Records from 1985 to 1998. Most recent: inspection, 3 March 1998.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 19
3 March 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 413363
6 October 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 408616
11 July 1997
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 405770
18 November 1996
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 397357
3 November 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 384386
19 May 1994
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 367042
24 March 1993
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 357179
2 October 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 647201
1 October 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 353550
12 July 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 345309
12 July 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 482765
28 February 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 540516
31 October 1989
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 333393
22 July 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 324539
10 February 1988
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 439460
18 July 1987
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 317400
6 October 1986
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 487683
20 December 1985
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 306014
26 February 1985
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 300555
Engineering
Issued 6 October 1997
Resolved
Provide permanent containment for the fuel oil vents and fill pipes locatedport and starboard aft, prior to the next U. S. port call._x001C_ 33 CFR 151.10
Condition: Unknown
Due 5 March 1998
Resolved 5 March 1998
Engineering
Issued 6 October 1997
Resolved
Make permanent repairs to the following piping systems: 1) Patched forward cover for L/O cooler. 2) clamped repair inboard of valve for aft peak tankoutlet line at aft bulkhead, lower engine room level 3) clamped repair for f/o & d/o purifiers outlet line to sump pump, prior to next U. S. port call
Condition: Unknown
Due 5 March 1998
Resolved 5 March 1998
Engineering
Issued 18 November 1996
Resolved
Make permanent repairs to 1) rubber clamped repair on the S/W outlet pipe at the connection to the S/W temp control valve, 2) holed aft cover for generator engine F/W cooler, and 3) patched S/W inlet & outlet pipes at connections to evaporator, prior to the next U.S. port call.
Condition: Unknown
Due 10 October 1997
Resolved 10 October 1997
Construction/Loadline
Issued 1 October 1992
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 25 March 1993
Resolved 25 March 1993
Engineering
Issued 1 October 1992
Resolved
VESSEL IS TO PROVIDE A STANDARD DISCHARGE CONNECTION THAT MEETS THE REQUIREMENTS OF MARPOL 73/78 ANNEX I REGULATION 19 PRIOR TO THE VESSELS NEXT U.S. VOYAGE.
Condition: Unknown
Due 25 March 1993
Resolved 25 March 1993
Documentation
Issued 12 July 1991
Resolved
Vessel faile dto produce supplement for IOPP Certificate.
Condition: Unknown
Due 12 August 1991
Resolved 12 August 1991
Navigation
Issued 31 October 1989
Resolved
VESSEL FAILED TO HAVE A OPERABLE CONTINUOUS RECORDER FOR ECHO DEPTH SOUNDER AS REQUIRED BY 33 CFR 164.35(I).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Navigation
Issued 31 October 1989
Resolved
VESSEL DID NOT HAVE BLOCK DIAGRAM OPERATING INSTRUCTIONS FOR EMERGENCY STEERING GEAR CHANGE OVER ON THE BRIGE AS REQUIRED BY 33 CFR 164.35(K).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Documentation
Issued 31 October 1989
Resolved
VESSEL'S OIL TRANSFER PROCEDURES DID NOT CONTAIN THE PROCEDURES FOR OPERATING THE MEANS OF COMMUNICATIONS AS REQUIRED BY 33 CFR 155.750(A)(6).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Documentation
Issued 31 October 1989
Resolved
OIL RECORD BOOK NOT SIGNED BY THE PERSON IN CHARGE AFTER EACH OPERATION AS REQUIRED BY 33 CFR 151.25(H).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Navigation
Issued 31 October 1989
Resolved
VESSEL TRANSITED PUGET SOUND WATERS UTILIZING CHARTS NOT CURRENTLY CORRECTED WITH CHANGES CONTAINED IN NOTICE TO MARINERS AS REQUIRED BY 33 CFR 164.33(A)(1)(II) OR EQUIVALENT FOREIGN GOVERNMENT CHARTS IN ACCORDANCE WITH 33 CFR 164.33(B).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Navigation
Issued 31 October 1989
Resolved
VESSEL'S MANEUVERING INFORMATION DID NOT CONTAIN THE NORMAL LOAD AND NORMALBALLAST CONDITION FOR A CLEAN HULL AS REQUIRED BY 33 CFR 164.35(G)(6)(IV).
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Documentation
Issued 31 October 1989
Resolved
VESSEL FAILED TO MEET THE REQUIREMENT OF 33 CFR 151.25(F) IN THAT THE OIL RECORD BOOK WAS NOT PROPERLY MAINTAINED. OIL RECORD BOOK DID NOT NOTE EACH DISPOSAL AT SEA, AND FAILED TO NOTE TRANSFER OF OIL TO A RECEPTION FACILITY.
Condition: Unknown
Due 31 October 1989
Resolved 31 October 1989
Documentation
Issued 26 February 1985
Resolved
THE VESSELS OIL TRANSFER PROCEDURES WERE MISSING THE FOLLOWING ITEMS: A LIST OF PRODUCTS TRANSFERED, CARGO INFORMATION, THE NUMBER OF PERSONS TO BEON DUTY, PROCEDURES FOR TENDING MOORING LINES, PROCEDURES FOR TOPPING OFF TANKS, PROCEDURES FOR CLOSING VALVES, PROCEDURES FOR REPORTING OIL SPILLS.
Condition: Unknown
Due 26 February 1985
Resolved 26 February 1985