Records from 1984 to 1997. Most recent: operational control imposed, 28 October 1997.
Unknown
Issued 28 October 1997
Resolved
Repair leaks to the ballast pump and cargo tank cleaning pump prior to departure, SOLAS 60 Ch. I, Reg 10.
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Fire Fighting › Automatic Sprinkler System › Connection to Fire Main
Issued 28 October 1997
Resolved
Replace foam extinguisher hose, located in aft steering space, SOLAS 60, Ch. II, Reg. 66.
Condition: Unknown
Due 28 November 1997
Resolved 9 November 2006
Fire Fighting › Automatic Sprinkler System › Connection to Fire Main
Issued 28 October 1997
Resolved
Replace various holed fire hoses, SOLAS 60, Ch. II, Reg. 65(c).
Condition: Unknown
Due 28 November 1997
Resolved 9 November 2006
Fire Fighting › Automatic Sprinkler System › Connection to Fire Main
Issued 28 October 1997
Resolved
Install/replace fire hydrant connector gaskets, SOLAS 60, Ch. II, Reg. 65(c).
Condition: Unknown
Due 28 November 1997
Resolved 9 November 2006
Navigation › Collision/Grounding Avoidance › Automatic Radar Plotting Aid (ARPA)
Issued 28 October 1997
Resolved
Align port bridge wing gyrocompass repeater, SOLAS 74 Amended, Ch. V, Reg. 12 (d) & (e).
Condition: Unknown
Due 28 November 1997
Resolved 9 November 2006
Unknown
Issued 28 October 1997
Resolved
Remove oily water mixture located in duct keel - either transfer to slop tank or discharge to approved shore facility and provide receipt prior to departure, 33CFR160.113.
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Electrical
Issued 27 June 1997
Resolved
INSTALL PROTECTIVE COVERS ON LIGHTS IN THE ENGINEROOM WHERE MISSING,_x001C_ IN ACCORDANCE WITH SOLAS CHAPTER II-1 REGULATION 45.1.3_x001C_ CORRECT PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Electrical
Issued 27 June 1997
Resolved
INSTALL PROTECTIVE COVERS ON #1 AND #2 SEA WATER COOLING COMPRESSORS_x001C_ IN ACCORDANCE WITH SOLAS CHAPTER II-1 REGULATION 26.1_x001C_ CORRECT PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Electrical
Issued 27 June 1997
Resolved
INSTALL MOTOR COUPLING GUARD ON REEFER COOLING PUMP IN LOWER ENGINE ROOM_x001C_ IN ACCORDANCE WITH SOLAS CHAPTER II-1 REGULATION 26.1
Condition: Unknown
Due 28 July 1997
Resolved 28 July 1997
Construction/Loadline
Issued 7 August 1996
Resolved
MAKE PERMANENT REPAIRS TO FRACTURED/HOLED AFT BULKHEAD OF #7 HOLD IN WAY OFFRAME #45.
Condition: Unknown
Due 12 February 1997
Resolved 12 February 1997
Lifesaving
Issued 7 August 1996
Resolved
MSD BATON ROUGE CLEARED PS 95112766. REQUIREMENT TO INSTALL MISSING LIMIT SWITCHES FOR PORT/STBD LIFEBOATS. (SOLAS 60 CH. III REG. 36). EXTENDED TO OR COMPLETED NOT LATER THAN 30NOV96 PER CLASS REPORT.
Condition: Unknown
Due 12 February 1997
Resolved 12 February 1997
Navigation
Issued 3 August 1996
Resolved
One of the two required radars failed after arrival in the Port of New Orleans. However, no notice to the COTP was attempted. Operational failure of required equipment requires notification to the closest COTP.
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Navigation
Issued 3 August 1996
Resolved
Light List Volume 5 missing.
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Navigation
Issued 3 August 1996
Resolved
NOAA Charts 11360 (ed. 36), 11361 (ed. 60) and 11370 (ed. 18) (all requiredfor the area transitted) onboard with no corrections at all. The latest corrections in NTMs: 11360 - 31/96; 11361 - 27/96; and 11370 - 27/96. No foreign equivalents were available.
Condition: Unknown
Due 4 August 1996
Resolved 6 August 1996
Lifesaving
Issued 20 November 1995
Resolved
STDB LIFEBOAT MISSING COMPASS. (SOLAS 60 CH.III REG.11.vii)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Lifesaving
Issued 20 November 1995
Resolved
REPAIR/RPLACE BILGE PUMP IN STBD LIFEBOAT. (SOLAS 60 CH.III REG.11.xxii)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Navigation
Issued 20 November 1995
Resolved
RUDDER ANGLE INDICATOR MISALIGN, READING 20 DEGREES ON BRIDGE & 35 DEGREES IN AFT STEERING. (SOLAS 60 CH.II REG.27(iv))
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Accommodation/Occupational Safety
Issued 20 November 1995
Resolved
PROVIDE OPERABLE TOILETS IN CREW AREA. (ILO 147)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Accommodation/Occupational Safety
Issued 20 November 1995
Resolved
PROVIDE HOT WATER FOR GALLEY & CREW AREA. (ILO 147)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Electrical
Issued 20 November 1995
Resolved
PROVIDE GLOBE(S) & COVER(S) FOR LIGHTING FIXTURE (THROUGH-OUT VESSEL). (ILO 147)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Lifesaving
Issued 20 November 1995
Resolved
MISSING LIMIT SWITCHES FOR PORT/STBD LIFEBOATS. (SOLAS 60 SH. III REG.36)
Condition: Unknown
Due 12 September 1996
Resolved 12 September 1996
Fire Fighting
Issued 20 November 1995
Resolved
PROVIDE OPERABLE SELF-CONTAINED BREATHING APPARATUS (SCBA). (SOLAS 60 CH.IIREG.63(b)(ii))
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Navigation
Issued 20 November 1995
Resolved
SECOND MARINE RADAR INOPERABLE. (33 CFR 164.37)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Navigation
Issued 20 November 1995
Resolved
GYRO-COMPASS MISALIGN BY 20 DEGREES. (33 CFR 164.35)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Accommodation/Occupational Safety
Issued 20 November 1995
Resolved
SCREENS MISSING FOR ABOVE THE STOVE (GALLEY AREA). (ILO 147)
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Accommodation/Occupational Safety
Issued 26 October 1994
Resolved
VESSELES REFRIDGERATION SYSTEM WAS NOT OPERATING PROPERLY.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Navigation
Issued 26 October 1994
Resolved
Vessel was missing emergency steering gear procedures in steering gear room.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Navigation
Issued 26 October 1994
Resolved
Vessels crew could not "speedily" operate the emergency steering gear.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Lifesaving
Issued 26 October 1994
Resolved
VESSEL IMPROPERLY STORED PRESSURIZED BOTTLES.
Condition: Unknown
Due 26 November 1994
Resolved 7 November 1994
Construction/Loadline
Issued 26 October 1994
Resolved
VESSELS ROPE LOCKER HATCH COVER ON FAN TAIL WAS NOT WEATHER TIGHT.
Condition: Unknown
Due 26 November 1994
Resolved 7 November 1994
Electrical
Issued 26 October 1994
Resolved
ISOLATE AND REPAIR 440 VOLT ELECTRICAL EARTH GROUND NOTED ON MAIN SWITCHBOARD.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Construction/Loadline
Issued 26 October 1994
Resolved
VESSELS BILGE PUMP WAS NOT OPERATING.
Condition: Unknown
Due 28 October 1994
Resolved 7 November 1994
Engineering
Issued 26 October 1994
Resolved
VESSELS OILYWATER SEPERATOR WAS NOT OPERATING.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Engineering
Issued 26 October 1994
Resolved
VESSEL HAD NUMEROUS EXHAUST LEAK IN THE ENGINE ROOM.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Fire Fighting
Issued 26 October 1994
Resolved
VESSEL DID NOT HAVE TWO OPERABLE FIRE PUMPS.
Condition: Unknown
Due 28 October 1994
Resolved 7 November 1994
Electrical
Issued 26 October 1994
Resolved
VESSEL HAD SPLICED WIRE FEEDING EMERGECY FIRE PUMP HEATER.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Unknown
Issued 26 October 1994
Resolved
VESSELES ROSE BOXES IN STEERING GEAR ROOM AND FOSCLE EMERGENCY FIRE PUMP ROOM CONTAINED OIL.
Condition: Unknown
Due 26 November 1994
Resolved 7 November 1994
Construction/Loadline
Issued 26 October 1994
Resolved
VESSEL HAD 7-8 GUSSET BRACKETS WASTED IN #2 STB BALLAST TANK OVERHEAD/OUTBOARD SIDE.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Fire Fighting
Issued 26 October 1994
Resolved
VESSELS FIRE MAIN LEAKING PORT SIDE CARGO HOLD.
Condition: Unknown
Due 26 November 1994
Resolved 7 November 1994
Lifesaving
Issued 26 October 1994
Resolved
VESSELES PORT AND STB ANCHOR WINDLASSES HYDRAULIC LINE BRACKETS WERE WASTED.
Condition: Unknown
Due 26 November 1994
Resolved 7 November 1994
Accommodation/Occupational Safety
Issued 26 October 1994
Resolved
VESSELS STB CREW DECK HEADS WERE INOPERABLE.
Condition: Unknown
Due 26 November 1994
Resolved 7 November 1994
Navigation
Issued 26 October 1994
Resolved
VESSEL DID NOT HAVE AN OPERABLE RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Electrical
Issued 26 October 1994
Resolved
VESSEL WAS MISSING LIGHTS, FIXTURES, AND GLOBES THROUGH OUT THE SHIP.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Electrical
Issued 26 October 1994
Resolved
VESSEL HAD OPEN END WIRES THROUGH OUT SHIP.
Condition: Unknown
Due 6 August 1996
Resolved 6 August 1996
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE AT LEAST TWO LIFELINES FITTED TO THE DAVIT SPAN AND LONG ENOUGH TO REACH THE WATER WITH THE SHIP AT ITS LIGHTEST SEAGOING DRAUGHT ON PORT/STBDOF VESSEL.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
RENEW DETERIORATED LIFEBOAT WIRE FALLS DRUM ON PORT/STBD WINCH ASSEMBLY.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Documentation
Issued 6 September 1994
Resolved
PROVIDE MEDICAL CERTIFICATES FOR EACH PERSON EMPLOYED ON BOARD VESSEL SIGNED BY A PERSON AUTHORIZED BY THE COMPETENT AUTHORITY OF THE FLAG STATE TO ISSUE SUCH CERTIFICATES.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Navigation
Issued 6 September 1994
Resolved
PROVE OPERATION OF ALL NAVIGATION LIGHTS.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Electrical
Issued 6 September 1994
Resolved
NO OPEN OR NAKED LIGHTS SHALL BE USED IN HOLD SPACES. ALL LIGHTS SHALL BE ADEQUATELY PROTECTED TO PREVENT BREAKAGE WITH COMBUSTIBLE MATERIALS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Engineering
Issued 6 September 1994
Resolved
REPAIR AND PROVE OPERATION OF ALL SAFETY DEVICES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION FOR AUXILIARY BOILER.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Accommodation/Occupational Safety
Issued 6 September 1994
Resolved
PROVIDE HOT AND COLD FRESH WATER IN ALL COMMUNAL WASH PLACES.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
RENEW DETERIORATED SECTION OF FIRE MAIN PIPING ON MAIN DECK IN BETWEEN_x001C_ #1 AND #2 CARGO HOLDS.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVIDE INTERNATIONAL SHORE CONNECTION IN ACCORDANCE WITH SOLAS CHAPTER II REGULATION 5.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVE OPERATION OF RELIEF VALVES OF ALL FIRE PUMPS. SEE SOLAS CHAPTER II REGULATION 5
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Documentation
Issued 6 September 1994
Resolved
PROVIDE UP TO DATE FIRE CONTROL PLAN THAT DEPICTS ACTUAL ITEMS INSTALLED ONVESSEL IN ACCORDANCE WITH SOLAS CHAPTER II, REGULATION 4._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
RENEW/REPAIR DETERIORATED/LEAKING FIRE HYDRANT VALVES THROUGHOUT VESSEL. NOTED THAT NUMEROUS VALVE STEMS ARE BROKEN AND OR VALVE WHEEL ARE MISSING._x001C_
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Deck/Cargo
Issued 6 September 1994
Resolved
GUARDS OR FENCING SHALL BE INSTALLED AROUND ALL ROTATING AND HOT PARTS OF MACHINERY AND EQUIPMENT TO PREVENT INJURY TO PERSONNEL.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Navigation
Issued 6 September 1994
Resolved
INSTALL BELL STRIKER FOR SHIP'S BELL.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVIDE CURRENT SERVING REPORT OF ALL PORTABLE FIRE EXTINGUISHERS ON BOARD VESSEL. NOTED NUMEROUS EXTINGUISHERS WERE DISCHARGED, MISSING NOZZLES AND OR IMPROPERLY SECURED WITH WIRE THROUGHOUT VESSEL.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
CONDUCT HYDROSTATIC TEST OF ALL FIRE HOSES IN THE PRESENCE OF A COAST GUARDMARINE INSPECTOR.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVIDE A FIRE HOSE NOZZLE AND SPANNER WRENCH AT EACH FIRE STATION.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVIDE TWO FIREMAN'S OUTFITS IN ACCORDANCE WITH SOLAS CHAPTER II, REGULATION 14.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Accommodation/Occupational Safety
Issued 6 September 1994
Resolved
PROVIDE OPERATION OF REMOTE SHUTDOWN FOR POWER VENTILATION OF MACHINERY SPACES.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVIDE SAND FOR SAND RECEPTACLE IN ENGINE ROOM FOR AUXILLIARY BOILER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVE OPERATION OF INTERNAL COMBUSTION ENGINE FOR LIFEBOATS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
PROVE OPERATION OF ALL FIRE PUMPS WITH EACH PUMP CAPABLE OF PRODUCING THE QUANTITY OF WATER REQUIRED BY SOLAS CHAPTER II REGULATION 5.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE LIFEBOAT EQUIPMENT FOR EACH LIFEBOAT IN ACCORDANCE WITH SOLAS CHAPTER III, REGULATION 11.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
ALL LIFESAVING APPLIANCES SHALL BE KEPT IN WORKING ORDER AND AVAILABLE FOR IMMEDIATE USE IN ACCORDANCE WITH SOLAS CHAPTER III, REGUALTION 4. PROVE OPERATION OF PORT/STBD LIFEBOAT DAVITS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
RENEW DETERIORATED RUDDERS FOR PORT/STBD LIFEBOATS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Electrical
Issued 6 September 1994
Resolved
ISOLATE AND REPAIR 220 VOLT ELECTRICAL EARTH GROUND NOTED ON MAIN SWITCHBOARD IN ENGINE ROOM.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Accommodation/Occupational Safety
Issued 6 September 1994
Resolved
RENEW DETERIORATED EXTERIOR LADDER STEPS THROUGHOUT VESSEL.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Lifesaving
Issued 6 September 1994
Resolved
RENEW DETERIORATED KEEL GRAB RAILS ON PORT AND STARBOARD LIFEBOATS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Construction/Loadline
Issued 6 September 1994
Resolved
RENEW DETERIORATED DECK PLATING ON MONKEY ISLAND, BRIDGE DECK, FUNNEL DECK AND BOAT DECK DURING NEXT SCHEDULED DRYDOCK PERIOD BUT NO LATER THAN 30 OCTOBER 1994.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Accommodation/Occupational Safety
Issued 6 September 1994
Resolved
RENEW DETERIORATED FLAME AND INSECT SCREENS TO ALL VENT PIPES.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Accommodation/Occupational Safety
Issued 6 September 1994
Resolved
RENEW DETERIORATED AIR PIPES TO BALLAST AND OTHER TANKS THAT EXTEND ABOVE FREEBOARD OR SUPERSTRUCTURE DECK.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Engineering
Issued 6 September 1994
Resolved
PROVE OPERATION OF EMERGENCY AIR COMPRESSOR. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Engineering
Issued 6 September 1994
Resolved
REPAIR FUEL OIL LEAK TO FUEL OIL PUMP TO AUXILIARY BOILER.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
RENEW HYDROSTATIC RELEASE FOR EPIRB_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Navigation
Issued 6 September 1994
Resolved
PROVIDE REQUIRED DAY SHAPES IN ACCORDANCE WITH 72 COLREGS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Construction/Loadline
Issued 6 September 1994
Resolved
RENEW/REPAIR FROZEN AND OR MISSING DOG BOLTS TO ALL WATERTIGHT/WEATHERTIGHTDOORS, HATCHES, AND VENT CLOSURES THROUGHOUT VESSEL.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Construction/Loadline
Issued 6 September 1994
Resolved
REPAIR AND PROVE OPERATION OF VENTILATOR CLOSURES TO ENSURE AN EFFICIENT WEATHERTIGHT CLOSURE. NUMEROUS CLOSURES ARE FROZEN SHUT OR INOPERABLE.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Construction/Loadline
Issued 6 September 1994
Resolved
PROVIDE STANDARD DISCHARGE CONNECTION IN ACCORDANCE WITH MARPOL 73/78 REGULATION 19.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Documentation
Issued 6 September 1994
Resolved
PROVIDE EVIDENCE OF LOG ENTRIES INDICATING DISCHARGE OF GARBAGE IN ACCORDANCE WITH MARPOL V AND 33 CFR 151.63
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Accommodation/Occupational Safety
Issued 6 September 1994
Resolved
RENEW DETERIORATED/HOLED GOOSENECK VENT ON STARBOARD SIDE FORWARD.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Electrical
Issued 6 September 1994
Resolved
REPAIR AND PROVE OPERATION OF EMERGENCY GENERATOR UNDER A LOADED CONDITION IN ACCORDANCE WITH SOLAS CHAPTER III, REGULATION 26.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Fire Fighting
Issued 6 September 1994
Resolved
RENEW DETERIORATED SECTIONS OF FIRE MAIN SUCTION AND DISCHARGE PIPING IN WAY OF EMERGENCY FIRE PUMPS.
Condition: Unknown
Due 6 September 1994
Resolved 6 September 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE SUFFICIENT APPROVED LIFEJACKETS WITH LIGHTS AND WHISTLES FOR EACH PERSON ON BOARD VESSEL.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE LINE-THROWING APPLIANCE IN ACCORDANCE WITH SOLAS CHAPTER III, REGULATION 23.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE CURRENT SERVICING REPORT FOR INFLATABLE LIFERAFT (3 EA) HYDROSTATICRELEASES.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE CURRENT SERVICING REPORT FOR ALL THREE LIFERAFTS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
INSTALL WEAK LINKS FOR ALL LIFERAFT SEA PAINTER INSTALLATIONS.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Navigation
Issued 6 September 1994
Resolved
LOCATE AND REPAIR LEAKS TO STEERING GEAR SYSTEM IN STEERING GEAR COMPARTMENT. REMOVE AND CLEAN ALL HYDRAULIC FLUID FROM CONTAINMENT AREA AND ASSOCIATED PUMPS AND PIPING.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Electrical
Issued 6 September 1994
Resolved
PROVIDE AND PROVE A MEANS OF ILLUMINATING THE LIFEBOATS AND THEIR LAUNCHINGGEAR DURING PREPARATION FOR AND THE PROCESS OF LAUNCHING AND ALSO FOR ILLUMINATING THE WATER INTO WHICH THE LIFEBOATS ARE LAUCHED: SOLAS III, REGULATION 19.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
AT LEAST HALF OF THE REQUIRED LIFE BUOYS SHALL BE PROVIDED WITH APPROVED SELF-IGNITING LIGHTS. THE LIGHTS SHALL BE KEPT NEAR THE LIFEBUOYS TO WHICHTHEY BELONG WITH NECESSARY MEANS OF ATTACHMENT.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
PROVIDE AT LEAST EIGHT LIFEBUOYS THROUGHOUT THE VESSEL IN ACCORDANCE WITH FLAG STATE ISSUED SAFETY EQUIPMENT CERTIFICATE.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Lifesaving
Issued 6 September 1994
Resolved
MEANS SHALL BE PROVIDED FOR BRINGING THE LIFEBOATS AGAINST THE SHIPS SIDE AND THERE HOLDING THEM SO THAT PERSONS MAY BE SAFELY EMBARKED.
Condition: Unknown
Due 30 September 1994
Resolved 5 October 1994
Navigation
Issued 17 December 1991
Resolved
VESSEL'S AUTOMATIC RADAR PLOTTING AID (ARPA) IS CONSIDERED INOPERABLE DUE TO THE FACT THAT THE CAPTAIN AND CREW WERE UNABLE TO SUCCESSFULLY TEST THE COLLISION ALARM.
Condition: Unknown
Due 18 December 1991
Resolved 18 December 1991
Navigation
Issued 19 March 1987
Resolved
VESSEL HAD OPERATING INSTRUCTIONS IN PLACE OF BLOCK DIAGRAM FOR STEERING GEAR CHANGE OVER AS REQUIRED BY 33 CFRRR 164.35(K).
Condition: Unknown
Due 19 March 1987
Resolved 19 March 1987
Documentation
Issued 19 March 1987
Resolved
VESSEL DID NOT HAVE INDICATE THE MEANS OF COMMUNICATIONS DURING THE OIL TRANSFER PROCEDURES AS REQUIRED BY 33 CFR 155.750(A)(6).
Condition: Unknown
Due 19 March 1987
Resolved 19 March 1987
Documentation
Issued 19 March 1987
Resolved
VESSEL DID NOT LIST EACH PRODUCT TRANSFERED BY THE VESSEL ON THIER OIL TRANSFER PROCEDURES AS REQUIRED BY33 CFR 155.750(A)(1)(I).
Condition: Unknown
Due 19 March 1987
Resolved 19 March 1987
Documentation
Issued 11 October 1984
Resolved
I.O.P.P. CERTIFICATE EQUIVALENT AS REQUIRED BY 33 CFR 151.21, NOT ON BOARD. SURVEY TO BE CONDUCTED IN BALTIMORE.
Condition: Unknown
Due 12 October 1984
Resolved 11 October 1984