Records from 2007 to 2026. Most recent: inspection, 13 May 2026.
Inspection history · 20
13 May 2026
MTSA Verification · Annual Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8320055
6 January 2026
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8291012
12 March 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8092091
26 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7885393
18 March 2024
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7881059
13 March 2024
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7879019
17 May 2023
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7690811
10 May 2023
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7686243
9 April 2022
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7427607
27 May 2021
Drydock Exam · Administrative Inspection · Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7208398
28 May 2020
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6963062
4 June 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6703001
31 May 2019
Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6699074
8 August 2018
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6504630
12 July 2018
MTSA/ISPS Verification · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6441383
21 February 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6358845
22 August 2017
Type not recorded
No type recorded · Station Lake Charles · USCG Heartland District (CGD-H) · Activity 6248620
9 May 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6142239
13 April 2017
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6119220
9 June 2016
Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5902656
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 18 March 2024
Resolved
Steering gear must be capable of moving the rudder from 35 degrees to 30 degrees in 28 seconds; rudder could not go beyond 30 degrees stbd.
46 CFR 130.130(c)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 March 2025
Resolved 18 March 2024
Resolution: RAI calibrated
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 May 2023
Resolved
Vessel shall ensure that the vessel is in satisfactory condition and is fit for the service for which it is intended. Vessel had Port Gen Air Starter blow diesel onto the engine and had the fuel soaked rag under the RACOR. Vessel also had not desposed of the prior nights fuel filter change was in a bucket near the air compressors.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 May 2023
Resolution: SSG(s) starting system was overhauled and witnessed to be in satisfactory condition. All oily rags and filters were removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 May 2023
Resolved
Vessel shall maintain watertight integrity. The Port & STBD Engine Room Hatches required adjustment as air was felt roming through in multiple places. STBD Escape Hatch would not dog. Galley WTD was adjusterd and Corrected during the inspection.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2023
Resolution: ABS observed WTD correction and signed ILLC. Using signed ILLC as objective evidence to clear def.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 10 May 2023
Resolved
Fire Drills shall be held on alternating weeks. Vessel went 6 weeks w/o a fire drill.
Action required: 10 - Deficiency Rectified
Resolved 10 May 2023
Resolution: Notified Vessel Rep, Master, & Mate on requirement. Vessel had done a fire drill just prior to the inspection.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 10 May 2023
Resolved
Abandon Ship drills must be held on each vessel in alternating weeks. Last abandon ship drill prior to insepction was on 27MAR2023.
Action required: 10 - Deficiency Rectified
Resolved 10 May 2023
Resolution: Conducted Abandon Ship drill during inspection allowing the vessel to come into complaince.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 April 2022
Resolved
A fuel leak was found on the port generator and a lube oil leak was found on the starboard generator. Vessel is required to rectify the leak before operation.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 12 April 2022
Resolved 12 April 2022
Resolution: Engines and generators were operated with no leaks observable leak.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 9 April 2022
Resolved
Each embarkation station must be adequately lighted. No lighting was present at the survival craft embarkation station. Vessel is required to install lighting for the embarkation station.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 11 April 2022
Resolved 12 April 2022
Resolution: Embarkation lighting was installed and verified to operate on Emergency Power.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 9 April 2022
Resolved
Doubler plate on port aft of the vessel, approximately 6 feet above the water line has an 8 inch crack. The doubler plate acts to protect the frame of the vessel. Crack must be non-destructively tested to confirm it is only in the doubler plate and not in the frame of the vessel.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2022
Resolved 12 April 2022
Resolution: Weld was completed on the doubler plate that was cracked. This satifies the requirement.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 9 April 2022
Resolved
Navigation light indicator panel must have an audible and visual alarm if there is a failure of the navigation lights. Vessels panel did not audibly alarm. Alarm must be audible.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2022
Resolved 12 April 2022
Resolution: Navigation lighting panel audible and visual alarm was operable.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 27 May 2021
Resolved
All access openings in bulkheads at ends of enclosed superstructures shal be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and rframed, and stiffened and fitted so that the whole structure is of equivalent strength to the unpiereced bulkhead and weathertight when closed; 02 watertight doors and the starboard side escape hatch scuttle leading to the main deck were unable to be secured to create a watertight seal.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 June 2021
Resolution: Watertight doors were adjusted to create a watertight seal prior to completing the inspection.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 May 2021
Resolved
The rules concerning lights shall be complied with from sunset to sunrise; masthead light was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 June 2021
Resolution: New bulb for masthead light was installed prior to the completion of the inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 May 2021
Resolved
Lifesaving appliances and arrangements are subject to tests and amd inspections as described i this section during OSV boardings to ensure that the appliances and arrangements comply with applicable requirements, are in satisfactory condition, and remain fit for service; retro-reflective tape on lifefloats were sun-damaged.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 June 2021
Resolution: New retro-reflective tape was applied to the lifefloats prior to the completion of the inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › Tonnage certificate
Issued 27 May 2021
Resolved
A certificate of measurement issued by an authorized official is the only acceptable evidence of the gross and net tonnage of a vessel measured in accordance with subaprt B, C, or D of 46 CFR Part 69; vessel's tonnage certificate was not present on the vessel at the time of inspection and not present in ship's files.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2021
Resolved 18 June 2021
Resolution: Company emailed attending MI a copy of the company's request to the CG to have a new copy of the vessel's tonngae certificate mailed out.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 May 2020
Resolved
ALL INSTALLATIONS SHALL BE OF MARINE TYPE ENGINES SUITABLE FOR INTENDED SERVICE; VSL HAD AN EXHAUST LEAK ON THE PORT ENGINE; VSL REPLACED SEAL TO MAKE "GASTIGHT" PRIOR TO INSPECTION COMPLETION.
Action required: 10 - Deficiency Rectified
Due 29 May 2020
Resolved 29 May 2020
Resolution: Replaced seal
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 May 2020
Resolved
EACH GENERATOR MUST HAVE AN OVERSPEED DEVICE THAT IS INDEPENDENT OF NORMAL OPERATING GOVENOR; VSL'S PORT GENERATOR WAS INOPERABLE; PROVIDE TECH REPORT VERIFYING PROPER OPERATION.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 May 2020
Resolved 1 October 2020
Resolution: Verified port generator operational and overspeed tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 May 2020
Resolved
SELF-IGNIGTING LIGHTS MUST BE ATTACHED TO LIFEBUOYS WITH
A BUOYANT LIFELINE; THE LIFELINE WAS WASTED AND NOT
SERVICABLE; VSL REPLACED LINE PROIR TO INSPECTION COMPLETION.
Action required: 10 - Deficiency Rectified
Due 29 May 2020
Resolved 29 May 2020
Resolution: Line was replaced prior to inspection completion.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 28 May 2020
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 10 - Deficiency Rectified
Due 29 May 2020
Resolved 29 May 2020
Resolution: Replaced batteries.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 28 May 2020
Resolved
EACH LIFEBOAT AND RESCUE BOAT MUST BE MARKED WITH TYPE
II RETRO-REFLECTIVE MATERIAL; THE THREE LIFE FLOATS DID
NOT HAVE APPROVED RETRO TAPE; VSL REPLACED TAPE WITH
APPROVED MATERIAL PRIOR TO COMPLETION OF INSPECTION.
46CFR131.855(d)
Action required: 10 - Deficiency Rectified
Due 29 May 2020
Resolved 29 May 2020
Resolution: Replaced retro-reflective tape
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 June 2019
Resolved
Navigation Light screens were painted green and not matt black. Paint navigation light screens matt black.
33 CFR 84.05
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 June 2019
Resolved 4 June 2019
Resolution: Navigation Light screens painted matt black.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2018
Resolved
Vessel crew could not prove proper operation of ship service generators. Prove proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 August 2018
Resolution: Obtained objective evidence that a third party completed test of overspeed shutdowns.
Lifesaving › Lifeboat Equipment › Life Saving Signals Card
Issued 13 April 2017
Resolved
Vessel did not have lifesaving signal and helicpoter recovery placard
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 9 May 2017
Resolution: Placard is now posted
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 13 April 2017
Resolved
Vessel had log book but preunderway checks were not being logged.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 9 May 2017
Resolution: Appropriate entries are now being made
Lifesaving › Line-Throwing Appliances › Lines
Issued 13 April 2017
Resolved
Vessel captain and crew could not find auxliary line. The line had to be pointed out by port captain
Due 13 April 2017
Resolved 13 April 2017
Resolution: Port Captain provided location of sufficient aux line.
Fire Fighting › Portable CO2 Fire Extinguisher › Marking
Issued 13 April 2017
Resolved
Vessel is equiped with more than one type and size of extinguisher. None were marked with stowage location number.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 14 April 2017
Resolution: Stowage locations were clearly marked and all portable extiguishers were of type and stowed in locations as defined on vessels fire and safety plan.
Engineering › Diesel Engine (propulsion-electric) › Emergency shutdown
Issued 13 April 2017
Resolved
emergency shutdown and overspeed not operational. SSDG also did not run smooth and hunted.
Action required: 17 - Rectify deficiencies prior to departure
Due 13 April 2017
Resolved 14 April 2017
Resolution: Emergency shutdow poperly operated when actuated.
Engineering › Fuel Oil Service System › Valve, Solenoid
Issued 13 April 2017
Resolved
Excessive fuel leak on bow thruster fuel pressure sensor.
Action required: 17 - Rectify deficiencies prior to departure
Due 13 April 2017
Resolved 14 April 2017
Resolution: Fuel Presure sensor was replace. No leaks detected.
Communications › Public Address System › Loudspeaker
Issued 13 April 2017
Resolved
Vessels two way communication system was not operable on E power.
Action required: 705 - Other - as specified
Due 13 May 2017
Resolved 14 April 2017
Resolution: Two way comms system operated correctly on E power.