Records from 1984 to 2001. Most recent: operational control imposed, 9 August 2001.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Electrical
Issued 9 August 2001
Resolved
REMOVE TEMPORARY WIRE INSTALLATIONS ON BATTERY CHARGER IN EMERGENCY GENERATOR SPACE PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Electrical
Issued 9 August 2001
No resolution recorded
PROVIDE A SECOND MEANS OF STARTING THE EMERGENCY GENERATOR.
Condition: Unknown
Due 30 September 2001 — due date passed with no resolution recorded
Electrical
Issued 9 August 2001
Resolved
MAKE TEMPORARY REPAIR ON EDG EXHAUST INSTILLATION PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Construction/Loadline
Issued 9 August 2001
Resolved
REMOVE OILY WATER SEPERATOR DISCHARGE LINE FROM FIRE MAIN PIPING, REPIPE TOAN ACCEPTABLE LOCATION PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Construction/Loadline
Issued 9 August 2001
Resolved
REPAIR WASTED MAIN DECK IN WAY OF TRANSOME CONNECTION PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Construction/Loadline
Issued 9 August 2001
Resolved
MAKE TEMPORARY REPAIRS ON HOLED 01 DECK PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Construction/Loadline
Issued 9 August 2001
Resolved
MAKE TEMPORARY REPAIRS TO WASTED DECK GRATEING ON 01 DECK PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Fire Fighting
Issued 9 August 2001
Resolved
PROVIDE APPROVED FIRE CONTROL PLAN BY 09SEP01.
Condition: Unknown
Due 9 September 2001
Resolved 10 September 2001
Unknown
Issued 9 August 2001
Resolved
REMOVE ALL DEAD END WIRING FROM SHIP OR TERMINATE THEM IN JUNCTION BOXES PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Unknown
Issued 9 August 2001
Resolved
MAKE TEMPORARY REPAIRS TO WIRE HOLES PORT AND STARBOARD SIDE BRIDGE CHART ROOM PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Unknown
Issued 9 August 2001
Resolved
PROVIDE SAFETY GUARD FOR WATER FOUNTAIN IN BRIDGE VESTABULE.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2001
Unknown
Issued 9 August 2001
Resolved
REMOVE WOODEN FLANGES FROM FLYING BRIDGE DECK AND PROVIDE A STEEL FLANGE ONEACH PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Engineering
Issued 9 August 2001
No resolution recorded
PROVIDE CONTAINMENT FOR POLLUTION PREVENTION THROUGHOUT VESSEL AT ALL FUEL,LUBE OIL, VENTS AND FILLING STATIONS PRIOR TO 30SEP01.
Condition: Unknown
Due 30 September 2001 — due date passed with no resolution recorded
Documentation
Issued 9 August 2001
Resolved
VESSEL IS TO OBTAIN A VALID CERTIFICATE OF FINANCIAL RESPONSIBILITY PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001
Unknown
Issued 9 August 2001
Resolved
CONDUCT FIRE AND BOAT DRILL PRIOR TO DEPARTURE.
Condition: Unknown
Due 10 August 2001
Resolved 10 September 2001