Records from 1984 to 2000. Most recent: inspection, 6 April 2000.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 39
6 April 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 276629
6 January 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 273240
14 December 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 435774
14 December 1999
Tank Vessel Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1046736
8 December 1999
Port Security Assessment
Type not classified · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 610754
6 December 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 208327
6 December 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 770770
4 April 1999
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 427229
12 September 1998
Tank Vessel Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 799362
27 October 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 363031
27 October 1993
Tank Vessel Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 850159
6 October 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 869642
28 April 1993
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 500535
28 April 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1145784
30 September 1992
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 353413
30 September 1992
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1376881
5 June 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 356477
5 June 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 442440
12 December 1991
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 463070
22 September 1991
Certificate of Compliance
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1243597
15 April 1990
Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 903002
6 March 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1203878
8 February 1989
Certificate of Compliance
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1034859
6 February 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 328192
11 July 1987
Type not recorded
No type recorded · COTP NEW HAVEN · USCG Northeast District (CGD-NE) · Activity 513997
11 July 1987
Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1325730
11 July 1987
MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1325734
25 August 1986
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 311011
5 June 1986
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 309317
30 April 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 985613
29 April 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 308984
28 April 1986
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 308625
6 November 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 466699
26 August 1985
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 303970
28 June 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 476042
6 May 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 983008
19 February 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 452895
22 October 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 461344
30 September 1984
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 436731
Deck/Cargo
Issued 6 April 2000
Resolved
Repair inoperable P/V valves and renew the flame screens in all P/V valves prior to cargo operations.
Condition: Unknown
Due 7 April 2000
Resolved 10 April 2000
Navigation
Issued 6 April 2000
No resolution recorded
Prior to arrival at next U. S. port, repair the speed log and provide ARPA speed log input.
Condition: Unknown
Due 6 April 2000 — due date passed with no resolution recorded
Lifesaving
Issued 6 April 2000
No resolution recorded
Repair starboard lifeboat davit limit switches prior to 06MAY00.
Condition: Unknown
Due 6 May 2000 — due date passed with no resolution recorded
Fire Fighting
Issued 6 April 2000
Resolved
Repair and provide Class Society report of satisfactory repairs to Cargo Pump Room electrical fixtures in way of their explosion proof condition prior to cargo operations.
Condition: Unknown
Due 7 April 2000
Resolved 10 April 2000
Construction/Loadline
Issued 6 April 2000
No resolution recorded
Repair or renew as required wasted Cargo Pump Room bilge alarm bracket.
Condition: Unknown
Due 6 May 2000 — due date passed with no resolution recorded
Deck/Cargo
Issued 6 January 2000
Resolved
HIGH LEVEL ALARMS AND OVER FILL ALARMS NOT LABELED IAW 46 CFR 39.20. CORRECT NO LATER THAN 06FEB00.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Navigation
Issued 6 January 2000
Resolved
NUMBER 1 PUMP SEAL LEAKING EXCESSIVE OIL REPAIR/REPLACE NO LATER THAN 06FEB00.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Deck/Cargo
Issued 14 December 1999
No resolution recorded
PROVIDE CLASS APPROVAL LETTER FOR IGS AS PER 46 CFR 32.53.
Condition: Unknown
Due 14 January 2000 — due date passed with no resolution recorded
Fire Fighting
Issued 14 December 1999
Resolved
PROVE PROPER OPERATION AND SUFFICIENT PRESSURE OF THE EMERGENCY FIRE PUMP PRIOR TO DEPARTURE FROM PORT.
Condition: Unknown
Due 15 December 1999
Resolved 16 December 1999
Deck/Cargo
Issued 14 December 1999
No resolution recorded
ALL CARGO TANKS TO BE MANNED BY QUALIFIED PERSONNEL WHILE LOADING UNTIL ELECTRONIC GAUGING MONITORS ARE REPAIRED.
Condition: Unknown
Due 14 January 2000 — due date passed with no resolution recorded
Engineering
Issued 14 December 1999
Resolved
REPAIR FUEL OIL LEAK ON NO. 3 GENERATORS NO. 1 INJECTION PUMP.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Unknown
Issued 14 December 1999
Resolved
REPAIR TEMP PATCH ON OUTLET PIPE OF GENERAL SERVICE PUMP.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Engineering
Issued 14 December 1999
Resolved
REPAIR WATER LEAKS ON NO. 1 GENERATOR CYLINDER HEADS.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Deck/Cargo
Issued 14 December 1999
Resolved
REMOVE ALL DEAD END WIRING FROM CARGO DECK.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Accommodation/Occupational Safety
Issued 14 December 1999
Resolved
TYPE II MSD NOT PROPERLY MAINTAINED, AIR PUMPS DISCONNECTED FROM TANK AND NOT OPERATIONAL. ALL SEWAGE OVERBOARDS ARE TO BE SHUT AND LOCKED WHILE IN U.S. WATERS UNTIL THE SYSTEM IS PROVED TO BE OPERATING PROPERLY.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Unknown
Issued 14 December 1999
Resolved
REPAIR AS ORIGINAL THE COOLING SYSTEMS ON ALL STARTING AIR COMPRESSORS.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Deck/Cargo
Issued 14 December 1999
Resolved
REPAIR OIL LEAK ON GREEN CARGO PUMP STEAM TURBINE.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Unknown
Issued 8 December 1999
Resolved
-
Condition: Unknown
Due 9 December 1999
Resolved 10 December 1999
Unknown
Issued 8 December 1999
Resolved
_x001C_
Condition: Unknown
Due 10 December 1999
Resolved 10 December 1999
Unknown
Issued 8 December 1999
Resolved
_x001C_
Condition: Unknown
Due 10 December 1999
Resolved 10 December 1999
Fire Fighting
Issued 27 October 1993
Resolved
MAKE REPAIRS AND PROVE PROPER OPERATION OF THE EMERGENCY FIRE PUMP._x001C_ PRIOR TO DEPARTURE FROM PORT ARTHUR, TEXAS.
Condition: Unknown
Due 9 December 1993
Resolved 9 December 1993
Deck/Cargo
Issued 27 October 1993
Resolved
PROVE PROPER OPERATION OF VESSELS IGS PLANT PRIOR TO CARGO OPS IN US WATERS.
Condition: Unknown
Due 9 December 1993
Resolved 9 December 1993
Construction/Loadline
Issued 27 October 1993
Resolved
MAKE PERMENANT REPAIRS IN WAY OF 3CM FRACTURE IN #6PCT SIDE HULL PRIOR TO DEPARTURE FROM PORT ARTHUR, TX
Condition: Unknown
Due 9 December 1993
Resolved 9 December 1993
Construction/Loadline
Issued 28 April 1993
Resolved
PRIOR TO NEXT U.S. PORT AND PRIOR TO NEXT U.S. CARGO OR FUEL OIL OPERATIONS, PROVIDE THE REQUIRED STANDARD DISCHARGE CONNECTION (33CFR155.430).
Condition: Unknown
Due 28 April 1993
Resolved 28 April 1993
Deck/Cargo
Issued 30 September 1992
Resolved
MAKE REPAIRS TO NUMBER ONE IGS BLOWER.
Condition: Unknown
Due 30 September 1992
Resolved 30 September 1992
Deck/Cargo
Issued 30 September 1992
Resolved
PROVIDE ADEQUATELY SIZED CONTAINMENT FOR PORT AND STARBOARD MANIFOLDS.
Condition: Unknown
Due 30 September 1992
Resolved 30 September 1992
Navigation
Issued 22 September 1991
Resolved
COMPASS DEVIATION TABLE NOT CURRENT IN ACCORDANCE WITH 33CFR164.35(C).
Condition: Unknown
Due 27 September 1991
Resolved 8 October 1991
Deck/Cargo
Issued 8 February 1989
Resolved
REPAIR INERT GAS SYSTEM TO PROVIDE READOUT AND RECORD OF PRODUCT GAS OXYGENCONTENT.
Condition: Unknown
Due 8 February 1989
Resolved 8 February 1989
Fire Fighting
Issued 8 February 1989
Resolved
DEMONSTRATE OPERATION OF EMERGENCY FIRE PUMP.
Condition: Unknown
Due 8 February 1989
Resolved 8 February 1989
Construction/Loadline
Issued 8 February 1989
Resolved
REPAIR CRACK IN SIDE SHELL OF #6 PORT CARGO TANK; REPAIR TO BE COMPLETED TOTHE SATISFACTION OF CLASSIFICATION SURVEYOR AND [name withheld] OAHU.
Condition: Unknown
Due 8 February 1989
Resolved 8 February 1989
Construction/Loadline
Issued 8 February 1989
Resolved
MAKE REPAIR TO UPSET DECK PLATES IN WAY OF PORT AND STBD HAWSE PIPES.
Condition: Unknown
Due 8 February 1989
Resolved 8 February 1989
Deck/Cargo
Issued 8 February 1989
Resolved
REPAIR LEAKS IN CARGO TANK STEAM HEATING LINE LOCATED ON MAIN DECK PRIOR TONEXT US PORT CALL.
Condition: Unknown
Due 8 February 1989
Resolved 8 February 1989
Navigation
Issued 8 February 1989
Resolved
REPAIR RADAR PRIOR TO DEPARTING OAHU.
Condition: Unknown
Due 8 February 1989
Resolved 8 February 1989
Deck/Cargo
Issued 6 February 1989
Resolved
THE FLAME SCREENS ATTACHED TO CARGO VENT LINES WERE FOUND TO BE TORN AND INNEED OF REPAIR AND CLEANING
Condition: Unknown
Due 6 February 1989
Resolved 6 February 1989
Navigation
Issued 6 February 1989
Resolved
THE VESSEL'S SECOND RADAR WAS INOPERABLE DURING U.S. COAST GUARD BOARDING.
Condition: Unknown
Due 6 February 1989
Resolved 6 February 1989
Navigation
Issued 6 February 1989
Resolved
VESSEL DID NOT NOTIFY THE COTP OF THEIR RADAR FAILURE.
Condition: Unknown
Due 6 February 1989
Resolved 6 February 1989
Engineering
Issued 11 July 1987
Resolved
PRIOR TO RETURNING TO US WATERS, MAKE PERMANENT REPAIRS IN WAY OF SOFT PATCH ON BUNKER DECK MAIN.
Condition: Unknown
Due 11 July 1987
Resolved 11 July 1987
Deck/Cargo
Issued 11 July 1987
Resolved
PRIOR TO RETURNING TO US WATERS, PROVE PROPER OPERATION OF IGS SYSTEM.
Condition: Unknown
Due 11 July 1987
Resolved 11 July 1987
Documentation
Issued 25 August 1986
Resolved
VESSEL'S PERSON-IN-CHARGE SIGNED DECLARATION OF INSPECTION (DOI) WITHOUT INITIALLING ALL THE SPACES ON IT.
Condition: Unknown
Due 25 August 1986
Resolved 25 August 1986
Documentation
Issued 5 June 1986
Resolved
IOPP CERT EXPIRED 19 MAY 86
Condition: Unknown
Due 5 June 1986
Resolved 5 June 1986
Deck/Cargo
Issued 28 April 1986
Resolved
TV ENCL:"REPAIR LEAK ON YELLOW NO. 3 CARGO PUMP IN PUMP ROOM STARBOARD SIDE"
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Deck/Cargo
Issued 28 April 1986
Resolved
TV ENCL:"HAVE PUMP ROOM BILGES PUMPED OUT INTO SLOP TANK"
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Deck/Cargo
Issued 28 April 1986
Resolved
TV ENCL:"HAVE OPERATIONAL O2 DETECTOR ON BOARD."
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Construction/Loadline
Issued 28 April 1986
Resolved
TV ENCL:"REPLACE PACKING AROUND PACKING GLAND FOR BALLAST PUMP IN CARGO PUMP ROOM."
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Deck/Cargo
Issued 28 April 1986
Resolved
46USC3703 PRESSURE VACUUM RELIEF VALVE FITTED WITH FLAME SCREEN 46CFR32.20-5 THAT DID NOT MEET REQUIREMENTS OF 30.10-25 DUE TO 3/8 INCH HOLE ON PV VENT NO. 6 STARBOARD.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Deck/Cargo
Issued 28 April 1986
Resolved
46USC3703 CARGO TANK VENTS CONTAINED FLAME SCREENS THAT FAILED TO 46CFR30.10-25 MEET THE REQUIREMENTS DUE TO HAVING SPACES BETWEEN SCREEN AND VENT.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986