← All vessels
HAYDAR
HAYDAR is a 1981 freight ship. The Coast Guard has recorded 43 inspections since 1984, most recently in May 2012, along with 55 deficiencies and 9 operational controls.
Records from 1984 to 2012. Most recent: operational control imposed, 25 May 2012.
- Built
- 1981
- Last inspected
- 25 May 2012
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 55 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
7930682 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
TCCD
228125
Flag
GREECE
—
Maury page id
psix-228125
Inspections, by type
The 43 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it35336 - Convention (Subpart B), Gross Ton
65337 - Dead Weight, Ton
77134 - Displacement, Ton
21754 - Convention (Subpart B), Net Ton
65337 - Dead Weight, Ton
77134 - Displacement, Ton
21754 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 43
25 May 2012
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4321682
14 February 2012
PI Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4240819
25 January 2012
Ballast Water Examination · ISPS III Exam · PI Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4229061
8 January 2012
Ballast Water Examination · ISPS III Exam · PI Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4220678
21 September 2011
Deficiency Check · Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4145027
4 September 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4134938
19 August 2011
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4111451
25 July 2011
ISPS II Exam · Ballast Water Examination · Deficiency Check · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4088193
8 December 2005
PII Safety Exam · Ballast Water Examination · MARPOL Annex I Examination · ISPS II Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2540908
8 October 2004
ISPS II Exam
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2216813
6 October 2004
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2215388
13 May 2004
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2066510
12 May 2004
Administrative Inspection · Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2066359
21 August 2003
Security Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1882798
2 May 2003
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1789122
28 April 2003
Security Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1787128
10 March 2003
Annual Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1753917
7 March 2003
Security Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1766908
17 October 2000
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 283047
20 March 2000
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 276103
18 August 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 431913
17 November 1998
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 422439
15 September 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 12125
27 August 1998
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 420229
20 October 1997
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 408879
19 December 1996
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 398351
10 April 1996
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 389713
27 April 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 654485
24 April 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 377249
16 April 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 167901
14 November 1994
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 372406
2 August 1994
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 369078
2 August 1994
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1181684
17 July 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 352020
28 September 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 514096
24 February 1991
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 342122
12 December 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 334162
13 October 1988
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 326177
12 October 1987
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 318892
28 May 1986
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 487040
22 May 1986
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 450900
19 September 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 304356
14 November 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 299460
Deficiency record · 55
Engineering › Bilge Water Management System › Not Operational
Issued 14 February 2012
Resolved
1099- Other (alarm-signals)- After any survey has been completed, no change shall be made in the structural integrity arrangements, machinery, equip and other items covered by the survey. PSCO observed fwrd port and strbrd well bilge alarms not working properly. C/E stated floating switches were damaged. Provide doc attesting to the proper fix of bilge alarms. SOLAS 09 I/11
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 14 February 2012
Resolved
0340- Drainage- After any survey has been completed, no change shall be made in the structural arrangement, machinery, equip and other items covered by the survey. PSCO observed drain pipe from G/E spaces to Bilge Holding Tank disconnected, clogged and corroded. Observed containment around G/E with about 6 inches of water. Provide docs attesting the proper function of drainage. SOLAS 09 ch. I/11
Fire Fighting › Remote Fuel Shutoff › General
Issued 25 January 2012
Resolved
0750-Fire prevention-Fire protection and fire fighting systems and appliances shall be maintained ready for use. Quick closing fuel shutoff valve from mixing tank to main engine was wired open . Valve not capable of being remotely closed in event of fire. Provide report from certificate issuing authority attesting to proper operation of main engine quick closing valve. SOLAS 74a II-2/14
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 January 2012
Resolved
0750-Fire prevention-The maintenance plan should include at least the following fire protection systems where installed: emergency shutdown of fuel supply. Quick closing fuel valve was wired open, when asked to see maintenance records, C/E could not produce records for quick closing fuel valves. Provide corrective action plan from company with concurrence from Administration. SOLAS II-2/14
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 January 2012
Resolved
1470-Insulation wetted thru (oil)-In a ship in which oil fuel is used, the arrangements shall be such as to ensure the safety of the ship and persons on board. #1 generator has leaks around #6 cyl exhaust not being maintained; #6 cyl exhaust lagging is oil soaked producing fire hazard. Provide report from certificate issuing authority attesting to safe conditions of leaks/lagging. SOLAS 74a II-2/4
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 January 2012
Resolved
1470-In a ship in which fuel oil is used, the arrangements shall be such as to ensure the safety of the ship and persons on board. Viscosimeter in purifier room is leaking and has soaked flange shielding. Provide report from certificate issuing authority attesting to safe conditions of leak and soaked flange shielding. SOLAS 74a II-2/4
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 January 2012
Resolved
0800-Accident prevention-The condition of ship and its equipment shall be maintained to ensure ship will remain fit to proceed to sea without danger to ship or persons. PSCO observed soot on front of economizer and main engine exhaust. C/E stated main engine exhaust leaks. Provide report from certificate issuing authority attesting to integrity of main engine exhaust and economizer. SOLAS 74a I/11
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 25 January 2012
Resolved
0715-Detection-The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: fire detection and fire alarm systems. PSCO discovered smoke detector next to economizer taped over while examining what appeared to be an exhaust leak on the economizer.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 January 2012
Resolved
0800-Accident prevention-Condition of ship/equipment shall be maintained to ensure ship will remain fit to proceed to sea w/out danger to ship/persons. PSCO witnessed F/O lines disconnected from #1 generator leak tk and modification by replacing with hose on #2 generator. Provide clarification from certificate issuing authority attesting to acceptability of modifications. SOLAS 74a I/11
Electrical › Lighting (service) › Lighting Fixture
Issued 25 January 2012
Resolved
0520-Condition of ship/equipment shall be maintained to ensure ship will remain fit to proceed to sea w/out danger to ship/persons. Lighting in E/R has been modified by installing a new lighting system done by ship's crew. Provide documentation from certificate issuing authority as to acceptability of new lighting arrangement. SOLAS 74a I/11
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 25 January 2012
Resolved
0740-Pumps-Condition of ship/equipment shall be maintained to ensure ship will remain fit to proceed to sea w/out danger to ship/persons. PSCO observed emergency fire pump leaking oil at a rate of 60 drops per minute from L/O press gage line. SOLAS 74a I-11
Engineering › Fuel Oil Service System › Piping
Issued 8 January 2012
Resolved
0710-Fire prevention-External high pressure fuel delivery lines between high pressure fuel pumps and fuel injectors shall be protected with jacketed piping system. PSCO observed f/o leaking from crack in jacketed fuel injector line on #3 cyl backside injector. Provide documentation from certificate issuing authority attesting to adequacy of jacketed fuel line #3 cyl. SOLAS 74a II-2/15
Fire Fighting › Semiportable CO2 Fire Extinguishers › Service
Issued 8 January 2012
Resolved
0730-Appliances (general equip)-Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Installed ER CO2 hose reel had actuator handles tied off. Crew removed ties, one actuator handle fell off rendering CO2 bottle inoperable. Provide documentation from certificate issuing authority attesting to activation capability. SOLAS 74a II-2/14.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 8 January 2012
Resolved
0220-Certificates of competency-Each Administration shall hold companies responsible for the assignment of seafarers for service in their ships. 3rd engineers license limitations limited him to ships up to 3,000 kw. Provide letter of dispensation from Administration or appropriate license for 3rd engineer prior to departure. STCW I/1-14.1.2
Stability › Watertight Integrity › General
Issued 8 January 2012
Resolved
0999-Other (safety in general)-After survey of the ship has been completed, no change shall be made in its equipment without the sanction of the Administration. PSCO discovered valve in ER on port sea chest closed with no valve handle and nothing attached. Crew installed blank flange. Provide clarification from certificate issuing authority attesting to current valve arrangements. SOLAS 74a I/11
Stability › Watertight Integrity › General
Issued 8 January 2012
Resolved
0999-Other (safety in general)-After survey has been completed, no change shall be made without sanction of the Administration. Drain valves from steering gear room and emergency fire pump space were wired open in ER creating open communication between compartments. Crew removed wire ties. SOLAS 74a I/11
Fire Fighting › Means of Escape › Doorways
Issued 8 January 2012
Resolved
0730-appliances (general equipment)-Stairways and lift trunks which penetrate more than a single deck shall be surrounded by self-closing doors at all levels. Emergency escape door in ER would not self close. Crew adjusted and demonstrated proper self closing of door-SOLAS 74a, II-2/57
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 19 August 2011
Resolved
1499 - Other (Prop & Aux Machinery) - Each transfer pipe system must no leak under static liquid pressure test at 1.5 times MAWP. The frequency of the test must be annually. The ship's bunker and lube oil transfer pipes were not tested.- 33CFR156.170
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 19 August 2011
Resolved
0999 - Safety in general - During exam PSCO observed excessive oily water in the bilges. C/E stated several pipes were repaired causing a estimated 4.0cm3 of oily water to collect in the engine room bilges. In addition the Bilge Water Holding tank was completely full. PWSA 1223
Fire Fighting › Fire Main › Condition
Issued 25 July 2011
Resolved
0799- Other (fire fighting equipment)- the arrangement for the ready availability of water supply shall be to the satisfaction of the administration. PSCO observed during test of fire main a 3 inches crack which had burst under fire main pressure. 2009 SOLAS II-2/ 10
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 25 July 2011
Resolved
0950- Electric equip in general- During deficiency check, PSCO observed electrical boxes forward and aft of the port and starboard life boat still wasted, not water tight and no class report for repair.- 74 SOLAS II-1/ 27
Accommodation/Occupational Safety › Heating › Fuel Containers/Tanks
Issued 25 July 2011
Resolved
0900- Safety in general- During deficiency check, PSCO observed insulation of the feed water heating tank still deteriorated and no class report for repair. - 74 SOLAS I/11
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 25 July 2011
Resolved
1230-Railing- Effective guard rails shall be fitted to all exposed parts of freeboards and superstructure. PSCO observed a 20 foot section of guard rail missing on the starboard main deck forward. In addition the railing that is in place is severely wasted. 2009SOLAS II-1/27
Engineering › Steering Gear System › Pump
Issued 8 December 2005
Resolved
#1 STEERING GEAR CIRCUIT BOARD HEATER WAS NOT PROPERLY WORKING. PUMP MOTOR WOULD NOT START. ELECTRICIAN INSTALLED A NEW HEATER AND PUMP WAS OBSERVED TO PROPERLY START SEVERAL TIMES. CLASS MUST VERIFY INSTALLATION & OPERATION OF #1 STEERING PUMP.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 8 December 2005
Resolved
TWO WATER LEAKS WERE OBSERVED IN OVERHEAD IN CO2 ROOM. SOURCE OF WATER APPEARS TO BE THE A/C COOLING WATER LINE. THE WATER LEAK HAS STARTED TO RUST THE METAL CO2 BOTTLE ACTIVATION LEVERS AND WIRE (CABLE).
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 8 December 2005
Resolved
EXHAUST LEAK ON EMERGENCY FIRE PUMP PIPE AT TOP OF LADDER FROM THE EMERGENCY FIRE PUMP WELL.
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 8 December 2005
Resolved
EMERGENCY FIRE PUMP PRIMING PUMP CHECK VALVE IS IN BAD CONDITION. CREW HAD TO DISASSEMBLE AND PERFORM MAINTENANCE ON VALVE WHICH APPEARS TO HAVE OCCURED ON SERVAL OTHER OCCASIONS AS THE VALVE IS IN REALLY BAD SHAPE.
Electrical › Electric Generation Source (service) › Generator
Issued 8 December 2005
Resolved
MAIN GENERATOR #2 HAS A COOLING WATER LEAK NEAR THE FLANGE CONNECTION TO ENGINE BLOCK IN WAY OF #1 AND #2 CYLINDERS. PIPING IS HOLED AND COULD EFFECT PROPER OPERATION OF GENERATOR (OVERHEATING).
Engineering › Diesel Engine (propulsion-direct drive)
Issued 12 May 2004
Resolved
Vessel lost propulsion power. Inspect and repair to the satisfaction of class society.
Deck/Cargo › Ballast
Issued 10 March 2003
Resolved
Lifesaving › Launching Appliances
Issued 10 March 2003
Resolved
STBD davit arm for life boat is rusted LEGACY COMPONENT DESC: Davit
Fire Fighting › Structural - A Class Divisions
Issued 10 March 2003
Resolved
Fire door on main deck is missing a latch. LEGACY COMPONENT DESC: Openings - Fire Doors
Documentation › Certificates/Documents
Issued 10 March 2003
Resolved
Ship needed to provide a copy of the ISM Audit report. LEGACY COMPONENT DESC: Safety Management Certificate (ISM)
Fire Fighting › Fire Main
Issued 10 March 2003
Resolved
Fire Main leaking in 7 different places on the main deck.
Construction/Loadline
Issued 17 October 2000
Resolved
Investigate cause, determine extent of damage, and complete repairs to ballast piping in way of #1 cargo hold to satisfaction of U.S. Coast Guard prior to departure IAW ILLC 66 Annex I/1.
Unknown
Issued 17 October 2000
Resolved
z
Construction/Loadline
Issued 17 October 2000
Resolved
Provide written Class Society Survey report to USCG reflecting satisfactoryexamination of port internals in way of #1 cargo hold and port topside ballast tank prior to entering next US port IAW ICLL 66 Annex I/1.
Construction/Loadline
Issued 17 October 2000
Resolved
Effect permanent repairs to port #1 topside WBT drop valve and associated piping to the satisfaction of Lloyds and USCG prior to returning to U.S. port IAW ICLL 66 Annex I/1.
Fire Fighting
Issued 20 March 2000
Resolved
TEMP PATCH ON FIRE MAIN LINE AFT OF #5 CARGO HATCH STRB.
Fire Fighting
Issued 20 March 2000
Resolved
NEED FIRE PROOF LIFE LINE FOR EACH F/F APPARATUS
Fire Fighting
Issued 20 March 2000
Resolved
SHOW PROPER OPERATION OF EMER. FIRE PUMP._x001C_ PROVIDE CLASS REPORT.
Accommodation/Occupational Safety
Issued 20 October 1997
Resolved
PRIOR TO RETURN TO U.S., REPAIR HANDRAILS ON MAINDECK WHERE NEEDED. PWSA 33 USC 1231
Engineering
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, PRIOVIDE CLASS ATTESTATION AS TO ADEQUACY OF REPAIR IWOCEMENT PATCH ON SKIN VALVE, M/E ROOM, BOILER CONDENSATE DISCHARGE LINE (L/LEVEL, STARBOARD AFT). SOLAS 74, I/11
Lifesaving
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, INSTALL HAZARD GUARD IWO ROTATING SHAFT OF EMERGENCY FIRE PUMP. PWSA 33 USC 1231
Fire Fighting
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, REMOVE OIL SOAKED FIRE HOSES FROM LOWER LEVEL OF M/E ROOM AND REPLACE WITH SUITABLE EQUIPMENT. SOLAS 74 AMEN, II-2/21
Fire Fighting
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, DEMONSTRATE PROPER OPERATION OF FIRE DAMPERS IN HOUSE (WITH SPECIAL ATTENTION TO DAMPER IWO [name withheld], IN PASSAGE) ANDPROVIDE ATTESTATION TO SATISFACTORY OPERATION OF SAME. SOLAS 74, II-2/54
Engineering
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, PROVIDE CLASS ATTESTATION AS TO ADEQUACY OF REPAIR IWO MAIN SEAWATER COOLING LINE WHERE TEMP REPAIR EXISTS, M/E ROOM, LOWER LVL, P/S FORWARD. SOLAS 74, I/11
Construction/Loadline
Issued 20 October 1997
Resolved
PRIOR TO RETURN TO U.S., RENEW LOADLINE AND DRAFT MARKS AMIDSHIPS IN CONTRASTING COLOR WITH HULL. ICLL 66
Lifesaving
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, PROVIDE CLASS ATTESTATION AS TO CURRENT ARRANGEMENT OF EPIRB (FLOAT FREE). SOLAS 74 AMEN, IV/7.6.4
Lifesaving
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE CONDUCT SATISFACTORY ABANDON SHIP DRILL IN PRESENCE OF CLASS SOCIETY AND COAST GUARD AND PROVIDE ATTESTATION TO SATISFACTION WITH SAME. SOLAS 74 AMEN, III/18.3.4
Lifesaving
Issued 20 October 1997
Resolved
PRIOR TO DEPARTURE, PROVIDE CLASS ATTESTATION AS TO PROPER OPERATION OF STARBOARD LIFEBOAT DAVIT LIMIT SWITCH. SOLAS 74, III/36
Navigation
Issued 10 April 1996
Resolved
VESSEL ENTERED THE PORT NEW YORK WITHOUT A COPY OF U.S. COAST PILOT OR FOREIGN EQUIVALENT AS REQUIRED BY 33 C.F.R. 164.33(a)(2)(i).
Navigation
Issued 24 April 1995
Resolved
Vessel transited U.S. Waters without currently corrected charts of the area. M/V VIRGINIA came into Puget Sound with chart 1427(BA) needing corrections 73, 662, and 924. Chart 2689 needed correction 660.
Navigation
Issued 24 April 1995
Resolved
Vessel transited U.S. Waters without a current coast pilot or foreign equivalent. Vessels BA sailing directions hadn't been corrected since 1990.
Navigation
Issued 12 December 1989
Resolved
33 CFR 164.33 (A)(1)(II) VESSEL CHART OF THE AREA WAS NOT CURRENTLY CORRECTED 11370-14TH ED. LAST CORRECTED 23/88 05DEC87. AUTH:33 USC 1231 PEN:33 USC 1232
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.