ROWAN LOUISIANA is a mobile offshore drilling unit. The Coast Guard has recorded 84 inspections since 1983, most recently in May 2014, along with 107 deficiencies and 3 casualty investigations between 2000 and 2003.

Records from 1983 to 2014. Most recent: inspection, 12 May 2014.

Built
Not recorded
Last inspected
12 May 2014
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8754619 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WYU8968
228795
Flag
MARSHALL ISLANDS
338176000 (licence lapsed)
Maury page id
psix-228795

Inspections, by type

…with no type recorded27
Years with a record 29 calendar years (1983–2014)
The 84 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 12 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it7106 - Regulatory (Subpart C or D), Net Ton
7222 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WYU8968MMSI 338176000 · expired · compulsorily equipped · granted 28 October 2004, cancelled 24 January 2015 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 84

12 May 2014 COC-MODU Renew
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4841890
9 May 2012 Administrative Inspection · COC-MODU Renew
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4307075
27 January 2010 Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3659041
16 March 2009 Hull Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3434460
24 January 2009 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3399374
22 January 2009 Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3432855
13 November 2008 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3362502
26 November 2007 Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3105202
11 April 2005 Internal Structural Exam
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2331458
8 December 2004 Annual Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2255631
17 September 2004 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2198005
16 September 2004 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2197277
9 January 2004 Administrative Inspection · Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1963520
8 September 2003 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1903389
11 May 2003 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1799240
16 March 2003 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1773993
16 January 2003 Annual Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1727432
2 December 2002 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1718551
24 November 2002 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1726402
25 August 2002 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1688510
17 April 2002 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1629380
26 March 2002 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1597628
29 October 2001 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1401591
5 August 2001 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 24554
14 April 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1061602
31 October 2000 Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 823046
27 October 2000 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 72886
4 April 2000 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1436358
21 January 2000 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 815474
16 January 2000 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1491545
4 November 1999 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1448040
30 November 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 806958
26 October 1998 Deficiency Check · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1378495
23 June 1998 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 42775
9 June 1998 Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1128758
13 April 1998 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1446633
31 March 1998 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1419907
5 November 1997 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1416578
20 May 1997 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1096284
28 December 1996 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 94647
9 October 1996 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1460031
16 April 1996 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 764620
11 April 1996 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 192747
24 January 1996 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 878462
7 November 1995 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1400239
28 August 1995 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 881872
14 August 1995 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 871415
3 June 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 875942
10 April 1995 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1357162
5 January 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 683854
26 December 1994 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 5714
10 December 1994 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 149171
8 November 1994 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1469781
7 April 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 857539
1 February 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1162092
15 December 1993 Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1444780
7 October 1993 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1451898
5 October 1993 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 847420
13 August 1993 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 847441
5 May 1993 Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1459809
8 March 1993 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1145257
9 November 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 91062
28 October 1992 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1472654
28 March 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 87156
2 February 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 129034
18 October 1991 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 942866
11 October 1991 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1248577
10 May 1991 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1212897
11 October 1990 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1235744
21 September 1990 Deficiency Check · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1243295
12 April 1990 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 924576
10 April 1990 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 959773
2 November 1989 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 907743
18 October 1988 Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 887838
10 April 1988 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1352710
16 October 1987 COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1323951
3 March 1987 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1010980
7 January 1987 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1003835
3 November 1986 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1004050
23 October 1985 COI Inspection · Credit Drydock
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1295519
15 January 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 976141
27 November 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1285326
12 June 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1281841
11 October 1983 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1279602

Deficiency record · 107

Deck/Cargo › Cargo Transfer (solid) › General
Issued 12 May 2014 Resolved
Each crane must meet the following rated load test at both maximum and minimum boom angles usually employed in material transfers over the side of the unit. Rig could only show proof that the 5-year crane load test was conducted with only one boom angle during the test. All four cranes must be tested from 2 pulls at the required angles. 46 CFR 107.260(a) & NVIC 03-88.
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Rig provided an ABS Statement of Fact on 24May2014 but no crane load charts to verify the tests were conducted IAW 46 CFR 107.260. Received load charts and verified the tests were conducted IAW 46 CFR 107.260.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 12 May 2014 Resolved
The local CO2 instructions for the generator room are incorrect which would cause confusion if need to be followed for activation. Rewrite and label the instructions properly as to avoid confusion.
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Received an email from OIM [name withheld] on 19Jun2014 showing that the CO2 instructions had been rewritten to make them easier to understand.
Stability › Watertight Integrity › General
Issued 12 May 2014 Resolved
Numerous watertight doors were found to need adjusting to ensure proper closure. Adjust watertight doors to ensure watertight integrity prior to rig movement.
Action required: 705 - Other - as specified
Resolved 4 June 2014
Resolution: Received an email from OIM [name withheld] on 04Jun2014 stating that he had inspected and adjusted the watertight doors.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 12 May 2014 Resolved
During the testing of the auxiliary generator's over speed device, the air cut-off flaps were not seating properly, causing the generator to not shut down. Prove proper operation of the generator air cut-off flaps on the auxiliary generator.
Action required: 705 - Other - as specified
Due 26 May 2014
Resolved 16 May 2014
Resolution: Received an email from OIM [name withheld] stating that he had witnessed the repairs and testing and the generator shut down properly without hesitation.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 12 May 2014 Resolved
The auxiliary geerator muffler was found to be holed casuing a chance of a fire/explosion hazard. Repair/replace the auxiliary generator muffler.
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 9 June 2014
Resolution: A new Muffler was installed on board and verified by pictures sent in to clear the deficiency.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 12 May 2014 Resolved
The fuel oil day tank has suspect areas of wastage. Have non-destructive testing carried out to ensure the metal is a thickness that is acceptable.
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 30 May 2014
Resolution: Resolved after receiving gauge reports on the Fuel Tank, all gaugings showed no significant wastage at all. Sent clearance email to [name withheld] Barge Engineer at [email withheld] [name withheld] Marine Inspector
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 12 May 2014 Resolved
For the CO2 fixed extinguishing system, the engine shutdowns were not tested during the annual third party test. Prove proper operation of the CO2 engine shutdowns.
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 9 June 2014
Resolution: Service Reports from [name withheld] dated 06Jun2014 shows all pressure switches tested.
Engineering › Pressure Vessel › Weld
Issued 9 May 2012 Resolved
No proof of internal inspection for the pressure vessels. Have internal inspection completed by ABS or USCG MI
Action required: 705 - Other - as specified
Due 17 June 2012
Resolved 8 June 2012
Resolution: Provided documenatation from ABS class society stating that the due dates for the next ISE on all PV''s is Dec 2016
Lifesaving › Visual Distress Signals (General) › Storage
Issued 9 May 2012 Resolved
All lifeboat distress signals are not stored in a waterproof container. Store distress signals in a waterproof container and mark the container with distress signals or flares.
Action required: 705 - Other - as specified
Due 17 June 2012
Resolved 8 June 2012
Resolution: Vsl procured and correctly labled new waterproof flare container.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 9 May 2012 Resolved
LB #2 has an air leak within the system. Repair air leak
Action required: 705 - Other - as specified
Due 17 June 2012
Resolved 25 May 2012
Resolution: Corrected using a 3rd party (Survival System International)
Lifesaving › Launching Appliances › Release Mechanism
Issued 9 May 2012 Resolved
Release gear load test on 36 man L/B has not been conducted. Complete load test
Action required: 705 - Other - as specified
Due 17 June 2012
Resolved 25 May 2012
Resolution: Weight Test completed using Survival Systems International
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 27 November 2007 Resolved
Prove proper opetation of breathing air pressure gauge in port life boat.
Condition: Unknown
Due 27 December 2007
Resolved 3 December 2007
Lifesaving › Buoyant Smoke Signals › General
Issued 27 November 2007 Resolved
Attach both self activating buoyant smoke signals to their respective ring buoys
Condition: Improper Installation
Due 27 December 2007
Resolved 3 December 2007
Engineering › Freshwater System (intermediary cooling) › Piping
Issued 27 November 2007 Resolved
Renew S/W cooling pipes from main cooling loop to the #2 & #3 generator engine water coolers.
Condition: Improper/Lack of Maintenance
Due 27 December 2007
Resolved 3 December 2007
Communications › Alarms/Indicators › General Alarm
Issued 8 December 2004 Resolved
Provide proof of adequate audible and visual general alarm for engine room. (worklist)
Action required: 705 - Other - as specified
Resolved 11 April 2005
Lifesaving › Inflatable Liferafts
Issued 16 January 2003 Resolved
Complete Annual servicing for #2 and #4 Liferafts.
Due 15 February 2003
Resolved 14 February 2003
Resolution: Reports faxed to MSU Galveston.
Construction/Loadline › Hull
Issued 16 January 2003 Resolved
Issued 835 to complete the Phase II SEILOD.
Action required: 705 - Other - as specified
Resolved 2 June 2003
Resolution: Fax was received from ABS pertaining to the dry dock survey clearing the 835. Also, Cargo gear statement of fact.
Construction/Loadline
Issued 29 October 2001 Resolved
CROP AND RENEW AS NEEDED WASTED OVERHEAD LONGITUDINALS IN MUD PIT ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Electrical
Issued 29 October 2001 Resolved
REPLACE HOLED GENERAL ALARM BATTERY BOX.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Construction/Loadline
Issued 4 April 2000 Resolved
IN THE MOTOR ROOM PORT SIDE WHERE THE OLD WATER MAKER WAS REMOVED CROP AND RENEW WASTED DECK AREA APPROXIMATELY 24 BY 36 INCHES.
Condition: Unknown
Due 4 May 2000
Resolved 10 April 2000
Lifesaving
Issued 4 November 1999 Resolved
Prove proper operation of the port lifeboat motor controller and limit switch. Limit switch failed to operate.
Condition: Unknown
Due 4 November 1999
Resolved 5 November 1999
Electrical
Issued 4 November 1999 Resolved
Prove proper operation of ventilation and total rig shutdown.
Condition: Unknown
Due 4 November 1999
Resolved 5 November 1999
Unknown
Issued 4 November 1999 Resolved
Conduct NDT of pedestal port side crane at base of brackets. A one inch crack was noted on one toe of one bracket.
Condition: Unknown
Due 8 November 1999
Resolved 8 November 1999
Fire Fighting
Issued 26 October 1998 Resolved
HYDRO-TEST PAINT LOCKER CO2 BOTTLE.
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Lifesaving
Issued 26 October 1998 Resolved
REMOUNT RING BUOY WATERLIGHT LOCATED AT #2 L/B STATION
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Electrical
Issued 26 October 1998 Resolved
REMOVE TWO WIRES IN ONE THRU HOLE AND REWIRE SEPARATELY USING PROPER THRU HOLE FITTING IN MUD PIT ROOM BETWEEN WTDS
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Lifesaving
Issued 26 October 1998 Resolved
INSTALL 100 PSI SAFETIES ON WATER HTR
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Lifesaving
Issued 26 October 1998 Resolved
REPLACE QUICK DISCONNECTS WITH SCHRADER VALVES ON PORTABLE & SANITARY TANKS.
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Electrical
Issued 26 October 1998 Resolved
REPAIR SHUTDOWN ON STANDBY GENERATOR SO SHUTDOWN CAN BE SMOOTHLY OPERATIONAL.
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Lifesaving
Issued 26 October 1998 Resolved
WATERLIGHT ON LIFERING AT STBD L/R STATION NOT WORKING
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Documentation
Issued 26 October 1998 Resolved
PROVIDE 3RD PARTY DOCUMENTATION ATTESTING TO RELEASE GEAR TEST ON 50 L/B, PORT & STBD LIFERAFT DAVITS.
Condition: Unknown
Due 2 November 1998
Resolved 2 November 1998
Lifesaving
Issued 26 October 1998 Resolved
WATERLIGHT AT L/B STATION 2 NEEDS TO BE REMOUNTED
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Fire Fighting
Issued 26 October 1998 Resolved
APPLICATOR AT FIRE STATION NEAR HELODECK HAS HOLE IN IT AND LEAKS EXCESSIVELY.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Electrical
Issued 26 October 1998 Resolved
EMERGENCY LIGHTING JUST OUTSIDE 3RD DECK NEAR EMERGENCY GENERATOR NOT OPERABLE.
Condition: Unknown
Due 29 October 1998
Resolved 29 October 1998
Electrical
Issued 26 October 1998 Resolved
ENSURE THAT EMERGENCY VENTILATION SHUTDOWN OPERATES CORRECTLY.
Condition: Unknown
Due 2 November 1998
Resolved 2 November 1998
Documentation
Issued 26 October 1998 Resolved
CONDUCT ANNUAL SURVEYS OF PORT AFT & PORT CRANES AND PROVIDE COPY OF REPORTTO [name withheld], TX
Condition: Unknown
Due 26 October 1998
Resolved 26 October 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Complete repairs to deficiences issued by ABS class surveyor, dated 31MAR98. Provide statement of fact and copy of survey report to [name withheld] when completed.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Engineering
Issued 31 March 1998 Resolved
Crop and renew as original, fuel transfer line in No.9 void tank, where pad-welded.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Crop and renew as original, shaker pump foundation framing members and vertical frame supports on shaker tank.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Crop and renew as original, engine room bilge eductor line where pad-welds and doubler plates are fastened.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Conduct NDE of leg-to-can critical connections to the satisfaction of the attending marine inspector. Provide report to [name withheld].
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Make ready for inspection, master dump valve and daowell dump valve to the satisfaction of the attending marine inspector or class surveyor.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
In void No.10, on the starboard aft-bulkhead, crop and renew vertical frames 1, 2, and 4 approximately 12" up from the bottom shell plate. Gauge starboard aft bulkhead approximately 6" up from the bottom plate between vertical frames 2-3 and 4-5. Submit report to [name withheld].
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Replace missing dogs on preload tank hatches and vent closures throughout rig, as necessary.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Construction/Loadline
Issued 31 March 1998 Resolved
Grind and reweld snipe wrap around welds on stiffening bracket along main deck to jacking house truss supports G and H. Make repairs in accordance with construction portfolio.
Condition: Unknown
Due 31 March 1998
Resolved 31 March 1998
Electrical
Issued 5 November 1997 Resolved
Conduct operational test of standby generator under load.
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Lifesaving
Issued 5 November 1997 Resolved
Implement revisions to lifesaving regulations per 46 CFR 109.213(d),(e), (g), (h), and 109.301(i).
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Fire Fighting
Issued 5 November 1997 Resolved
Update fire control plan to include revisions to capacity and location of lifesaving equipment. Submit to cognizant OCMI for approval.
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Deck/Cargo
Issued 5 November 1997 Resolved
Repair, as original, rig cranes per ABS report/inspection, dtd 28OCT97.
Condition: Unknown
Due 5 November 1997
Resolved 5 November 1997
Lifesaving
Issued 9 October 1996 Resolved
REPAIR GUAGES ON SELF CONTAINED BREATHING APPARATUS.
Condition: Unknown
Due 9 October 1996
Resolved 9 October 1996
Lifesaving
Issued 9 October 1996 Resolved
TRAIN ALL PERSONNEL ON LINE THROWING APPLIANCE AND MAKE REQUIRED LOG ENTRIES.
Condition: Unknown
Due 9 October 1996
Resolved 9 October 1996
Lifesaving
Issued 9 October 1996 Resolved
REPAIR AND CALIBRATE O2/EXPLOSIVE METERS.
Condition: Unknown
Due 9 October 1996
Resolved 9 October 1996
Construction/Loadline
Issued 9 October 1996 Resolved
MAKE MUD PIT ROOM DOORS SEAL PROPERLY, PLUG ALL STUFFING TUBES AND REPAIR EYS/CABLE INSTALLATIONS ON MUD PUMPS.
Condition: Unknown
Due 9 October 1996
Resolved 9 October 1996
Lifesaving
Issued 9 October 1996 Resolved
OPERATE LIFEBOATS IN THE WATER. TRAIN ALL PERSONNEL ON PROPER ABANDONMENT PROCEDURES AND LIFEBOAT OPERATIONS. LOG ACCORDINGLY.
Condition: Unknown
Due 9 October 1996
Resolved 9 October 1996
Deck/Cargo
Issued 7 November 1995 Resolved
MAKE READY FOR INTERNAL EXAM HALLIBURTON ROOM BULK AIR TANK.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Lifesaving
Issued 7 November 1995 Resolved
REPLACE THROW-OVER TYPE LIFERAFTS WITH DAVIT LAUNCHED LIFERAFTS.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 7 November 1995 Resolved
CLEAN PAINT OFF DOGS TO WATERTIGHT HATCH BETWEEN HEAVY EQUIPMENT ROOM & HALLIBURTON ROOM.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Electrical
Issued 7 November 1995 Resolved
PROVE PROPER OPERATIONS OF LOW LUBE OIL TRIPS FOR GENERATOR UNITS #1-4.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 7 November 1995 Resolved
REPAIR & ADJUST WATERTIGHT DOOR PORTSIDE HINGES BETWEEN MUD PUMP ROOM & AIRCOMPRESSOR BULK AIR TANKS.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Lifesaving
Issued 7 November 1995 Resolved
PERFORM ANNUAL PROOF LOAD TEST ON BOTH LIFERAFT DAVIT HOOKS & FAX RESULTS TO MSO PORT ARTHUR, TEXAS.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Fire Fighting
Issued 7 November 1995 Resolved
MAKE PERMANENT REPAIRS TO LEAKING PIPING ON SALT WATER SYSTEM BY FIRE PUMPS.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Electrical
Issued 7 November 1995 Resolved
AFTER COMPLETION OF CURRENT DRILLING OPERATIONS, PROVE PROPER OPERATIONS OFTOTAL RIG SHUTDOWN.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 7 November 1995 Resolved
REPAIR & ADJUST WATERTIGHT DOOR STBDSIDE HINGES BETWEEN MUD PUMP ROOM & HEAVY EQUIPMENT ROOM.
Condition: Unknown
Due 24 January 1996
Resolved 24 January 1996
Construction/Loadline
Issued 10 April 1995 Resolved
PERFORM GAUGING OF PRELOAD TANK NUMBER 5 IN AREA OF BOTTOM SHELL AREA AND LONGITUDINAL STIFFNERS. SUBMIT REPORT TO PATMS TO REVIEW FINDINGS.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
PERFORM HOSE TEST OF REPAIRED WELDS ON DECK IN AREA OF OIL STORAGE HATCH ONPORT SIDE.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
COMPLETE PHASE II PORTION OF SEILOD AT NEXT RIG MOVE AND PRIOR TO NEW DRILLING OPERATIONS.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
DISASSEMBLE AND MAKE READY FOR INSPECTION MUD DUMP VALVE.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 10 April 1995 Resolved
REPAIR WASTED WELDS IN WAY OF RED HAND FOUND BY PORTSIDE OIL STORAGE HATCH.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Engineering
Issued 8 November 1994 Resolved
HYDROSTATICALLY TEST FUEL TRANSFER HOSE.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Lifesaving
Issued 8 November 1994 Resolved
PROVIDE LIGHTING FOR STARBOARD LIFERAFT EMBARKATION AREA.
Condition: Unknown
Due 30 November 1994
Resolved 30 November 1994
Electrical
Issued 7 October 1993 Resolved
INSTALL EMERGENCY LIGHTING AS PER OLD "J" 46CFR112.05-10 AND 46CFR112.15-1 AND 5.
Condition: Unknown
Due 7 October 1993
Resolved 7 October 1993
Accommodation/Occupational Safety
Issued 7 October 1993 Resolved
MAKE AIR RECEIVER AND RELIEF VALVE ON DRILL FLOOR AVAILABLE FOR INSPECTION
Condition: Unknown
Due 7 October 1993
Resolved 7 October 1993
Construction/Loadline
Issued 5 May 1993 Resolved
MAKE AVAILABLE VESSELS SPUD CANS FOR EXTERNAL INSPECTION OF HIGH STRESS CONNECTIONS TO LEG PRIOR TO NEXT RIG MOVE.
Condition: Unknown
Due 5 May 1993
Resolved 5 May 1993
Electrical
Issued 28 October 1992 Resolved
REPAIR BRACKET AND REWIRE SPEAKER BY DRILLERS CONSOLE.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Deck/Cargo
Issued 28 October 1992 Resolved
CONDUCT LOAD TEST ON ALL CRANES.
Condition: Unknown
Due 29 November 1992
Resolved 21 December 1992
Electrical
Issued 28 October 1992 Resolved
REMOVE ALL DEAD END CABLES, PROPERLY INSTALL CABLES IN COMPRESSOR ROOM.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Electrical
Issued 28 October 1992 Resolved
INSTALL EXPLOSION PROOF E-LIGHT IN MUD PIT ROOM.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Electrical
Issued 28 October 1992 Resolved
INSTALL APPROVED EXPLOSION PROOF CONNECTOR TO DOGHOUSE LIGHT SWITCH.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Electrical
Issued 28 October 1992 Resolved
REPLACE ALL BICC FITTINGS ON ARMORED CABLE WITH FITTING APPROVED FOR ARMORED CABLE.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Electrical
Issued 28 October 1992 Resolved
REPLACE ALL NON-APPROVED CABLE WITH APPROVED CABLE IN SHALE SHAKER AREA.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Electrical
Issued 28 October 1992 Resolved
REPLACE NON-APPROVED PLASTIC WIRE TIES WITH APPROVED TIES.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Documentation
Issued 11 October 1991 Resolved
SUBMIT FOR APPROVAL A REVISED FIRE CONTROL AND LIFESAVING PLAN
Condition: Unknown
Due 11 October 1991
Resolved 11 October 1991
Documentation
Issued 21 September 1990 Resolved
IN THE PRESENCE OF A COAST GUARD INSPECTOR CONDUCT A FIRE AND ABANDON DRILL.
Condition: Unknown
Due 21 September 1990
Resolved 21 September 1990
Electrical
Issued 21 September 1990 Resolved
PROVE PROPER OPERATION OF #2 GENERATOR REVERSE POWER RELAY.
Condition: Unknown
Due 21 September 1990
Resolved 21 September 1990
Electrical
Issued 21 September 1990 Resolved
PRESENT FOR INSPECTION THE DRILL FLOOR AND SHALE SHAKER AREAS.
Condition: Unknown
Due 21 September 1990
Resolved 21 September 1990
Electrical
Issued 21 September 1990 Resolved
PROVE PROPER OPERATION OF #1, 2 & 3 GENERATOR OVERSPEED TRIPS AND LOW L/O PRESSURE TRIPS.
Condition: Unknown
Due 21 September 1990
Resolved 21 September 1990
Construction/Loadline
Issued 12 April 1990 Resolved
RENEW VERTICAL DIAGONAL TUBULAR MEMBER LOCATED IN WAY OF THE BOW LEG, CHORDB LEFTSIDE LOWEST MEMBER DUE TO 9 INCH CIRCUMFENCIAL CRACK IN BASE METAL. REPORT OF CONDITION OF MATERIAL REMOVED SHALL BE SENT TO THIS OFFICE WHEN REPAIRS COMPLETED. THIS REPAIR IS TO BE COMPLETED PRIOR TO 15OCT90.
Condition: Unknown
Due 12 April 1990
Resolved 12 April 1990
Electrical
Issued 18 October 1988 Resolved
PROPERLY SEAL EYS FITTINGS ON MARTIN DECKER SYSTEM IN DOG HOUSE AND DRILL FLOOR MAIN POWER DISTRIBUTION PANEL NLT 18NOV88.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Electrical
Issued 7 January 1987 Resolved
DEMONSTRATE THE PROPER OPERATION OF THE OVERSPEED, LOW LUBE OIL AND REVERSECURRENT SHUTDOWNS ON ALL FOUR MAIN GENERATORS.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Electrical
Issued 7 January 1987 Resolved
DEMONSTRATE THE PROPER OPERATION OF THE LOW LUBE OIL SHUTDOWNS ON THE EMERGENCY GENERATOR.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Accommodation/Occupational Safety
Issued 7 January 1987 Resolved
DEMONSTRATE THE PROPER OPERATION OF ALL RIG AND EMERGENCY AND VENTILATION SHUTDOWNS.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Lifesaving
Issued 7 January 1987 Resolved
REPLACE DAMAGED CUTLASS BEARING AND TIGHTEN PACKING NUT ON THE RUDDER POST ON #1 CAPSULE.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Lifesaving
Issued 7 January 1987 Resolved
PROVIDE EMERGENCY LIGHTING FOR #2 CAPSULE.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Lifesaving
Issued 7 January 1987 Resolved
REPLACE THE CRACKED PORT WINDOWS ON #2 CAPSULE.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Lifesaving
Issued 7 January 1987 Resolved
MARK LIFERAFT STATIONS WITH LIFERAFT NUMBER AND CAPACITY.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Lifesaving
Issued 7 January 1987 Resolved
PROVIDE THE RIG WITH DAVIT LAUNCHED INFLATABLE LIFERAFTS OR REINSTALL THE ORIGINAL RAFTS.
Condition: Unknown
Due 7 January 1987
Resolved 7 January 1987
Engineering
Issued 27 November 1984 Resolved
RENEW BROKEN SIGHT GLASS AND PROVIDE SUITABLE PROTECTION FOR THE SIGHT GLASS ON THE GENERATOR ROOM FUEL TANK.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Fire Fighting
Issued 27 November 1984 Resolved
PROVIDE ON BOARD THE MODU TWO OPERATIONAL OXYGEN/COMBUSTIBLE GAS INDICATORS
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Documentation
Issued 27 November 1984 Resolved
PROVIDE ON BOARD THE MODU A CONSTRUCTION PORTFOLIO.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Lifesaving
Issued 27 November 1984 Resolved
PROVIDE ON BOARD THE VESSEL IN THE VICINITY OF THE CONTROL HOUSE AN AUXIL- LARY LINE FOR THE LINE THROWING APPARATUS.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Fire Fighting
Issued 27 November 1984 Resolved
PROVIDE OPERATING INSTRUCTIONS FOR THE PAINT LOCKER FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Electrical
Issued 27 November 1984 Resolved
PROVIDE PROPER EYS SEALS FOR ELECTRICAL CONNECTIONS ON RENTAL EQUIPMENT IN THE MUD PIT ROOM.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Electrical
Issued 27 November 1984 Resolved
RENEW MISSING BOLTS IN THE ELECTRICAL FIXTURE PANEL IN THE MUD PIT ROOM.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Lifesaving
Issued 27 November 1984 Resolved
PROVIDE TWO SMOKE SIGNALS FOR THE 50 MAN SURVIVAL CAPSULE.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Deck/Cargo
Issued 27 November 1984 Resolved
PROVIDE EVIDENCE ANNUAL CRANE INSPECTIONS HAVE BEEN CONDUCTED.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Electrical
Issued 27 November 1984 Resolved
PROVIDE PROPER SUPPORTS FOR THE ELECTRICAL CABLE IN THE SACK ROOM.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Unknown
Issued 11 October 1983 Resolved
PROVIDE AND INSTALL LOAD CHARTS FOR ALL RIG CRANES IN THE CONTROL BOXES.
Condition: Unknown
Due 11 October 1983
Resolved 11 October 1983

Casualty record · 3

16 January 2000Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 1491545
17 April 2002Routine · role: Involved in a Marine Casualty · 1 injured · activity 1629380
11 May 2003Routine · role: Involved in a Marine Casualty · 1 injured · activity 1799240
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record