Records from 1984 to 2001. Most recent: inspection, 11 May 2001.
Inspection history · 62
11 May 2001
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 289997
16 April 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 289272
20 March 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 288383
26 February 2001
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 287561
26 February 2001
Tank Vessel Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1062839
17 October 2000
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 283083
25 September 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 282333
6 May 2000
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 277410
2 April 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 276441
2 April 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 467875
29 February 2000
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 275367
29 February 2000
Tank Vessel Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 816384
23 September 1999
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 516828
18 February 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 425728
18 February 1999
Tank Vessel Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1413493
10 July 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 417940
16 May 1998
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 496599
8 March 1998
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 413499
8 March 1998
Tank Vessel Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1120526
29 August 1997
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 407320
31 March 1997
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 401918
7 March 1997
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 401405
5 March 1997
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 401155
6 May 1996
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 390671
6 March 1996
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 388427
11 January 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 374591
11 January 1995
Tank Vessel Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1459913
2 December 1994
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 373027
2 December 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1141788
31 March 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 700184
28 March 1994
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1389797
26 March 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 12604
26 March 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 172189
25 January 1994
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1163157
27 December 1993
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 363438
27 December 1993
Tank Vessel Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431299
23 November 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 475365
2 August 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 170139
1 June 1993
Administrative
Administrative · Commandant (CG-CVC) · Activity 837463
7 May 1993
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 357958
4 January 1993
Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1140469
16 November 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 354456
12 August 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 540122
29 December 1991
Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1262609
2 September 1990
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 921141
31 August 1990
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1233104
30 August 1990
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 339074
21 June 1990
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1219441
22 November 1989
Type not recorded
No type recorded · COTP LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 537304
13 August 1989
Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1036313
9 March 1989
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 444574
31 July 1988
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 324726
31 July 1988
Certificate of Compliance
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1033959
25 April 1988
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 518665
25 May 1987
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 316332
25 May 1987
Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1335106
18 November 1986
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 485799
14 May 1986
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 471990
29 January 1986
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 306639
29 January 1986
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 997487
24 September 1984
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 454566
7 August 1984
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 297296
Engineering
Issued 16 April 2001
Resolved
NOTED MULTIPLE LEAKS IN CARGO VENTING. ULLAGE OPENINGS AND PURGE PIPES. SOLAS 74/78 II-2 REG 59
Condition: Unknown
Due 18 April 2001
Resolved 18 April 2001
Navigation
Issued 20 March 2001
Resolved
STEERING GEAR STORAGE TANK HAS RUBBER HOSE ATTACHING PIPING TO STEERING UNIT. REPAIR PERMANENTLY TO SATISFACTION OF CLASS PRIOR TO 20APR01. (SOLAS 74A II-2/29.12)
Condition: Unknown
Due 18 April 2001
Resolved 18 April 2001
Lifesaving
Issued 20 March 2001
Resolved
BOTH OF VESSEL'S PORTABLE OXYGEN ANALYZERS ARE INOP. PROVIDE ONE WORKING OXYGEN ANALYZER ON BOARD PRIOR TO 20MAR01. (SOLAS 74A II-2/62.17)
Condition: Unknown
Due 20 March 2001
Resolved 21 March 2001
Deck/Cargo
Issued 20 March 2001
Resolved
PROVIDE CLASS APPROVAL OF IGS PERMANENT OXYGEN ANALYZER ARRANGEMENT BY 21MAR01.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Lifesaving
Issued 26 February 2001
Resolved
Provide adequate number of SOLAS Training Manuals for the officer's and crew's mess/recreational rooms.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Lifesaving
Issued 26 February 2001
Resolved
Renew or permanently repair broken embarkation ladder at the port lifeboat station.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Construction/Loadline
Issued 26 February 2001
Resolved
Permanently repair wasted edges on watertight door frames for all watertight doors located on the Lifeboat Deck.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Lifesaving
Issued 26 February 2001
Resolved
Provide a total of two serviceable O2 meters.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Fire Fighting
Issued 26 February 2001
Resolved
Properly adjust fire screen doors located outside of galley forward_x001C_ bulkhead, prove remote operation.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Navigation
Issued 26 February 2001
Resolved
Properly identify (color code or mark) the extension arm for operation of the emergency steering gear.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Engineering
Issued 26 February 2001
Resolved
Prior to bunkering at a U.S. port, perform hydrostatic test of fuel piping to 1.5 MAWP.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Electrical
Issued 26 February 2001
Resolved
Replace missing covers on overhead lights throughout accommodation spaces.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Electrical
Issued 26 February 2001
Resolved
Repair lights in hospital bathroom.
Condition: Unknown
Due 21 March 2001
Resolved 21 March 2001
Engineering
Issued 26 February 2001
Resolved
Permanently repair to the satisfaction of class society all leaking piping throughout engine room; AC-Reefer salt water cooling and drain lines throughout.
Condition: Unknown
Due 11 May 2001
Resolved 11 May 2001
Documentation
Issued 26 February 2001
Resolved
Properly update the IGS Manual and Cargo Transfer Procedures to reflect_x001C_ Vapor Recovery System operations.
Condition: Unknown
Due 18 April 2001
Resolved 18 April 2001
Deck/Cargo
Issued 2 April 2000
Resolved
VENTILATION DUCT IN LOWER PORT PUMPROOM IS WASTEDALONG ENTIRE HORIZONTAL RUN. REPAIR TO THE SATISFACTION OF CLASS, PRIOR TO 01MAY00.
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Deck/Cargo
Issued 29 February 2000
Resolved
RENEW ALL FLAME SCREENS ON ALL CARGO TANK PRESSURE/RELIEF VALVES VACCUM SIDE TO A 30 X 30 MESH PINCH NON-CORROSIVE MESH OR 20 X 20 PER INCH. TO BE COMPLETED PRIOR TO CARGO OPERATION IN NEXT U.S. PORT.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Deck/Cargo
Issued 29 February 2000
Resolved
PROVIDE PRESSURE REDUCER TO N2 CALIBRATION TEST GAS POINT FOR THE INERT GASFIXED OXYGEN METER. CURRENTLY N2 PUSHING FILTER JARS WATER INTO OXYGEN SENSOR. TO BE COMPLETED PRIOR TO CARGO OPERATION AT NEXT U.S. PORT. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING CLASS SOCIETY SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Engineering
Issued 29 February 2000
Resolved
REPLACE HOLED RUBBER COUPLING ON INERT GAS COMBUSTION AIR LINE. TO BE COMPLETED PRIOR TO CARGO OPERATIONS AT NEXT U.S. PORT TO THE SATISFACTION OF THE ATTENDING CLASS SOCIETY SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Fire Fighting
Issued 29 February 2000
Resolved
REPAIR FIRE SCREEN DOORS MAGNETIC HOLD BACK DEVICES TO DOORS ON C-DECK & B-DECK STAIR TOWER TO THE SATISFACTION OF ATTENDING CLASS SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Lifesaving
Issued 29 February 2000
Resolved
PROVIDE A MARINE CHEMIST TO MAKE SAFE FOR ENTRY NO.3 STARBOARD BALLAST TANKFOR INTERNAL EXAM TO BE COMPLETED BY A C.G. MARINE INSPECTOR--NO LATER THAN29 MAR 00.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Lifesaving
Issued 29 February 2000
Resolved
PROVIDE A MARINE CHEMIST TO MAKE SAFE FOR ENTRY CARGO PUMP ROOM TO BE EXAMINED BY A C.G. MARINE INSPECTOR--NO LATER THAN 29 MAR 00.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Deck/Cargo
Issued 29 February 2000
Resolved
REPAIR HIGH LEVEL VISUAL ALARMS ON DECK PRIOR TO NEXT U.S. PORT AND CONDUCTING CARGO LOADING OPERATIONS TO THE SATISFACTION OF CLASS SOCIETY SURVEYOR.
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Fire Fighting
Issued 29 February 2000
Resolved
REPAIR FIRE SCREEN DOOR OUTSIDE CARGO CONTROL ROOM TO STAIRWELL TO MAIN DECK--WILL NOT FULLY CLOSE. REPAIRS TO BE CONDUCTED TO THE SATISFACTION OF ATTENDING CLASS SOCIETY SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Navigation
Issued 29 February 2000
Resolved
Vessel's 10cm radar inop. Issued LOD to enter port. Received tech report attesting repairs completed and radar properly functioning.
Condition: Unknown
Due 5 April 2000
Resolved 5 April 2000
Unknown
Issued 29 February 2000
Resolved
CONDUCT REPAIRS TO DRY AIR SYSTEM TO SHIPS CONTROL AIR SYSTEM TO THE SATISFACTION OF CLASS SURVEYOR.
Condition: Unknown
Due 8 May 2000
Resolved 8 May 2000
Fire Fighting
Issued 29 February 2000
Resolved
CROP AND RENEW HYDRAULIC PIPING LINES FROM EMERGENCY FIRE PUMP ROOM WHICH OPERATE PRIMER PUMP BELOW DECK. HYDRAULIC LINES LOCATED FORWARD OF BULKHEADPORT SIDE EXTERNAL TO EMERGENCY FIRE PUMP ROOM. CONTAINS A TEMPORARY PATCH.REPAIRS TO BE COMPLETED TO THE SATISFACTION OF CLASS SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Electrical
Issued 29 February 2000
Resolved
CONDUCT REPAIRS TO NO.2 GENERATOR LABRINYTH OIL SEAL LOCATED AFT OF FLY WHEEL ASSEMBLY TO THE PRIME MOVER TO THE SATISFACTION OF CLASS SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Construction/Loadline
Issued 29 February 2000
Resolved
CONDUCT REPAIRS TO THE OILY WATER SEPARTOR SHUTTLE VALVE TO THE SATISFACTION OF CLASS SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Construction/Loadline
Issued 29 February 2000
Resolved
CONDUCT REPAIRS TO COOLING WATER JACKET ASSEMBLY TO DIESEL BALLAST PUMP PRIME MOVER TO THE SATISFACTION OF CLASS SURVEYOR.
Condition: Unknown
Due 3 April 2000
Resolved 3 April 2000
Deck/Cargo
Issued 7 March 1997
Resolved
MAKE REPAIRS TO #2 CARGO PIPELINE PRIOR TO NEXT U.S. CARGO TRANSFER OPERATIONS. REPAIRS TO BE COMPLETED TO SATISFACTION OF CLASS. PIPELINE TOREMAIN SECURED UNTIL REPAIRS HAVE BEEN MADE.
Condition: Unknown
Due 3 April 1997
Resolved 3 April 1997
Deck/Cargo
Issued 5 March 1997
Resolved
INSTALL EMERGENCY TOWING FORWARD AND AFT.
Condition: Unknown
Due 8 August 1997
Resolved 8 August 1997
Deck/Cargo
Issued 5 March 1997
Resolved
REPAIR LEAK ON HYDRAULIC LINE STBD SIDE MIDSHIP.
Condition: Unknown
Due 8 March 1997
Resolved 10 March 1997
Deck/Cargo
Issued 5 March 1997
Resolved
REPAIR INBOARD DECK SEAL PUMP FOR IGS SYSTEM.
Condition: Unknown
Due 8 March 1997
Resolved 10 March 1997
Deck/Cargo
Issued 6 March 1996
Resolved
Both deck seal pumps are inoperable. Vessel currently has 3 alternate sources of water supply to the deck seal.
Condition: Unknown
Due 6 May 1996
Resolved 6 May 1996
Fire Fighting
Issued 6 March 1996
Resolved
Section of main fire pump discharge piping is wasted due to corrosion.
Condition: Unknown
Due 6 May 1996
Resolved 6 May 1996
Deck/Cargo
Issued 6 March 1996
Resolved
Circuit card # 10 on IGS control panel was removed for repairs.
Condition: Unknown
Due 6 May 1996
Resolved 6 May 1996
Fire Fighting
Issued 6 March 1996
Resolved
Provide report of servicing for portable fire extinguishers and fixed CO2 system.
Condition: Unknown
Due 8 March 1996
Resolved 8 March 1996
Electrical
Issued 6 March 1996
Resolved
Plastic covers for numerous fluorescent light fixtures are missing in the engineroom.
Condition: Unknown
Due 6 May 1996
Resolved 6 May 1996
Construction/Loadline
Issued 2 December 1994
Resolved
WHEN BOARDING TEAM ARRIVED ON BOARD THE VESSEL, RADIO HOLLAND GROUP WAS ON BOARD REPAIRING THE O.W.S. BILGE ALARM. THE ALARM TEST WAS UNABLE TO BE COMPLETED DUE TO THE SITUATION.
Condition: Unknown
Due 3 December 1994
Resolved 4 December 1994
Deck/Cargo
Issued 27 December 1993
Resolved
Repair wasted ventilation duct work in the lower level of the cargo pump room. Section missing, bottom wasted away. Prior to next U.S. Port.
Condition: Unknown
Due 27 December 1993
Resolved 27 December 1993
Construction/Loadline
Issued 27 December 1993
Resolved
Prior to next U.S. port of entry replace missing bolts on bolted Hatch in tank C 3. Tank leaking Inert Gas.
Condition: Unknown
Due 27 December 1993
Resolved 27 December 1993
Navigation
Issued 31 August 1990
Resolved
PRIOR TO CARGO DISCHARGE CLEAN-UP EXCESSIVE OIL & DEBRIS IN AFT STEERING COMPARTMENT.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Electrical
Issued 31 August 1990
Resolved
REPAIR LIGHTING IN CARGO PUMP ROOM.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Fire Fighting
Issued 31 August 1990
Resolved
PRIOR TO RETURN NEXT PORT REPAIR ACO2 ALARM SIREN IN LOWER PUMP ROOM.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Construction/Loadline
Issued 31 August 1990
Resolved
PRIOR TO CARGO DISCHARGE CLOSE OR DISPOSE OF OPEN PAINT CANS IN DECK STORES
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Deck/Cargo
Issued 31 August 1990
Resolved
PRIOR TO RETURN NEXT US PORT REPAIR IGS OXYGEN CONTENT & PRESSURE INDICATOR/CHART RECORDER UNIT.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Deck/Cargo
Issued 31 August 1990
Resolved
PRIOR TO RETURN NEXT US PORT REPAIR OXYGEN CONTENT METER IN MAIN ENGINE CONTROL BOOTH.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Deck/Cargo
Issued 31 August 1990
Resolved
PRIOR TO RETURN NEXT US PORT REPAIR BURNER MAIN FLAME RELAY IN INERT GAS GENERATOR.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Fire Fighting
Issued 31 August 1990
Resolved
PRIOR TO RETURN NEXT US PORT RENEW/REPAIR FOAM VALVE AND FIRE MAIN TO FOAM SYSTEM RETURN VALVES AFT OF #1 FOAM MONITOR.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Deck/Cargo
Issued 31 August 1990
Resolved
PRIOR TO CARGO DISCHARGE CLEAN-UP EXCESSIVE OIL IN PUMP ROOM BILGES.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Construction/Loadline
Issued 31 August 1990
Resolved
PRIOR TO CARGO DISCHARGE CLEAN-UP EXCESSIVE OIL ON DECK IN PURIFIER ROOM.
Condition: Unknown
Due 31 August 1990
Resolved 31 August 1990
Deck/Cargo
Issued 30 August 1990
Resolved
33CFR155.430(a) VESSEL DID NOT HAVE A STANDARD DISCHARGE CONNECTION ON BOARD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 August 1990
Resolved 30 August 1990
Navigation
Issued 29 January 1986
Resolved
33 CFR 88.05 VESSEL DID NOT HAVE ON BOARD A COPY OF THE INLAND NAVIGATION RULES.
Condition: Unknown
Due 29 January 1986
Resolved 29 January 1986
Navigation
Issued 29 January 1986
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 29 January 1986
Resolved 29 January 1986