Records from 1986 to 2003. Most recent: inspection, 3 April 2003.
Documentation record
Registered dimensions (L × B × D)502.3 ft
Registered tonnagegross 23,304 / net 6,991
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilt 1980
Hull materialNot recorded
PropulsionDiesel Direct
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNot recorded
Trade endorsementsNot recorded
DocumentationInvalid
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it6991 - Simplified, Net Ton
23304 - Simplified, Gross Ton
7300 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
3 April 2003
Ballast Water Examination · Annual Inspection · Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1767738
1 November 2002
Re-Inspection · Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1699568
17 January 2002
Ballast Water Examination · Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1479994
12 January 2002
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1478302
8 March 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 376038
14 March 1993
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 469116
7 August 1992
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 352411
18 April 1990
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 336562
30 August 1989
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 530646
15 December 1988
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 327410
23 December 1987
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 320352
18 October 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 319119
1 July 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 309893
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 17 January 2002
Resolved
Bunker Piping not tested/inspected IAW 33 CFR 156.170(f)(iii). Vessel not allowed to bunker within waters of the United States until corrected. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 18 January 2002
Resolved 3 April 2003
Resolution: verified report for testing of bunker piping conducted Nov02
Pollution Prevention/Response › Prevention Equipment
Issued 17 January 2002
Resolved
Fuel Oil / Lubricating Oil containment hold has multiple holes in it. Correct prior to next U.S. port after sailing foreign. 33CFR155.320(a)(ii) LEGACY COMPONENT DESC: Fixed Containment
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 18 January 2002
Resolved 1 November 2002
Engineering › Generator (propulsion-electric)
Issued 17 January 2002
Resolved
Exhaust leak in Ships Main Generator. Correct to the satisfaction of Classification Society prior to next U.S. port after sailing foreign. Solas Ch. 1 Reg. 11(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2002
Resolved 1 November 2002
Fire Fighting › Fire Hoses
Issued 17 January 2002
Resolved
Firefighting hoses and nozzles not in functioning condition. Metal bands connecting hose to clamps rusted and / or have cracks in bands. Replace or Repair one hose from engine room has hole(s) in it. Correct prior to next U.S. port after sailing foreign. LEGACY COMPONENT DESC: Connections
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 November 2002
Construction/Loadline › Penetrations
Issued 17 January 2002
Resolved
Exterior Natural Ventilation dampers missing dogs to secure ventilation. Also Engine room hatch on main deck aft missing dogs and not water & air tight. Correct prior to next U.S. port after sailing foreign.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 18 January 2002
Resolved 1 November 2002
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 17 January 2002
Resolved
Inspect and Test Paint Locker Fixed Firefighting (CO2) system to the satisfaction of the Administration prior to next U.S. port after sailing foreign. LEGACY COMPONENT DESC: Paint Locker Fixed CO2 System
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2002
Resolved 1 November 2002
Fire Fighting
Issued 17 January 2002
Resolved
Keep all fire doors closed IAW Solas II-2 Reg 47. Fire doors not to be tied open or remain open while not in use. Correct Prior to next U.S. port after sailing foreign. NOTE: Almost every fire door seen while conducting inspection was tied open or kept open by other means. LEGACY COMPONENT DESC: Fire Doors
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 18 January 2002
Resolved 1 November 2002
Navigation
Issued 17 January 2002
Resolved
Obtain Navigational Rules publication prior to next U.S. port after sailing foreign. LEGACY COMPONENT DESC: Publications
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 18 January 2002
Resolved 1 November 2002
Construction/Loadline
Issued 15 December 1988
Resolved
33CFR155.430 VESSEL'S STANDARD DISCHARGE CONNECTION WAS BROKEN OFF BEFORE THE MANIFOLD. AUTHORITY:33USC1903 PENALTY:33USC1908
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Navigation
Issued 1 July 1986
Resolved
33 CFR 164.35(K) NO STEERING GEAR INSTRUCTIONS POSTED ON THE BRIDGE.
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986