Records from 1985 to 2003. Most recent: inspection, 6 April 2003.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 21
6 April 2003
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1769004
4 December 2001
Tank Vessel Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1476270
14 February 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 274533
13 April 1999
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 427425
13 April 1999
Tank Vessel Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 790260
16 November 1998
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 422616
24 October 1998
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 421844
18 July 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 418248
2 July 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 418815
25 December 1997
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 411157
25 December 1997
Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1122031
30 October 1996
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 396985
2 October 1996
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 395585
26 July 1994
Tank Vessel Examination · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1181830
18 January 1990
Certificate of Compliance
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 928323
21 June 1988
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 470879
3 May 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 308545
3 May 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1293111
2 December 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 455018
13 May 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 302010
13 May 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 981421
Electrical › Electric Generation Source (service)
Issued 6 April 2003
Resolved
Vessel has malfunctioning #3 generator that was reported prior to entering, vessel to have Administration approve the repairs prior to departing from Port of New York.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 6 April 2003
Resolved 9 April 2003
Resolution: Received fax Class report extending the repair of the #3 Generator till 04 May 2003.
Engineering › Steam System (main) › Piping
Issued 6 April 2003
No resolution recorded
Cement box found on the condensate overboard, starboard side in lower level of the engine room in way of frame #10-12. Vessel to make permanent and proper repairs to satisfaction of the Administration.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 May 2003 — due date passed with no resolution recorded
Lifesaving › Lifeboat › Safety Belt
Issued 6 April 2003
No resolution recorded
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2003 — due date passed with no resolution recorded
Lifesaving › Inflatable Liferafts
Issued 6 April 2003
Resolved
Vessel has three (3) life rafts per side with one weak link for each set of three. Provide each life raft with its own weak link in accordance with manufactures instructions, prior to departing. LEGACY COMPONENT DESC: Weak Link
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 6 April 2003
Resolved 9 April 2003
Resolution: Vessels management is disputing the fax (see attached document) that PSCO is requiring weak link for each raft as per manufacture instruction (see attached document). Item #4 has been cleared, letter to MOC to report issue pending.
Deck/Cargo
Issued 13 April 1999
Resolved
NO. 1 IGS FAN BLOWER INOPERABLE. MAKE REPAIRS, PROVE PROPER OPERATION TO THE SATISFACTION OF CLASS SOCIETY AND PRIOR TO CARGO TRANSFER WITHIN THE U.S. SOLAS 74(amended)Reg 62 II-2/3.1, Reg 62 II-2/7.1
Condition: Unknown
Due 14 April 1999
Resolved 16 April 1999
Deck/Cargo
Issued 13 April 1999
Resolved
IGS FIXED OXYGEN ANALYZER INOPERABLE. MAKE REPAIRS,CALIBRATE & PROVE PROPEROPERATION TO THE SATISFACTION OF CLASS SOCIETY AND PRIOR TO CARGO TRANSFER WITHIN THE U.S. SOLAS 74(amended)REG62 II-2/18.
Condition: Unknown
Due 14 April 1999
Resolved 16 April 1999
Electrical
Issued 13 April 1999
Resolved
REPAIR FUEL OIL LEAK ON NO.4 GENERATOR FUEL OIL FILTER. SOLAS 74(amended)Reg II.2/11
Condition: Unknown
Due 18 April 1999
Resolved 16 April 1999
Electrical
Issued 13 April 1999
Resolved
REPAIR LUBE OIL LEAK ON FWD END OF NO. 4 GENERATOR. SOLAS 74 (amended)Reg II.2/11
Condition: Unknown
Due 18 April 1999
Resolved 16 April 1999
Navigation
Issued 24 October 1998
Resolved
Prior to arrival & departure of U.S. waters, conduct all required tests in accordance with Title 33 CFR, Part 164.25 and vessel Safety Management System check lists.
Condition: Unknown
Due 16 November 1998
Resolved 16 November 1998
Fire Fighting
Issued 18 July 1998
Resolved
Prior to conducting cargo transfer operations, repair and prove proper operation of the firemain in way of holed piping on Main Deck, stbd side just forward of the superstructure.(SOLAS 74(A) CH I, REG 11).
Condition: Unknown
Due 19 July 1998
Resolved 20 July 1998
Navigation
Issued 18 July 1998
Resolved
Provide Class Society surveyor report attesting to the satisfactory repair and testing of the failed rudder stock hydraulic seal prior to 20JUL98._x001C_ (SOLAS 60 REG 29 CH 2)
Condition: Unknown
Due 20 July 1998
Resolved 20 July 1998
Deck/Cargo
Issued 18 July 1998
Resolved
Repair three broken cargo piping ground conducting straps.
Condition: Unknown
Due 18 July 1998
Resolved 18 July 1998
Deck/Cargo
Issued 18 July 1998
Resolved
Provide Class Society surveyor report regarding apparent temporary repairs to the bottom shell plating in way of #4 Port Ballast tank.(SOLAS 74(A) CH I, REG 11.
Condition: Unknown
Due 20 July 1998
Resolved 20 July 1998
Deck/Cargo
Issued 18 July 1998
Resolved
Provide Class Society report attesting to the removal of other proper disposition of the loosened heat exchanger assembly in the #4 Port Ballast tank. (SOLAS 74(A) CH I, REG 11.
Condition: Unknown
Due 18 August 1998
Resolved 20 July 1998
Deck/Cargo
Issued 2 July 1998
Resolved
REPAIR AND ENSURE PROPER OPERATION OF PORT INERT GAS BLOWER PRIOR TO DISCHARGING IN U.S. PORT, IN ACCORDANCE WITH SOLAS 74 AMENDED II-2/62.
Condition: Unknown
Due 1 September 1998
Resolved 1 September 1998
Engineering
Issued 2 October 1996
Resolved
RENEW NON-METALIC DISTRIBUTOR AIR HOSES ON 2 AND 4 GENERATOR.
Condition: Unknown
Due 31 October 1996
Resolved 31 October 1996
Deck/Cargo
Issued 2 October 1996
Resolved
PROVE PROPER OPERATION OF COMBUSTIBLE GAS INDICATORS
Condition: Unknown
Due 2 October 1996
Resolved 4 October 1996
Navigation
Issued 13 May 1985
Resolved
33CFR164.33 TIDE TABLE AND TIDAL CURRENT TABLES WERE OUT OF DATE AND UNCORRECTED. THEY WERE DATED 1984. THERE WERE NO FOREIGN EQUIVALENT PUBLICATIONS ABOARD. APPROPRIATE EDITIONS WERE PLACED ON BOARD AFTER LIGHTERING OPS. WERE COMPLETED AND BEFORE FINAL DEPARTURE.
Condition: Unknown
Due 16 May 1985
Resolved 13 May 1985