SUN BIG NO. 9 is a 1974 freight ship. The Coast Guard has recorded 10 inspections since 1985, most recently in August 1996, along with 39 deficiencies and 2 operational controls.
Records from 1985 to 1996. Most recent: inspection, 7 August 1996.
- Built
- 1974
- Last inspected
- 7 August 1996
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 39 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
7352816 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3FJO3
226600
Flag
PANAMA
—
Maury page id
psix-226600
Inspections, by type
…with no type recorded10
Years with a record
4 calendar years (1985–1996)
The 10 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 30 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it3332 - Regulatory (Subpart C or D), Net Ton
7336 - Dead Weight, Ton
7354 - Regulatory (Subpart C or D), Gross Ton
7336 - Dead Weight, Ton
7354 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 10
7 August 1996
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 719553
16 June 1996
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 392432
24 May 1996
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 694369
22 May 1996
Type not recorded
No type recorded · Marine Safety Unit Dutch Harbor · USCG Arctic District (CGD-A) · Activity 391578
11 October 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 383646
16 May 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 711472
15 May 1995
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 378199
25 April 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 505618
22 October 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 494258
16 April 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 301548
Deficiency record · 39
Documentation
Issued 22 May 1996
Resolved
Oil record book not properly maintained, did not account for all waste oil on board vessel.
Construction/Loadline
Issued 22 May 1996
Resolved
The watertight door between the engine room and shaft alley does not operate properly; shows evidence of a hydraulic leak.
Documentation
Issued 22 May 1996
Resolved
The vessel is not manned per the safe manning certificate, none of the vessel's officers or seamen have licenses/documents issued by the Republic of Panama. Panama has allowed vessel to operate through 24AUG96 with crew sailing on home country's licenses.
Engineering
Issued 22 May 1996
Resolved
The oil water separator is not operable insofar as it is not hard piped to the vessel's sludge tanks.
Documentation
Issued 22 May 1996
Resolved
The International Oil Pollution Prevention Certificate shows the wrong system throughput (5 m3/hr vice 2 m3/hr marked on OWS flaceplate).
Accommodation/Occupational Safety
Issued 22 May 1996
Resolved
The sewaage holding tank (former ballast tank) was not isolated from slop tank or ballast system.
Lifesaving
Issued 22 May 1996
Resolved
Excessive oil/water slops in the engine room bilge; ballast tank being usedto store bilge slops. Indicates OWS may not be operating properly when used for extended periods. Crew could not prove ballast tank used to store slops was isolated from ballast system or MSD.
Fire Fighting
Issued 22 May 1996
Resolved
Doors in machinery casing were not fire or smoke tight per SOLAS 60 II/35.
Accommodation/Occupational Safety
Issued 22 May 1996
Resolved
Not all toilets flushed (ILO 147).
Engineering
Issued 22 May 1996
Resolved
Main diesel engine has excessive fuel and lubricating oil leaks; is a fire and pollution hazard (SOLAS 74 II-1/26.1).
Deck/Cargo
Issued 11 October 1995
Resolved
REPLACE GUARD ON MOORING LINE CAPSTAN GEAR.
Fire Fighting
Issued 11 October 1995
Resolved
REPAIR/RENEW FIRST 8FT OF EXHAUST PIPE ON EMERGENCY FIRE PUMP ENGINE. ICLL 66 RS.19 AND 20
Construction/Loadline
Issued 11 October 1995
Resolved
REPAIR/RENEW GRATING AROUND 2ND FORWARD DECK CRANE. ICLL 66 R.25
Engineering
Issued 11 October 1995
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPERATOR FOR 15PPM OIL CONTENT
Construction/Loadline
Issued 11 October 1995
Resolved
REPAIR/RENEW ONBOARD STEP IN FRONT OF STEERING GAR ROOM. ICLL 66 R.25
Documentation
Issued 11 October 1995
Resolved
MODIFY IOPP CERTIFICATE TO REFLECT PROPER TYPE OF OILY WATER SEPERATING EQUIPMENT
Construction/Loadline
Issued 15 May 1995
Resolved
MAKE PERMANENT REPAIRS TO BULKHEADS, BULKHEAD/DECK STIFFNERS AND OTHER STRUCTURAL MEMBERS IN CHAIN LOCKER. MOST STRUCTURAL MEMBERS ARE WASTED DUE TO SEVERE CORROSION. ITEM TO BE RESOLVED TO THE SATISFACTION OF THE ATTENDING CLASS SURVEYOR PRIOR TO REENTRY OF NEXT U.S. PORT.
Lifesaving
Issued 15 May 1995
Resolved
RENEW PORT LIFEBOAT. LIFEBOAT WOODEN HULL IS DRYROTTEN AND HOLED ON THE UNDERWATER BODY OF THE LIFEBOAT. REPUBLIC OF PANAMA GRANTED EQUIVALENT LIFESAVING ARRANGEMENT FOR ONE WAY VOYAGE TO REPAIR FACILITY. ADDITIONAL 25MAN INFLATABLE LIFERAFT INSTALLED PORT SIDE OF VESSEL.
Fire Fighting
Issued 15 May 1995
Resolved
UPDATE FIRE CONTROL PLAN TO REFLECT VENTILATION CLOSURES/REMOTE SHUTDOWNS. SOLAS 74 AMENDED/II-2/20.
Engineering
Issued 15 May 1995
Resolved
REPAIR/RENEW DETERIORATED VENTILATION CLOSURES LOCATED ON STARBOARD SIDE OFSTERN(8 EACH).
Lifesaving
Issued 15 May 1995
Resolved
PROVIDE INFLATABLE LIFERAFTS TO PORT AND STBD SIDE OF VESSEL IN ACCORDANCE WITH SOLAS SAFETY EQUIPMENT CERTIFICATE ISSUED BY FLAG ADMINISTRATION. _x001C_
Engineering
Issued 15 May 1995
Resolved
PROVIDE CLOSURE FOR VENT CLOSURE ON STBD SIDE FORECASTLE.
Lifesaving
Issued 15 May 1995
Resolved
RENEW/REPAIR BILGE PUMP FOR STBD LIFEBOAT.
Navigation
Issued 15 May 1995
Resolved
INSTALL RUDDER ANGLE INDICATOR IN STEERING GEAR ROOM SO OPERATOR CAN VIEW DURING EMERGENCY STEERING OPERATIONS.
Navigation
Issued 15 May 1995
Resolved
REPAIR LEAK ON HYDRAULIC RAM TO STEERING GEAR AND REMOVE EXCESS OIL ON DECK.
Lifesaving
Issued 15 May 1995
Resolved
RENEW DETERIORATED SHEAVES (2 EACH) ON STBD LIFEBOAT DAVIT.
Fire Fighting
Issued 15 May 1995
Resolved
REPAIR/REPLACE FIREMAIN ISOLATION VALVE ON MAIN DECK AND PROVE OPERATION_x001C_ OF RELIEF VALVES.
Accommodation/Occupational Safety
Issued 15 May 1995
Resolved
REPAIR TYPE II MARINE SANITATION DEVICE. OVERBOARD DISCHARGE VALVE SHALL REMAIN CLOSED WHILE IN PORT. PROVIDE PORTABLE TOILET FACILITIES FOR CREW WHILE IN PORT.
Unknown
Issued 15 May 1995
Resolved
MAKE PERMANENT REPAIRS TO 12" SALTWATER COOLING PIPING IN ENGINE ROOM (REEFER COOLING SYSTEM). TEMPORARY REPAIR CONDUCTED UNTIL DISCHARGE OF CARGO. TO BE COMPLETED PRIOR TO ENTRY OF NEXT U.S. PORT.
Documentation
Issued 15 May 1995
Resolved
PROVIDE TRAINING MANUAL FOR LIFESAVING APPLIANCES IN ACCORDANCE WITH SOLAS 74 AMENDED III/18.2/51.
Lifesaving
Issued 15 May 1995
Resolved
PAINT LOCKERS AND FLAMMABLE LIQUID LOCKERS SHALL BE PROTECTED BY AN APPROPRIATE FIRE-EXTINGUISHING ARRANGEMENT APPROVED BY THE FLAG ADMINISTRATION IN ACCORDANCE WITH SOLAS 74 AMENDED II-2/18
Lifesaving
Issued 15 May 1995
Resolved
PORT AND STARBOARD NAVIGATING BRIDGE WING RING LIFEBUOYS SHALL BE FITTED WITH A QUICK RELEASE MECHANISM IN ACCORDANCE WITH SOLAS 60/III/21(g).
Lifesaving
Issued 15 May 1995
Resolved
PROVIDE EVIDENCE THAT HYDROSTATIC RELEASES WERE SERVICED WITHIN THE PAST 12MONTHS IN ACCORDANCE WITH SOLAS 74 AMENDED III/19.9.1.
Lifesaving
Issued 15 May 1995
Resolved
MEANS SHALL BE PROVIDED FOR BRINGING THE LIFEBOATS AGAINST THE SHIPS SIDE_x001C_ AND THERE HOLDING THEM SO THAT PERSONS MAY SAFELY EMBARK. SOLAS 60/III/36.
Fire Fighting
Issued 15 May 1995
Resolved
RENEW HOLED/DETERIORATED SECTIONS OF FIREMAIN PIPING ON MAIN DECK IN WAY OFSTBD #2 CARGO HOLD FWD, #1 CARGO HOLD AFT AND #2 CARGO HOLD AFT. SEE SOLAS 74 AMENDED II-2/21.
Lifesaving
Issued 15 May 1995
Resolved
PROVIDE AND INSTALL SKATES TO STBD LIFEBOAT IN ACCORDANCE WITH SOLAS 60/III/36.
Lifesaving
Issued 15 May 1995
Resolved
PROVIDE AND INSTALL REQUIRED EQUIPMENT FOR STARBOARD LIFEBOAT IN ACCORDANCEWITH SOLAS 60/III/11.
Lifesaving
Issued 15 May 1995
Resolved
INSTALL WEAK LINKS TO PORT/STBD LIFERAFT SEA PAINTERS.
Construction/Loadline
Issued 15 May 1995
Resolved
INSTALL GASKET TO STERN COMPARTMENT WATERTIGHT HATCH ON MAIN DECK.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.