MAURY USCG vessel records Sign in
← All vessels

TAI CHUNG

TAI CHUNG is a 1982 freight ship. The Coast Guard has recorded 29 inspections since 1984, most recently in May 2000, along with 32 deficiencies and 2 operational controls.

Records from 1984 to 2000. Most recent: inspection, 8 May 2000.

Built
1982
Last inspected
8 May 2000
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8018431 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
226946
Flag
TAIWAN
—
Maury page id
psix-226946

Inspections, by type

…with no type recorded29
Years with a record 15 calendar years (1984–2000)
The 29 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 26 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it9767 - Regulatory (Subpart C or D), Net Ton
22089 - Regulatory (Subpart C or D), Gross Ton
37611 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 29

8 May 2000 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 277530
18 October 1999 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 433763
13 April 1999 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 427290
14 September 1998 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 420336
3 June 1998 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 416386
11 October 1997 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 409649
18 August 1997 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 406706
30 March 1997 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 401905
4 November 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 397009
1 August 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 393612
31 July 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 29467
7 June 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 391943
11 November 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 100103
19 June 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 379617
18 April 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 377259
3 February 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 375667
28 March 1994 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 512678
14 December 1992 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 354998
4 March 1992 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 349193
30 December 1991 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 646993
17 June 1991 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 344512
22 March 1991 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 342625
17 March 1991 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 342518
19 December 1989 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 334351
7 November 1988 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 326672
4 June 1987 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 470158
1 December 1986 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 313133
18 November 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 482009
13 December 1984 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 299300

Deficiency record · 32

Documentation
Issued 13 April 1999 Resolved
Provide vessel specific crew familiarization checklist for new crewmembers.STCW 95 Section A-VI/1. Correct prior to next U.S. Port.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 18 August 1997 Resolved
Install rubber mats on deck in front of all electrical switch boards in engine room. Repair prior to next US port. _x001C_SOLAS 74amd. II-1 reg.45.2 _x001C_
Condition: Unknown
Due 11 October 1997
Resolved 4 November 1997
Fire Fighting
Issued 18 August 1997 Resolved
Repair pipe on fire main branch line to fire plug at forward starboard sideof lower level of engine room where holed prior to next U.S. Port. The hole is very small and does not effect the operating pressure_x001C_ SOLAS74 amd. II-2 reg.4
Condition: Unknown
Due 11 October 1997
Resolved 4 November 1997
Accommodation/Occupational Safety
Issued 18 August 1997 Resolved
Repair exhaust duct from galley stove at third deck where holed. The exhaust duct is located at the exterior of the vessel._x001C_ SOLAS 74 I/11
Condition: Unknown
Due 11 October 1997
Resolved 4 November 1997
Engineering
Issued 18 August 1997 Resolved
Install mechanical means of closing each drain to containment coamings._x001C_ Prior to next U.S. Port._x001C_ 33 CFR 155.310(b)(3)
Condition: Unknown
Due 11 October 1997
Resolved 4 November 1997
Lifesaving
Issued 4 November 1996 Resolved
Have class surveyor make inspection of fiberglass repairs to the port lifeboat. Current repairs appear improper. Also examine the bow stem and areas about seating where fiberglass has broken. Make repairs as required by class surveyor prior to return to a U. S. port. SOLAS 60 III/5.a
Condition: Unknown
Due 30 March 1997
Resolved 30 March 1997
Lifesaving
Issued 4 November 1996 Resolved
Properly mount the smoke floats & lights on the bridge wings to release into the water prior to departure. _x001C_ _x001C_ SOLAS 74 amd III/7.1.3
Condition: Unknown
Due 30 November 1996
Resolved 3 January 1997
Engineering
Issued 4 November 1996 Resolved
Rewire the governors on all three generator engines to prevent chaffing of wires. Also properly mount foundations. Complete prior to return to a U. S. port. Condition of class issued._x001C_ SOLAS 60 II/27.a
Condition: Unknown
Due 30 March 1997
Resolved 30 March 1997
Engineering
Issued 7 June 1996 Resolved
Make permanent repairs to plastic steel patched aft cover for M/E L/O cooler cover, prior to the next U.S. port call._x001C_ Solas 74 amd, II-2/47
Condition: Unknown
Due 1 September 1996
Resolved 4 November 1996
Engineering
Issued 7 June 1996 Resolved
Make permanent repairs to the holed and leaking M/E S/W circulating temperature control valve, located at the center bottom of the valve, priorto next U.S. port call. Temporary cement patch was authorized by class withcondition of class imposed. Solas 74 amd, II-1/26
Condition: Unknown
Due 1 September 1996
Resolved 4 November 1996
Engineering
Issued 7 June 1996 Resolved
Clean the oil residue on the F/O purifiers and in the surrounding containment extending to the area under the F/O service tank, and the oil around the #3 generator and in the containment, prior to the next U.S. portcall. Solas 74 amd, II-2/15
Condition: Unknown
Due 11 June 1996
Resolved 11 June 1996
Engineering
Issued 7 June 1996 Resolved
Make permanent repairs to the leaking air compressor cooling F/W cooler S/Woutlet line at the elbow, prior to the next U.S. port call._x001C_ Solas 74 amd, II-1/26
Condition: Unknown
Due 11 June 1996
Resolved 11 June 1996
Fire Fighting
Issued 7 June 1996 Resolved
Remove the hold back devices on the fire doors to the engine room from the main deck and in the stairtower, prior to the next U.S. port call._x001C_ Solas 74 amd, II-2/47
Condition: Unknown
Due 11 June 1996
Resolved 11 June 1996
Fire Fighting
Issued 18 April 1995 Resolved
Provide new or repair closure devices on the fire doors to the engine room,steering gear room and main stair tower. Remove hold back devices. Complete prior to return to a U.S. port per SOLAS Chapter II-2 Reg 47.
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Fire Fighting
Issued 18 April 1995 Resolved
Repair or replace the following items on the emergency fire pump; replace the fly wheel guard, replace the insulation over the exhaust line joints, repair the oil leak and repair the gauges. Complete prior to return to a U.S. port per SOLAS Chpt II-2 Reg 4.
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Deck/Cargo
Issued 18 April 1995 Resolved
Repair the oil leak on the aft hydraulic lifting ram on the stbd side of #2hatch prior to return to a U. S. port, per 33 C.F.R. 151.10(b).
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Lifesaving
Issued 18 April 1995 Resolved
Clean up the excessive oil in the drip pans under the main engine lube oil pumps, fuel oil transfer pumps, fuel purifiers and steering gear prior to return to a U.S. port per SOLAS Chapter II-2 Reg 2.
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Unknown
Issued 18 April 1995 Resolved
Provide containment around the oil discharge fitiings on both sides of the main deck superstructure, (4 fittings on stbd and 2 on port). Complete prior to return to a U.S. port per 33 C.F.R. 155.320(a)(2).
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Accommodation/Occupational Safety
Issued 18 April 1995 Resolved
Renew the wasted walkway on the stbd, forecastle bulkhead/ladder prior to return to a U.S. port, per ILO 147.
Condition: Unknown
Due 19 June 1995
Resolved 19 June 1995
Fire Fighting
Issued 18 April 1995 Resolved
Make permanent repairs to the wasted fire main on the port, fwd corner of #2 cargo hatch, prior to departure, per SOLAS Chapter II-2 Reg. 4.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Lifesaving
Issued 18 April 1995 Resolved
Mount fwd life raft on main deck prior to departure, per SOLAS Chapter III Reg. 13.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Fire Fighting
Issued 3 February 1995 Resolved
Make permanent repairs to the engineroom firemain where patched just above the No. 1 fire and general service pump, per SOLAS II-2/4, prior to next cargo operations during this port visit.
Condition: Unknown
Due 15 February 1995
Resolved 27 February 1995
Lifesaving
Issued 3 February 1995 Resolved
Remove all paint and oily rags stowed in the steering gear room, per 33 CFRpart 160.
Condition: Unknown
Due 15 February 1995
Resolved 27 February 1995
Fire Fighting
Issued 3 February 1995 Resolved
Make permanent repairs to weatherdeck firemain piping where holed between the #2 and #3 cargo holds, per SOLAS II-2/4, prior to next cargo operationsduring this port visit.
Condition: Unknown
Due 15 February 1995
Resolved 27 February 1995
Documentation
Issued 3 February 1995 Resolved
Properly record discharges thru the 15ppm oily water separator in the Oil Record Book, per MARPOL Annex I regulation 20, prior to next U.S. port call.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Fire Fighting
Issued 3 February 1995 Resolved
Remove the holdback device for the fire door between the engineroom and theemergency fire pump space, per SOLAS II-2/45, prior to next cargo operations during this port visit.
Condition: Unknown
Due 15 February 1995
Resolved 27 February 1995
Navigation
Issued 22 March 1991 Resolved
SECONDARY MARINE RADAR SYSTEM INOPERATIVE.[33 CFR 164.11(r)]
Condition: Unknown
Due 17 June 1991
Resolved 22 March 1991
Navigation
Issued 22 March 1991 Resolved
EMERGENCY STEERING DRILL NOT LOGGED.[33 CRF 164.25(d)]
Condition: Unknown
Due 17 June 1991
Resolved 22 March 1991
Documentation
Issued 22 March 1991 Resolved
OIL TRANSFER PROCEDURES DID NOT LIST PRODUCTS TRANSFERED.[33 CFR 155.750(a)(1)(i)]
Condition: Unknown
Due 22 March 1991
Resolved 22 March 1991
Documentation
Issued 22 March 1991 Resolved
OIL TRANSFER PROCEDURES DID NOT STATE NUMBER OF PERSONS REQUIRED FOR OIL TRANSFER.[33 CFR 155.750(a)(3)]
Condition: Unknown
Due 17 June 1991
Resolved 22 March 1991
Accommodation/Occupational Safety
Issued 22 March 1991 Resolved
VESSEL DISCHARGED PLASTICS AT SEA.[33 CFR 151.67]
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Navigation
Issued 19 December 1989 Resolved
U.S. COAST PILOT VOL. 7 NOT CURRENTLY CORRECTED.
Condition: Unknown
Due 19 December 1989
Resolved 19 December 1989

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.