Records from 2016 to 2026. Most recent: inspection, 19 February 2026.
Inspection history · 14
19 February 2026
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8313476
30 July 2025
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8198130
2 October 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8013193
31 January 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7858849
3 August 2023
Examination of Repairs · Hull Examination · Deficiency Check · COI Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7799091
8 May 2023
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7683712
13 September 2022
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7556853
12 July 2021
COI Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7248311
6 November 2020
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7092130
13 August 2020
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7032036
1 October 2019
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6825739
19 September 2018
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6544176
14 August 2017
Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6177948
6 July 2016
COI Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 5899112
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 February 2026
Resolved
Flexible nonmetallic hose may be used in lube oil, fuel oil and fluid power systems, subject to the following requirements:(i) Flexible hose may only be used at a pressure not to exceed the manufacturer's rating and must have a high resistance to saltwater, petroleum oils, and vibration;(ii) Flexible hose runs must be visible, easily accessible, protected from mechanical damage, and must not penetrate watertight decks or bulkheads;(iii) Flexible hose must be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid; and(v) For the purpose of flexibility only, flexible hose installed in lengths of not more than 760 millimeters (30 inches) and subject to pressures of not more than 35 kPa (5 psig), may meet the following requirements:(A) Suitable compression type connection fittings may be accepted;(B) Flexible hose designed for use with hose clamps may be installed with two clamps, at both ends of the hose, which:(1) Do not rely on the spring tension of the clamp for compressive force; and(2) Are installed beyond the bead or flare or over the serrations of the mating spud, pipe, or hose fitting; and USCG Type A1, A2, B1, or B2 flexible hose may be accepted in accordance with 33 CFR part 183 subpart J.
Install proper hose on the hydraulic return line for the vessels paddle wheel. Make system available or provide proof to marine inspector.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2026
Resolved 26 February 2026
Resolution: O/O procured correct hoses. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 July 2025
Resolved
Remote fuel shut off stations shall be marked in at least 1-inch letter indicating purpose of the valve and direction of operation. Valves not labeled, label valves as mentioned above. OLD (T)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 December 2025
Resolution: This office received photos clearing deficiency.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 July 2025
Resolved
Covered metal trash containers shall be provided. Replace plastic trash can with metal trash can. 46CFR177.30-7 (d) (OLD T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 January 2026
Resolved 11 December 2025
Resolution: Received photo evidence.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 July 2025
Resolved
A vessel of more than 7.9 meters (26 feet) in length, but not more than 19.8 meters (65 feet), must carry a minimum of one life buoy of not less than 610 millimeters (24 inches) in diameter. Please arrange life ring buoys in accordance with this site. 46 CFR180.70, 46CFR180.70 (b) (5)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 December 2025
Resolved 1 December 2025
Resolution: This office received photos clearing deficiency.
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 31 July 2025
Resolved
A vessel must comply with the applicable requirements for any radio) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessel needs updated call sign and all pertinent certificates. 46CFR184.502
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 January 2026
Resolved 11 December 2025
Resolution: Received photo evidence.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 November 2023
Resolved
Vessels carrying more than 49 passengers and not more than 65 feet must have a fixed bilge pump capable of dewatering at 25 GPM. Bilge pump was unable to dewater the aft two compartments.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 December 2023
Resolved 22 November 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023
Resolved
Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in the SMI within 2 hours. Alcohol test swabs were not onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 21 November 2023
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. emergency instructions do not adequately represent the actins the crew will take in an emergency situation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 21 November 2023
Resolved
A vessel with a power driven main steering gear must be provided with a rudder angle indicator. The RAI did not represent the position of the rudders.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Power to the forward ramp is supplied by a battery.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 November 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Lights on the port and starboard bow are not adequately housed and supported. The wiring under the helm is not properly supported.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 November 2023
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. the strn light is inoperable and the masthead light is not properly wired or supported.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 21 November 2023
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. The belt housing on the Port and stbd generators are exposed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 21 November 2023
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The port generator needs to be wiped dur to excess oil.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 21 November 2023
Resolved
Visual distress signals shall be in a watertight box marked "Distress Signals". The VDS are not properly stored.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 20 December 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 September 2022
Resolved
Starboard paddlewheel inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2022
Resolved 26 September 2022
Resolution: Received video of STBD paddlewheel fully operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 September 2022
Resolved
Bilge system is not getting any suction. Bilge pumps could not be tested.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 September 2022
Resolution: after repeated attempts, owner aligned the valves properly and the system worked.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 1 October 2019
Resolved
crew was not provided with fixed or portable means to communicate with the navigation bridge during emergencies (fire, MOB). Visual between the navigation bridge and first deck where MOB is maneuvered and picked up is limited.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: portable means of communications (walkie talkie) are now provided for communication between Captain at the operating station and crew in safety sensative positions.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 September 2018
Resolved
Repair inoperable port engine temperature gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2018
Resolution: Gauge now operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 September 2018
Resolved
Re-label breakers in distribution panel forward compartment.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 October 2018
Resolution: Breaker panel re-labeled.
Lifesaving › Hand Flares › Quantity
Issued 14 August 2017
Resolved
Add 2 additional red flares or 3 smoke signals
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 September 2017
Resolved 15 August 2017
Resolution: New flares purchased.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 14 August 2017
Resolved
Mount BII fire extinguisher in the wheelhouse in a proper bracket.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 September 2017
Resolved 15 August 2017
Resolution: Fire extinguisher (spare) was removed from the vessel.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 14 August 2017
Resolved
Provide proof of enrollment in drug consortium.
Action required: 705 - Other - as specified
Due 14 September 2017
Resolved 15 August 2017
Resolution: Proof of enrollment provided.