HAWK is a 1976 freight barge. The Coast Guard has recorded 36 inspections since 1984, most recently in March 2003, along with 54 deficiencies.
Records from 1984 to 2003. Most recent: inspection, 10 March 2003.
- Built
- 1976
- Last inspected
- 10 March 2003
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 54 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
648967
7620536 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WCW8204
228674
Flag
UNITED STATES
—
Maury page id
psix-228674
Inspections, by type
…with no type recorded10
Years with a record
16 calendar years (1984–2003)
The 36 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 23 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Tonnage as PSIX records it7100 - Regulatory (Subpart C or D), Net Ton
8896 - Convention (Subpart B), Net Ton
7100 - Regulatory (Subpart C or D), Gross Ton
19285 - Convention (Subpart B), Gross Ton
8896 - Convention (Subpart B), Net Ton
7100 - Regulatory (Subpart C or D), Gross Ton
19285 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WCW8204MMSI not assigned · expired · compulsorily equipped · granted 21 August 1996, cancelled 21 October 2006
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 36
10 March 2003
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1755111
3 February 2000
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 814392
1 March 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 799558
27 January 1999
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 789918
10 February 1998
Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1454516
28 April 1997
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1094473
9 April 1997
Re-Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1433188
5 November 1996
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 760749
1 November 1996
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 190180
29 February 1996
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 884996
24 January 1996
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1428588
7 April 1995
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1033231
12 October 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1470097
14 April 1994
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 366035
15 February 1994
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 853223
25 April 1993
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 832127
5 April 1993
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1419098
7 March 1993
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 854327
21 December 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 828675
29 July 1992
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 960487
14 April 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 953271
21 February 1992
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1266097
18 April 1991
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1236647
23 February 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 902780
17 October 1989
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1352342
5 April 1989
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1043597
18 March 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1208003
23 May 1988
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1352713
1 September 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 467314
23 June 1987
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1317682
14 April 1987
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1323596
19 March 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 438142
18 March 1987
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1326920
14 March 1987
COI Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1017836
3 March 1987
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1005084
21 December 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 976960
Deficiency record · 54
Construction/Loadline
Issued 27 January 1999
Resolved
Gouge and reweld emergency towing bitt joints. (Weldment fractured and wasted)
Accommodation/Occupational Safety
Issued 27 January 1999
Resolved
Repair approx 15' of safety railing, third deck, portside forward. (Damagedduring loading operations)
Engineering
Issued 27 January 1999
Resolved
Provide proper plug for fueling station containment trunk.
Lifesaving
Issued 27 January 1999
Resolved
Remove discontinued overhead electrical junction box, main deck.
Construction/Loadline
Issued 27 January 1999
Resolved
Crop and renew stbd stern frame member in vicinity of mooring winch. (Approx 3'x 4' flange stock)
Lifesaving
Issued 10 February 1998
Resolved
RENEW BULWARK ON THE ENTIRE 3RD DECK. (TEMPORARY REPAIRS MADE).
Lifesaving
Issued 10 February 1998
Resolved
PLACE GUARD OVER BULWARK OPENING ON THIRD DECK OF BARGE.
Construction/Loadline
Issued 10 February 1998
Resolved
RENEW THE (4) EXPANSION JOINTS ON 3RD DECK DUE TO SEVERE WASTAGE.
Construction/Loadline
Issued 10 February 1998
Resolved
RENEW FLANG PLATING ON OUTBOARD SIDES OF RAMP FROM 2ND TO 3RD DECK DUE TO WASTAGE.
Electrical
Issued 24 January 1996
Resolved
CONDUCT OPERATIONAL TEST OF OVERSPEED TRIPS OF BOTH SERVICE GENERATORS TO THE SATISFACTION OF ATTENDING INSPECTOR
Deck/Cargo
Issued 24 January 1996
Resolved
CONDUCT OPERATIONAL TEST ON PORT/STBD ANCHOR WINDLASS TO THE SATISFACTION OF ATTENDING INSPECTOR
Electrical
Issued 7 April 1995
Resolved
SECURE CABLE.
Lifesaving
Issued 7 April 1995
Resolved
REPAIR AND PROVE WATER TIGHT THE STARBOARD GENERATOR ROOM HATCH.
Navigation
Issued 7 April 1995
Resolved
RENEW NAVIGATION LIGHT SOLAR PANEL.
Construction/Loadline
Issued 7 April 1995
Resolved
PAINT PLIMSOL MARKS.
Lifesaving
Issued 7 April 1995
Resolved
RESTENCIL LIFE RINGS.
Construction/Loadline
Issued 7 April 1995
Resolved
ARC AND REWELD FRATURE TO THE PORT ROLLER CHOCK OPENING.
Electrical
Issued 7 April 1995
Resolved
INSTALL ELECTRICAL PANEL RUBBER MAT.
Construction/Loadline
Issued 7 April 1995
Resolved
THIRD DECK EXPANSION JOINT, CROP AND RENEW.
Deck/Cargo
Issued 7 April 1995
Resolved
RESTOW FUELING HOSE.
Deck/Cargo
Issued 7 April 1995
Resolved
STARBOARD WINCH MAINTENCE AND RENEW STRIPPING PAWL.
Unknown
Issued 7 April 1995
Resolved
REMOVE ALL USED CARGO LIGHTS.
Lifesaving
Issued 7 April 1995
Resolved
RENEW LIFERAFT
Construction/Loadline
Issued 15 February 1994
Resolved
CROP AND RENEW WASTED EXSPANSION JOINT AT THE BOTTOM OF THE SECOND LEVEL RAMP
Lifesaving
Issued 15 February 1994
Resolved
CLEAN EXCESSIVE HYDRAULIC FLUID AROUND PUMP FOR AFT RAMP PORT
Deck/Cargo
Issued 15 February 1994
Resolved
INSTALL CONTAINMENT SYSTEM AROUND HYDRAULIC PUMP FOR RAMP, PORT AFT
Electrical
Issued 15 February 1994
Resolved
REMOVE EXCESSIVE OIL FROM BOTH GENERATORS
Engineering
Issued 15 February 1994
Resolved
REPLACE DAMAGED P/V FOR THE GENERATOR FUELOIL TANK
Electrical
Issued 15 February 1994
Resolved
REMOVE EXCESSIVE OIL FROM GENERATOR ROOM FLOOR
Engineering
Issued 15 February 1994
Resolved
INSTALL MISSING CONTAINMENT AROUND GENERATOR FUEL OIL VENT
Accommodation/Occupational Safety
Issued 15 February 1994
Resolved
INSTALL MISSING LADDERS TO MANWAYS ON THE THRID DECK
Accommodation/Occupational Safety
Issued 5 April 1993
Resolved
REPLACE/ REPAIR ALL SAFTY CHAINS IN WAY OF ACCESS AREAS.
Construction/Loadline
Issued 5 April 1993
Resolved
PROVIDE GAUGINGS OF THE THIRD DECK, DECK PLATING AND CROP AND RENEW ALL UNSAT AREAS.
Construction/Loadline
Issued 5 April 1993
Resolved
REWELD ALL FRACTURED MAIN DECK RUB RAILS.
Construction/Loadline
Issued 5 April 1993
Resolved
PROVIDE DOCUMENTATION/ENGINEERING AS TO WHY VESSEL IS WORKING IN THE MID- BODY SECTION.
Construction/Loadline
Issued 5 April 1993
Resolved
CROP AND RENEW ALL WASTED BULWARK SECTIONS ON THE MAIN, SECOND AND THIRD DECKS.
Construction/Loadline
Issued 5 April 1993
Resolved
MAKE PERMENANT REPAIRS TO THE WASTED EXPANSION JOINTS ON THE SECOND AND THIRD DECKS.
Construction/Loadline
Issued 18 March 1989
Resolved
MAKE PERMANENT REPAIRS TO VESSELS HAND RAILS AND GUARDS LOCATED AROUND THE LOADING RAMP 02 LEVEL AMIDSHIPS.
Construction/Loadline
Issued 14 March 1987
Resolved
#4 STBD VOID, BETWEEN FRAMES 17&18, BETWEEN 2ND & 3RD SIDESHELL LONGS, VEE OUT AND WELD FRACTURED PLATE.
Construction/Loadline
Issued 14 March 1987
Resolved
#9 STBD VOID, CROP AND RENEW DAMAGE TO FRAME 46 AND RELATED INTERNALS AT SIDESHELL.
Construction/Loadline
Issued 14 March 1987
Resolved
#6 STBD VOID, BETWEEN FRAMES 30-31, AT SIDESHELL, MAKE REPAIRS OR REINFORCEUPPER SIDESHELL LONGS.
Electrical
Issued 14 March 1987
Resolved
RENEW ALL LIGHTING FIXTURES ON MAIN DECK, OVERHEAD.
Electrical
Issued 14 March 1987
Resolved
SECURE ALL LOOSE WIRING ON, OR TO LIGHT FIXTURES THROUGHOUT VESSEL.
Electrical
Issued 14 March 1987
Resolved
RENEW LIGHT FIXTURE, MAIN DECK, FWD AT BOW.
Electrical
Issued 14 March 1987
Resolved
SECURE WIRING AND LABEL CIRCUIT SWITCHES ON PORTSIDE, MAIN DECK LIGHT DISTRIBUTION PANEL.
Electrical
Issued 14 March 1987
Resolved
REPAIR AND PROVE PROPER OPERATION OF #2 GENERATOR.
Construction/Loadline
Issued 14 March 1987
Resolved
PROVE OPERATION OF PORT AND STBD BALLAST PUMPS.
Deck/Cargo
Issued 14 March 1987
Resolved
PROVE OPERATION OF PORT ANCHOR WINDLASS. MAKE CHAIN AVAILABLE FOR INSPECTION.
Electrical
Issued 14 March 1987
Resolved
PROPERLY SECURE WIRING ON PORT AND STARBOARD BALLAST PUMPS AND RELATED MOTOR CONTROLLERS.
Electrical
Issued 14 March 1987
Resolved
PROVE PROPER OPERATION OF EMERGENCY FUEL SHUT OFF FOR GENERATOR FUEL TANK.
Electrical
Issued 14 March 1987
Resolved
REPAIR OVERSPEED TRIP ON #1 GENERATOR.
Electrical
Issued 14 March 1987
Resolved
LABEL EMERGENCY FUEL SHUT OFF FOR GENERATOR FUEL TANK.
Construction/Loadline
Issued 14 March 1987
Resolved
REPAIR GASKET ON ENGINE ROOM VENT LOCATED ON PORT SIDE, FORWARD.
Electrical
Issued 14 March 1987
Resolved
PROVIDE BATTERY FOR #2 GENERATOR.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.