Inspection history · 20
16 June 2026
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8406512
31 March 2026
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8309534
22 April 2025
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8123617
21 May 2024
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7916340
3 April 2024
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7889473
29 June 2023
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7726843
24 May 2022
COI Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7457277
2 March 2022
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7404388
25 August 2021
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7284807
1 September 2020
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7043075
27 April 2020
Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6945307
16 March 2020
Deficiency Check · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6927332
26 March 2019
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6649342
20 March 2019
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6646264
9 April 2018
Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6566429
26 March 2018
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6378635
11 April 2017
COI Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6122428
4 January 2017
COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6066046
7 April 2016
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5848483
29 March 2016
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5842453
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 21 May 2024
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. MI found that the bilge alarm light at the operating station was not installed. Install light for bilge alarm and notify local OCMI when complete.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2024
Resolved 31 May 2024
Resolution: Received photo of alarm and light working from the operating station. All SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 June 2023
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018. Replace retroreflective on 04 Life Jackets.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 4 July 2023
Resolution: O/O replaced retro on 04 life jackets.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 24 May 2022
Resolved
Vessel VHF DSC radio found to be programmed without MMSI information. Program radio to include MMSI
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 May 2022
Resolved 24 May 2022
Resolution: Programmed VHF-DSC radio with MMSI and GPS information.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 March 2022
Resolved
Port fwd corner of engine room bulkhead found to be delaminated. Repair delaminated section of bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 May 2022
Resolution: Vessel POC removed damaged fiberglass and replaced with new. Fiberglass repair appeard to have a good secondary bond.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 2 March 2022
Resolved
Stern light lens found to be broken and missing. Repair stern light.
Action required: 705 - Other - as specified
Resolved 10 May 2022
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 25 August 2021
Resolved
Install operable VHF radio. Vessel is restricted from operationg > 1000' from land.
Action required: 705 - Other - as specified
Resolved 3 September 2021
Resolution: New radio installed in tested. Video received.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 August 2021
Resolved
Obtain FCC Safety Radio Certificate. Vessel is restricted from operating >1000' from land.
Action required: 705 - Other - as specified
Resolved 10 September 2021
Resolution: Picture of new FCC radio certificate received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 August 2021
Resolved
Provide 01 portable hand bilge pump of >5 GPM.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2021
Resolved 3 September 2021
Resolution: Picture of new bilge pump received.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 August 2021
Resolved
Replace or restock First Aid Kit meeting 46CFR 160.041.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 September 2021
Resolved 3 September 2021
Resolution: Picture of new first aid kit received.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 1 September 2020
Resolved
Properly install guard on serpentine belt in machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2020
Resolved 18 November 2020
Resolution: Vessel Rep emailed picture of Guard installed.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 1 September 2020
Resolved
Trace all dead end wiring and cable to ensure everything is secured properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2020
Resolved 29 September 2020
Resolution: Vessel rep emailed picture of all dead end wiring traced and labeled not in service. Deemed SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 1 September 2020
Resolved
Clean out debris from Rakor filter bowl.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2020
Resolved 29 September 2020
Resolution: Vessel rep emailed picture of cleaned Rakor filter bowl.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 1 September 2020
Resolved
Properly seal hatch on collision bulkhead.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2020
Resolved 29 September 2020
Resolution: Vessel rep emailed pictures of hatch on collision bulkhead properly sealed.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 1 September 2020
Resolved
Send us a copy of their updated crew list along with proof of pre-employment drug testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2020
Resolved 29 September 2020
Resolution: Vessel rep emailed updated DAPI crew roster.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead strength
Issued 17 March 2020
Resolved
Repair engine compartment bulkhead on stbd side @ hull. Fiberglass seal has broken bond.
Action required: 705 - Other - as specified
Due 30 April 2020
Resolved 27 April 2020
Resolution: Repaired.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 17 March 2020
Resolved
Re-tab deck beams @ hull that have broken bond (stbd x4 / port x1).
Action required: 705 - Other - as specified
Due 30 April 2020
Resolved 27 April 2020
Resolution: Repaired.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 March 2020
Resolved
Clean bilge of all oil/debris.
Action required: 705 - Other - as specified
Due 30 April 2020
Resolved 27 April 2020
Resolution: Bilge found cleaned.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 March 2019
Resolved
Provide life buoy with lifeline.
Action required: 705 - Other - as specified
Due 9 April 2019
Resolved 9 April 2019
Resolution: Lifeline was provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 March 2019
Resolved
Repair leaking salt water pump.
Action required: 705 - Other - as specified
Due 9 April 2019
Resolved 9 April 2019
Resolution: New pump was isntalled.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 26 March 2019
Resolved
Make repairs to rudder post tube to remove flexible hose between packing gland and thru-hull penetration.
Action required: 705 - Other - as specified
Due 9 April 2019
Resolved 9 April 2019
Resolution: Satisfactory repairs were made.
02 - Structural Conditions › N/A - No Subsystem › Spaces in cargo areas
Issued 26 March 2019
Resolved
Secure all mooring cleats firmly to the vessel.
Action required: 705 - Other - as specified
Due 9 April 2019
Resolved 9 April 2019
Resolution: All cleates were securely fastened.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 26 March 2018
Resolved
Properly seperate adult and child sized life jackets.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2018
Resolved 4 May 2018
Resolution: Life jackets seperated.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 26 March 2018
Resolved
Install aspirin and iodine in the first aid kit.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2018
Resolved 4 May 2018
Resolution: First aid kit up to date.
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 26 March 2018
Resolved
Properly secure the air intake housing on the MDE
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018
Resolved 4 May 2018
Resolution: New housing installed .
Engineering › Sea-water System (primary cooling) › Piping
Issued 26 March 2018
Resolved
Renew raw water discharge hose on MDE pump.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2018
Resolved 4 May 2018
Resolution: Renewed the raw water hose.
Engineering › Fuel Oil Service System › Valve
Issued 26 March 2018
Resolved
properly label the emergency fuel cut-off valve location.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2018
Resolved 4 May 2018
Engineering › Fuel Oil Service System › Valve
Issued 26 March 2018
Resolved
Re-design and demenstarte existing emergency cut-off valve mechanism
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2018
Resolved 4 May 2018
Resolution: Witnessed proper operation of the emergency cut-off valve.
Navigation › Piloting/Steering › Magnetic Compass
Issued 26 March 2018
Resolved
Install a magnetic compass
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2018
Resolved 4 May 2018
Resolution: Compass installed
Fire Fighting › Ventilation Systems › Ducts
Issued 26 March 2018
Resolved
Make engine compartment gastight and provide closures to prevent the admission of air during pre-engineered fixed sytem discharge.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2018
Resolved 4 May 2018
Resolution: Engine compartment is gastight.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 11 April 2017
Resolved
Provide name of the vessel on the PFDs, ring buoy and lifefloats to match the vessel name.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 29 June 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 April 2017
Resolved
Provide anchor light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 29 June 2017
Lifesaving › Lifebuoys › Size
Issued 11 April 2017
Resolved
Provide 24" ring bouy and bracket.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 29 June 2017
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 11 April 2017
Resolved
Provide ventilation for battery installation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 29 June 2017
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 7 April 2016
Resolved
Provide service report for one fire extinguisher and Fireboy.
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 13 April 2016
Resolution: Service report provided.
Engineering › Sea-water System (primary cooling) › Valve
Issued 29 March 2016
Resolved
Repair or replace ball valve for MDE cooling water intake.
Action required: 705 - Other - as specified
Due 29 March 2016
Resolved 7 April 2016
Resolution: Ball valve replaced.