11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 March 2024
Resolved
Lifebuoys must have the following attachments and fittings: At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. The self-igniting light may not be attached to the lifebuoys required by this section to be fitted with lifelines. Vessel had 2 SM-3 float lights that were not fitted with lithium ion batteries. Replace currently installed batteries with batteries specified in 46 CFR
161.010. Vessel restricted to daylight operations only.
46 CFR 199.70(a)(3)(ii)
17 C
Action required: 17 - Rectify deficiencies prior to departure
Due 7 April 2024
Resolved 7 April 2024
Resolution: Vessel operator provided images of new batter for float light.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 7 March 2024
Resolved
Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that the liferaft or liferafts, when released and inflated, are not dragged under by the sinking vessel. A hydrostatic release unit used in a float-free arrangement must be approved under approval series 160.162. Both of the vessel's two hydrostatic release units (HRU) are expired. Replace expired HRUs with new units.
46 CFR 199.130(c)7
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 7 April 2024
Resolution: Vessel operator provided HRU servicing records for liferafts.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 7 March 2024
Resolved
There must be a sufficient number of deck officers, able seamen, or certificated persons on board the vessel to operate the survival craft and launching arrangements required for abandonment by the total number of persons on board. Vessel failed to provide 2 lifeboatmen to satisfy requirements of this section. Provide credentialing for 2 lifeboatmen.
46 CFR 199.100(b)
50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 9 April 2025
Resolution: Owner/Operator enrolled 02 crew members in lifeboatman school. Conducted internal training and designated 02 crew members in charge of liferafts.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 June 2023
Resolved
Electrical cable runs in main storage space on the 02 housing deck have sustained severe fire damage that deems it not serviceable. Must replace all damaged cable runs to the 120V distribution panel marked "Panel C" located on the main housing deck. All cable replacements must be in kind in accordance with the vessel electrical plan and 46 CFR 111.60 (Wiring Materials and Methods) to the satisfaction of the U.S. Coast Guard.
Action required: 705 - Other - as specified
Resolved 24 October 2023
Resolution: Replacment in kind cables were installed, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 June 2023
Resolved
Must replace all damaged fire fighting appliances; e.g. fire extinguishers, caused by fire damage to the satisfaction of the U.S. Coast Guard.
Action required: 705 - Other - as specified
Resolved 20 October 2023
Resolution: All damaged portable fire extinguishers were replaced; all sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 March 2023
Resolved
Except as provided in paragraphs (b) through (g) of this section, each vessel must undergo drydock, internal structural, and cargo tank internal examinations as follows:(1) Except under paragraph (a)(2) of this section, vessels that operate in salt water must be examined in a must be examined in accordance with the intervals set forth in Table 91.40-3(a) of this section. Where Table 91.40-3(a) indicates a 2.5 year examination interval, it means a vessel must undergo two examinations within any five year period. No more than three years may elapse between any two examinations. Make the following spaces available for inspection, bow rake, port and starboard #3 voids, and center fuel tank. Spaces must be inspected by a USCG MI prior to the vessel receiving CG ISE credit. 46 CFR 91.40-3(a)(1)
Action required: 705 - Other - as specified
Resolved 20 October 2023
Resolution: Deficiency cleared during vessel's 2023 credit drydock. See MISLE activity 7690025.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2023
Resolved
In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. Corrosion was observed on the center stern rake’s forward bulkhead in the vicinity of the first and second bottom longitudinals adjacent to the space’s entrance ladder. Provide a 3 inch by 3 inch grid pattern gauging report of the forward bulkhead between the first and second bottom longitudinals from the bottom plate to 2 feet up the forward bulkhead. The gauging report shall be submitted and reviewed to the satisfaction of the attending USCG MI prior to the vessel receiving CG ISE credit. 46 CFR 92.01-10(a)
Action required: 705 - Other - as specified
Resolved 20 October 2023
Resolution: Deficiency cleared during vessel's 2023 credit drydock. See MISLE activity 7690025.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2023
Resolved
In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. Corrosion was observed on the center stern rake’s first and second bottom longitudinals from center in the space’s inner most bay. Provide a 3 inch by 3 inch grid pattern gauging report of the corroded bottom longitudinals or submit a repair proposal for the replacement of the longitudinals to the satisfaction of the attending USCG MI prior to the vessel receiving CG ISE credit. 46 CFR 92.01-10(a)
Action required: 705 - Other - as specified
Resolved 20 October 2023
Resolution: Deficiency cleared during vessel's 2023 credit drydock. See MISLE activity 7690025.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2023
Resolved
In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. An inset was observed in bottom plate at girthbelt 7.5 in the #2 starboard void. Make the inset available for USCG MI external inspection prior to receiving CG ISE credit. 46 CFR 92.01-10(a)
Action required: 705 - Other - as specified
Resolved 20 October 2023
Resolution: Deficiency cleared during vessel's 2023 credit drydock. See MISLE activity 7690025.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2023
Resolved
In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. Corrosion was observed on the upper most side longitudinal between frames 9 and 10 in the #2 port void. Provide a gauging report of the corroded side longitudinal or submit a repair proposal for the replacement of the longitudinal to the satisfaction of the attending USCG MI prior to the vessel receiving CG ISE credit. 46 CFR 92.01-10(a)
Action required: 705 - Other - as specified
Resolved 20 October 2023
Resolution: Deficiency cleared during vessel's 2023 credit drydock. See MISLE activity 7690025.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 January 2023
Resolved
Each lifejacket must have a lifejacket light approved under approval series 161.112 securely attached to the front area of the lifejacket. 09 of the onboard lifejackets have lights that are expired.
46 CFR 199.70
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 February 2023
Resolution: life jacket lights replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 January 2023
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with sub chapter J (Electrical Engineering) of this chapter. Multiple dead end wires were found above upper generator and in the below deck storage compartment. Remove all dead end wiring.
46 CFR 90.25-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 February 2023
Resolution: Dead end wiring removed.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 February 2022
Resolved
When musters are held, details of abandon-ship drills, fire drills, drills of other lifesaving appliances, and onboard training must be recorded in the vessel's official logbook. Vessel has no record of fire or abandon ship drills.
46 CFR 199.180(h)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2022
Resolved 29 March 2022
Resolution: Drills completed and logged/documented.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2021
Resolved
Pressure vessels that are required by 54.10-3 to be stamped must have the following information, manufacturer's name and serial number, maximum allowable working pressure, class, etc.
The fwd and aft deck winch as well as the crane 2nd deck pressure vessels had data plates that were unreadable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2021
Resolved 14 January 2021
Resolution: 03 P/Vs had the paint removed from their data plates. Data plate shows the MAWP is 200 PSI with 150 PSI pressure relief devices installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 January 2021
Resolved
Each lifejacket must have a lifejacket light approved under approval series 161.112 securely attached to the front area of the lifejacket.
06 of the onboard lifejackets have lights that have expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2021
Resolved 14 January 2021
Resolution: 06 new approved lifejacket lights were installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 January 2021
Resolved
All marine engineering details such as piping, ..., shall be designed, constructed, and installed in accordance with the provision of subchapter F (Marine Engineering) of this chapter.
The generator exhaust piping in the overhead of the downstairs forward storage reached a temperature of 250 degrees F while inspector was onboard with possible ignition material (cardboard boxes, absorbent pads, etc.) within close proximity.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2021
Resolved 21 January 2021
Resolution: All possible ignition source material has been removed and appropriate heat shielding has been installed to protect the overhead I-beams.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 January 2021
Resolved
All marine engineering details such as piping, ..., shall be designed, constructed, and installed in accordance with the provision of subchapter F (Marine Engineering) of this chapter.
In the downstairs starboard aft storage there were 2 heating elements installed in the overhead with possible ignition material (cardboard boxes, absorbent pads, etc.) within close proximity.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2021
Resolved 14 January 2021
Resolution: Electrical cables running to the heating elements have been removed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 January 2021
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150.
The forward lifebuoy has a deteriorated plug and no longer meets the Q spec approval.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2021
Resolved 14 January 2021
Resolution: Approved lifebuoy plug has been installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 January 2021
Resolved
Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc.
The salt water pump does not have a guard in place.
Action required: 10 - Deficiency Rectified
Resolved 9 January 2021
Resolution: Guard was installed prior to end of inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 13 February 2020
Resolved
The type of piping joint used shall be suitable for the design conditions and shall be selected with consideration of joint tightness, mechanical strength and the nature of the fluid handled. Discovered exhaust leak on the upstairs generator. Demonstrate proper operation of exhaust piping under normal working conditions. Do not operate engine until corrected.
Action required: 705 - Other - as specified
Resolved 4 March 2020
Resolution: Verified proper installation of exhaust piping. Conducted operational test with no leaks. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 February 2020
Resolved
The use of oil-level gauges with flat glasses and self-closing valves between the gauges and fuel tanks is acceptable. Plastic guage was found installed on lube oil tank and waste oil tank. Install glass or other type of guage glass that will not melt in the case of a fire.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 March 2020
Resolved 4 March 2020
Resolution: Verified new guage glass was installed on the two oil tanks. All sat.
Electrical › Electric Supply System (service) › Cable
Issued 17 July 2017
Resolved
Replace damaged electrical cable for lower machinery space generator.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 August 2017
Resolved 24 January 2018
Resolution: Electrical cable replaced.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 17 July 2017
Resolved
Replace blade type fuse with proper UL listed cartridge type fuse.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 August 2017
Resolved 24 January 2018
Resolution: Fuse replaced with UL listed type fuse.
Electrical › Electric Supply System (service) › Cable
Issued 17 July 2017
Resolved
Replace bare unprotected wire with proper electrical cable.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 August 2017
Resolved 24 January 2018
Resolution: Wire removed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 17 July 2017
Resolved
Ensure splices are made in a junction box and support cables with metallic clamps every 24".
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 August 2017
Resolved 24 January 2018
Resolution: Verified acceptable splices made in junction box and cables supported with metallic clamps every 24".
Electrical › Electric Generation Source (service) › Generator
Issued 7 April 2017
Resolved
Provide data sheets for new machinery installations. Provide information for hoses, valves, and piping. Machinery located on the crane machinery deck to include new generators.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: Operator provided data sheets for new machinery installations.
Engineering › Compressed Air System (control) › Valve
Issued 7 April 2017
Resolved
Prove proper operation of relief valves for air receivers.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: Air receiver relief valves tested to popping pressure; all sat.
Construction/Loadline › Markings › Load Line Mark
Issued 7 April 2017
Resolved
Provide valid Loadline Certificate that corresponds with the markings on the port and stbd side of the vessel.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: Only the fresh water load line needs to be marked. This was verified with ABS surveyor. See attached email and document.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 7 April 2017
Resolved
Provide 08 lifejackets for use on approved route.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: 08 lifejackets with appropriate Q spec purchased by operator and onboard.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 7 April 2017
Resolved
Provide new batteries and corrosion resistant clip for water light attached to ring buoy.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: New battery and corrosion resistant clip installed on ring buoy.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 7 April 2017
Resolved
Service and demonstrate proper operation of fuel shutoff valve for fuel tank located centerline of the barge.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: Valve operated satisfactory and was placed back in service.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 April 2017
Resolved
Replace wiring and connections in crane operator space. Electrical connections must comply with 46 CFR Subchapter J.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: Electrical connections comply with subchapter J.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 7 April 2017
Resolved
Repair crane winch engine exhaust leak. 1" hole found on muffler.
Action required: 705 - Other - as specified
Due 17 July 2017
Resolved 17 July 2017
Resolution: Doubler welded in place over 1" hole on muffler.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 7 April 2017
Resolved
Re-install missing exhaust lagging on exhaust side of crane prime mover turbo charger
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 May 2017
Resolved 17 July 2017
Resolution: Verified lagging was replaced. All sat.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 7 March 2016
Resolved
Condition: Improper Installation
Action required: 703 - Prior to bunkering operations
Due 17 July 2017
Resolved 17 July 2017
Resolution: Fuel/oil transfer procedures provided and verified IAW 33CFR155 and 156.
Lifesaving › Inflatable Buoyant Apparatus › Not on Board
Issued 7 March 2016
Resolved
Provide an IBA to replace the life float.
Condition: Improper Installation
Due 15 April 2016
Resolved 17 July 2017
Resolution: Operator installed two new inflatable life rafts for all personnel onboard. Painter distance verified with installation.
Construction/Loadline › Structures › Superstructure
Issued 7 March 2016
Resolved
Repair the wasted structure under the crane operating station.
Condition: Improper/Lack of Maintenance
Due 15 April 2016
Resolved 17 July 2017
Resolution: Temporary repairs made to the crane structure IAW approved repair plan.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 7 March 2016
Resolved
Provide a dead front cover inway of the D/C distribution control panel.
Condition: Improper/Lack of Maintenance
Due 15 April 2016
Resolved 17 July 2017
Resolution: Dead front cover installed in way of the D/C distribution control panel.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 7 March 2016
Resolved
Provide a junction box for the exciter motor.
Condition: Improper/Lack of Maintenance
Due 15 April 2016
Resolved 17 July 2017
Resolution: Junction box provided for the exciter motor.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 7 March 2016
Resolved
Reinstall the lube oil line supports on the main crane engine in way of the lube oil by-pass.
Condition: Improper/Lack of Maintenance
Due 15 April 2016
Resolved 10 March 2016
Construction/Loadline › Structures › Rake
Issued 7 March 2016
Resolved
As indicated on 7MAR16 worklist item 1.
Condition: Damaged By Earlier Event
Due 15 March 2016
Resolved 17 July 2017
Resolution: Port aft rake, repaired gouge found in the outboard side shell.
Construction/Loadline › Structures › Rake
Issued 7 March 2016
Resolved
As indicated on 7MAR16 worklist item 2.
Due 15 March 2016
Resolved 17 July 2017
Resolution: Center aft rake, cropped and renewed longitudinal deck fram in way of port hatch.
Construction/Loadline › Structures › Rake
Issued 7 March 2016
Resolved
As indicated on 7MAR16 worklist item 3.
Condition: Damaged By Earlier Event
Due 15 March 2016
Resolved 17 July 2017
Resolution: Center aft rake, cropped and renewed fractured stern chord.
Construction/Loadline › Structures › Rake
Issued 7 March 2016
Resolved
As indicated on 7MAR16 worklist item 4.
Condition: Improper Installation
Due 15 March 2016
Resolved 17 July 2017
Resolution: Starboard aft rake, added missing gusset in way of outboard longitudinal side shell stiffner.
Construction/Loadline › Structures › Rake
Issued 7 March 2016
Resolved
Provide additional bottom hull gauging as indicated by the attending CG Marine Inspector.
Condition: Invalid
Due 31 July 2018
Resolved 15 July 2018
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 7 March 2016
Resolved
General - gauge the original longitudinal bottom stiffeners and replace as need to the satisfaction of a CG Marine Inspector.
Condition: Invalid
Due 31 July 2018
Resolved 12 July 2018
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 March 2016
Resolved
Measure and repair insets located on the stern and forward logs of the vessel IAW NVIC 7-68.
Condition: Invalid
Due 31 July 2018
Resolved 12 July 2018
Documentation › Certificates/Documents › Cargo Ship Safety Construction Certificate
Issued 7 March 2016
Resolved
Provide plans indicating or prove the priginal scantling of the vessel's bottom side shell and transvers/logitudinal bilkheands.
Condition: Invalid
Due 31 July 2018
Resolved 12 July 2018
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 7 March 2016
Resolved
Gauge/replace all wasted vertical and jogitudinal frames/stiffeners located within the P/C/S forward rake.
Condition: Invalid
Due 31 July 2018
Resolved 12 July 2018
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 7 March 2016
Resolved
As indicated on 10MAR16 worklist item 2.
Condition: Improper Installation
Due 15 April 2016
Resolved 17 July 2017
Resolution: Weld on the 1st bottom longitudinal outboard at the turn satisfactory.
Pollution Prevention/Response › Prevention Equipment › Internal Cargo Transfer Capability
Issued 6 April 2015
Resolved
No transfer procedures exist onboard
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 May 2015
Resolved 20 May 2015
Resolution: Provided satisfactory transfer procedures
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 6 April 2015
Resolved
Test all five (5) presure safety relief valves.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2015
Resolved 20 May 2015
Resolution: Satisfactorily tested 4 safety relief valves. 1 brand new valve was installed.
Construction/Loadline › Hull › Side Shell
Issued 6 April 2015
Resolved
Open bow and stern voids for inspections
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2015
Resolved 20 May 2015
Resolution: Satisfactory visual inspection of voids
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 6 April 2015
Resolved
One portable fire extinguishers just by office needs to be serviced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2015
Resolved 20 May 2015
Resolution: Fire extinguisher was in serviceable condition.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 19 February 2014
Resolved
Provide current transfer procedures iaw 33 CFR 155.720
Action required: 705 - Other - as specified
Due 12 March 2014
Resolved 20 May 2015
Resolution: Provided transfer procedures. Reviewed and found satisfactory.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 19 February 2014
Resolved
Provide updated local contacts in SOPEP iawa 33 CFR 157.26
Action required: 705 - Other - as specified
Due 12 March 2014
Resolved 6 April 2015
Resolution: Provided list of local contacts.
Operations/Management › Ballast Water Managment › Training
Issued 19 September 2013
Resolved
Company ballast plan conflicts with stability letter, personel fill all ballast tanks at same time, stability states to fill either centerline or p/s tanks, not all tanks. Gave company option to update company ballast plan to reflect stability letter or propose to MSC new stability measurements.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 10 December 2013
Resolution: Company is not going to seek new stability lettter and will comply with wording on stability letter.
Construction/Loadline › Hull › Bottom Plating
Issued 19 September 2013
Resolved
Some washed out welds in external bow rake, centerline. Approximately 20 linear feet.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 30 October 2013
Resolution: visual examined prior to completing drydock.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 19 September 2013
Resolved
Flammable lockers on back side of crane maindeck were not mounted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 10 December 2013
Resolution: Lockers were welded down, secured for sea.
Construction/Loadline › Hull › Stiffener
Issued 19 September 2013
Resolved
The port #3 Ballast tank bottom longs were suspect due to heavy rust. It was discovered that the vessel ballasts in uncoated spaces with salt water so rust is highly prevelant.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 30 October 2013
Resolution: Vessel UT suspect bottom longs and repalced.
Operations/Management › Pollution › Compliance with Transfer Procedures
Issued 30 April 2012
Resolved
Provide transfer procedures.
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 30 April 2012
Resolved
Provide floating waterlight.
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Lifesaving › Buoyant Apparatus › Quantity
Issued 30 April 2012
Resolved
Provide missing (2) paddles
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 30 April 2012
Resolved
Mark emergency scuttle located on main deck "emergency exit".
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Construction/Loadline › Markings › Load Line Mark
Issued 30 April 2012
Resolved
Properly mark L/L IAW load line certificate.
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Communications › Radio Communications › VHF Radiotelephone
Issued 30 April 2012
Resolved
Provide valid radio station licence
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Engineering › Fuel Oil Service System › Suction Strainer
Issued 30 April 2012
Resolved
Provide flame deflector bowls for all racor fuel filters.
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Operations/Management › Pollution › Control of Discharge of Oil
Issued 30 April 2012
Resolved
Provide vessel response plan.
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Operations/Management › Pollution › Control of Discharge of Oil
Issued 30 April 2012
Resolved
Provide SOPEP
Action required: 705 - Other - as specified
Due 15 May 2012
Resolved 15 May 2012
Documentation › Certificates/Documents › Stability Letter
Issued 23 April 2009
Resolved
Provide stability letter on board the vessel
Action required: 705 - Other - as specified
Resolved 27 April 2009
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 23 April 2009
Resolved
update SOPEP to reflect required clean up equipment
Action required: 705 - Other - as specified
Resolved 31 May 2009
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 23 April 2009
Resolved
install lights on lifejackets
Action required: 705 - Other - as specified
Resolved 31 May 2009
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 23 April 2009
Resolved
install burn protection on the exhuast stack on the bow wench near operator's station.
Action required: 705 - Other - as specified
Resolved 31 May 2009
Engineering › Diesel Engine (auxiliary) › Crankshaft
Issued 23 April 2009
Resolved
provide covers on rotatiing pullies on the bow wench engine
Action required: 705 - Other - as specified
Resolved 31 May 2009
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 23 April 2009
Resolved
install water float light to lifefloat
Action required: 705 - Other - as specified
Due 31 May 2009
Resolved 31 May 2009
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 28 January 2008
Resolved
Make paint lockers self closing.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2008
Resolved 4 February 2008
Engineering › Diesel Engine (propulsion-direct drive) › Gear, Timing
Issued 28 January 2008
Resolved
Conduct operational safety test of safety test on main engine prior to its operation
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2008
Resolved 4 February 2008
Construction/Loadline › Hull › Bottom Plating
Issued 19 November 2007
Resolved
18in x 18 in inset on bottom plate between bottom longitudinal in the stbd #2 void.
Action required: 705 - Other - as specified
Due 28 April 2008
Resolved 18 June 2008
Deck/Cargo › Holds/Tanks › Hatch
Issued 22 February 2007
Resolved
All Hatch Gaskets wasted.
Action required: 705 - Other - as specified
Due 22 March 2007
Resolved 6 March 2007
Construction/Loadline › Structures › Deck Plating
Issued 22 February 2007
Resolved
Repair wasted section of deck plating above #3SWT
Due 22 March 2007
Resolved 6 March 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 22 February 2007
Resolved
Install guard on light fixture in crane house.
Due 22 March 2007
Resolved 6 March 2007
Engineering › Pressure Vessel › Shell Plate
Issued 22 February 2007
Resolved
Replace all Air Recievers on open Deck. (wasted)
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 2 September 2008
Resolution: Air recievers are less than 5 CUFT. Air recievers belong to portable equipment that has been removed or replaced.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 22 February 2007
Resolved
Replace two wasted paint lockers aft of deck house.
Action required: 705 - Other - as specified
Due 10 April 2007
Resolved 28 February 2008
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 22 February 2007
Resolved
properly mount all portable fire extinguishers for easy access.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 April 2007
Resolved 28 January 2008
Deck/Cargo › Towing › Towline
Issued 22 February 2007
Resolved
Replace wasted emergency tow cable
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 April 2007
Resolved 28 January 2008
Construction/Loadline › Hull › Bottom Plating
Issued 22 February 2007
Resolved
Provide complete gauging report of entire hull and deck plating. Next drydock.
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 18 June 2008
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 24 January 2007
Resolved
Vessel must complete satisfactory ISE prior to operating beyond the Bounday Line IAW 46 CFR 91.40-3(a).
Action required: 705 - Other - as specified
Resolved 6 March 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 January 2006
Resolved
In crane operating station, provide UL approved electrical power strip.
Condition: Improper Installation
Due 26 February 2006
Resolved 6 March 2007
Fire Fighting › Means of Escape › Number
Issued 26 January 2006
Resolved
Provide second means of escape from machinery space for crane.
Condition: Design Flaw
Due 26 February 2006
Resolved 6 March 2007
Engineering › Fuel Oil Service System › Valve
Issued 26 January 2006
Resolved
Paint all fuel shut-off valves in contrasting color.
Due 26 February 2006
Resolved 6 March 2007
Lifesaving › Lifebuoys › Stowage
Issued 26 January 2006
Resolved
Properly mount and stencil all ring lifebouys and attached lights (inlcuding light brackets).
Due 26 February 2006
Resolved 6 March 2007
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 26 January 2006
Resolved
Replace containment plug for stbd fuel containment.
Due 26 February 2006
Resolved 6 March 2007
Lifesaving › Buoyant Apparatus › Retroreflective Material
Issued 26 January 2006
Resolved
Replace retroreflective tape & painter for bouyant apparatus.
Due 26 February 2006
Resolved 6 March 2007
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 26 January 2006
Resolved
Ensure proper storage in 1) all flammable lockers & 2) oils in storage room (i.e. motor, hydraulic oil).
Due 26 February 2006
Resolved 6 March 2007
Electrical › Electrical Distribution System (service)
Issued 29 January 2004
Resolved
Remove or properly dead end all loose or dead ended electrical wiring. LEGACY COMPONENT DESC: Conductor
Due 15 February 2004
Resolved 10 February 2004
Electrical › Electrical Distribution System (service)
Issued 29 January 2004
Resolved
Provide covers or blanks for all open electrical panels and boxes including: 220V heater thermostat in aft shop, top/btm power feed breaker in lower generator rm. LEGACY COMPONENT DESC: Distribution Panel Bus
Due 15 February 2004
Resolved 10 February 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 29 January 2004
Resolved
Properly lable all portable extinguisher stations throughout vessel; ensure all extinguishers are properly mounted, and remove excess portable extinguisher signage. LEGACY COMPONENT DESC: Marking
Due 15 February 2004
Resolved 10 February 2004
Electrical › Electrical Distribution System (service)
Issued 29 January 2004
Resolved
Replace plastic wire ties with metallic ties on wiring installations throughout vessel. LEGACY COMPONENT DESC: Conductor
Due 15 February 2004
Resolved 10 February 2004
Construction/Loadline › Structures
Issued 29 January 2004
Resolved
Prove proper operation and adjustment of watertight door located below main deck. LEGACY COMPONENT DESC: Door
Due 15 February 2004
Resolved 10 February 2004
Electrical › Lighting (service)
Issued 29 January 2004
Resolved
Provide cover on florescent light in port aft shop above outboard motor.
Due 30 April 2004
Resolved 27 April 2004
Construction/Loadline › Markings
Issued 29 January 2004
Resolved
Properly mark loadline on both side of vessel in accordance with vessel's loadline certificate. LEGACY COMPONENT DESC: Load Line Mark
Due 30 April 2004
Resolved 27 April 2004
Electrical
Issued 29 January 2004
Resolved
Ensure all batteries and battery boxes are properly maintained including: port battery on main deck single drum winch, and battery box located on the stbd 01 deck.
Due 15 February 2004
Resolved 10 February 2004
Pollution Prevention/Response › Prevention Equipment
Issued 29 January 2004
Resolved
Remove water from fuel oil containment located at front of deckhouse. LEGACY COMPONENT DESC: Fixed Containment
Due 15 February 2004
Resolved 10 February 2004
Engineering › Compressed Air System (control)
Issued 29 January 2004
Resolved
Replace or repair pressure gauge on generator driven air compressor.
Due 15 February 2004
Resolved 10 February 2004
Engineering › Diesel Engine (auxiliary)
Issued 29 January 2004
Resolved
Prove operation of main crane PTO engine (398) trips and alarms.
Due 15 February 2004
Resolved 10 February 2004
Lifesaving › Lifebuoys
Issued 29 January 2004
Resolved
Install retroreflective tape on all ring life buoys. LEGACY COMPONENT DESC: Markings (ship name/port)
Due 15 February 2004
Resolved 10 February 2004
Documentation › Certificates/Documents
Issued 21 January 2003
Resolved
Provide valid Certificate of Documentation. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Condition: Unknown
Due 30 January 2003
Resolved 23 January 2003
Documentation › Safety/Response Plans/Programs
Issued 21 January 2003
Resolved
Provide valid SOPEP letter. LEGACY COMPONENT DESC: SOPEP
Condition: Unknown
Due 30 January 2003
Resolved 23 January 2003
Construction/Loadline › Markings
Issued 21 January 2003
Resolved
Paint all hull markings in contrasting colors. LEGACY COMPONENT DESC: Hull
Condition: Improper/Lack of Maintenance
Due 30 January 2003
Resolved 24 January 2003
Engineering › Compressed Air System (control)
Issued 21 January 2003
Resolved
Make all air receiver pressure relief valves available for testing. LEGACY COMPONENT DESC: Valve
Due 30 January 2003
Resolved 24 January 2003
Accommodation/Occupational Safety
Issued 21 January 2003
Resolved
Remove all flammable containers from below deck storage compartment. LEGACY COMPONENT DESC: Flammables
Due 30 January 2003
Resolved 24 January 2003
Stability › Watertight Integrity
Issued 21 January 2003
Resolved
Properly adjust storage space watertight door. LEGACY COMPONENT DESC: Watertight Door
Condition: Improper/Lack of Maintenance
Due 30 January 2003
Resolved 24 January 2003
Lifesaving › Lifejacket/PFD (Type I)
Issued 21 January 2003
Resolved
Replace expired chemical lights on all life jackets. LEGACY COMPONENT DESC: Lights
Due 30 January 2003
Resolved 24 January 2003
Engineering › Diesel Engine (auxiliary)
Issued 21 January 2003
Resolved
Prove proper operation of Crane Swinger Generator overspeed. LEGACY COMPONENT DESC: Overspeed Device
Due 30 January 2003
Resolved 31 January 2003
Electrical › Lighting (service)
Issued 24 April 2002
Resolved
Repair flourescent light fixture located in lower storage hold (fwd/port). LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Due 8 May 2002
Resolved 1 May 2002
Electrical › Electric Supply System (service)
Issued 24 April 2002
Resolved
Repair temperature sensor connection to crane diesel engine. LEGACY COMPONENT DESC: Temperature sensor
Condition: Unknown
Due 8 May 2002
Resolved 29 April 2002
Electrical › Electric Supply System (service)
Issued 24 April 2002
Resolved
Repair dead end electrical wire (s) on air compressor (engine space). LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Due 8 May 2002
Resolved 29 April 2002
Electrical › Electrical Distribution System (emergency) › Distribution Panel Bus
Issued 24 April 2002
Resolved
Clean inside of machinery space distribution panel (trash/dangling wires). Repair dead end electrical wire.
Condition: Improper/Lack of Maintenance
Due 8 May 2002
Resolved 29 April 2002
Electrical › Electric Supply System (service)
Issued 24 April 2002
Resolved
Replace missing cover-plate (2) on junction boxes on forward bulkhead of crane space engine room. LEGACY COMPONENT DESC: Junction boxes (COVER)
Condition: Improper/Lack of Maintenance
Due 8 May 2002
Resolved 29 April 2002
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 24 April 2002
Resolved
Make permanent repairs to leaking heat exchanger (crane diesel engine). LEGACY COMPONENT DESC: Heat Exchanger
Condition: Unknown
Due 8 May 2002
Resolved 29 April 2002
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 24 April 2002
Resolved
Repair fractured mounting bracket to cooling line support (engine space fwd). LEGACY COMPONENT DESC: Mounting Bracket
Condition: Unknown
Due 8 May 2002
Resolved 29 April 2002
Engineering › Freshwater System (injector cooling)
Issued 24 April 2002
Resolved
Repaired dryed/wasted hose (or cap off) to "un-used" water retarder (system). LEGACY COMPONENT DESC: Water Retarder
Condition: Improper/Lack of Maintenance
Due 8 May 2002
Resolved 29 April 2002
Construction/Loadline
Issued 16 October 2001
Resolved
Prior to barge operations, affect permanent repairs to damaged main-deck inset(s). Location: Storage hold overhead/port-side, and fuel tank overhead (center).
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 April 2002
Resolved 25 April 2002
Deck/Cargo
Issued 16 October 2001
Resolved
Prior to barge operations, affect permanent repairs to crane and its appliances.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 April 2002
Resolved 25 April 2002
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to orginal condition: PORT Stern Rake; Cracked weld on #1 (upper)_x001C_ main vertical frame (outboard) in way of #1 main transverse from (upper- overhead)._x001C_
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #3 STBD Void; Renew wasted/cut out 1/4 frame inboard behind #2 main transverse frame.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #3 STBD Void; Cracked weld on #3 main transverse frame (outboard/inboard) in way of #3 main vertical frame.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #2 STBD Void; Cracked weld on #1 main transverse outboard frame (lower) in way of #1 main vertical frame.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #1 PORT Void; Bent/cracked bottom main transverse frames #1, 2 and 3 (outboard) intersecting #1, 2 and 3 vertical frames.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #1 PORT Void; Bent/cracked bottom main transverse frames #1, 2 and 3 (inboard) intersecting #1, 2 and 3 vertical frames.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #1 PORT Void; #2 overhead long (8in from #1 upper transverse frame) *fill in "half circle cut-out".
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #1 PORT Void; Tripped weld at #4 side long (outboard) in way of #4 BHD.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #2 PORT Void; Cracked welds on #1 and 2 vertical frames in way of #2 and 3 side longs (outboard).
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #2 PORT Void; Dent/inset on #1 vertical frame(outboard) in way of #1 overhead transverse frame.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: PORT Stern Rake; Dent/inset on (inboard) centerline BHD in way of AFT BHD, * 4ft from deck to overhead.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: PORT Stern Rake; 2 tripped welds,_x001C_ approximately 4 ft up on #3 vertical long in way of AFT BHD (inboard)._x001C_
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #2 STBD Void; Crop and renew entire #4 (top) side long from FWD bulkhead to AFT bulkhead.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #2 STBD Void; Crop and renew entire #3 (from top) side shell long from frame #1 and 2.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #2 STBD Void; Cracked weld on #2 main transverse outboard frame (lower) in way of #2 main vertical frame.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: Centerline AFT Rake; Cracked weld on center line bottom long at vertical frame on FWD Bulkhead.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #3 STBD Void; Crop and renew entire #4 (top) side long from FWD bulkhead to #2 frame main transverse.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #3 STBD Void; Cracked weld on #1 main_x001C_ transverse frame (outboard/inboard) in way of #1 main vertical frame._x001C_
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Construction/Loadline
Issued 29 May 2001
Resolved
Repair to original condition: #3 STBD Void; Cracked weld on #2 main transverse frame (outboard/inboard) in way of #2 main vertical frame.
Condition: Unknown
Due 29 May 2001
Resolved 29 May 2001
Unknown
Issued 26 January 2001
Resolved
Install missing screen/guard to #1 exhaust fan (lower level), IAW: 46 CFR 58.01-20.
Condition: Unknown
Due 26 January 2001
Resolved 26 January 2001
Electrical
Issued 26 January 2001
Resolved
Install missing guard/cover to light fixture (base of ladder, lower level) IAW: 46 CFR 111.75-20 (3) (b).
Condition: Unknown
Due 26 January 2001
Resolved 26 January 2001
Accommodation/Occupational Safety
Issued 24 March 2000
Resolved
Install newly tested relief valves on air receivers. (46 CFR 54.15-10)
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Documentation
Issued 24 March 2000
Resolved
Post Oil Pollution placards. (33 CFR 155.450)
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 24 March 2000
Resolved
Test main generator overspeed and low lube oil trips in the presence of a USCG Marine Inspector. (46 CFR 111.12)
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Construction/Loadline
Issued 19 March 1999
Resolved
Repair or replace the lower right dog device on the port watertight door and the upper left dog device on the starboard watertight door._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Electrical
Issued 19 March 1999
Resolved
Drain fluid out of downstairs battery boxes._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Lifesaving
Issued 19 March 1999
Resolved
Replace upstairs grinder shields._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Lifesaving
Issued 19 March 1999
Resolved
Replace Type I PFD waterlights._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Engineering
Issued 19 March 1999
Resolved
Demonstrate overspeed trip on the generator motor._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Engineering
Issued 19 March 1999
Resolved
Hydrostatically test all bunker and fuel transfer piping and hoses in accordance with 33 CFR 156.170._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Lifesaving
Issued 19 March 1999
Resolved
Renew all relief valves on all inspected air receivers._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Fire Fighting
Issued 26 March 1998
Resolved
Install a door latch on the ship service generator space door.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Electrical
Issued 26 March 1998
Resolved
Properly secure boom lights electrical wire splices in a junction box with pressure connectors, located in forward end of crane house.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Engineering
Issued 26 March 1998
Resolved
Install the proper size and type relief valve on the forward deck winch airreceiver.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Engineering
Issued 26 March 1998
Resolved
Install remote fuel shutoff valves for the crane engine and crane generator. The valves shall be operable from outside of the machinery space in which the engines are located.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Lifesaving
Issued 26 March 1998
Resolved
Properly connect the buoyant apparatus weak link and sea painter to the vessel.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Lifesaving
Issued 26 March 1998
Resolved
Properly label the buoyant apparatus with the capacity and vessel's name.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Lifesaving
Issued 26 March 1998
Resolved
Provide a Coast Guard approved waterlight with an 18 foot lanyard for the buoyant apparatus.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Construction/Loadline
Issued 26 March 1998
Resolved
Dewater; gas free certified safe for entry by a marine chemist; make the following voids available for Coast Guard internal exam: forward port rake,forward center rake, forward stbd rake, #4 port, #4 stbd and aft stbd rake.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Construction/Loadline
Issued 26 March 1998
Resolved
Paint vessel name on port and stbd sides of bow, stern and on lifesaving equipment. Paint hailing port on stern.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Electrical
Issued 26 March 1998
Resolved
Properly label all circuit breakers in all distribution panels.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Documentation
Issued 26 March 1998
Resolved
Provide oil transfer procedures and person-in-charge (PIC) IAW 33CFR155.720and 33CFR155.710.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Engineering
Issued 26 March 1998
Resolved
Hydrostatically test all bunker and fuel transfer piping and hoses IAW 33CFR156.170. Provide proper documentation of test results.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Construction/Loadline
Issued 26 March 1998
Resolved
Renew worn bushings and properly adjust port and stbd watertight doors.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Engineering
Issued 26 March 1998
Resolved
Properly insulate exhaust piping on the ship service generator, crane engine and crane generator.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Engineering
Issued 26 March 1998
Resolved
Pop test all air receiver relief valves (5 each) in the presence of a CoastGuard marine inspector or provide documentation of the test.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Engineering
Issued 26 March 1998
Resolved
Demonstrate operation of all safety devices (overspeed trip, low lube oil pressure and H. W. temperature) in the presence of a Coast Guard marine inspector or provide documentation of the test; crane engine and crane generator.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Engineering
Issued 26 March 1998
Resolved
Provide specifications on newly installed air receiver (crane sub-base) indicating ASME Code approval, MAWP and manufacturer name plate data.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Documentation
Issued 26 March 1998
Resolved
Provide a valid loadline certificate. Vessel is not permitted to operate beyond the boundary line until this item is satisfied.
Condition: Unknown
Due 26 March 1998
Resolved 26 March 1998
Engineering
Issued 26 March 1998
Resolved
Double hose clamp salt water hoses on the ship service generator.
Condition: Unknown
Due 6 May 1998
Resolved 6 May 1998
Electrical
Issued 29 May 1996
Resolved
Remove all wires/cables with solid conductors used throughout the vessel.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Install required ground detection system for the electrical plant.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Install missing electrical gauges/meters for the ship service generator.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Provide the cognizant OCMI with approved as-built electrical one line diagram of the electrical system on board.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Reinstall all the electric cables in the forward center and stbd rakes in conduits for protection from ballast water.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Remove all unapproved wire nuts used in electrical splices/connections throughout the vessel._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Accommodation/Occupational Safety
Issued 29 May 1996
Resolved
Provide emergency escape ladder below the 27" emergency escape hatch outboard to port of ladder leading to the engine room below deck._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Remove wasted pipe penetrating the long bulkhead between center forward rake and stbd forward rake and make bulkhead watertight._x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Remove all type SOJ (portable) cables permanently installed inside the crane generator panel.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Install drip shield above the battery charger forward of the crane generator panel.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Properly install connection box covers above the crane generator.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Electrical
Issued 29 May 1996
Resolved
Properly install covers for the crane lighting ballast in the crane machinery deck.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Renew all manhole covers to all the voids._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
crop and renew wrinkled/buckled deck main deck edges on #3 stbd void (2 places)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Properly weld the 4"x8" plug in the aft bulkhead of the port fwd rake approximately 2' below #3 underdeck long where a 2.5" pipe used to penetrate the bulkhead.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Repair fractured weld in the top sidelong in #3 port void, #1 bay._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Crop and renew 2'x2' damaged deck 3' inboard of #2 port void manhole.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Accommodation/Occupational Safety
Issued 29 May 1996
Resolved
Make deck hatch (emergency escape) overhead of the storeroom operable from the storeroom side for proper emergency escape._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Construction/Loadline
Issued 29 May 1996
Resolved
Crop and renew buckled sidelong (top) in #1 port void, #4 bay._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Unknown
Issued 8 April 1996
Resolved
PRIOR TO OPERATING VESSEL IN COASTWISE TRADE PROVIDE A COPY OF VESSEL'S SOPEP CG APPROVAL LETTER.
Condition: Unknown
Due 15 April 1996
Resolved 8 April 1996
Engineering
Issued 8 April 1996
Resolved
PROVE PROPER OPERATION OF REMOTE FUEL SHUT OFF VALVE.
Condition: Unknown
Due 15 April 1996
Resolved 8 April 1996
Lifesaving
Issued 8 April 1996
Resolved
CLEAN OR REPLACE AFT RING BUOY(COATED IN BLACK OIL) AND MAKE READILY ACCESSIBLE(STOWED BEHIND CABLE AND HOSE).
Condition: Unknown
Due 15 April 1996
Resolved 8 April 1996
Unknown
Issued 8 April 1996
Resolved
VESSEL MAY NOT OPERATE IN COASTWISE TRADE UNTIL CG D14 GRANTS APPROVAL FOR DRYDOCK EXTENSION.
Condition: Unknown
Due 15 April 1996
Resolved 8 April 1996
Engineering
Issued 8 April 1996
Resolved
PROVE PROPER OEPRATION OF THE CRANE GENERATOR, ASSOCIATED LUBE OIL ALARMS AND SHUTDOWN DEVICES.
Condition: Unknown
Due 15 April 1996
Resolved 8 April 1996
Unknown
Issued 8 April 1996
Resolved
PROVIDE A COPY OF THE VESSEL'S ABS CLASS DOCUMENT.
Condition: Unknown
Due 15 April 1996
Resolved 8 April 1996
Electrical
Issued 24 May 1995
Resolved
Stair room - remove or properly terminate dead end wires._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 June 1995
Resolved 27 June 1995
Electrical
Issued 24 May 1995
Resolved
CRANE GENERATOR ROOM - REMOVE ALL DEAD END WIRING
Condition: Unknown
Due 14 June 1995
Resolved 27 June 1995
Electrical
Issued 24 May 1995
Resolved
CRANE GENERATOR ROOM - PROPERLY LABEL BREAKERS IN ELECTRICAL DISTRIBUTION PANEL.
Condition: Unknown
Due 14 June 1995
Resolved 27 June 1995
Electrical
Issued 24 May 1995
Resolved
CRANE GENERATOR ROOM - PROVE PROPER OPERATION OF GENERATOR OVERSPEED.
Condition: Unknown
Due 14 June 1995
Resolved 27 June 1995
Navigation
Issued 21 April 1994
Resolved
Prove proper operation of navigation lights. Vessel is restricted to daylight operations until requirement is corrected.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 21 April 1994
Resolved
Renew weak link for Buoyant Apparatus.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Navigation
Issued 21 April 1994
Resolved
Hydrostatically test air receivers IAW 46 CFR 61.10-5(d).
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 21 April 1994
Resolved
Prove proper operation of volt and ammeter for lower machinery space generator.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Accommodation/Occupational Safety
Issued 21 April 1994
Resolved
Prove proper operation of MSD. When manned, vessel is restricted to voyages of 30 minutes until requirement is cleared.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Deck/Cargo
Issued 21 April 1994
Resolved
Provide window for winch operator house.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 21 April 1994
Resolved
Provide metal shelves in place of wood shelves in the paint locker IAW 46 CFR 92.05-10 (a).
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Unknown
Issued 21 April 1994
Resolved
Remove fuel oil from containment under crane turret.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 28 December 1993
Resolved
PROVE PROPER OPERATION OF THE ELECTRICAL LIGHTING SYSTEM IN THE SPACE CONTAINING THE ELECTRICAL GENERATOR FOR DECK POWER.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Electrical
Issued 28 December 1993
Resolved
PROVE PROPER OPERATION OF THE DECK LIGHTS.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
IN #1S, CROP AND RENEW WHERE BUCKLED, THE 3RD VERTICAL SIDE SHELL STIFFENERFROM THE FWD BULKHEAD WHERE THE 2ND SIDE LONGITUDINAL FROM THE OVHD PASSES THROUGH.
Condition: Unknown
Due 1 March 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
In no. 2 S, arc out andreweld the fractured weld seam located between the 3rd vertical side stiffener and the aft bulkhead where the side shell ties to the main deck.
Condition: Unknown
Due 1 March 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
REPLACE THE CONTROL CIRCUITRY ELECTRICAL BOXES ON THE GENERATOR IN THE ELECTRICAL GENERATOR COMPARTMENT.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Electrical
Issued 28 December 1993
Resolved
PROPERLY SECURE ELECTRICAL CABLES LOCATED IN THE CENTER BOW RAKE COMPARTMENT.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Lifesaving
Issued 28 December 1993
Resolved
REMOVE OR PROPERLY BLANK UNUSED SECTION OF 1/4" PIPE LINES BROKEN OR WASTEDIN #2P, AND #3P VOIDS.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Navigation
Issued 28 December 1993
Resolved
REPLACE CABLE CLAMP/TERMINAL LUG FOR THE BATTERY CABLE TO THE FWD NAVIGATION LIGHTS.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
FAIR IN AND PARTIALLY CROP AND RENEW WHERE TWISTED, THE 1ST BOTTOM LONGITUDINAL FROM THE SIDE SHELL, AND THE ASSOCIATED GUSSET THAT TIES IT TOTHE STERN FRAME IN THE AFT RAKE STBD COMPARTMENT.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Construction/Loadline
Issued 28 December 1993
Resolved
REPLACE THE TRIPPED BRACKET THAT TIES THE 1ST SIDE LONGITUDINAL FROM THE OVERHEAD TO THE BULKHEAD IN THE #3S VOID.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Construction/Loadline
Issued 28 December 1993
Resolved
CROP AND RENEW WHERE BUCKLED, THE 1ST VERTICAL SIDE STIFFENER FM THE FWD BULKHEAD BETWEEN THE OVERHEAD AND THE 1ST SIDE LONGITUDINAL FROM_x001C_ THE OVERHEAD IN # 3S VOID.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Construction/Loadline
Issued 28 December 1993
Resolved
In # 2 S, crop and renew where buckled, the 1st vertical side stiffener from the forward bulkhead between side longitudinals # 1 & # 2 from the overhead.
Condition: Unknown
Due 1 March 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
In No. 2 S, arc out and reweld the fracture weld located where the 2nd sidelongitudinal from the overhead passes through the 2nd vertical side stiffener from the forward bulkhead.
Condition: Unknown
Due 28 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
IN THE AFT RAKE STBD COMPARTMENT NEAR THE FWD BULKHEAD, ARC OUT AND REWELD THE FRACTURED WELD THAT TIES A 2' PIECE OF ANGLE IRON TO THE 1ST UNDER DECKLONGITUDINAL FROM THE SIDE SHELL. WELDMENT IS FRACTURED WHERE ANGLE TIES TOSIDE SHELL._x001C_
Condition: Unknown
Due 28 January 1994
Resolved 20 January 1994
Deck/Cargo
Issued 28 December 1993
Resolved
FABRICATE AND INSTALL A METAL COVER FOR THE DECK WINCH ENGINE LOCATED ON THE MAIN DECK PORT SIDE FWD.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Engineering
Issued 28 December 1993
Resolved
REMOVE FUEL OIL IN CONTAINMENT AREA LOCATED ON FWD END OF CRANE ROUND HOUSE.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Deck/Cargo
Issued 28 December 1993
Resolved
REPAIR LEAKS IN ROOF OVER CRANE GENERATOR SPACE.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Electrical
Issued 28 December 1993
Resolved
REPLACE THE CONTROL CIRCUITRY ELECTRICAL BOXES ON THE ELECTRIC GENERATOR INTHE CRANE GENERATOR SPACE.
Condition: Unknown
Due 15 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
ARC OUT AND REWELD THE FRACTURED WELD LOCATED BETWEEN THE 1ST AND 2ND VERTICAL SIDE STIFFENERS FM THE FWD BULKHEAD WHERE THE SIDE SHELL TIES TO THE MAIN DECK IN # 3 P VOID.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Construction/Loadline
Issued 28 December 1993
Resolved
BUILD UP THE INSIDE COAMINGS ON THE ACCESS HOLES FOR #1C, #2P, #3P, AND THEAFT RAKE STBD COMPARTMENT. BUILD UP WITH WELD METAL, GRIND SMOOTH, AND RETHREAD BOLT HOLES AS NEEDED.
Condition: Unknown
Due 28 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
RENEW THE TOP LADDER RUNG ON THE LADDER LEADING DOWN TO #1C.
Condition: Unknown
Due 28 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
PROVIDE ACCESS TO THE LOWER FRAMES IN THE LOCKER ROOM, TO ALLOW FOR COAST GUARD INSPECTION.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Construction/Loadline
Issued 28 December 1993
Resolved
RENEW THE TOP 2 LADDER RUNGS ON THE LADDER LEADING DOWN INTO #3S.
Condition: Unknown
Due 28 January 1994
Resolved 20 January 1994
Engineering
Issued 28 December 1993
Resolved
CROP AND RENEW THE CONTAINMENT AREA AROUND THE STBD FUEL FILL AND VENT VALVE. EFFECT TEMPORARY REPAIRS UNTIL PERMANENT REPAIRS ARE MADE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 28 January 1994
Resolved 20 January 1994
Construction/Loadline
Issued 28 December 1993
Resolved
REMOVE PART OF THE WOOD FLOORING THAT COVERS THE FRAMES IN THE MACHINERY SPACES TO ALLOW FOR THE INSPECTION OF THE LOWER FRAMES.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Accommodation/Occupational Safety
Issued 28 December 1993
Resolved
REPAIR THE MSD AND THE TOILET AND PROVE OPERATIONAL.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Construction/Loadline
Issued 28 December 1993
Resolved
PREPARE FOR CLOSER EXAMINATION, THE RAISED AREA ON THE DECK JUST AFT OF THE3RD VERTICAL SIDE STIFFENER FROM THE FWD BULKHEAD IN THE #1S VOID.
Condition: Unknown
Due 28 December 1993
Resolved 28 December 1993
Documentation
Issued 9 July 1993
Resolved
PLACE CURRENT LOADLINE CERTIFICATE ON BOARD VESSEL.
Condition: Unknown
Due 19 August 1993
Resolved 19 August 1993
Engineering
Issued 9 July 1993
Resolved
PROVE PROPER OPERATION OF GENERATOR PRIME MOVER TRIPS, ON BOTH GENERATOR SETS.
Condition: Unknown
Due 19 August 1993
Resolved 19 August 1993
Electrical
Issued 17 April 1992
Resolved
PROVE PROPER OPERATION OF THE SHIPS SERVICE GENERATOR SAFETY TRIPS.
Condition: Unknown
Due 17 April 1992
Resolved 17 April 1992
Deck/Cargo
Issued 17 April 1992
Resolved
PROPERLY MARK CRANE WITH THE SAFE WORKING LOAD IN ACCORDANCE WITH 46 CFR 91.37-45.
Condition: Unknown
Due 17 April 1992
Resolved 17 April 1992
Construction/Loadline
Issued 11 February 1991
Resolved
REPAIR(WELD) THE FRACTURED VERTICAL STIFFNER(#4 FROM STARBOARD) IN THE AFTER CENTER RAKE AT FRAME 15.
Condition: Unknown
Due 11 February 1991
Resolved 11 February 1991
Construction/Loadline
Issued 11 February 1991
Resolved
CROP AND RENEW A 20"X60" BUCKLED SECTION OF TRANSVERSE DEEP WEB FRAME #15, OUTBOARD STARBOARD RAKE._x001C_
Condition: Unknown
Due 11 February 1991
Resolved 11 February 1991
Deck/Cargo
Issued 28 March 1990
Resolved
PROVIDE PROOF TESTING FOR CRANE.
Condition: Unknown
Due 28 March 1990
Resolved 28 March 1990
Lifesaving
Issued 15 December 1988
Resolved
LABEL THE PFD STOWAGE LOCKER.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Lifesaving
Issued 15 December 1988
Resolved
RENEW THE BROKEN WATER LIGHT AND INSTALL 100 FT. PAINTER ON THE BUOYANT APPARATUS.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Documentation
Issued 15 December 1988
Resolved
SUBMIT STABILITY CALCULATIONS IN ACCORDANCE WITH 46 CFR 173 SUBPART B, FOR REVIEW AND APPROVAL.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Engineering
Issued 15 December 1988
Resolved
INSTALL REACH ROD ON THE FUEL TANK DISCHARGE VALVE TO ENABLE SECURING THE VALVE FROM OUTSIDE THE SPACE.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Construction/Loadline
Issued 15 December 1988
Resolved
LABEL THE WATER TIGHT DOOR IN THE 2ND TRANSVERSE BULKHEAD FROM THE STERN LEADING TO THE GENERATOR AND OIL STORAGE TANK TO READ, " TO BE CLOSED AND DOGGED WHEN VESSEL IS UNDERWAY."
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Engineering
Issued 15 December 1988
Resolved
INSTALL 30X30 MESH FLAME SCREENS ON THE TWO CRANE DAY TANKS, AND THE MAIN FUEL TANK VENT AND 20X20 MESH ON THE MSD TANK VENT.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Electrical
Issued 15 December 1988
Resolved
REMOVE THE SHORE TIE CONNECTION FROM THE DISTRIBUTION PANEL OR PROVIDE A MEANS/SAFETY INTERLOCK TO PREVENT SHORE TIE FROM BEING PLACED ON THE SYSTEMWHEN THE GENERATOR IS ON THE LINE.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Construction/Loadline
Issued 15 December 1988
Resolved
INSTALL BLANK ON THE 1/2 INCH SEA VALVE WHICH IS NO LONGER IN USE ON THE STBD SIDE SEA CHEST.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Electrical
Issued 15 December 1988
Resolved
PROVIDE A PROTECTIVE COVER OVER THE BATTERY TERMINALS.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Electrical
Issued 15 December 1988
Resolved
PROPERLY INSTALL GENERATOR METERS TO PREVENT ELECTRICAL SHOCK.
Condition: Unknown
Due 15 December 1988
Resolved 15 December 1988
Documentation
Issued 12 January 1988
Resolved
OBTAIN VALID LOADLINE CERTIFICATE.
Condition: Unknown
Due 12 January 1988
Resolved 12 January 1988
Deck/Cargo
Issued 12 January 1988
Resolved
INSTALL GUARD AT PUMP MOTOR COUPLING LDFT SIDE ON CRANE PRIME MOVER.
Condition: Unknown
Due 12 January 1988
Resolved 12 January 1988
Lifesaving
Issued 12 January 1988
Resolved
PROVIDE LIGHTS AND WHISTLES FOR LIFEJACKETS.
Condition: Unknown
Due 12 January 1988
Resolved 12 January 1988
Electrical
Issued 12 January 1988
Resolved
INSTALL GLASS GLOBES ON ALL INCANDESCENT LIGHT FIXTURES.
Condition: Unknown
Due 12 January 1988
Resolved 12 January 1988
Deck/Cargo
Issued 12 January 1988
Resolved
MAKE PRESSURE VESSELS AVAILABLE FOR INTERNAL INSPECTION OR HYDROSTATIC TEST.
Condition: Unknown
Due 12 January 1988
Resolved 12 January 1988
Fire Fighting
Issued 13 December 1985
Resolved
ALL PORTABLE FIRE EXTINGUISHERS ON BOARD NEED ANNUAL SERVICING.
Condition: Unknown
Due 13 December 1985
Resolved 13 December 1985
Lifesaving
Issued 13 December 1985
Resolved
PERMANENTLY INSTALL BUOYANT APPARATUS ON WEATHER DECK AND PROPERLY AFFIX SEA PAINTER AND FLOAT FREE WEAK LINK.
Condition: Unknown
Due 13 December 1985
Resolved 13 December 1985
Lifesaving
Issued 13 December 1985
Resolved
BUOYANT APPARATUS SHALL HAVE VESSEL'S NAME STENCILED ON IT.
Condition: Unknown
Due 13 December 1985
Resolved 13 December 1985
Lifesaving
Issued 13 December 1985
Resolved
STENCIL LIFE RINGS WITH VESSEL'S NAME.
Condition: Unknown
Due 13 December 1985
Resolved 13 December 1985
Lifesaving
Issued 13 December 1985
Resolved
PERMANENTLY INSTALL LIFE RINGS (2) ON WEATHER DECK. AFFIX LINE AND FLOAT LIGHT TO BOTH OF THESE RINGS.
Condition: Unknown
Due 13 December 1985
Resolved 13 December 1985