Records from 2003 to 2026. Most recent: inspection, 15 April 2026.
Inspection history · 30
15 April 2026
Deficiency Check · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8313400
22 January 2026
Vessel Attendance · Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8296444
27 August 2025
Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8220053
18 June 2025
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8163427
15 April 2025
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8111805
8 July 2024
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7953543
1 May 2024
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7876448
20 February 2024
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7867932
19 May 2023
Damage Survey · Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7693280
24 March 2023
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7656572
7 October 2022
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7573562
18 September 2022
Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7562439
25 July 2022
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7522627
25 April 2022
COI Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7437686
18 March 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7414327
9 February 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7393654
13 August 2020
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7084642
3 April 2020
COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6939615
17 October 2019
Administrative Inspection · Internal Structural Exam · Drydock Exam · Hull Examination · Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6831388
10 September 2019
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6808356
30 April 2019
Administrative Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6670283
15 October 2018
Administrative Inspection · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6558874
19 August 2018
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6564691
2 May 2018
COI Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6403043
14 September 2017
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6284327
25 April 2017
COI Inspection · MTSA Verification · MTSA/ISPS Verification · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6127650
7 October 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6017121
1 September 2016
Examination of Repairs · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5989789
22 May 2016
In-Service Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5885782
27 April 2016
COI Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5862007
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 15 April 2026
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. 1) The door leading from the galley to the engine room was unable to fully close and maintain the fire boundary. 2) Port side galley door doesn't latch properly when fire doors are activated.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 April 2026
Resolution: O/o provided video of both fire doors functioning as they should. Videos uploaded to Deficiencies-->Documents
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 April 2026
Resolved
All electrical installations shall be to the satisfaction of the OCMI. 1) Laundry room washer receptacle has ground pin broken off in one side of the outlet and extension cord with multiple plugs being utilized presenting an electrical hazard. 2) Junction box over the #1 SSDG is not mounted and just hanging. 3) Portable sump pump is being utilized as permanent installation using extension cord for galley ice maker drain. 4) Wires and connectors for equipment that was removed from the utility room on the 400 deck need to be secured.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026
Resolved 20 April 2026
Resolution: O/o provided objective evidence that the above deficiencies have been corrected. See deficiencies--Documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 April 2026
Resolved
Valves for removing water or impurities from fuel in water traps or strainers shall be provided with caps or plugs to prevent fuel leakage. Main and generator fuel filters are missing plugs for drain valves.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026
Resolved 23 April 2026
Resolution: O/o provided objective evidence of the fuel filters with the plugs installed. See Def---Docs tab.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 15 April 2026
Resolved
Each vessel must meet the applicable requirements in Subchapter S of this chapter...Penetrations and openings in watertight bulkhead penetrations must have means to make them watertight. Multiple cable penetrations at WTD #2 is loose and not watertight. Cable penetrations at WTD #1 are loose and not watertight.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026
Resolved 20 April 2026
Resolution: O/o Provided videos displaying each of the cable penetrations are properly sealed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 April 2026
Resolved
A fire control plan must show the location of fire protection/emergency equipment. The fire control plan does not show the interconnected smoke detector system installed by A Gow on 23APR2024.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2026
Resolved 23 April 2026
Resolution: Received and verified amended fire and safety plan. Amended by a P.E. uploaded to vessel documents tab.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 27 August 2025
Resolved
A vessel of more than 19.8 meters (65 feet) in length carrying more than 600 passengers or with overnight accommodations for more than 49 passengers must have:(a) Two generator sets;(b) An electrical power system that complies with the requirements of §§ 111.10-4, 111.10-5, and 111.10-9, in subchapter J of this chapter;(c) A final emergency power source, as defined by § 112.01-20 in subchapter J of this chapter, with sufficient capacity to power the loads listed in § 112.15-5 in subchapter J of this chapter for three hours; and(d) The final emergency power source located outside the machinery space. The vessel's starboard side generator shutdown while underway with 74 passengers on board. The vessel's emergency generator came on within 15 seconds and the port generator was brought on line with in a couple of minutes.46 CFR 120.312 (a)(b)(c)(d)
Action required: 10 - Deficiency Rectified
Resolved 27 August 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 April 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel giving consideration to protection against fire.
Fire Door on 2nd Deck leading to passageway for passenger accommodation did not latch. Inner spring found to be defective.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2025
Resolved 15 April 2025
Resolution: Damaged spring replaced. MI reviewed video or latching door
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 15 April 2025
Resolved
…the public address system must be […] audible during normal operating conditions throughout the accommodation spaces.
Passenger cabins have the ability to mute the public address system when switched to Channel 1.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2025
Resolved 15 April 2026
Resolution: Verified passenger cabins are unable to mute the public address system during the annual inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 April 2025
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape…
Various instances of emergency lighting throughout vessel, as designated on Fire Control Plan, not illuminated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2025
Resolved 15 April 2025
Resolution: O/o replaced worn lights and retested emergency lighting.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 April 2025
Resolved
or each watertight door which is in a required subdivision bulkhead, an indicator light must be installed in the pilothouse […]. The indicator must show whether the door is open or closed.
Mechanism for activation switch on 02 watertight doors found to be bent and unable to accurately indicate status of door.
Due by next DDX.
Action required: 705 - Other - as specified
Due 15 April 2026
Resolved 15 April 2026
Resolution: Verified the watertight door indicators accurately indicate the status of wt door during the annual inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2025
Resolved
[…] marine inspector shall require that all observed unsafe practices and hazardous situations be corrected.
Dead end wires in E/R and steering compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2025
Resolved 17 April 2025
Resolution: MI reviewed photo evidence of reapired dead end wires
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 May 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by
or originating in electrical equipment, and electrical shock;
Live deadend wires located above both main engines and generators in the engine room.
46CFR120.200
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2024
Resolved 2 May 2024
Resolution: Dead end wire removed from above engines.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 September 2022
Resolved
A vessel of more than 19.8 meters (65 feet) in length carrying more than 600 passengers or with overnight accommodations for more than 49 passengers must have:
(a) Two generator sets;
(b) An electrical power system that complies with the requirements of §§111.10-4, 111.10-5, and 111.10-9, in subchapter J of this chapter;
(c) A final emergency power source, as defined by §112.01-20 in subchapter J of this chapter, with sufficient capacity to power the loads listed in §112.15-5 in subchapter J of this chapter for three hours; and
(d) The final emergency power source located outside the machinery space…
Vessels port ship service diesel generator (SSDG) is out of commission. Repairs to be made to the satisfaction of the attending CG Marine Inspector. 46 CFR 120.312
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 24 September 2022
Resolved 24 September 2022
Resolution: Port generator oil cooler was replaced, ops check good.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 26 April 2022
Resolved
Floor framing in crew berthing #8 found corroded. Repair framing between operational season of 2022 and 2023.
46 CFR 115.610
Action required: 705 - Other - as specified
Resolved 21 April 2023
Resolution: Floor framing in crew berthing 8 was cropped and renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 April 2022
Resolved
Each major generator and motor shall be fitted with name plate. Marine inspector noted that No. 2 generator did not have a data plate attached. -46 CFR 183.10-5a ; 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 June 2022
Resolved 3 May 2023
Resolution: The port and starboard motors have data plates as well as the drive engines.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 April 2022
Resolved
Prove proper operation of fixed sprinkling system. Vessel completed extensive repairs of sprinkler system and system was not ready for inspection during USCG attendance. -46 CFR 181.05-5 ; 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 15 May 2023
Resolution: The system was brought up to pressure, dumped the valve on the zone and all alarms on the panel were tested. The alarm that is tied into the integrated smoke/fire detection system was tested as well.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 April 2022
Resolved
Flow meter is currently an indication of pump running but not flow or pressure. Vessel intends to install alarms associated with current flow meter -46CFR182.20-10 ;
705C-Prior to carrying passengers in 2023
Action required: 705 - Other - as specified
Resolved 21 April 2023
Resolution: Flow meter installed and alarm connected for all wet exhaust systems
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 30 April 2019
Resolved
(Cleared) 46 CFR 122.524(a) – Conduct a fire and man overboard drill in the presence of an attending CG Marine Inspector. The vessel did not provide adequate crew during the COI inspection. (Combined 2 similar CG-835 items).
Action required: 17 - Rectify deficiencies prior to departure
Due 30 April 2019
Resolved 3 May 2019
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 30 April 2019
Resolved
33 CFR 151.25(h) – Provide a corrective action plan and implement the same to ensure the Oil Record Book is being properly maintained to include Master’s signature, relevant entries with corresponding receipts and documents. (Combined 3 similar CG-835 items).
Action required: 702 - Prior to embarking on international voyage
Due 30 April 2019
Resolved 3 May 2019
01 - Certificates & Documentation › 013 - Documents › Cargo information
Issued 30 April 2019
Resolved
MARPOL VI/18.3 - Provide bunker delivery notes that provide all details required by MARPOL Annex VI.
Action required: 702 - Prior to embarking on international voyage
Due 30 April 2019
Resolved 3 May 2019
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 30 April 2019
Resolved
Provide a standard discharge connection.
Action required: 702 - Prior to embarking on international voyage
Due 30 April 2019
Resolved 30 July 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 April 2019
Resolved
Repair the deteriorated gasket on the FSD between the accommodation space and operating station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2019
Resolved 30 July 2019
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 30 April 2019
Resolved
46 CFR 120.432(a) - Provide adequate e-lighting serving below deck spaced to the assembly station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 3 May 2019
01 - Certificates & Documentation › 013 - Documents › Cargo information
Issued 30 April 2019
Resolved
Provide reception facility receipt for the off load of sludge and oily water.
Action required: 702 - Prior to embarking on international voyage
Due 30 April 2019
Resolved 3 May 2019
01 - Certificates & Documentation › 013 - Documents › SAR co-operation plan for pass. ships on fixed trade
Issued 30 April 2019
Resolved
SOLAS (2014) V/7.3 - Provide a SAR Cooperation Plan.
Action required: 702 - Prior to embarking on international voyage
Due 30 April 2019
Resolved 26 November 2019
Resolution: SAR Co-op plan approval letter rcvd and entered into MISLE
11 - Life Saving Appliances › N/A - No Subsystem › Thermal Protective Aids
Issued 30 April 2019
Resolved
SOLAS (2014) III/22.4.1 – Provide a thermal protective aid for each person on board (9 more).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 30 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 April 2019
Resolved
46 CFR 115.840 – Make repair to the leaking cooling water pipes for both MDE exhausts and starboard shaft seal.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 3 May 2019
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 30 April 2019
Resolved
46 CFR 121.602(b) – Repair the inoperative annunciator on the sound power phone between the steering compartment and the pilothouse.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 3 May 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 April 2019
Resolved
46 CFR 115.830(a) – Remove the combustible material stowed under the dry exhaust on the port and starboard side.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2019
Resolved 3 May 2019
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 April 2017
Resolved
Air conditioning unit in bow thruster/laundry room was wired with a 'permanent' extension cord. Remove and rearrange wiring to be in accordance with 46 CFR 120.340(r).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 25 April 2017
Resolution: Extension cord removed from service. Air conditioner plugged directly into ship's outlet.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 25 April 2017
Resolved
Electrical outlet box was missing front cover, presenting shock hazard. Renew outlet cover in accordance with 46 CFR 120.200(b).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 25 April 2017
Resolution: New cover was affixed to electrical outlet.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 April 2017
Resolved
Light fixture in A/C flat was loose and not properly mounted/secured. Mount in a fixed position in accordance with 46 CFR 120.410(c)(2).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 25 April 2017
Resolution: Lighting fixture was properly re-mounted to ceiling framing.
Stability › Unintentional Flooding › General
Issued 25 April 2017
Resolved
Laundry room/bow thruster room bilge had nearly two feet of water in the bilge. Bilges must be clean and dry for inspection in accordance with 46 CFR 115.802(a)(1).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 25 April 2017
Resolution: Vessel configured bilge system and pumped water overboard to allow for inspection.
Communications › Radio Communications › EPIRB
Issued 25 April 2017
Resolved
Service or Replace EPIRB. Update any contact information as necessary in NOAA Registration.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2017
Resolution: EPIRB renewed and registered.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 April 2017
Resolved
Many small electrical lines had improper terminations, including some on main propulsion engines. Terminate ends in an approved manner or remove to provide safe environment, per 46 CFR 120.200(c).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 1 May 2017
Resolution: New wiring harnesses installed and junction boxes fitted.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 25 April 2017
Resolved
Phone in lower passageway had un-mounted junction box with exposed wires. The box should be properly mounted in a way as to not present a shock/fire hazard, in accordance with 46 CFR 120.200(b).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 May 2017
Resolved 1 May 2017
Resolution: Junction box renewed.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 25 April 2017
Resolved
Engine room had excessive oil and fuel in the bilge as a result of ongoing engine maintenance. Bilges to be pumped at conclusion of engine work. 46 CFR 115.802(a)(1).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 1 May 2017
Resolution: Bilges pumped and cleaned.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 25 April 2017
Resolved
Oily water separator was undergoing maintenance and not available for inspection. Complete work and make available for USCG inspection prior to sailing international. 46 CFR 115.804.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 1 May 2017
Resolution: OWS work completed and tested sat.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 25 April 2017
Resolved
Starboard exhaust system found leaking corrosive fluid through gaskets near side-shell. Deck plate corroded & needs renewal. Make fittings leak-tight and arrest corrosion. 46 CFR 119.430(b).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 1 May 2017
Resolution: New gaskets installed and fittings tightened, sat.
Navigation › Piloting/Steering › Maneuverability Rating
Issued 25 April 2017
Resolved
Several parts of the navigation suite were tagged out for maintenance. Complete work and make ready for inspection per 46 CFR 115.804(b).
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 1 May 2017
Resolution: Navigation suite op-tested sat during sea trials.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 25 April 2017
Resolved
Fire Control Plan D, copy onboard vessel, did not have a USCG approval letter onboard. Plans must be approved by OCMI or MSC. Provide approval to OCMI's satisfaction, per 46 CFR 116.202.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 1 May 2017
Resolution: Fire control plan matches current vessel configuration.
Engineering › Diesel Engine (propulsion-direct drive) › Emergency shutdown
Issued 25 April 2017
Resolved
Main diesel engines were not available for safe testing, due to other work taking place in engine room at the time. Make available for USCG inspection prior to carrying passengers. 46 CFR 115.804(a).
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2017
Resolution: Generator and propulsion system op-tested sat during sea trials.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 25 April 2017
Resolved
Smoke detector batteries were expired and units were not working. Renew batteries.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2017
Resolved 28 July 2017
Resolution: Batteries replaced and units op-tested sat.
Engineering › Fuel Oil Service System › Valve
Issued 25 April 2017
Resolved
Engine room remote fuel shut-offs could not properly actuate. Overhaul remote connection so valve can actuate.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2017
Resolution: Valves overhauled and greased. Op-tested to actuate with ease.
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 25 April 2017
Resolved
Generator was undergoing maintenance and was not available for inspection. Make generator ready for op-testing and inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2017
Resolution: Generator was re-assembled after regular maintenance was complete and op-tested sat.
Operations/Management › Drills/Instruction › Not Conducted
Issued 25 April 2017
Resolved
Vessel not ready to get underway to perform drills. Vessel must get underway and perform required drills (Fire, MOB, Abandon Ship, Security).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2017
Resolution: Vessel got underway, performed drills satisfactory.
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 25 April 2017
Resolved
IBA’s were being serviced at time of inspection. Make IBA’s ready for inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2017
Resolution: IBA’s were made available for inspection. All sat.
Construction/Loadline › Penetrations › Pipe Flange
Issued 25 April 2017
Resolved
Bow thruster tunnel has wasted plate and holes beyond acceptable levels. Crop and renew plate to original scantlings, renew unit, or propose new design at next drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 October 2017
Resolved 8 November 2017
Resolution: Bow thruster tunnel completely replaced, see activity 6284327.
Fire Fighting › Fire Hoses › Condition
Issued 22 May 2016
Resolved
Replace all yellow fire hoses that are not commericially lined and do not meet UL 19.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 5 June 2016
Resolved 25 May 2016
Resolution: hoses replaced.
Engineering › Bilge Water Management System › Not Operational
Issued 27 April 2016
Resolved
Bilge high level alarm inop in lazerette. 46 CFR 119.530
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2016
Resolution: Attended vessel and witnessed satisfactory operation of bilge high level alarm in lazarette.