KESTREL is a 1979 tank ship. The Coast Guard has recorded 54 inspections since 1985, most recently in August 2002, along with 82 deficiencies and 9 operational controls.

Records from 1985 to 2002. Most recent: operational control imposed, 12 August 2002.

Built
1979
Last inspected
12 August 2002
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7391927 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
224872
Flag
CHINA
—
Maury page id
psix-224872

Inspections, by type

…with no type recorded44
Years with a record 14 calendar years (1985–2002)
The 54 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 24 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it15902 - Convention (Subpart B), Net Ton
15902 - Simplified, Net Ton
69810 - Displacement, Ton
58540 - Dead Weight, Ton
30337 - Convention (Subpart B), Gross Ton
30337 - Simplified, Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

YORKTOWN Passenger (Uninspected) · MISLE 55017 · 15 January 1999 · activity 103033UNNAMED Freight Barge · MISLE 489356 · 15 January 1999 · activity 103033

Inspection history · 54

12 August 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1660181
25 March 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1599874
16 March 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1494608
6 February 2002 Tank Vessel Examination · Deficiency Check · Certificate of Compliance · MARPOL Annex I Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1483960
2 January 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1484500
28 December 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1477867
13 November 2001 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 295276
7 September 2001 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 293520
2 May 2001 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 289703
7 February 2001 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 286666
7 February 2001 Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1432441
15 November 1999 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 434728
13 November 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 434734
30 September 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 433262
30 September 1999 Tank Vessel Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1044876
15 January 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 103033
3 December 1998 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 423287
12 November 1998 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 422562
12 November 1998 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 804504
11 October 1998 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 421682
11 October 1998 Tank Vessel Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 803019
8 July 1997 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 405600
6 July 1997 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 405449
14 August 1996 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 718247
5 August 1996 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 393846
24 April 1996 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 390465
14 May 1992 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 647555
12 May 1992 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 647559
26 March 1991 Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 449390
26 March 1991 Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1221919
3 November 1990 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 340066
3 November 1990 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 503721
3 November 1990 Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1238187
15 April 1990 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 441471
11 April 1990 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 336519
11 April 1990 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 336520
10 April 1990 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 336385
10 April 1990 Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1230165
21 August 1989 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 331693
17 July 1989 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 490299
8 October 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 326060
8 October 1988 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1193968
22 April 1988 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 322858
28 October 1987 MARPOL Annex II Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1325111
19 September 1987 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 318651
19 September 1987 Certificate of Compliance
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1315643
3 September 1987 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 480026
18 July 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 519982
13 May 1986 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 308741
6 May 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 308698
6 May 1986 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1296263
5 May 1986 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 308637
30 May 1985 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 302258
18 March 1985 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 450981

Deficiency record · 82

Lifesaving › Lifeboat
Issued 7 February 2002 Resolved
STBD SIDE LIFEBOAT,PORTSIDE GRAB RAIL IS CORRODED AND BROKEN. IAW SOLAS CHAPTER III REG7.9 LEGACY COMPONENT DESC: Fender
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 March 2002
Resolved 15 February 2002
Resolution: Repaired made by ship. Guard rail welded.
Documentation › Certificates/Documents
Issued 7 February 2002 Resolved
VESSEL OWNER/OPERATOR TO PROVIDE FROM CLASS SOCIETY WRITTEN STATEMENT TO CLARFY INFO ABOUT TYPE OF VESSEL [IOPPFORM B SECT. 1.11] AND IF VESSEL IS ALLOWED TO CARRY FUEL OIL.SUPPLE- MENT DESIGNATES VESSEL AS PRODUCT CARRIER NOT CARYING FUEL OIL OR HEAVY DIESEL.VESSEL FOUND OFF\LD.SLURRY OIL IN PR. LEGACY COMPONENT DESC: IOPP Certificate
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2002
Resolution: Class submitted report, It was a mistake on behalf of Class.
Navigation › Piloting/Steering
Issued 28 December 2001 Resolved
VESSEL WAS GRANTED DEVIATION TO ENTER THE PORT OF NEW ORLEANS WITH INOPERABLE GYRO COMPASS. VESSEL TRANSIT PERMITTED ONLY DURING DAYLIGHT HOURS HOURS. GRANTED A DEVIATION TO DEPART ON 31DEC01. UNABLE TO RECEIVED PART WHILE INPORT LEGACY COMPONENT DESC: Gyro Compass
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 7 February 2002
Resolution: RECEIVED SURVEY REPORT STATING THAT HE SOLID STATE RELAY AND THE SELENOID VALVE WERE BOTH RENEWED.THE STEERING SYSTEM WAS TESTED TO THE SATISFACTION OF THE SURVEYOR.
Electrical
Issued 7 September 2001 Resolved
MAKE REPAIRS TO THE DECK AND WATER TIGHT DOOR IN THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 14 November 2001
Resolved 14 November 2001
Lifesaving
Issued 7 September 2001 Resolved
FAX CURRENT LIFE RAFT SERVICE REPORT TO COAST GUARD.
Condition: Unknown
Due 7 September 2001
Resolved 7 September 2001
Lifesaving
Issued 7 February 2001 Resolved
REPAIR PROTECTIVE PLATE ON STARBOARD LIFEBOAT GUNNEL.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Lifesaving
Issued 7 February 2001 Resolved
REPAIR FRAPPING LINE AND GUNWALE PROTECTIVE PLATE ON STARBOARD LIFEBOAT.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Accommodation/Occupational Safety
Issued 7 February 2001 Resolved
PROVIDE HOT WATER AND HEAT FOR THE CREW ACCOMMODATIONS.
Condition: Unknown
Due 2 May 2001
Resolved 2 May 2001
Lifesaving
Issued 7 February 2001 Resolved
REINSTALL WOOD BLOCKS FOR THE STARBOARD LIFEBOAT CHOCKS TO PREVENT DAMAGE ON THE LIFEBOAT. REPLACE PORT AND STARBOARD LIFEBOAT ENGINE ENCLOSURES.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Lifesaving
Issued 7 February 2001 Resolved
REPAIR AND PROVE PROPER OPERATION OF STARBOARD LIFEBOAT DAVIT TO THE SATISFACTION OF CLASS SURVEYOR. PROVIDE NYCMI A COPY OF SURVEYOR'S REPORT.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Deck/Cargo
Issued 7 February 2001 Resolved
PROVE PROPER OPERATION OF CARGO PUMP REMOTE SHUTDOWNS.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Deck/Cargo
Issued 7 February 2001 Resolved
DEMONSTRATE PROPER CALIBRATION OF LEL METERS AND RANDOMLY CHECK BALLAST TANKS FOR HYDROCARBONS.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Deck/Cargo
Issued 7 February 2001 Resolved
PROPERLY INSTALL HYDRAULIC SYSTEM AIR BLEEDERS FOR THE MOORING AND DERRICK WINCHES.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Electrical
Issued 7 February 2001 Resolved
MISSING LIGHT COVERS IN CREW ACCOMODATIONS, PROOF OF ORDER NEEDS TO BE PROVIDED TO USCG WITHIN 30 DAYS.
Condition: Unknown
Due 2 May 2001
Resolved 2 May 2001
Deck/Cargo
Issued 7 February 2001 Resolved
PROVE PROPER OPERATIONS OF CARGO TANK HIGH LEVEL AND LOW LEVEL ALARMS.
Condition: Unknown
Due 2 May 2001
Resolved 2 May 2001
Fire Fighting
Issued 7 February 2001 Resolved
PROPERLY INSTALL STARTING BATTERY FOR EMERGENCY FIRE PUMP.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Fire Fighting
Issued 7 February 2001 Resolved
INSTALL GUARD FOR EMERGENCY FIRE PUMP PTO.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Deck/Cargo
Issued 7 February 2001 Resolved
REPAIR AND PROVE PROPER OPERATION OF THE IGS AUDIOBLE ALARM IN THE CARGO CONTROL ROOM PRIOR TO CONDUCTING CARGO OPERATIONS.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Deck/Cargo
Issued 7 February 2001 Resolved
IGS LINE FOR CARGO TANKS 1S/P NEEDS PERMANENT REPAIR IWO SOFT PATCH.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Lifesaving
Issued 7 February 2001 Resolved
INSTALL FLOOR PLANKS IN PORT LIFEBOAT.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Fire Fighting
Issued 7 February 2001 Resolved
MAKE FIRE STATION 9 READY FOR IMMEDIATE USE.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Lifesaving
Issued 7 February 2001 Resolved
RENEW DAMAGED AIR VENT PIPES FOR FORECASTLE.
Condition: Unknown
Due 2 May 2001
Resolved 2 May 2001
Fire Fighting
Issued 7 February 2001 Resolved
REPAIR FIRE MAIN PIPING ON MAIN DECK IWO HOLES. PROVE PROPER OPERATION OF THE EMERGENCY AND MAIN FIREPUMP BY PRODUCING TWO JETS OF FIREFIGHTING WATER.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Fire Fighting
Issued 7 February 2001 Resolved
PROVIDE PROPER FIRE EXTINGUISHERS AND BRACKETS IN PUMP ROOM.
Condition: Unknown
Due 22 February 2001
Resolved 22 February 2001
Documentation
Issued 30 September 1999 Resolved
OIL TRANSFER PROCEDURES INCOMPLETE. PROVIDE COMPLETE TRANSFER PROCEDURES PRIOR TO TRANSFER OR RETURN TO U.S.
Condition: Unknown
Due 5 October 1999
Resolved 5 October 1999
Fire Fighting
Issued 30 September 1999 Resolved
HOLE IN FIREMAIN PORT SIDE AFT MONITOR. REPAIR OR RENEW CONDUCT NON DESTRUCTIVE TEST AND PROVIDE CLASS REPORT PRIOR TO RETURN TO U.S.
Condition: Unknown
Due 13 November 1999
Resolved 13 November 1999
Lifesaving
Issued 30 September 1999 Resolved
PORT LIFEBOAT DAVIT LIMIT SWITCH FWD INOP. REPAIR OR RENEW PROVIDE CLASS REPORT PRIOR TO RETURN TO THE U.S.
Condition: Unknown
Due 5 October 1999
Resolved 5 October 1999
Deck/Cargo
Issued 30 September 1999 Resolved
CARGO TRANSFER PROCEDURES INCOMPLETE. PROCEDURES NOT FOLLOWED. PROCEDURES TO BE COMPLETED PRIOR TO RETURN TO U.S.
Condition: Unknown
Due 5 October 1999
Resolved 5 October 1999
Deck/Cargo
Issued 30 September 1999 Resolved
CEMENT PATCH FWD. OF MAIN CONTAINMENT AT DECK PORT AND STBD. SIDE. REPAIR OR RENEW PROVIDE CLASS REPORT PRIOR TO RETURN TO U.S. WATERS.
Condition: Unknown
Due 13 November 1999
Resolved 13 November 1999
Deck/Cargo
Issued 30 September 1999 Resolved
P.V. VALVES 6STBD AND 2STBD LEAK BY. REPAIR OR RENEW PROVIDE CLASS REPORT PRIOR TO RETURN TO U.S. WATERS.
Condition: Unknown
Due 13 November 1999
Resolved 13 November 1999
Lifesaving
Issued 11 October 1998 Resolved
PORT AND STARBOARD QUICK RELEASE LIFE RINGS ON THE BRIDGE WINGS ARE LESS THAN 4KG
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Construction/Loadline
Issued 11 October 1998 Resolved
BALLAST TANKS 3 PORT AND STARBOARD, 4 PORT AND STARBOARD, AND 6 CENTER HAVEEXCESSIVE CARGO IN THEM.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Lifesaving
Issued 11 October 1998 Resolved
STEEL SHOVELS IN OPA 90 POLLUTION RESPONSE GEAR.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Construction/Loadline
Issued 11 October 1998 Resolved
POST TIME REQUIRED FOR EXXON TEST IN PUMP ROOM.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Engineering
Issued 11 October 1998 Resolved
OILY WATER SEPARATOR 15 PPM ALARM WAS PROVEN BY CREW OF PROPER OPERATION.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Deck/Cargo
Issued 11 October 1998 Resolved
GROUNDING STRAPS (5) IN WAY OF 5,6,7 PORT CARGO TANKS ARE BROKEN.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Fire Fighting
Issued 11 October 1998 Resolved
EMERGENCY FIRE PUMP HAS HYDRAULIC LEAK IN PIPE ON MAIN DECK.
Condition: Unknown
Due 12 November 1998
Resolved 12 November 1998
Deck/Cargo
Issued 8 July 1997 Resolved
REPAIR AND PROVE OPERATION OF THE OIL DISCHARGE MONITOR AND CONTROL SYSTEM.
Condition: Unknown
Due 8 August 1997
Resolved 11 July 1997
Deck/Cargo
Issued 8 July 1997 Resolved
PROPERLY INSTALL THE FLAME SCREENS IN THE P/V VALVES.
Condition: Unknown
Due 10 July 1997
Resolved 11 July 1997
Deck/Cargo
Issued 8 July 1997 Resolved
REPAIR AND PROVE OPERATION OF THE HIGH LEVEL AND OVERFILL ALARMS ON #1 PORT& STARBOARD, #2 PORT & STARBOARD, #5 CENTER, AND #6 PORT CARGO TANKS.
Condition: Unknown
Due 10 July 1997
Resolved 11 July 1997
Deck/Cargo
Issued 8 July 1997 Resolved
THE INERT GAS SYSTEM IS INOPERABLE; INCLUDING THE O2 ANALYZER, ALARMS & SHUTDOWNS AND CONTROLS.
Condition: Unknown
Due 10 July 1997
Resolved 11 July 1997
Construction/Loadline
Issued 5 August 1996 Resolved
OILY WATER SEPERATOR WAS INOP.
Condition: Unknown
Due 7 August 1996
Resolved 7 August 1996
Deck/Cargo
Issued 5 August 1996 Resolved
IGS READINGS WERE OVER 8% IN THE #1P AND #1S TANK.
Condition: Unknown
Due 7 August 1996
Resolved 7 August 1996
Lifesaving
Issued 5 August 1996 Resolved
RING BUOYS NEED BUOYANT LINE ATTACHED. SOLAS 60 CHAPTER III, REG 21(d).
Condition: Unknown
Due 7 August 1996
Resolved 7 August 1996
Navigation
Issued 5 August 1996 Resolved
ECHO DEPTH SOUNDER RECORDING DEVICE IS INOPERABLE.
Condition: Unknown
Due 9 July 1997
Resolved 9 July 1997
Fire Fighting
Issued 24 April 1996 Resolved
PROVIDE COPY OF FOAM ANALYSIS.
Condition: Unknown
Due 24 April 1996
Resolved 29 May 1996
Electrical
Issued 24 April 1996 Resolved
THE VESSEL'S CREW WAS UNABLE TO PERFORM PROPER TEST OF EMERGERCY GENERATOR.PRIOR TO 24MAY96 VESSELS CLASS SOCIETY TO ATTEST TO THE PROPER OPERATION OFE-GENERATOR IN AUTOMATIC MODE.
Condition: Unknown
Due 16 December 1996
Resolved 16 December 1996
Deck/Cargo
Issued 24 April 1996 Resolved
THE AUDIBLE ALARM IN THER CARGO CONTROL ROOM WAS INOPERABLE. CLASS TO PROVIDE REPORT TO THE PROPER OPERATION OF ALARMS PRIOR TO 24MAY96.
Condition: Unknown
Due 16 December 1996
Resolved 16 December 1996
Construction/Loadline
Issued 24 April 1996 Resolved
Make a midships ballast tank ready (clean, gas free and of a temperature acceptable to the Marine Chemist) for internal examination at next US port.Provide valid Marine Chemist Certificate certifying space as "SAFE FOR WORKERS".
Condition: Unknown
Due 16 December 1996
Resolved 16 December 1996
Navigation
Issued 24 April 1996 Resolved
THE VESSELS ARPA IS INOPERABLE.
Condition: Unknown
Due 12 May 1996
Resolved 30 May 1996
Construction/Loadline
Issued 3 November 1990 Resolved
33 CFR 157.216(a)(1) Master did not ensure foreign tank vsl meeting 157.10a(c)(2) entering U.S. nav waters had on board DCBT ops manual certified by USCG or flag state govt (i.e., DCBT on board not certified by USCG or CCS, authorized CS for flag state).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Deck/Cargo
Issued 3 November 1990 Resolved
33 CFR 155.820(b) Vessel operator did not keep a written record available for most recent test of vessel's cargo piping system, as per 33 CFR 156.170(c)(4) (i.e., master could not produce evidence of hydrostatic test of vessel's cargo transfer piping at 150 percent of MAWP).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Deck/Cargo
Issued 3 November 1990 Resolved
33 CFR 155.310 (a)(3) Vessel had insufficient mechanical means of closing each drain and scupper in the containment (i.e., vessel had no plug and then wooden plug in the containment's drain hole during cargo transfer).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Navigation
Issued 3 November 1990 Resolved
33 CFR 164.33(a)(2)(i) Vsl did not have on board currently corrected ed. orapplicable currently corrected extract from U.S. Coast Pilot or foreign equiv. for area transited(Boston Hbr and approaches,North Chan.,President Roads,Reserved Chan.)(i.e. no pilot info pertaining to safe nav in Boston).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Navigation
Issued 3 November 1990 Resolved
33 CFR 164.33(a)(3)(i) Vessel did not have on board current ed. of or applicable extract from tide table or foreign equivalent for area transited(Boston Harbor and approaches, North Channel, President Roads, Reserved Channel) (i.e., no tide info pertaining to Boston).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Navigation
Issued 3 November 1990 Resolved
33 CFR 164.33(a)(3)(ii) Vessel did not have on board current ed. of or applicable extract from tidal current tables or foreign equivalent for the area transited(Boston Harbor and approaches, North Channel, President Roads,Reserved Channel)(i.e., no tidal current info for Boston tidal currents).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Construction/Loadline
Issued 3 November 1990 Resolved
33 CFR 157.10a(c)(2) Extng foreign tankship 40,000 DWT or more carrying product operated in U.S. nav waters without SBT or DCBT mtg eqpt rqmts in 157.222(c)(d) (i.e., vsl had 5 ballast tanks loaded with product due to improper alignment/closure of ballast piping/isolating valves).
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Documentation
Issued 3 November 1990 Resolved
DEDICATED CLEAN BALLAST TANK OPERATIONS MANUAL NOT REVIEWED/APPROVED BY FLAG STATE.
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Documentation
Issued 3 November 1990 Resolved
DEDICATED CLEAN BALLAST MANUAL NOT IN LANGUAGE UNDERSTOOD BY CREW. MANUAL TRANSULATED FROM ENGLISH TO CHINESE.
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Deck/Cargo
Issued 3 November 1990 Resolved
MAKE PERMANENT REPAIR TO CARGO TANK VENT RISERS ON TANKS 1,2,4,6,7 PORT; 1,3,4,5,6 STARBOARD; 2, 3, 4, 6, 7 CENTER. MAKE REPAIRS PRIOR TO RETURN TOU.S. PORT.
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Navigation
Issued 3 November 1990 Resolved
PROVE PROPER OPERATION OF SHIPS WHISTLE. WHISTLE WOULD NOT STOP SOUNDING ATPERSCRIBED INTERVALS.
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Deck/Cargo
Issued 3 November 1990 Resolved
PROVIDE HYDROSTATIC TESTING OF CARGO PIPING AT 1.5 TIMES MAWP PRIOR TO RETURNING TO U.S. PORT.
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Construction/Loadline
Issued 3 November 1990 Resolved
DEDICATED CLEAN BALLAST TANKS LOADED WITH CARGO. CLEAN PRIOR TO RETURN TO U.S. PORT.
Condition: Unknown
Due 3 November 1990
Resolved 3 November 1990
Navigation
Issued 10 April 1990 Resolved
U. S. COAST PILOT OR EQUIVALNT NOT CURRENTLY CORRECTED, THIS IS A VILOATIONOF 33 CFR 164.33(A)(2)(I).
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Navigation
Issued 10 April 1990 Resolved
CURRENT EDITION OF TIDAL CURRENT TABLES NOT ON BOARD, THIS IS A VIOLATION OF 33 CFR 164.33(A)(3)(II).
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Navigation
Issued 10 April 1990 Resolved
TEST REQUIRED BY REGULATIONS NOT CONDUCTED OR LOGGED ON SHIP LOG, THIS IS A VIOLATION OF 33 CFR 164.25(A).
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Navigation
Issued 10 April 1990 Resolved
CURRENT EDITION OF TIDE TABLE OR EQUIVALENT NOT ON BOARD. THIS IS A VIOLATION OF 33 CFR 164.33(A)(3)(I).
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Deck/Cargo
Issued 10 April 1990 Resolved
REMOVE TEMPORARY PATCHES ON #2 ON DECK CARGO PIPE, BUNKER AND COW LINES, CROPOUT AND RENEW AND MAKE PERMENANT REPAIRS. VESSEL IS OVERDUE FOR HYDRO- TEST ALL CARGO PIPING. THIS ITEM MUST BE COMPLETED PRIOR TO TRANSFER OF CARGO IN U.S. PORTS.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Deck/Cargo
Issued 10 April 1990 Resolved
HAVE PRESSURE GAUGES RENEWED ON TRANSFER MANIFOLDS TO INSURE ALL CARGO PIPING IS PRESURIZED DURING THE REQUIRED HYDRO-TEST. THIS ITEM MUST BE COMPLETED PROIR TO TRANSFER OF CARGO IN U.S. PORTS.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Deck/Cargo
Issued 10 April 1990 Resolved
WHILE IGS PLANT WAS IN OPERATIONS SEVERAL LEAKS OF INERT GAS WERE NOTED AS A RESULT OF BAD GASKETS IN THE ULLAGE AND EXSPANSION DOME LID COVERS, WORST LEAKS NOTED ON #4 PORT AND #4 CENTER CARGO TANKS. IGS SYSTEM MUST BE IN OPERATION IN ORDER TO CLEAR THIS REQUIREMENT.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Fire Fighting
Issued 10 April 1990 Resolved
PROVIDE FIRE FIGHTING FOAM ANALISIS REPORT.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Navigation
Issued 8 October 1988 Resolved
VESSEL HAD A BRITISH ADMIRALTY COAST PILOT ON BOARD CORRECTED UP TO JUNE 301984.
Condition: Unknown
Due 8 October 1988
Resolved 8 October 1988
Navigation
Issued 8 October 1988 Resolved
VESSEL DID NOT HAVE A TIDAL CURRENT TABLE ON BOARD.
Condition: Unknown
Due 8 October 1988
Resolved 8 October 1988
Fire Fighting
Issued 8 October 1988 Resolved
PROVE PROPER OPERATION OF EMERGENCY FIRE PUMP PRIOR TO NEXT U. S. PORT OF CALL.
Condition: Unknown
Due 8 October 1988
Resolved 8 October 1988
Navigation
Issued 22 April 1988 Resolved
CHART 18751 (31ST ED./1986) ONBOARD BUT NOT CORRECTED TO DATE AS REQUIRED BY 33CFR164.33(A)(1). FOLLWING NTM CORRECTINONS NOT POSTED: 86/31, 87/36- 41-48, 88/3. NO FOREIGN EQUIVALENTS ONBOARD.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Navigation
Issued 22 April 1988 Resolved
CHART 18749 (28TH ED./1986) ONBOARD BUT NOT CORRECTED TO DATE BY 33CFR164.33(A)(1). FOLLOWING NTM CORRECTION NOT POSTED: 87/4-41-48-49, 88/3-10. NO FOREIGN EQUIVALENTS ONBOARD.
Condition: Unknown
Due 22 April 1988
Resolved 22 April 1988
Navigation
Issued 19 September 1987 Resolved
NOS CHARTS 18749 AND 18751 WERE NOT ON BOARD AND NO FOREIGN EQUIVALENTS WERE AVAILABLE:A VIOLATION OF 33CFR164.33(A)(1).
Condition: Unknown
Due 22 April 1988
Resolved 19 September 1987
Navigation
Issued 19 September 1987 Resolved
VESSEL DEPARTED UNDER COTP ORDER. VESSEL WAS DETAINED FOR NAV SAFETY DISCREPANCIES ON 19SEP87 AND DEPARTED PORT WITHOUT CLEARING DETENTION ORDER:A VIOLATION OF 33CFR160.105.
Condition: Unknown
Due 22 April 1988
Resolved 19 September 1987
Fire Fighting
Issued 5 May 1986 Resolved
VESSEL DID NOT HAVE THE REQUIRED AMOUNT OF FIRE FIGHTING SUITS ON BOARD.
Condition: Unknown
Due 5 May 1986
Resolved 5 May 1986
Deck/Cargo
Issued 5 May 1986 Resolved
VESSEL ENTERED THE PORT OF NEW YORK WITHOUT IT'S IGS SYSTEM OPERATING AND WITHOUT AN INERT ATMOSPHERE IN CARGO TANKS.
Condition: Unknown
Due 5 May 1986
Resolved 5 May 1986
Documentation
Issued 5 May 1986 Resolved
VESSEL DID NOT HAVE ANY OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 5 May 1986
Resolved 5 May 1986
Deck/Cargo
Issued 30 May 1985 Resolved
TEMPORARY PATCH ON YELLOW CARGO DISCHARGE LINE FROM MAIN CARGO PUMP IN PUMPROOM. 46 CFR 35.35-70
Condition: Unknown
Due 30 May 1985
Resolved 30 May 1985

Ownership record