Records from 2004 to 2026. Most recent: inspection, 4 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 8 May 2026
No resolution recorded
Each dead cover must be designed so that it can be secured watertight. Vessel is outfitted with wooden dead covers (Allowed by CG Letter Dated 06DEC1983) only to be used aft of the cargo doors. Vessel was found using wooden covers on the cargo doors. Vessel to replace wooden dead covers with suitable materials, to the satisfaction of the OCMI, prior to 2027 operating season.
46 CFR 171.117(d)1
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 May 2026
Resolved
The two required fixed power bilge pumps shall be self-priming. MI observed vessel unable to adequately prime aft bilge pump.
46 CFR 182.225-10 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 May 2026
Resolved 8 May 2026
Resolution: MI witnessed satisfactory operation of the bilge pump to include pumping out the lazarette and dry stores. ALL SAT
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 4 May 2026
Resolved
Where liquid level indicating gages are installed, they shall be of heat resistant materials, adequately protected from mechanical damage and provided at the tank connections with devices which will automatically close in the event of rupture of the gage or gage lines. MI discovered a plastic sight gage on the fuel return tank (Port Forward).
46 CFR 182.20-25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 8 May 2026
Resolution: MI observed satisfactory repairs of the fuel tank sight glass. Sight glass is made of heat resistant materials and mechancically protected. ALL SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2026
Resolved
All electrical installations shall be to the satisfaction of the Officer In Charge, Marine Inspection. MI discovered dead end wires in the lazarette and BOSN stores, fire pump breaker was oversized, missing plus in MSD breaker panel and wires pulled out of stuffing tubes on the MSD controller.
46 CFR 183.01-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2026
Resolved 8 May 2026
Resolution: MI Observed all above electrical deficiencies corrected. Fire pump now has appropirate 60amp breaker. ALL SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 May 2025
Resolved
MAIN ENGINE EXHAUST COOLING PUMP FAILED TO PROVIDE COOLING WATER. PUMP IMPELLER FAILED.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 June 2025
Resolved 12 June 2025
Resolution: Attending MIs verified satisfactory repairs and observed sea trials in Puget Sound.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 May 2025
Resolved
An A-class fire door may not have an undercut greater than 1/2 inch. The double-leaf fire door located on the forward side of the third deck stairtower has a gap that exceeds this limit. Adjust the diamond plating so that the undercut for each door leaf does not exceed 1/2 inch.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 12 June 2025
Resolution: Attending MI verified adjustment of diamond plating for door undercut. Door undercut is not <1/2 inch and meets regulatory requirements.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 May 2025
Resolved
At each inspection for certification, the vessel must be fully prepared for inspection and testing of fire protection equipment, including fire-confining appliances such as doors. The A-class fire door between the stairtower and lobby on Deck 1, near the purser’s office, is required to be self-closing per the vessel’s FCP. The door’s self-closing device currently makes contact with a smoke detector mounted in the false overhead.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 12 June 2025
Resolution: Smoke detector relocated to no longer make contact with door self-closing device. Attending Marine Inspector confirmed proper operation.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 28 May 2025
Resolved
The master is required to post a passenger safety bill in each passenger cabin, stateroom, and accommodation space. Each safety bill must indicate the assigned embarkation station and the number and location of the survival craft assigned to each occupant. The current passenger safety bills posted on the back of each stateroom door list muster stations but do not include embarkation station designations or survival craft assignments. Provide a means to ensure each passenger is notified of their specific embarkation station and assigned survival craft. A trip-specific addendum is acceptable to meet this requirement.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2025
Resolved 12 June 2025
Resolution: Passengers now assigned to specific survival crafts by use of liferaft numbers listed on passenger safety bill.
10 - Safety of Navigation › N/A - No Subsystem › GNSS receiver/terrestrial radio navigation system
Issued 28 May 2025
Resolved
At each inspection for certification the owner or managing operator shall make available for inspection all items in the ship’s outfit, such as navigation equipment. Two GPS units on the bridge have experienced GPS rollover and no longer display the correct date, which affects the positional accuracy provided by the units to the electronic charting and/or VHF-DSC. Repair or replace. Prior to 2026 operating season.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 April 2026
Resolved 4 May 2026
Resolution: Vessel installed 02 new GPS units.
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 28 May 2025
Resolved
Vessels described by 46 CFR 114.110(e) must have an interconnected fire detection system in compliance with 46 CFR 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Discrepancies were noted between the approved fire detection plan (dated 01/24/2025, MSC letter E2-2500916) and the onboard installation: Heat detectors in the galley and laundry are Autronica BD-501, but plans specify BD-300. All heat detectors should be verified for correct part numbers. The sea cabin is shown with a V-430 smoke detector with sounder (“S” symbol), but a standard optical head (“B” symbol) without sounder is installed. Ensure onboard installations match approved plans. Submit revised drawings to MSC if changes are necessary. Prior to 2026 Operating season.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2026
Resolved 8 May 2026
Resolution: Vessel submitted updated fire detection plan (04/01/26). MI verified callouts were corrected. (Attached revised plan). ALL SAT
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 28 May 2025
Resolved
A minimum clear opening of a door or passageway used as a means of escape must not be less than 32 inches in width. Aft exterior stairwell from 4th deck leading down to 3rd deck is the secondary means of escape for passengers from the spa/workout area, but is only 18 inches wide. Provide a proposal to the OCMI on modifications to this stairwell to meet the relevant means of escape requirements from new K. Prior to 2026 operating season.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 April 2026
Resolved 4 May 2026
Resolution: Ladder installation on aft deck 3-4 deck - New aluminum ladder has been installed with 36" clearance inside railing diameter (Drawings Attached).
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 28 May 2025
Resolved
The following discrepancies were identified in the vessel’s FCP dated 5/5/2025: 1) FCP shows an A-class bulkhead between the sea cabin and pilothouse, but there is an approx. 3 ft x 3 ft opening in the bulkhead, 2) FCP indicates a General Alarm and Talkback Speaker in the captain’s cabin (Deck 3), but only a standard PA speaker is installed, and 3) Only port/starboard amidships cargo doors are marked as embarkation stations, but the aft swim platform is also used as a primary embarkation station. Update the FCP to reflect actual vessel arrangements, including the additional corrections already/previously identified by the crew. Submit the revised plan to Sector Puget Sound for verification/approval. Prior to 2026 operating season.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 April 2026
Resolved 4 May 2026
Resolution: 1) (Vessel’s revised FCP dated 4/30/26 has the bulkhead classified as a class B, vessel installed new steel door (drawing and photos attached).
2) (Vessel replaced with steel cabinet)
3) (Vessel removed wooden cabinet and is replacing it with a 16GA s
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 28 May 2025
Resolved
At each inspection for certification all fire hazards must be corrected. Passageways (i.e. corridors) shall contain only fire resistant furnishings. The following structural fire protection and arrangement issues were identified within category (3) corridors: 1) there is only a wooden accordion style partition separating the mechanical closet on third deck forward from the adjacent corridor, near the Captain's stateroom. The items in the mechanicals closet are not permitted in corridors, and therefore the class A bulkhead shown on the FCP must be maintained in the door penetration, 2) there is a wooden cabinet with linen stores in the third deck forward corridor outside the captain’s stateroom, and 3) there is a wooden cabinet at the forward end of the second deck, starboard side, corridor outside room 201. These current arrangements present an unacceptable fire load in the category 3 corridors. Provide a plan to the OCMI for how these issues will be addressed prior to the 2026 season.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 April 2026
Resolved 4 May 2026
Resolution: 1) (Vessel removed class A bulkhead on FCP dated 4/30/26)
2) (Vessel removed the talkback speaker and added a telephone station on FCP dated 4/30/26)
3) (Vessel added aft deck embarkation stations on FCP dated 4/30/26)
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 19 May 2025
Resolved
Repairs to the hull must not be initiated without prior approval from the cognizant Officer in Charge, Marine Inspection (OCMI).During the underway portion of the Certificate of Inspection (COI), the vessel made contact with a moored fishing vessel, resulting in damage to the starboard-side gunwale and third-deck railing. The owner/operator is required to submit a detailed repair proposal to the OCMI for review and approval prior to beginning any corrective work.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2025
Resolution: MI inspected repairs and witnessed NDT of welds during follow on inspection in Pacific Fishermen's Shipyard.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 19 May 2025
Resolved
In areas with fire resistant furniture and furnishings on passenger vessels, the carpet must either be wool, or other materials having equivalent fire resistant properties. Provide evidence that newly installed carpet in corridors and stairways is fire-resistant (NVIC 9-97 CH1, Enclosure 1, Section 2.8.1 lays out 5 different acceptable test criteria) 116.423 (a)(4) and (b).
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2025
Resolution: O/o removed unacceptible carpet that was installed in corridors and stairways. Replaced with acceptable fire-resistant carpet. Confirmed by MI during follow-on inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 19 May 2025
Resolved
On vessels required to have a final emergency power source by § 112.05-5(a) of this chapter, the following emergency lighting and power loads must be arranged so that they can be energized from the final emergency power source. Vessel’s emergency generator was inoperable during inspection.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2025
Resolution: MI witnessed successful testing of vessel's emergency generator.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 19 May 2025
Resolved
All glass panels or windows located in the first tier of the superstructure or deckhouse above the bulkhead deck are considered potential downflooding points during intact stability evaluations, regardless of the vessel’s operating route. Provide deadlight covers for all windows in the first tier of the superstructure, as specified in Section 5 of the vessel’s stability letter.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: Deadlight covers provided and sampling of installation was verified by attending Marine Inspectors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2023
Resolved
Penetrations of watertight bulkheads by a rigid plastic pipe system is prohibited unless, each penetration is accomplished using an acceptable metallic fitting and an acceptable metallic shutoff valve is installed adjacent to the bulkhead. Only one valve is required if operable from above the bulkhead deck. If not, two valves are required (one on either side of the bulkhead). Two bulkhead penetrations on the starboard side of the forward engine room bulkhead are of the rigid plastic type. Cite: 46 CFR 182.40-1(a)(1)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 March 2023
Resolved 30 March 2023
Resolution: Piping replaced with metalic piping in way of bulkhead.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2023
Resolved
Where rigid nonmetallic piping is permitted, the material specification shall show that the rigid nonmetallic material possesses characteristics adequate for its intended service and environment and shall be approved for use by the OCMI. The nonmetallic flange connection for the MSD discharge piping through hull penetration does not meet OCMI approval. Cite: 46 CFR 182.40-1(a)(4)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 March 2023
Resolved 30 March 2023
Resolution: MSD discharge flange replaced with steel flange and threaded connection to existing PVC type piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2023
Resolved
Machinery spaces shall be separated from accommodation spaces by a watertight and/or vapor tight bulkhead. One bulkhead penetration on the starboard side of the forward engine room bulkhead is loose and does not meet watertight requirements. Bulkhead does not meet requirements for structural fire protection. Cite: 46 CFR 182.35-1(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 March 2023
Resolved 30 March 2023
Resolution: Bulkhead penetrations welded and fire boundary reinstalled.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2023
Resolved
Exposed, non-current carrying metal parts of fixed equipment that may become energized because of any condition must be grounded. Both port and starboard shaft grounding straps are not connected.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 March 2023
Resolved 30 March 2023
Resolution: Grounding straps on shafts renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 January 2023
Resolved
Bilge and drainage system shall provide means for testing pumping of bilges. Bilges pumping/drainage system is unable to be tested due to large amount of debris. Cite: 46 CFR 176.25-10(a)(7)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 March 2023
Resolved 30 March 2023
Resolution: Bilges cleaned.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 28 April 2022
Resolved
Materials used in piping systems must meet the requirements of this subpart and be otherwise acceptable to the cognizant [name withheld] found a soft patch on the seawater pump for the MSD. Make permanent repairs. 46 CFR 119.700
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2022
Resolved 29 April 2022
Resolution: Received an email from the vessel Master with pictures of repaired pipe.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 April 2022
Resolved
Multiple self-closing fire doors were not closing properly as required. Adjust/repair both sets of main deck fire doors in vicinity of lounge and bar. 46 CFR 116.435
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2022
Resolution: Witnessed proper door closure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2022
Resolved
Each distribution panel must be totally enclosed and of the dead front type. The hinged door for the galley stores panel did not close properly preventing total enclosure. 46 CFR 120.330(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2022
Resolved 28 April 2022
Resolution: Hinged door adjusted to close.
09 - Working and Living Conditions › 091 - Living Conditions › Furnishings
Issued 15 April 2022
Resolved
All mattresses must comply with either 1. the U.S. Department of Commerce Standard for Mattress Flammability (16 CFR Part 1632), Subpart A and not contain polyurethane foam; or 2. International Maritime Organization Resolution A.688(17) "Fire Test Procedures for Ignitability of Bedding Components." Mattresses tested to this standard may contain polyurethane foam. Provide approval specifications to marine inspector within 14 days. 46 CFR 116.405(j)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2022
Resolved 30 June 2022
Resolution: Mattresses are approved.
09 - Working and Living Conditions › 091 - Living Conditions › Furnishings
Issued 15 April 2022
Resolved
Rugs and carpets are not permitted in areas where the spillage or leakage of flammable or combustible liquids is possible including areas immediately adjacent to bar service areas. Rug runs directly next to the bar. Provide plans to meet 46 CFR 116.423(a)(4)(ii) within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2022
Resolved 30 March 2023
Resolution: Non-absorbant flooring installed around the bar area extending 4 inches from the edge of the bar counter.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 April 2022
Resolved
Each life jacket carried on a vessel on a coastwise route must have a life jacket light approved IAW Subpart 161.012. Several life jacket light batteries were not being replaced annually and one had a light that did not operate. Batteries replaced and labeled. 46 CFR 117.75(a)
Action required: 10 - Deficiency Rectified
Resolved 15 April 2022
Resolution: Replaced batteries.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 April 2022
Resolved
One set of self-closing fire doors on deck 3 did not close properly. The wheel was removed from the base. Attending MI witnessed proper closure. 46 CFR 116.435
Action required: 10 - Deficiency Rectified
Resolved 15 April 2022
Resolution: Witnessed proper closure.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 15 April 2022
Resolved
Protect passengers, crew, other persons and the vessel from electrical hazards including fire caused by or originating in electrical equipment. Unattended items being charges and multi-outlet device plugged into single outlet in crew, focsle berthing. Chief mate unplugged devices and will conduct training with crewmembers on electrical safety. 46 CFR 120.200(b)
Action required: 10 - Deficiency Rectified
Resolved 15 April 2022
Resolution: Unplugged devices on the spot. Chief mate was going to conduct training with crew.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2022
Resolved
Protect passengers and crew from electrical hazards. Dead-end wires were found in the engine room and fwd crew berthing area. Properly remove dead-end wires. 46 CFR 120.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2022
Resolved 28 April 2022
Resolution: Removed dead-end wires.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2022
Resolved
The main and emergency switchboard were both missing a lens covering a light bulb on the front of the panel. Install lens cover over the openings on the panel.
Protect passengers and crew from electrical hazards. 46 CFR 120.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2022
Resolved 28 April 2022
Resolution: Replaced lens.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2022
Resolved
The power cord for the dryer, in the main deck laundry, was pulled out of stuffing tube, exposing bare conductors. Properly re-install power cord. 46 CFR 120.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2022
Resolved 28 April 2022
Resolution: Re-installed power cord.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2022
Resolved
All cable and wire must be installed with metal supports spaced not more than 24" apart. Several wires and wire runs in the engine run were only supported by plastic wire ties. Ensure all wire runs throughout vessel are supported by metallic supports. 46 CFR 120.340
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2022
Resolved 28 April 2022
Resolution: Installed metallic supports.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 24 September 2021
Resolved
Sightglass for the daytank in the engine room is non heat resistant. Meet requirements listed in 46 CFR 119.
Action required: 705 - Other - as specified
Resolved 25 March 2022
Resolution: Installed heat resistant sight glass.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 September 2021
Resolved
Waste receptacle on the starboard bow is constructed of combustible material and is open on the bottom. Remove
garbage can from the vessel. 46 CFR 116.405
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2021
Resolved 1 October 2021
Resolution: Trash can taken off the vessel.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 August 2021
Resolved
The following spaces must be equipped with a fire detection and alarm system of an approved type: a space containing propulsion machinery and a space containing an internal combusion engine of more than 50 hp. Each accommodation space, control space and service space must be fitted with a smoke actuated fire detection system of type approved by the Commandant and a manual alarm system that meets the requirements in 46 CFR part 76. Fire detection system was reported inoperable. Prove proper operation to the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 August 2021
Resolved 28 August 2021
Resolution: Attending marine inspectors conducted operational test of the fire detection system to include heat and smoke detectors and fire door closures.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 26 March 2020
Resolved
Multiple exposed electrical hazards must be corrected: Thermostat and heating element in fwd crew berthing, 110V distribution panel opening in office fwd of galley. Ensure electrical hazards are repaired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 29 July 2020
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 26 March 2020
Resolved
Vessel did not have nor could display "Not Under Command" with lights at night time. Procure/install NUC nav lights to display as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: NUC nav lights have been installed
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 March 2020
Resolved
Multiple fire door self-closing devices were not closing properly as required. Adjust/repair doors to close and latch as required.
Action required: 10 - Deficiency Rectified
Resolved 26 March 2020
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 26 March 2020
Resolved
Vessel did not have a waste management plan posted. Post vessel's waste management plan.
Action required: 10 - Deficiency Rectified
Resolved 26 March 2020
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 March 2020
Resolved
Vessel did not have emergency instructions posted. Post emergency instructions.
Action required: 10 - Deficiency Rectified
Resolved 26 March 2020
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 26 March 2020
Resolved
Restore fire control boundaries in fwd and inboard bulkhead in laundry space and deck going to the tank space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: vessel has repaired fire boundaries
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 March 2020
Resolved
Repair leaking salt water pipe in tank space on starboard side heading to the stateroom above.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: pipe has been repaired, all sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 March 2020
Resolved
Adjust dogs on water tight door to ensure all are making contact with jam.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: Door has beeen properly adjusted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 March 2020
Resolved
Repair exhaust leak on both main engines and the fwd Generator exhaust piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 29 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 March 2020
Resolved
Repair water leak in aft generator stainless steel exhaust pipe at overboard starboard side.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: pipe has been repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 March 2020
Resolved
Replace all leaking salt water cool pipe for aft generator in the area of starboard side where it attaches to exhaust pipe at is leaking. Currently there are two patches and other leaks.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: Piping has been replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 March 2020
Resolved
Repair leaking salt water exhaust cooling line on port main by overboard exhaust pipe.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: piping has been repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 March 2020
Resolved
Repair all leaking piping for the sewage water flushing system on the port side of the engine room fwd.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: piping has been replaced
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 March 2020
Resolved
Repair electrical conduit wire plug on the bottom of Engine room fire pump controller box on the port side fwd engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 March 2020
Resolved 8 July 2020
Resolution: Wiring has been fixed
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 March 2020
Resolved
Replace all expired items in both the laundry room and galley First aid kit and ensure there is the Min. contents of 46 CFR 160.041-4 are in them.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: all expired items have been replaced
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 March 2020
Resolved
Replaced all expired eye wash bottles in the galley and main passage way.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: Eye wash has been replaced
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 26 March 2020
Resolved
Replace expired adult epinephrine injection pen
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: adult epinephrine injection pen has been replaced
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 26 March 2020
Resolved
Secure washer and dryer to prevent them from moving and falling over.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: washer ans dryer have been secured
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 March 2020
Resolved
Provide wire support/chaffing protection for wire running into fwd. lower hot water heater by crew berthing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: wire has been secured and protected
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 March 2020
Resolved
Remove all flammable items stored in the bouson shop or provide a flammable storage locker.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2020
Resolved 8 July 2020
Resolution: all flammables have been removed
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 March 2019
Resolved
A-Class bulkheads must be capable of preventing the passage of smoke and flame for 1 hour. The forward double doors on the 300 deck stairway have a large gap at the base of the door and the deck.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2019
Resolved 4 April 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 March 2019
Resolved
A fire door in a A-class boundary must be of the self-closing type. Purser door leading to the alcove is not a self-closing type.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2019
Resolved 4 April 2019
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 26 March 2019
Resolved
The master shall conduct sufficient fire drills to make sure that each crew member is familiar with his or her duties in case of a fire. Conduct a fire drill to the satisfaction of the attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 April 2019
Resolved 4 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 March 2019
Resolved
The vessel is required to have an 2 power bilge pumps connected to a bilge suction line. The emergency bilge pump could not draw suction.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 April 2019
Resolved 4 April 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 March 2019
Resolved
Remove all dead-end/open wires from the lazarette.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 April 2019
Resolved 4 April 2019
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 26 March 2019
Resolved
Locate water leak and repair of deck in way of aft, 300 deck and passageway below as marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 April 2019
Resolved 4 April 2019
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 4 April 2018
Resolved
Replace all combustible trash receptacles.
Action required: 705 - Other - as specified
Due 18 April 2018
Resolved 12 April 2018
Resolution: Vessel has replace all combustible trash receptacles.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 4 April 2018
Resolved
Replace two torn lifejackets. Until replaced passenger count will be reduced by two passengers.
Action required: 705 - Other - as specified
Due 4 April 2018
Resolved 12 April 2018
Resolution: Vessel has bought 2 new lifejackets
Electrical › Electrical Distribution System (service) › Switchboard
Issued 4 April 2018
Resolved
Install guards electrical Switchboards to prevent contacting energized parts in galley.
Action required: 705 - Other - as specified
Due 18 April 2018
Resolved 12 April 2018
Resolution: vessel has installed a blank in switchboard
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 April 2018
Resolved
Install guards on all rotating machinery on both main engines.
Action required: 705 - Other - as specified
Due 18 April 2018
Resolved 12 April 2018
Resolution: vessel has installed guards
Engineering › Sea-water System (primary cooling) › Piping
Issued 4 April 2018
Resolved
Fix water leaks on both main engines and generator exhaust cooling system.
Action required: 705 - Other - as specified
Due 18 April 2018
Resolved 12 April 2018
Resolution: vessel has fixed all water leaks
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 April 2018
Resolved
Remove temporary electrical cord from refrigerator and properly wire as per 46 CFR 116.530
Action required: 705 - Other - as specified
Due 18 April 2018
Resolved 12 April 2018
Resolution: vessel has proprely wire the refrigerator
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 4 April 2018
Resolved
Provide update temporary fire control plan before carrying passenger and provide final fire control plan for approval in one month
Action required: 705 - Other - as specified
Due 4 May 2018
Resolved 13 April 2018
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 30 April 2016
Resolved
Hydro test or renew with tested hoses all high pressure flex loops and one 75 lb high pressure CO2 bottle that expired on 05/16. Hoses to replaced prior to carrying passengers and hydro of bottle to be completed at the next port call to Juneau, AK or 7 May 2016.
Action required: 705 - Other - as specified
Due 7 May 2016
Resolved 7 May 2016
Resolution: vessel had new hoses and bottle installed, witnessed sat test with approved facility.