Records from 1989 to 1993. Most recent: inspection, 23 April 1993.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 9
23 April 1993
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 475031
15 September 1992
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 354254
15 September 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1246297
16 July 1992
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 354242
16 July 1992
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 354253
16 July 1992
Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 957484
31 May 1991
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 344027
31 May 1991
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1228946
21 September 1989
Certificate of Compliance · MARPOL Annex II Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1237903
Navigation
Issued 16 July 1992
Resolved
VESSEL DID NOT HAVE AN AUDIBLE ALARM FOR STEERING GEAR LOCATED ON THE BRIDGE. A VIOLATION OF SOLAS CHAPTER II-1 REG. 29.8.4
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 16 July 1992
Resolved
VESSEL'S EMER. FIRE PUMP REMOTE STOP DID NOT WORK PROPERLY. A VIOLATION OFSOLAS II-1 REG 31.1
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 16 July 1992
Resolved
VESSEL HAS TEMPORARY PATCHES ON FIRE AND FOAM MAINS. A VIOLATION OF SOLAS II-2 REG 4.6.1.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Lifesaving
Issued 16 July 1992
Resolved
VESSEL HAS TEMP. PATCHES AND SEVERE PITTING ON THE WATER DECK SEAL.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 16 July 1992
Resolved
VESSEL DID NOT HAVE CARGO TRANSFER PROCEDURES ON BRD.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 16 July 1992
Resolved
VESSEL'S RELAG INSULATION FOR EMER. FIRE PUMP WAS ON FIRE. A VIOLATION OF ILO 147.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Navigation
Issued 16 July 1992
Resolved
VESSEL'S MANUEVERING FACT SHEET WAS INCOMPLETE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 16 July 1992
Resolved
VESSEL'S RELAG INSULATION FOR THE EMER. FIRE PUMP WAS ON FIRE. A VIOLATIONOF ILO 147.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Lifesaving
Issued 16 July 1992
Resolved
VESSEL'S WATER DECK SEAL HAS TEMP. PATCHES AND SEVERE PITTING.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 16 July 1992
Resolved
VESSEL DID NOT HAVE ANY CARGO TRANSFER PROCEDURES.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Navigation
Issued 16 July 1992
Resolved
VESSEL'S AUDIBLE ALARM FOR POWER STEERING FAILURE DID NOT OPERATE PROPERLY.A VIOLATION OF SOLAS II-2REG 29.8.4.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 16 July 1992
Resolved
VESSEL'S EMER. FIRE PUMP REMOTE STOP WAS INOPERATIVE. A VIOLATION OF SOLASII-2 REG 31.1.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 16 July 1992
Resolved
VESSEL HAS TEMP PACHES ON FIRE AND FOAM MAINS. A VIOLATION OF SOLAS II-2 REG. 4.6.1.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Navigation
Issued 16 July 1992
Resolved
VESSEL'S MNAUEVERING FACT SHEET WAS INCOMPLETE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 16 July 1992
Resolved
TEMPORARY PATCH AND SEVERE PITTING ON DECK WATER SEAL. MAKE PERMANENT REPAIRS NO LATER THAN 16AUG92.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Documentation
Issued 16 July 1992
Resolved
CARGO TRANSFER PROCEDURES NOT ABOARD. PROVIDE SAME NO LATER THAN 16AUG92._x001C_
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Fire Fighting
Issued 16 July 1992
Resolved
PROVIDE INSULATION FOR EMERGENCY FIRE PUMP EXHAUST NO LATER THAN 16AUG92.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Navigation
Issued 16 July 1992
Resolved
MANUEVERING FACT SHEET INCOMPLETE. TIME/DISTANCE TO STOP AND TURN CIRCLES.COMPLETE MANUEVERING FACT SHEET PRIOR TO NEXT US PORT._x001C_
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Fire Fighting
Issued 16 July 1992
Resolved
EMERGENCY FIRE PUMP REMOTE STOP WAS INOPERATIVE. PROVE PROPER OPERATION PRIOR TO 16AUG92.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Fire Fighting
Issued 16 July 1992
Resolved
TEMPORARY PATCHES ON FIRE AND FOAM MAINS. MAKE PERMANENT REPAIRS NO LATER THAN 16AUG92.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Navigation
Issued 16 July 1992
Resolved
STEERING GEAR POWER FAILURE AUDIBLE ALARM NOT ON BRIDGE. PROVE PROPER OPERATION PRIOR TO ENTRY INTO A US PORT.
Condition: Unknown
Due 29 October 1992
Resolved 29 October 1992
Electrical
Issued 31 May 1991
Resolved
PROPERLY INSTALL BATTERIES NEXT TO EMERGENCY FIRE PUMP; BATTERIES ARE CURRENTLY LASHED TO A PALLET.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Fire Fighting
Issued 31 May 1991
Resolved
REPLACE CO2 DISCHARGE HORN LOCATED IN THE PUMPROOM, STBD SIDE AFT,BILGE LEVEL.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Navigation
Issued 31 May 1991
Resolved
PROVE PROPER OPERATION OF STEERING GEAR POWER FAILURE AUDIBLE ALARM ON BRIDGE.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Fire Fighting
Issued 31 May 1991
Resolved
REPAIR INBOARD SIDE OF #6 FOAM MONITOR STATION HAND RAILING.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991
Deck/Cargo
Issued 31 May 1991
Resolved
REPAIR P/V VALVE FLAME SCREEN ON P/V VALVE FORWARD OF #5 STBD CARGO TANK.
Condition: Unknown
Due 31 May 1991
Resolved 31 May 1991