BALKAN is a 1977 freight ship. The Coast Guard has recorded 36 inspections since 1984, most recently in July 2006, along with 29 deficiencies and 2 operational controls.

Records from 1984 to 2006. Most recent: inspection, 3 July 2006.

Built
1977
Last inspected
3 July 2006
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7617216 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
225928
Flag
PANAMA
—
Maury page id
psix-225928

Inspections, by type

…with no type recorded24
Years with a record 20 calendar years (1984–2006)
The 36 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 20 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it19198 - Regulatory (Subpart C or D), Net Ton
19198 - Convention (Subpart B), Net Ton
72990 - Displacement, Ton
61132 - Dead Weight, Ton
34705 - Regulatory (Subpart C or D), Gross Ton
34705 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 36

3 July 2006 Deficiency Check · Ballast Water Examination · MARPOL Annex V Examination · ISPS III Exam · MARPOL Annex I Examination · PI Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2697287
15 June 2006 Ballast Water Examination · PI Safety Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2679672
11 May 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2646486
9 December 2005 Ballast Water Examination · ISPS III Exam · MARPOL Annex I Examination · PI Safety Exam · MARPOL Annex V Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2548393
4 October 2005 Type not recorded
No type recorded · Maritime Safety & Security Team New York (91106) · Activity 2514807
24 May 2005 Ballast Water Examination · ISPS III Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · PI Safety Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2366090
6 November 2004 PI Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2235514
1 November 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2232859
7 July 2004 ISPS II Exam
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2124738
2 July 2004 ISPS II Exam
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2117403
9 March 2004 Annual Inspection · Ballast Water Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2021488
22 February 2003 Deficiency Check · Re-Inspection · Ballast Water Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1748019
5 February 2003 Annual Inspection · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1734833
10 April 2002 Ballast Water Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1603271
18 September 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 293895
14 August 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 292654
23 August 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 432172
1 February 1999 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 425151
29 July 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 419222
21 July 1998 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 417979
23 November 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 397593
10 August 1996 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 708197
9 August 1996 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 394157
8 September 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 382262
28 November 1994 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 372402
10 May 1994 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 366453
17 June 1992 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 351769
8 June 1991 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 346234
25 July 1990 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 338188
24 April 1989 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 329879
8 April 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 322520
20 August 1987 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 528804
13 March 1987 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 314830
14 October 1986 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 496807
26 December 1985 Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 306200
21 July 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 297081

Deficiency record · 29

Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 15 June 2006 Resolved
The NO.3 Generator has a fuel oil leak on the fuel pressure switch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 June 2006
Resolved 3 July 2006
Resolution: Received class report from Phoenix Register of Shipping satisfying requirement.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 15 June 2006 Resolved
The NO.3 Generator has a fuel oil leak on the fuel pressure switch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2006
Resolved 15 June 2006
Resolution: Cleared by SECTOR New Orleans PSC boarding team.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 15 June 2006 Resolved
The No.1 Generator has a fuel oil leak on the No.5 fuel pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2006
Resolved 15 June 2006
Resolution: Cleared by SECTOR New Orleans PSC boarding team.
Lifesaving › Inflatable Liferafts
Issued 9 March 2004 Resolved
The vessel does not have liferafts to accommodate 60 people as required by Supplement E of the Safety Equipment Certificate. Provide liferafts with combined capacity of 60 people NLT 10 March 2004. LEGACY COMPONENT DESC: Accomodation
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 March 2004
Resolved 11 March 2004
Resolution: Received satisfactory documentation. Liferaft replaced on March 10, 2004. Cleared deficiency.
Personnel › Manning/Qualifications
Issued 5 February 2003 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 February 2003
Resolution: Replacement second officer does have a valid Malta license which will be sent to the ship as stated by the class surveyor.
Lifesaving › Lifeboat
Issued 5 February 2003 Resolved
The starboard lifeboat's motor did not run properly. The operator had to keep moving the throttle lever back and forth to keep the motor from shutting off. He could not get the motor to run at idle. LEGACY COMPONENT DESC: Propulsion Engine
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 February 2003
Resolution: Starboard Lifeboat engine was started and operated in ahead and astern modes as witnessed by ABS class society.
Lifesaving › Lifeboat Equipment
Issued 5 February 2003 Resolved
Food rations in both lifeboats is expired LEGACY COMPONENT DESC: Food Ration
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 February 2003
Resolution: Food rations in both lifeboatsvalid until March 2006 as witnessed by ABS class society.
Fire Fighting › Structural - A Class Divisions
Issued 5 February 2003 Resolved
Fire doors in main control, main staircase, and engine room did not close properly and self-closing mechanisms were inoperable. LEGACY COMPONENT DESC: Openings - Fire Doors
Action required: 705 - Other - as specified
Due 7 February 2003
Resolved 8 February 2003
Resolution: Self-closing doors in engine room and stair tower access were adjusted and repaired. Witnessed by ABS class society.
Construction/Loadline › Structures
Issued 5 February 2003 Resolved
Guard rail on starboard side at hatch #3 is torn.
Action required: 15 - Rectify deficiencies by next port
Resolved 8 February 2003
Resolution: Guard rail on starboard side at Hatch #3 was welded and witnessed by ABS class society.
Construction/Loadline › Markings
Issued 5 February 2003 Resolved
Loadline markings not in contrasting color to hull. LEGACY COMPONENT DESC: Load Line Mark
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Due 6 February 2003
Resolved 22 February 2003
Resolution: Loadline markings painted in contrast color satisfying requirement.
Fire Fighting › Miscellaneous Items
Issued 5 February 2003 Resolved
Remove paint and other flammable materials from main control room and pollution locker. LEGACY COMPONENT DESC: Paint/Flammable Liquid Lockers
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 February 2003
Resolution: Paint and flammable materials were removed from the main engine control as witnessed by ABS class society.
Engineering
Issued 14 August 2001 Resolved
#1 OIL COOLER DISCHARGE FLANGE HOLED WELDED AND LEAKING. (SOLAS 74A REG I/11). CLASS TO ATTEST TO PROPER REPAIR PRIOR TO COMPLIANCE DATE.
Condition: Unknown
Due 19 September 2001
Resolved 19 September 2001
Engineering
Issued 14 August 2001 Resolved
#3 GENERATOR AIR COOLER SUPPLY LINE PATCHED AND LEAKING. (SOLAS 74A REG I/11). CLASS TO ATTEST TO PROPER REPAIR PRIOR TO COMPLIANCE DATE.
Condition: Unknown
Due 19 September 2001
Resolved 19 September 2001
Engineering
Issued 14 August 2001 Resolved
HIGH PRESSURE FUEL LINES ON ALL 3 GENERATORS MISSING DOUBLE WALLED JACKETING. (SOLAS 74 II-2/15.2.9) ALL EXTERNAL HIGH PRESSURE FUEL LINES ON GENERATORS TO BE DOUBLE JACKETED AND APPROVED BY CLASS PRIOR TO COMPLINACE DATE.
Condition: Unknown
Due 19 September 2001
Resolved 19 September 2001
Navigation
Issued 23 August 1999 Resolved
VESSEL SECONDARY MARINE RADAR IS INOP._x001C_ _x001C_ 33 CFR 164.37_x001C_
Condition: Unknown
Due 25 August 1999
Resolved 26 August 1999
Fire Fighting
Issued 1 February 1999 Resolved
Provide current fire fighting foam analysis of 500 ltr foam tank.
Condition: Unknown
Due 2 February 1999
Resolved 2 February 1999
Documentation
Issued 21 July 1998 Resolved
PROVIDE DOCUMENTATION FROM VESSELS' FLAG ADMIN INDICATING ACCEPTANCE OF LICENSE OF OFFICERS ON BOARD.
Condition: Unknown
Due 22 July 1998
Resolved 22 July 1998
Navigation
Issued 21 July 1998 Resolved
PROPERLY REPAIR SECONDARY RADAR PRIOR TO RETURN TO US UPON DEPARTURE OF BEAUMONT.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Engineering
Issued 21 July 1998 Resolved
PROVE PROPER OPERATION OF THE OILY WATER SEPARATOR AND SENSOR. _x001C_ MARPOL 73/78 1/16 AND 33 CFR 155.380(B)_x001C_
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Navigation
Issued 9 August 1996 Resolved
VESSEL WAS MISSING CORRECTIONS ON N.O.S. CHARTS 18720, 18740, 18746, 18749 AND 18751. VESSEL IS REQUIRED TO CORRECT PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 November 1996
Resolved 27 November 1996
Navigation
Issued 9 August 1996 Resolved
VESSEL WAS MISSING CURRENT U.S. COAST PILOT AND CORRECTIONS. VESSEL IS REQUIRED TO OBTAIN CURRENTLY CORRECTED U.S. COAST PILOT PRIOR TO DEPARTURE._x001C_
Condition: Unknown
Due 27 November 1996
Resolved 27 November 1996
Lifesaving
Issued 9 August 1996 Resolved
VESSEL'S BRIDGEWINGS SELF-IGNITING LIGHTED LIFEBUOYS INOPERATIVE. LIGHTS DONOT WORK. VESSEL IS REQUIRED TO CORRECT PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 November 1996
Resolved 27 November 1996
Navigation
Issued 9 August 1996 Resolved
VESSEL WAS MISSING CORRECTIONS ON U.S.C.G. LIGHT LIST. VESSEL IS REQUIRED TO CORRECT PRIOR TO DEPARTURE.
Condition: Unknown
Due 27 November 1996
Resolved 27 November 1996
Engineering
Issued 8 September 1995 Resolved
Install containment around main engine cylinder oil fill pipes and dirty oil discharge pipe. Complete prior to next U.S. port call. per 33 CFR 155.320(a)(2)
Condition: Unknown
Due 10 August 1996
Resolved 10 August 1996
Navigation
Issued 8 June 1991 Resolved
WHILE CONDUCTING ANNUAL EXAM INVESTIGATORS NOTED THAT THE CHARTS 11412, 11413, AND 11414 NEEDED FOR TRANSIT OF TAMPA BAY WERE WITHOUT THE NECESSSARY CORRCTIONS AS PER 33 CFR 164.33.
Condition: Unknown
Due 1 October 1991
Resolved 1 October 1991
Documentation
Issued 8 April 1988 Resolved
33CFR164.35(K) NO STEERING BLOCK DIAGRAM ON THE BRIDGE.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Documentation
Issued 8 April 1988 Resolved
33CFR155.720 VESSEL DID NOT HAVE WRITTEN OIL TRANSFER PROCEDURES FOR ONGOING BUNKER OPERATIONS.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Documentation
Issued 8 April 1988 Resolved
33CFR155.820(A) MASTER COULD NOT PRODUCE A WRITTEN RECORD DESIGNATING THE CHIEF ENGINEER AS THE PERSON IN CHARGE OF OIL TRANSFER OPERATIONS.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988
Documentation
Issued 8 April 1988 Resolved
33CFR155.820(B) MASTER COULD NOT PRODUCE A WRITTEN RECORD INDICATING THE DATE AND RESULTS OF MOST RECENT TEST AND INSPECTION OF OIL TRANSFER PIPING SYSTEM.
Condition: Unknown
Due 8 April 1988
Resolved 8 April 1988

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.