Records from 2001 to 2012. Most recent: casualty investigation, 26 April 2012.
Documentation record
Registered dimensions (L × B × D)39.0 ft × 8.5 ft × 5.0 ft
Registered tonnagegross 13 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC.A.M.I. · SOUTH LIMA, NY, UNITED STATES · built 2001
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeBox
Hull configurationMonohull
Hailing portCHARLESTOWN, MA
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13 - Simplified, Gross Ton
11 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
11 March 2010
Annual Inspection · Drydock Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3694498
1 April 2009
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3444387
15 April 2008
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3184554
31 March 2008
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3175540
25 October 2007
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3086781
26 July 2007
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3089687
18 June 2007
In-Service Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2988603
15 May 2007
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2931311
20 September 2006
Hull Examination · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2649527
2 September 2003
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1894518
16 July 2003
Periodic Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1820585
23 June 2003
Construction Oversight
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1825349
16 September 2002
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1676193
26 February 2002
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1489328
6 November 2001
Examination of Repairs · Plan Review "T" Boat
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1075840
22 August 2001
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1072500
16 August 2001
Damage Survey
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1068997
14 August 2001
Examination of Repairs
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1072007
28 July 2001
Damage Survey
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1070098
7 July 2001
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 22338
5 July 2001
COI Inspection · Deficiency Check · Damage Survey
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1068118
28 June 2001
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 131535
15 June 2001
Plan Review "T" Boat · Initial Certification · Initial Construction-Excluding Oversight · Hull Examination
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1452836
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 31 March 2008
Resolved
Replace missing insulation behind rear passenger seat in way of exhaust pipe.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 29 April 2008
Resolution: Corrected
Electrical › Electrical Distribution System (service) › Cable
Issued 31 March 2008
Resolved
Properly support hanging 24 volt wires in after-most bilge compartment, port side.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 29 April 2008
Resolution: Corrected
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 31 March 2008
Resolved
Restencil faded markings on ring buoy.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 29 April 2008
Resolution: Corrected
Construction/Loadline › Penetrations › Bottom Plug Packing
Issued 31 March 2008
Resolved
Make proper watertight thru hull penetration at electrical wire aft of steering box.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 29 April 2008
Resolution: Corrected
Navigation › Piloting/Steering › Marine Charts
Issued 31 March 2008
Resolved
Provide appropriate updated chart for recently expanded route change.
Action required: 705 - Other - as specified
Due 15 April 2008
Resolved 29 April 2008
Resolution: Corrected
Engineering › Steering Gear System › Rudder
Issued 21 June 2007
Resolved
Make repairs to cracked rudder blade IWO rudder stock.
Due 28 June 2007
Resolved 26 June 2007
Resolution: New style rudder provided by builder installed.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 18 June 2007
Resolved
Make permenant repairs to broken V-Strut, as built.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 June 2007
Resolved 21 June 2007
Resolution: Corrected
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 9 May 2007
Resolved
re-fasten rear seats.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2007
Resolved 11 May 2007
Resolution: repaired sat.
Personnel › Training › Personal Survival Techniques
Issued 20 September 2006
Resolved
Prior to operating , conduct underway drills with crew members.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2007
Resolved 4 April 2007
Resolution: Completed
Documentation › Logs/Records › Drug Test Records
Issued 20 September 2006
Resolved
Enroll all crew members in a drug testing program.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 April 2007
Resolved 11 April 2007
Resolution: Corrected
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 20 September 2006
Resolved
Refasten main engine exhaust ducting.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 4 April 2007
Resolution: Completed
Construction/Loadline
Issued 5 July 2001
Resolved
HOSE TEST TO 30 PSI WELD REPAIR TO STEERING BOX THROUGH
Condition: Unknown
Due 9 July 2001
Resolved 9 July 2001
Navigation
Issued 5 July 2001
Resolved
REWELD BROKEN MOUNT BRACKET TO STEERING CONTROL CABLE FOR OUTDRIVE
Condition: Unknown
Due 9 July 2001
Resolved 9 July 2001
Construction/Loadline
Issued 5 July 2001
Resolved
GRIND OUT AND REWELD SEAM AT STEERING BOX THROUGH HULL, FWD, INBOARD, UPPERCORNER.
Condition: Unknown
Due 9 July 2001
Resolved 9 July 2001
Navigation
Issued 15 June 2001
Resolved
Provide an effective means to center the outdrive in the event the front wheels must be used for auxiliary steering.
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Documentation
Issued 15 June 2001
Resolved
Provide [name withheld], GA a revised electrical plan.
Condition: Unknown
Due 31 July 2001
Resolved 23 June 2003
Documentation
Issued 15 June 2001
Resolved
Complete MSO Savannah's worklist to the satisfaction of the cognizant OCMI.
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001
Documentation
Issued 15 June 2001
Resolved
Complete a new-to-zone inspection upon arrival, or within a time specified by the cognizant OCMI (MSO Portland, Maine).
Condition: Unknown
Due 15 June 2001
Resolved 15 June 2001