs to 03 ventilation risers leading to engine room forward of deck house. Risers are holed and wasted.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 September 2008
Resolution: Replaced #3 ventilation riser.
Fire Fighting › Fire Pumps › Capacity
Issued 15 August 2008 Resolved
Have flag state attest to adequate pressure from the main and emergency fire pumps.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 October 2008
Resolution: Marine Inspectors verified adequate pressure from the main and emergency fire pumps. Also rcvd Class Report attesting to such.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 August 2008 Resolved
Cheif engineer could not demonstrate testing procedures for the oily water separator. Demonstrate proper testing procedures prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2008
Resolution: Chief engineer demonstrated testing procedures of the oily water separator.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 August 2008 Resolved
Replace OWS filter and provide Flag State report attesting to the proper operation of OWS.
Action required: 705 - Other - as specified
Due 30 October 2008
Resolved 1 May 2009
Resolution: Vsl replaced OWS entirely with new OWS meeting MEPC 107(49).
Lifesaving › Inflatable Liferafts › Not on Board
Issued 23 January 2008 Resolved
Observed no liferaft onboard in accordance with record of equipment/ safety equipment cert.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2008
Resolution: Def corrected
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 23 January 2008 Resolved
Observed vsl had only three line throwing charges on board ( must have 4) must obtain additional charge for line throwing appliance.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2008
Resolution: Def corrected
Navigation › Piloting/Steering › Marine Charts
Issued 23 January 2008 Resolved
Observed most recent notice to mariners was more than 2 months old and charts not updated. Must update charts and pubs with current notice mariners.
Due 29 February 2008
Resolved 11 March 2009
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 23 January 2008 Resolved
Observed emergency fire pump exhaust was blocked or not properly fitted. Entire space filled with thick black smoke when fire pump was energized. Demonstrate proper operation of emergency fire pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2008
Resolution: Def corrected
Construction/Loadline › Hull › Hull Plating
Issued 23 January 2008 Resolved
Observed a 12 ft x 4 ft inset stbd side from midships aft. Flag admin to attest to the structural integrity.
Action required: 15 - Rectify deficiencies by next port
Resolved 11 March 2009
Personnel › Certificates/Documents/Licenses › Medical Fitness Document
Issued 23 January 2008 Resolved
Observed seaman, oiler and ordinary seaman did not have valid medical certificates must have valid medical certificates for all crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2008
Resolution: Def corrected
Engineering › Diesel Engine (propulsion-electric) › Crosshead Assembly
Issued 14 September 2007 Resolved
Complete satisfactory repairs to air cooler on turbo charger.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 September 2007
Resolved 17 September 2007
Resolution: def cleared. [name withheld]
Personnel › Certificates/Documents/Licenses › License, Mate
Issued 6 July 2007 Resolved
Vessel does not meet requirements of the minimum safe manning cert. No Chief Engineer on board.
Action required: 17 - Rectify deficiencies prior to departure
Due 13 July 2007
Resolved 13 July 2007
Resolution: Vessel has chief engineer on board that satisfys the minimum safe manning cert.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 30 June 2007 Resolved
VESSEL IS MISSING LABEL ON MARINE SANITATION DEVICE AS REQUIRED BY 33CFR159.7a(1).
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 July 2007
Resolved 20 July 2007
Resolution: Received e-mail from vessel with photograph of Label for the MSD.
Personnel › Certificates/Documents/Licenses › License, Chief Engineer
Issued 29 June 2007 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2007
Resolved 30 June 2007
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Personnel › Certificates/Documents/Licenses › License, Chief Engineer
Issued 29 June 2007 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 June 2007
Resolved 30 June 2007
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering › Lubricating Oil Service System › Cooler
Issued 2 March 2007 Resolved
Lube oil system has broken seal which caused oil to leak into jacket water cooling system and subsequently leak into salt water cooling system. Provide report from administration attesting to proper repairs of lube oil system seal.
Action required: 705 - Other - as specified
Due 2 March 2007
Resolved 4 March 2007
Resolution: Vessel replaced/repaired faulty gasket on Lube oil cooling system. A survey report from Tsunami Marine was faxed in attesting to proper repairs.
Construction/Loadline › Markings › Load Line Mark
Issued 11 October 2006 Resolved
Re-paint load line to reflect current load line certificate.
Due 11 October 2006
Resolved 11 October 2006
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 11 October 2006 Resolved
Paint locker door does not close properly.
Due 11 October 2006
Resolved 11 October 2006
Fire Fighting › Means of Escape › Doorways
Issued 11 October 2006 Resolved
Emergency escape hatch from engine room missing watertight gaskets, and dogs are frozen.
Due 11 October 2006
Resolved 11 October 2006
Lifesaving › Lifebuoys › Serviceable
Issued 11 October 2006 Resolved
Replace worn out retro-reflective tape on lifebuoys.
Due 11 October 2006
Resolved 11 October 2006
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 11 October 2006 Resolved
Replace discharged fire extinguisher on ladder to engine room.
Due 11 October 2006
Resolved 11 October 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 11 October 2006 Resolved
Properly mount overhead light fixture in engine room.
Due 11 October 2006
Resolved 11 October 2006
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 11 October 2006 Resolved
Remove materials blocking access to fire extinguishers.
Due 11 October 2006
Resolved 11 October 2006
Lifesaving › Hand Flares › Expired
Issued 11 October 2006 Resolved
Provide current hand flares.
Due 11 October 2006
Resolved 11 October 2006
Operations/Management › Drills/Instruction › Fire
Issued 11 October 2006 Resolved
Demonstrate proper fire drill.
Due 11 October 2006
Resolved 11 October 2006
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 11 October 2006 Resolved
Demonstrate proper operation of the OWS, until properly calibrated vessel must retain all slops onboard. Discharge slop tank prior to departure.
Due 11 October 2006
Resolved 26 October 2006
Resolution: Mackey technicians boarded Island Intrepid and provided work-order attesting to proper operation of OWS. [name withheld] has provided OWS training to crewmembers.
Personnel › Certificates/Documents/Licenses › STCW Certificate, Chief Mate
Issued 11 October 2006 Resolved
Provide flag STCW endorsement for the Chief Mate.
Due 15 November 2006
Resolved 26 October 2006
Resolution: Flag State /St. Vincent has provided endorsment for [name withheld].
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 25 April 2006 Resolved
Provide tech report attesting proper operation of oil water separator for 15 ppm.
Due 25 May 2006
Resolved 16 June 2006
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 13 December 2005 Resolved
Cargo hatch covers are wasted and gaskets are missing and deteriorated allowing water to enter cargo hold.
Action required: 705 - Other - as specified
Due 13 December 2005
Resolved 25 April 2006
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 13 December 2005 Resolved
Marine inspector doubts the validity of the vessel's safety management system due to deficiencies identifed during inspection. There were no reports of non-comformities or repair schedule for deficiencies.
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 25 April 2006
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 13 December 2005 Resolved
Sturctural support members that provide weight bearing support for cargo hatch covers and containers are severely wasted and have many temporary reparis in the form of doublers. Therefore structural members will not provide adequate support for cargo hatch covers and any additional wieght added from cargo.
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 25 April 2006
Stability › Weathertight Integrity › General
Issued 13 December 2005 Resolved
Door to galley, window covers and protholes will not seal properly when closed allowing water to enter superstructure.
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 25 April 2006
Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 13 December 2005 Resolved
Chief engineer and second engineer do not have a valid flag state enorsement. BOth crew members were issued two consecutive proof of applications for 6 months. STCW only allows a 3 month applicaiton process time fram.
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 25 April 2006
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 13 December 2005 Resolved
Emergency fire pump is inoperable.
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 25 April 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 13 December 2005 Resolved
Household lighting fixture and bulb over instrument panel.
Action required: 705 - Other - as specified
Due 27 December 2005
Resolved 25 April 2006
Fire Fighting › Structural - Horizontal Zones › General
Issued 30 March 2005 Resolved
Have Flagstate attest to the structural integrity of the overhead in the engineering storage room and crop and renew as necessery.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 12 May 2005
Resolution: New deck plateing installed.
Fire Fighting › Fire Main › Condition
Issued 19 November 2004 Resolved
A ten foot section of the firemain is sevearly wasted and holed. Crop and renew.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2004
Resolution: New 15 ft fire main line was installed
Fire Fighting › Fire Pumps › Pressure
Issued 19 November 2004 Resolved
Vsl's fire pumps do not have adequate pressure. Repair fire pumps.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2004
Resolution: Face plate cover replaced.
Construction/Loadline › Structures › Superstructure
Issued 19 November 2004 Resolved
Mount for navigation lights on main mast were severley wasted. Make permanent and proper repairs to nav. light mount.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2004
Resolution: New Mount installed
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 19 November 2004 Resolved
Cargo ship safety equipment is not valid. Anual survey was not conducted within time frame required. Flagstate must conduct initial survey and re-issue SOLAS cert. (SOLAS ch I/8 IV)
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 November 2004
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 19 November 2004 Resolved
Chief mate and Chief engineer do not have their flag state endorsements. Vsl needs to be manned in accordance with their safe manning document
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 November 2004
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 19 November 2004 Resolved
VSL needs to have a third party external audit based on the deficencies noted.
Action required: 705 - Other - as specified
Resolved 24 November 2004
Resolution: Witnessed third party audit.
Operations/Management › Port and Waterways Safety › Notice of Arrival, General
Issued 7 July 2004 Resolved
Vessel submitted an incomplete notice of arrival. NOA was missing International Ship Security Certificate status, Implementation of security plan and incorrect company security officer 24 hr contact phone number and ETA date and time were not updated. Vessel is detained until receipt of Letter of Undertaking to USCG.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 July 2004
Resolution: Received LOU.
Engineering › Sea-water System (primary cooling)
Issued 8 April 2004 Resolved
Port side sea water intake just aft of strainer is holed ans severely wasted. Mke permanent/proper repairs to the satisfaction of flag state rep and USCG Marine Inspector LEGACY COMPONENT DESC: Sea Chest
Action required: 705 - Other - as specified
Due 8 April 2004
Resolved 27 May 2004
Engineering › Fuel Oil Service System
Issued 8 April 2004 Resolved
Fule oil distribution line forward of main engine on centerline is holed and wasted. Crop and renew all affected and wasted piping to satisfaction of flag state and USCG Marine Inspector LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 8 April 2004
Resolved 27 May 2004
Personnel › Certificates/Documents/Licenses
Issued 8 April 2004 Resolved
Training certificates have expired for third engineer and O/S. Replace crew memebers or provide valid training certificates for each. LEGACY COMPONENT DESC: STCW BSTs
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2004
Resolved 27 May 2004
Operations/Management › Vessel Safety Management
Issued 8 April 2004 Resolved
Provide companies crew hiring procedures in reference to crewmember screening (Qualifications & Training) to MSO Miami. LEGACY COMPONENT DESC: Resources and Personnel
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2004
Resolved 27 May 2004
Communications › Radio Communications
Issued 8 April 2004 Resolved
SART Batteries have expired. Replace/renew batteries. LEGACY COMPONENT DESC: Satellite Communications Capability
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2004
Resolved 27 May 2004
Operations/Management › Vessel Safety Management
Issued 8 April 2004 Resolved
Marine Inspector doubts validity of Safety Management System. It is requested that a third party external audit be conducted.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2004
Resolved 27 May 2004
Fire Fighting › Fire Main › Condition
Issued 8 October 2003 Resolved
Properly repair holed fire main located on bridge deck.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 October 2003
Construction/Loadline › Hull
Issued 8 October 2003 Resolved
Provide flag state report on excessive doublers on bow above draft mark 17, and indentation on the port quarter.
Action required: 15 - Rectify deficiencies by next port
Due 17 December 2003
Resolved 6 January 2004
Pollution Prevention/Response › Prevention Equipment
Issued 8 October 2003 Resolved
Properly repair bunkering station intake valve located STBD side just aft of FOCSLE.
Due 8 November 2003
Resolved 17 December 2003
Lifesaving › Lifebuoys
Issued 8 October 2003 Resolved
Replace all SOLAS reflective tape on lifebuoys, and replace all "non-buoyant" lines with proper "buoyant" lines. LEGACY COMPONENT DESC: Buoyant Lifeline
Due 8 November 2003
Resolved 17 December 2003
Electrical › Lighting (service)
Issued 8 October 2003 Resolved
Provide proper explosion proof covers for lighting in forward locker just outside of paint locker. LEGACY COMPONENT DESC: Lighting Fixture
Due 8 November 2003
Resolved 17 December 2003
Documentation › Safety Management System
Issued 29 May 2003 Resolved
Due to the large number of deficiencies to basic safety requirements, a complete audit of the ISM system and documentation must be completed by the appropriate recognized organization in the presense of an attending USCG inspector, prior to loading any cargo or movement of the vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Deficiencies cleared.
Engineering › Sea-water System (primary cooling)
Issued 29 May 2003 Resolved
Salt water piping to main engine cooling is holed and completely wasted. MAke permanent and proper repairs to the satisfaction of the FLAG rep. LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Engineering › Gas Turbine (auxiliary)
Issued 29 May 2003 Resolved
Ballast water piping is holed and completely wasted. Make permanent and proper repairs to the satisfaction of the Flag Rep. LEGACY COMPONENT DESC: Ballast Water Piping
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Engineering › Freshwater System (jacketwater cooling)
Issued 29 May 2003 Resolved
Freshwater piping to the main engine is holed and wasted. Make permanent and proper repairs to the satisfaction of the FLAG rep.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Engineering › Bilge Water Management System
Issued 29 May 2003 Resolved
Ballast/Bilge manifold piping is holed and completely wasted. Make permanent and proper repairs to the satisfaction of the FLAG rep.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Engineering
Issued 29 May 2003 Resolved
All vital piping appears to be wasted, poorly maintained and in need of replacement. Have class/flag rep survey all vital piping/valves including sea valves and provide a report and repair proposal to this office prior to any repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Engineering
Issued 29 May 2003 Resolved
Prove proper leak free operation of the fuel and lube oil purifiers to attending USCG Marine Inspector at next inspection. LEGACY COMPONENT DESC: FUEL/LUBE OIL PURIFIER
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Electrical › Electric Supply System (service)
Issued 29 May 2003 Resolved
Improper electrical installations throughout the engine room, all electrical panels, switches, switchboard to be surveyed by class/flag and brought into compliance prior to departing the Port of Miami.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Engineering
Issued 29 May 2003 Resolved
Marine Sanitation Tank holed in several places and not to be used until proper repairs/replacement are complete to the satisfaction of class/flag. LEGACY COMPONENT DESC: MSD
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Construction/Loadline › Penetrations
Issued 29 May 2003 Resolved
Numerous bubbles of water found in paint on aft bulkhead of main engine room, pin holes and wastage suspected, have class/flag survey/gauge bulkhead then provide a report and repair proposal to this office prior to conducting any repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Navigation › Emergency Steering
Issued 29 May 2003 Resolved
Provide a guard on steering gear and prove proper operation at next USCG Inspection prior the departing the Port of Miami LEGACY COMPONENT DESC: STEERING GEAR
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2003
Resolution: Properly repaired.
Documentation
Issued 2 April 2003 Resolved
On April 2, 2003, it was confirmed that this vessel failed to submit a Notice of Arrival to the National Vessel Movement Center in accordance with 33CFR Part 160, as amended by the Federal Register Vol. 68, No. 40.
Action required: 15 - Rectify deficiencies by next port
Resolved 4 April 2003
Resolution: NOA received by the NVMC; COTP was canceled.
Engineering › Sea-water System (primary cooling)
Issued 16 October 2002 Resolved
Saltwater line from port sea strainer to main saltwater pump wasted, holed and has several soft patches. Make permanent and proper repairs to the satisfaction of the Administration prior to departing the Port of Miami. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Fire Fighting › Structural - A Class Divisions
Issued 16 October 2002 Resolved
Over head melted/wasted and holed over the #2 Ship's Service Generator. Make permanent and proper repair to satisfaction of the Administration prior to departing the Port of Miami. LEGACY COMPONENT DESC: Decks - Machinery Spaces
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Pollution Prevention/Response › Prevention Equipment
Issued 16 October 2002 Resolved
Oily Water Separator not operating properly. The OWS continues to discharge over board even when Oil content Monitor is off or above 15ppm. Make permanent and proper repair to the satisfaction of the Administration. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Pollution Prevention/Response › Prevention Equipment
Issued 16 October 2002 Resolved
OWS piping is PVC and hose. Make permanent repairs to satisfaction of the administration. No open fittings after (downstream) of the OCM sampling point. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Electrical › Electrical Distribution System (service)
Issued 16 October 2002 Resolved
Electric wiring through the vessel is unsafe and in poor condition. Survey entire vessel for electric hazards and make permanent and proper repairs to the satisfaction of the Administration prior to departing the Port of Miami
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Engineering › Sea-water System (primary cooling)
Issued 16 October 2002 Resolved
Port Main Sea Valve gasket leaking. Make permanent and proper repair to the satisfaction of the Administration prior to departing the Port of Miami LEGACY COMPONENT DESC: Valve
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Engineering › Fuel Oil Storage/Transfer System
Issued 16 October 2002 Resolved
Fuel oil piping from main tank leaking, make permanent and proper repairs to the satisfaction of the Administration prior to departing LEGACY COMPONENT DESC: Flange
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Deck/Cargo
Issued 16 October 2002 Resolved
Stuffing tubes (conduit) coming up through the deck forward of superstructure wasted and not watertight. Make permanent and proper repair to the satisfaction of the Administration prior to departing the Port of Miami.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Construction/Loadline › Structures
Issued 16 October 2002 Resolved
Holes wasted in superstructure on forward side IWO (in way of) of crews toilet. Make permanent and proper repair to the satisfaction of the Administration. LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Lifesaving › Rescue Boat
Issued 16 October 2002 Resolved
Provide SOLAS approved retro reflective tape on all life saving equipment as per Chapter III in SOLAS 74/60 to the satisfaction of the Administration. LEGACY COMPONENT DESC: Markings
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Lifesaving
Issued 16 October 2002 Resolved
Signage for muster station in correct, remove and place proper signage as per SOLAS to the satisfaction of the attending USCG Marine inspector.
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Electrical › Electric Supply System (service)
Issued 16 October 2002 Resolved
Battery box for emergency lights wasted and holed, replace or make permanent and proper repair to the satisfaction of the Administration LEGACY COMPONENT DESC: Battery Installation
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Deck/Cargo › Ballast
Issued 16 October 2002 Resolved
Cement patch on Ballast Piping. Have Class Survey all vital salt water piping, including the ballast and bilge piping. Remove all patches, and make permanent and proper repairs to the satisfaction of the Administration prior to departing the port of Miami. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Fire Fighting › Ventilation Systems
Issued 16 October 2002 Resolved
Ventilation in Engine room holed and missing screens. Make permanent and proper repairs to the satisfaction of Class LEGACY COMPONENT DESC: Ducts
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Fire Fighting › Miscellaneous Items
Issued 16 October 2002 Resolved
Oily rags and general house keeping are very poor and create a fire hazard, remove all flammables, rags and cardboard from engine room LEGACY COMPONENT DESC: Waste Receptacles
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Fire Fighting › Miscellaneous Items
Issued 16 October 2002 Resolved
Lube oil leaks on number #3 Ship's Service Generators as show in picture (9b) above. Make permanent repairs to the satisfaction of the Administration.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 November 2002
Construction/Loadline › Structures
Issued 16 October 2002 Resolved
Hole wasted into pilot hose and temp repair has failed. Make permanent repairs to all the holes in the pilot house to the satisfaction of the Administration LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Electrical › Electric Supply System (service)
Issued 16 October 2002 Resolved
Battery Box on port bridge wing not in use, remove or properly terminate all wire/cables leading into box. To the satisfaction of the attending USCG Marine Inspector LEGACY COMPONENT DESC: Battery Installation
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Deck/Cargo › Ballast
Issued 16 October 2002 Resolved
Port side air vents for ballast tanks wasted and holed. Make permanent and proper repair to the satisfaction of the Administration. LEGACY COMPONENT DESC: Vents
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Construction/Loadline › Structures
Issued 16 October 2002 Resolved
Water tight and weather tight doors throughout the vessel needs to be adjusted to the satisfaction of the attending USCG Marine inspector LEGACY COMPONENT DESC: Door
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 7 November 2002
Resolution: Cleared on board 11/7/02, CHK/MIAMI
Operations/Management › Port and Waterways Safety
Issued 20 September 2002 Resolved
Vessel must complete Annual Freight Vesel Exam prior to conducting cargo operations in the U.S. LEGACY COMPONENT DESC: Annual Exam
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 October 2002
Navigation › Collision/Grounding Avoidance
Issued 20 September 2002 Resolved
Properly wire forward navigation lights with permanent wires. Currently, navigation lights are rigged with extension cords through bosun stores. LEGACY COMPONENT DESC: Navigation Lights
Due 30 September 2002
Resolved 5 February 2003
Deck/Cargo › Holds/Tanks
Issued 5 September 2002 Resolved
Manhole covers on cargo hatches missing bolts and some are wasted. Specifically, on the aft hatch amidships. LEGACY COMPONENT DESC: Hatch
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Stability › Watertight Integrity
Issued 5 September 2002 Resolved
Wasted cap on WTF P pipe located amidships on port side and other sounding tube caps missing. Repair and replace as necessary. LEGACY COMPONENT DESC: Sounding tube caps
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Deck/Cargo › Holds/Tanks
Issued 5 September 2002 Resolved
Cargo hatches missing numerous dogs. Provide for all fittings. LEGACY COMPONENT DESC: Hatch Cover
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Stability › Watertight Integrity
Issued 5 September 2002 Resolved
Gooseneck on port side just forward of amidships is holed. Repair as necessary.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Stability › Watertight Integrity
Issued 5 September 2002 Resolved
Pipe leading from port side of bosun stores (near deck) to forward cargo hold wasted and holed. Repair as necessary.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Stability › Watertight Integrity
Issued 5 September 2002 Resolved
Hole wasted in hawsepipe on port side at overhead in bosun stores. Repair as necessary.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Stability › Watertight Integrity
Issued 5 September 2002 Resolved
Hatch cover for trunk in bosun stores leading to foc'sle deck is wasted and not watertight. Repair as necessary.
Due 30 September 2002
Resolved 5 February 2003
Construction/Loadline › Structures
Issued 5 September 2002 Resolved
Main deck between superstructure and cargo hatch amidships wasted with holes leading to engine room . Repair as necessary. LEGACY COMPONENT DESC: Deck Plating
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Documentation › Certificates/Documents
Issued 5 September 2002 Resolved
Vessel's cargo ship safety construction certificate expired as of 24AUG02. Provide valid certificate onboard. LEGACY COMPONENT DESC: Cargo Ship Safety Construction Certificate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Construction/Loadline › Hull
Issued 5 September 2002 Resolved
Vessel last dry-docked in February of 1999 with date of previous dry-dock unknown. Provide dates and evidence of previous dry-dock. LEGACY COMPONENT DESC: Dry-Docking
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Documentation › Manuals/Policy Documentation
Issued 5 September 2002 Resolved
No Steering gear instructions in steering flat and no block diagram in steering flat or on bridge. LEGACY COMPONENT DESC: Steering Gear Changeover Instructions
Due 30 October 2002
Resolved 20 September 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 5 September 2002 Resolved
Vessel has numerous exposed lights in engine room and bosun stores. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Due 30 October 2002
Resolved 20 September 2002
Navigation › Collision/Grounding Avoidance
Issued 5 September 2002 Resolved
Forward anchor light wired with extension cord through hatch in bosun stores. Permanently wire light. LEGACY COMPONENT DESC: Navigation Lights
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 5 September 2002 Resolved
Excessive amounts of open wiring in bosun stores. Properly terminate loose wires. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 5 September 2002 Resolved
Ladder in bosun stores to foc'sle not secured to deck. Properly secure to eliminate hazard. LEGACY COMPONENT DESC: Ladder
Due 30 October 2002
Resolved 20 September 2002
Documentation › Safety/Response Plans/Programs
Issued 5 September 2002 Resolved
Fire control plan is not inclusive of all required items. LEGACY COMPONENT DESC: Fire Control Plans
Due 30 October 2002
Resolved 20 September 2002
Documentation › Manuals/Policy Documentation
Issued 5 September 2002 Resolved
Oil transfer procedures line diagram does not inclde lube oil. Properly correct. LEGACY COMPONENT DESC: Transfer Procedures
Due 30 October 2002
Resolved 20 September 2002
Documentation › Safety/Response Plans/Programs
Issued 5 September 2002 Resolved
Vessel does not have garbage management plan onboard. LEGACY COMPONENT DESC: Waste Management Plan
Due 30 October 2002
Resolved 20 September 2002
Documentation › Manuals/Policy Documentation
Issued 5 September 2002 Resolved
Vessel does not have intructions for maintanence of lifesaving equipment. LEGACY COMPONENT DESC: Instructions for On-board Maintenance (lifesaving)
Due 30 October 2002
Resolved 20 September 2002
Pollution Prevention/Response › Prevention Equipment
Issued 5 September 2002 Resolved
Vessel is not fitted with standard discharge connection. To be fitted at dry-dock but NLT 30OCT02. LEGACY COMPONENT DESC: Standard Discharge Connection
Action required: 705 - Other - as specified
Due 30 October 2002
Resolved 20 September 2002
Lifesaving
Issued 9 October 2001 Resolved
Replace retro reflective tape on rescue boat.
Condition: Unknown
Due 9 October 2001
Resolved 9 October 2001
Lifesaving
Issued 9 October 2001 Resolved
Provide properly working float lights as required by cargo ship safety cert.
Condition: Unknown
Due 11 October 2001
Resolved 11 October 2001
Construction/Loadline
Issued 9 October 2001 Resolved
Provide surveyor report addressing wastage to fore peak tank top. Make such repairs as required by the same.
Condition: Unknown
Due 11 October 2001
Resolved 11 October 2001
Construction/Loadline
Issued 9 October 2001 Resolved
Renew hatch combing & hatch cover edge in way of Engineroom Main Watertighthatch.
Condition: Unknown
Due 9 October 2001
Resolved 9 October 2001
Navigation
Issued 25 August 2000 Resolved
Prior to return to the U. S. provide onboard all current notices to mariners and unpdate charts as needed.
Condition: Unknown
Due 4 October 2000
Resolved 4 October 2000
Deck/Cargo
Issued 25 August 2000 Resolved
Prior to departure, make repairs to anchor windlass brakes and provide class society report of sat repair.
Condition: Unknown
Due 25 August 2000
Resolved 26 August 2000
Fire Fighting
Issued 22 May 1999 Resolved
PROVIDE SOLAS SPRAY/JET/CLOSE FIRE NOZZLES TO REPLACE PLASTIC ONES._x001C_ FAX RECEIPT OF PURCHASE TO MSO MIAMI.
Condition: Unknown
Due 22 July 1999
Resolved 22 July 1999
Documentation
Issued 22 May 1999 Resolved
PRIOR TO 05JUNE99, PROVIDE FLAG STATE ENDORSEMENT OF HOME COUNTRY OFFICERS LICENSES. CURRENTLY PHILLIPINE OFFICERS WITHOUT AC LICENSES.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVIDE ALL LIFEJACKETS WITH OPERATIONAL LIGHTS.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVE PROPER OPERATION OF RESCUE BOAT DAVIT WINCH MOTOR.
Condition: Unknown
Due 23 May 1999
Resolved 23 May 1999
Documentation
Issued 22 May 1999 Resolved
PRIOR TO 05JUNE99, PROVIDE CLASS SURVEYOR'S REPORT ATTESTING TO CORECTION OF OUTSTANDING CLASS REQUIREMENTS WITH A LIMIT DATE OF 05JUN99. A LIST OF 6 ITEMS IS ATTACHED TO THE SAFETY EQUIPMENT CERTIFICATE INDICATING REPAIRS TO BE AFFECTED TO FIRE MAIN, HYDRANTS, ETC.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVIDE HYDROSTATIC RELEASE UNITS FOR BOTH LIFERAFTS.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Fire Fighting
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVE PROPER OPERATION OF MAIN FIRE PUMPS #1 AND #2.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Documentation
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVIDE CLASS SURVEYOR'S REPORT ATTESTING TO CORRECTIONOF ALL OUTSTANDING DEFICIENCIES.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Unknown
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, COMPLETE ALL OUTSTANDING WORKLIST ITEMS ISSUED BY BV ATTACHED TO EXPIRED SAFETY CONSTRUCTION CERTIFICATE DATED 22APR99.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Documentation
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVIDE VALID SAFETY CONSTRUCTION CERTIFICATE.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Documentation
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVIDE ORIGINAL REGISTRY FOR COAST GUARD REVIEW.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Documentation
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVIDE TONNAGE CERTIFICATE THAT ACCURATELY REFLECTS TONNAGE OF THE VSL. NO REMARKS MADE ADDRESSING THE VSL'S PREVIOUS TONNAGE MEASUREMENT UNDER NATIONAL RULES. CURRENTLY VSL LISTED AS 1649 GT RATHER THAN 1598.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Lifesaving
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, RENEW RESCUE BOAT PAINTER LINES.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Fire Fighting
Issued 22 May 1999 Resolved
PRIOR TO DEPARTURE, PROVE PROPER OPERATION OPF SMOKE DETECTORS/PANEL AND PROVIDE CLASS REPORT ATTESTING TO SAME.
Condition: Unknown
Due 8 June 1999
Resolved 8 June 1999
Documentation
Issued 8 May 1998 Resolved
PROVIDE ONBOARD INSTRUCTIONS FROM THE COMPANY TO THE VESSEL'S MASTER WITH PROCEDURES AND POLICY FOR NEW CREWMEMBER VSL FAMILIARIZATION.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Lifesaving
Issued 8 May 1998 Resolved
PROVIDE PROOF FROM THE SERVICE COMPANY THAT RE-PROGRAMMED THE 406 MHZ EPIRBTHAT NEW INFORMATION HAS BEEN ENTERED.
Condition: Unknown
Due 18 May 1998
Resolved 18 May 1998
Accommodation/Occupational Safety
Issued 8 May 1998 Resolved
PROVIDE AND POST PROPER MSD NAMEPLATE. THE ONE CURRENTLY POSTED DOESN'T COMPLY FULLY WITH 33 C.F.R. 159.55.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Accommodation/Occupational Safety
Issued 8 May 1998 Resolved
PROVIDE AND POST MSD PLACARD IAW 33 C.F.R. 159.59.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Accommodation/Occupational Safety
Issued 8 May 1998 Resolved
PROVIDE ONBOARD MSD OPERATING INSTRUCTIONS IAW 33 C.F.R. 159.57.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Lifesaving
Issued 8 May 1998 Resolved
PROVIDE ONBOARD 16 SOLAS LIFEJACKETS PRIOR TO DEPARTURE IAW SOLAS CH 3 REG 19.2.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Lifesaving
Issued 8 May 1998 Resolved
PROVIDE TWO 4.5 KG RING BUOYS FOR THE LIGHT/SMOKE BRIDGE DISTRESS SIGNALS AS PER SOLAS 60 CH III/21.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Lifesaving
Issued 8 May 1998 Resolved
PROVIDE ONBOARD 3 OPERATIONAL GMDSS TYPE PORTABLE MARINE RADIOTELEPHONES. IAW SOLAS 74 CH III/6.2.1.
Condition: Unknown
Due 18 May 1998
Resolved 18 May 1998
Lifesaving
Issued 8 May 1998 Resolved
PROPERLY INSTALL HYDROSTATIC RELEASES ON LIFERAFTS TO MAKE THEM FLOAT FREE IAW SOLAS 74 CH III/26.3.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Lifesaving
Issued 8 May 1998 Resolved
PROVIDE AND POST OPERATIONG INSTRUCTIONS AT RESCUE BOAT LAUNCHING APPLIANCEIAW SOLAS 74 CH III/9.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Engineering
Issued 8 May 1998 Resolved
PROVIDE STANDARD DISCHARGE CONNECTION PRIOR TO DEPARTURE.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Documentation
Issued 8 May 1998 Resolved
PRIOR TO DEPARTURE PROVIDE DCM FOR ALL DANGEROUS CARGO.
Condition: Unknown
Due 18 May 1998
Resolved 18 May 1998
Navigation
Issued 8 May 1998 Resolved
PROVIDE ONBOARD DAYLIGHT SIGNALING LAMP IAW SOLAS 74 CH V/11.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Fire Fighting
Issued 8 May 1998 Resolved
PROVIDE FIRE CONTROL PLAN IAW SOLAS 74 CH2-II REG 20._x001C_ MUST HAVE CLASS A AND B BOUNDARIES, DETAILS OF VENTILATION SYS AND FIXED F/F AND DETECTION SYS.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Engineering
Issued 8 May 1998 Resolved
VESSEL FAILED TO RECORD BUNKERINGS AS REQUIRED BY THEIR ORB._x001C_ MUST RECORD ALL BUNKERINGS AS PER ORB BY NEXT US BUNKERING OPS.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Documentation
Issued 8 May 1998 Resolved
MAKE CHANGES TO SOPEP TO SHOW NEW VESSEL'S NAME, OWNER, OPERATOR, AND P&I CLUB. PROVIDE DOCUMENTATION FROM CLASS INDICATING CHANGES COMPLETED.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Documentation
Issued 8 May 1998 Resolved
MAKE CHANGE TO IOPP CERT FORM A TO SHOW CORRECT TYPE OF OWS INSTALLED._x001C_ UNIT ONBOARD IS FITTED WITH ALARM AND AUTO STOPPING DEVICE.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Engineering
Issued 8 May 1998 Resolved
OIL TRANSFER PROCEDURES ARE INCOMPLETE. MUST PROVIDE OTP IAW 33 C.F.R. 155.760. PRIOR TO NEXT US BUNKERING.
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Lifesaving
Issued 8 May 1998 Resolved
PROVIDE AND INSTALL EMBARKATION LADDERS FOR BOTH LIFERAFTS IAW SOLAS 74 CH III/19
Condition: Unknown
Due 24 June 1998
Resolved 24 June 1998
Fire Fighting
Issued 10 April 1997 Resolved
Prior to departure, make permanent repairs to damaged firemain piping located on main deck, port side forward. When repairs are completed, notify MSO Miami and log same in the ship's log book.
Condition: Unknown
Due 10 April 1997
Resolved 11 April 1997
Navigation
Issued 26 August 1996 Resolved
Provide current edition of tide tables.
Condition: Unknown
Due 29 August 1996
Resolved 29 August 1996
Lifesaving
Issued 26 August 1996 Resolved
Provide new hydro-static release for port liferaft prior to departure.
Condition: Unknown
Due 29 August 1996
Resolved 29 August 1996
Documentation
Issued 26 August 1996 Resolved
Provide receipts in Oil Record Book for the disposal of oily waste.
Condition: Unknown
Due 13 September 1996
Resolved 16 September 1996
Documentation
Issued 26 August 1996 Resolved
Update SOPEP to include training/drill procedures IAW 33CFR155.1030 (c) prior to return to U.S.
Condition: Unknown
Due 12 September 1996
Resolved 12 September 1996
Fire Fighting
Issued 26 August 1996 Resolved
Have class address permanent repairs to the forward firepump in the engine room in way of discharge pipe and pump packing gland (red hand patches).
Condition: Unknown
Due 23 September 1996
Resolved 17 September 1996
Unknown
Issued 26 August 1996 Resolved
Have class address the following: repair and prove proper operation of OWS15ppm sensor. Sensor was dirty and was not operating below 21ppm, preventing the OWS from discharging even though the water was clean.
Condition: Unknown
Due 23 September 1996
Resolved 17 September 1996
Electrical
Issued 26 August 1996 Resolved
Provide cover for electrical panel in paint locker.
Condition: Unknown
Due 29 August 1996
Resolved 29 August 1996
Documentation
Issued 26 August 1996 Resolved
Provide statement from flag state accepting Croatian and Yugoslavian licenses prior to return to U.S.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Construction/Loadline
Issued 26 August 1996 Resolved
Have class address the flexible hose connections in bilge and ballast piping systems within the engine room.
Condition: Unknown
Due 23 September 1996
Resolved 17 September 1996
Accommodation/Occupational Safety
Issued 26 August 1996 Resolved
Have class address the window air conditioning units installed in the window ports on the 2nd deck in way of vsl weathertightness.
Condition: Unknown
Due 23 September 1996
Resolved 17 September 1996
Fire Fighting
Issued 26 August 1996 Resolved
Have class address permanent repairs to the pinhole leak on the firemain onaft port side near superstructure.
Condition: Unknown
Due 23 September 1996
Resolved 17 September 1996
Engineering
Issued 26 August 1996 Resolved
Install rotating machinery guards on all pump shafts in engine room.
Condition: Unknown
Due 13 September 1996
Resolved 16 September 1996
Fire Fighting
Issued 26 August 1996 Resolved
Properly repair pinhole leak in firemain (port side aft on outboard side ofsuperstructure. Prove repair by pressurizing firemain.
Condition: Unknown
Due 13 September 1996
Resolved 16 September 1996
Unknown
Issued 26 August 1996 Resolved
Remove paint from steering space and relocate to paint locker prior to departure.
Condition: Unknown
Due 29 August 1996
Resolved 29 August 1996
Documentation
Issued 26 August 1996 Resolved
Provide oil discharge prohibited signs at OWS and bilge pumping station prior to return to U.S.
Condition: Unknown
Due 12 September 1996
Resolved 12 September 1996
Engineering
Issued 26 August 1996 Resolved
Remove rubber hose and blank off or hard pipe connection between 2 fuel lines in aft area of engine room (lines are from day tanks).
Condition: Unknown
Due 13 September 1996
Resolved 16 September 1996
Accommodation/Occupational Safety
Issued 2 February 1996 Resolved
REPLACE MARINE SANITATION DEVICE PRIOR TO RETURN TO U.S. WATERS.
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Construction/Loadline
Issued 2 February 1996 Resolved
REPAIR/CROP AND RE-NEW BILGE PIPING TO SATISFACTION OF CLASS/ PROVIDE REPORT TO U.S.C.G.
Condition: Unknown
Due 2 March 1996
Resolved 22 February 1996
Engineering
Issued 2 February 1996 Resolved
PROPERLY LOG USE OF OILY WATER SEPARATOR IN OIL RECORD BOOK. (INCLUDE QUANTITY, LAT-LONG)
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Navigation
Issued 2 February 1996 Resolved
PROVIDE COPY OF INLAND NAVIGATION RULES (COLREGS)
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Fire Fighting
Issued 2 February 1996 Resolved
PROVIDE LANTERNS/SPARE BOTTLES FOR BOTH FIRE SUITS AND STOW W/ FIRE SUITS IN LOCKERS.
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Construction/Loadline
Issued 2 February 1996 Resolved
PROVIDE THREADED CAP FOR #5 BALLAST TANK SOUNDING TUBE.
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Lifesaving
Issued 2 February 1996 Resolved
PROVIDE EXHAUST LAGGING FOR EMERGENCY FIRE PUMP EXHAUST.
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Navigation
Issued 2 February 1996 Resolved
PROVIDE INSTRUCTIONS/CHANGE-OVER PROCEDURES FOR EMERGENCY STEERING.
Condition: Unknown
Due 2 March 1996
Resolved 12 February 1996
Electrical
Issued 2 February 1996 Resolved
PROVIDE NON-CONDUCTIVE MATTING IN WAY OF MAIN SWITCHBOARD.
Condition: Unknown
Due 8 March 1996
Resolved 13 March 1996
Documentation
Issued 2 February 1996 Resolved
PROVIDE VALID LOAD-LINE CERTIFICATED WHICH DISPLAYS PROPER MARKING.
Condition: Unknown
Due 2 March 1996
Resolved 12 February 1996
Deck/Cargo
Issued 15 June 1995 Resolved
PROVIDE 2ND ANCHOR NLT 24 JUNE 1995 PER BV CLASS STATEMENT DTD 15JUN95.
Condition: Unknown
Due 11 July 1995
Resolved 11 July 1995
Documentation
Issued 28 October 1992 Resolved
The owner/operator of the M/V Hybur Intrepid, a new vessel of greater than 79 feet in length, failed to have it's Loadline Certificate available for inspection.
Condition: Unknown
Due 28 October 1992
Resolved 8 December 1992
Documentation
Issued 28 October 1992 Resolved
The Hybur Intrepid, a vessel of greater than 400 GRT, failed to maintain the oil record book on board for a period of three years. The records dateback to when the vessel was purchased from previous owners.
Condition: Unknown
Due 27 May 1994
Resolved 27 May 1994
Documentation
Issued 21 August 1990 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 21 August 1990
Resolved 21 August 1990
Documentation
Issued 26 July 1988 Resolved
OIL TRANSFER PROCEDURES WERE NOT COMPLETE, DID NOT CONTAIN NUMBER OF PEOPLE ON DUTY, DUTIES BY TITLE OF EACH PERSON REQUIRED, AND PROCEDURES FOR EMPTING MANIFOLD CONTANMENT. VLS OIL CAP, 247 METRIC TONS
Condition: Unknown
Due 26 July 1988
Resolved 26 July 1988
Construction/Loadline
Issued 26 July 1988 Resolved
VSLS UPPER DECK MARK WAS NOT VISIBLE DUE TO THE HULL AND THE DECK MARK WEREBOTH OF THE SAME COLOR(WHITE).DECK MARK WAS MARKED ON HULL.
Condition: Unknown
Due 26 July 1988
Resolved 26 July 1988
Engineering
Issued 26 July 1988 Resolved
STANARD DISCHARGE CONNECTION NOT FOUND ONBOARD.
Condition: Unknown
Due 26 July 1988
Resolved 26 July 1988

Ownership record