Records from 1983 to 1988. Most recent: inspection, 31 October 1988.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Unknown
Issued 31 October 1988
Resolved
PROVIDE ON BOARD AN APPROVED PISTOL FOR PARACHUTE FLARES IN THE PORT LIFEBOAT.
Condition: Unknown
Due 31 October 1988
Resolved 31 October 1988
Fire Fighting
Issued 11 March 1988
Resolved
PROVIDE ONE ADDITIONAL OPERABLE, APPROVED OXYGEN AND EXPLOSIVE METER.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Unknown
Issued 11 March 1988
Resolved
CONDUCT INTERNAL EXAMINATION OF DRILL FLOOR AIR RECEIVER AND TEST RELIEF VALVE FOR SAME IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Lifesaving
Issued 11 March 1988
Resolved
PROVIDE SIGNAL MIRRORS AND FISHING KITS FOR BOTH LIFEBOATS.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Fire Fighting
Issued 11 March 1988
Resolved
CONDUCT ANNUAL SERVICING AND TESTING OF ALL PORTABLE AND FIXED FIRE EXTINGUISHING SYSTEMS INCLUDING TIME DELAYS, SIRENS AND FLEXIBLE HOSES AND SUBMIT COPIES OF THE SERVICE REPORTS TO MSO PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Fire Fighting
Issued 11 March 1988
Resolved
PROVIDE ONE ADDITIONAL APPROVED B-I FIRE EXTINGUISHER IN PORT LIFEBOAT.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Lifesaving
Issued 11 March 1988
Resolved
CONDUCT AND LOG OPERATIONAL TEST OF BOTH LIFEBOATS IN THE WATER FOR AT LEAST TEN MINUTES TO DEMONSTRATE PROPER OPERATION OF COOLING SYSTEM AND SUBMIT COPY OF THE LOG ENTRY TO MSO PORT ARTHUR, TEXAS.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Lifesaving
Issued 11 March 1988
Resolved
PROVIDE TWELVE (12) NEW PARACHUTE FLARES IN EACH LIFEBOAT.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Lifesaving
Issued 11 March 1988
Resolved
REPLACE ONE WAY/CHECK VALVE FOR STARBOARD BOAT EXHAUST/COOLING WATER MANIFOLD.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Lifesaving
Issued 11 March 1988
Resolved
CONDUCT WEIGHT TEST OF BOTH LIFE CAPSULE DAVITS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Unknown
Issued 11 March 1988
Resolved
MAKE OPERABLE THE DRILL FLOOR PURGE AIR ALARM.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Unknown
Issued 11 March 1988
Resolved
MAKE THE TELEPHONE IN THE SACK ROOM EXPLOSION PROOF OR MOVE PHONE AT LEAST 5' FROM PORT SIDE MUD PIT ROOM ENTRANCE.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Unknown
Issued 11 March 1988
Resolved
CONDUCT TEST OF REMOTE VENTILATION SHUTDOWN FOR PORT DIESEL GENERATOR ROOM IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 11 March 1988
Resolved 11 March 1988
Unknown
Issued 24 February 1986
Resolved
REPAIR FASTENERS FOR CABLE, ENGINE ROOM INTAKE BLOWER.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVIDE MSHA APPROVED FIRST AID KIT.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Construction/Loadline
Issued 24 February 1986
Resolved
MAKE OPERABLE THE REMOTE VENTILATION SHUTDOWN.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVIDE "BEWARE TAIL ROTOR" AT BOTH APPROACHES TO HELO DECK.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Construction/Loadline
Issued 24 February 1986
Resolved
MAKE REPAIRS TO FIRE PLUG VALVE STATION #5.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
RE-STENCIL FIRE STATION #34.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Deck/Cargo
Issued 24 February 1986
Resolved
REPAIR OR REPLACE SUPPORT DLIPS ON ELECTRICAL CABLE FOR THE CATHODIC SYSTEMLOCATED STBD SIDE, AFT. NVIC 4-78, 46CFR 111.160
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Electrical
Issued 24 February 1986
Resolved
REPLACE BROKEN GAS TIGHT TUBE ON OVENHEAD FLOURESCENT LIGHT LOCATED ON THE DRILL FLOOR, STBD SIDE. NVC 4-78, 46CFR 11.105.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Construction/Loadline
Issued 24 February 1986
Resolved
PROVIDE ELECTRICAL INSULATING GLOVES FOR RESCUEMAN OUTFITS AND ONE 3-CELL FLASHLIGHT.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Fire Fighting
Issued 24 February 1986
Resolved
PROVIDE SMOKE SIGNALLING CANNISTERS, 2 FOR EACH LIFECAPSULE, AND AN ADDITIONAL 75 QUARTS OF WATER FOR THE STBD LIFEBOAT, AND A BOARDING LADDER FOR EACH LIFEBOAT.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Lifesaving
Issued 24 February 1986
Resolved
INSTALL APPROVED NAVIGATIONAL LIGHT FIXTURES AND BULBS, CLEAN LENS AND REPAINT SCREENS MAT BLACK.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Navigation
Issued 24 February 1986
Resolved
PROVIDE EVIDENCE OF OR CONDUCT IN PRESENCE OF COAST GUARD, A WEIGHT TEST OFTHE PORT AND STBD CAPSULES, AND OPERATE BOTH BOATS IN THE WATER.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Electrical
Issued 24 February 1986
Resolved
PROVIDE ONE ADDITIONAL SERVICE LINE FOR LINE THROWING GUN. NVIC 4-78, 46 CFR 108.518.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVIDE RELIEF VALVES WITH HAND EASING DEVICES FOR NO. 1 ENGINE START AND DRILL FLOOR AIR RECEIVER.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Lifesaving
Issued 24 February 1986
Resolved
PROVIDE STATION EMERGENCY LIGHTING AT THE PORT; STBD LIFEBOAT EMBARKATION AREAS. NVC 4778.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Fire Fighting
Issued 24 February 1986
Resolved
PROVIDE ONE ADDITIONAL FIRE AXE AND INSTALL PER FIRE CONTROL PLAN. NVC 4-78, 46CFR 108.499
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Lifesaving
Issued 24 February 1986
Resolved
LOWER THE RING LIFEBUOYS (THAT HAVE THE SMOKE ATTACHED TO THEM) ON THE PORT; STBD SIDE OF THE ACCOMODATION SPACES, BUOYS ARE INSTALLED TOO HIGH ON THEBULKHEAD TO BE READILY USED. NVIC 4-78, 46CFR 108.515.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Lifesaving
Issued 24 February 1986
Resolved
PROVIDE ONE 10-FT LOW VELOCITY FOG APPLICATOR AT THE STBD APPROACH TO HELIPORT.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Fire Fighting
Issued 24 February 1986
Resolved
MAKE OPERABLE THE GENERAL ALARM BELLS IN THE FOLLOWING LOCATIONS; ENGINE ROOM 9DC) PORT SIDE; STANDBY GENERATOR ROOM, MUD PUMP ROOM NEAR SALT WATER MANIFOLD, STBD SIDE MAIN DECK.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Navigation
Issued 24 February 1986
Resolved
PROVIDE SELF CLOSING DEVICE AND NO LOOVERS IN DOORS LEADING TO TO STAIR TOWER, MAIN DECK QUARTERS. DOORS MUST NOT HAVE HOLD BACK DEVICES.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Construction/Loadline
Issued 24 February 1986
Resolved
PROVIDE API HAND SIGNAL CHART IN PORT AND STBD CRANES.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Deck/Cargo
Issued 24 February 1986
Resolved
CLEAN TRASH OUT OF CABS OF BOTH CRANES.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Lifesaving
Issued 12 February 1985
Resolved
CONDUCT WEIGHT TESTS FOR BOTH SURVIVAL CAPSULES IN THE PRESENSE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Lifesaving
Issued 12 February 1985
Resolved
REPAIR HYDRAULIC START RELIEF GEAR ON BOTH CAPSULES.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Electrical
Issued 12 February 1985
Resolved
AIR PURGE GENERAL ALARM SWITCH, TELEPHONE,AND SPEAKER PHONE IN WAY OF THE SHALE SHAKER OR RENEW WITH EXPLOSIN PROOF EQUIPMENT.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Fire Fighting
Issued 12 February 1985
Resolved
STENCIL GENERAL ALARM BELLS/CONTACT MAKERS/FIRE STATION/EMERGENCY LIGHTS ASNECESSARY.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Electrical
Issued 12 February 1985
Resolved
RENEW MISSING BOLT AND PROPERLY TIGHTEN BOLTS ON DRILL FLOOR ELECTRIC PANEL
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Engineering
Issued 12 February 1985
Resolved
PROVIDE RELIEF VALVES WITH HAND RELIEVING GEAR ON ALL P-TANKS.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Lifesaving
Issued 12 February 1985
Resolved
RENEW MISSING AIR BOTTLES FOR BOTH SURVIVAL CAPSULES.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Fire Fighting
Issued 12 February 1985
Resolved
PROVIDE APPLICATORS FOR HELIPORT AND MACHINERY SPACE FIRE STATIONS.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Lifesaving
Issued 12 February 1985
Resolved
RENEW OUTDATED CARTRIDGES FOR THE LINE THROWING APPARATUS.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Fire Fighting
Issued 12 February 1985
Resolved
CONDUCT ANNUAL SERVICING FOR FIXED CO-2 SYSTEMS.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Construction/Loadline
Issued 12 February 1985
Resolved
PROVIDE DOOR CLOSURES OR MAKE ALL MUD PIT ROOM DOORS SELF CLOSING.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Electrical
Issued 12 February 1985
Resolved
RENEW MISSING BUNK LIGHT LENSE/GUARDS/BULBS AS NECESSARY.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Electrical
Issued 12 February 1985
Resolved
RENEW IMPROPER SPLICES IN LOGGING CABLES ON DRILL FLOOR.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985
Electrical
Issued 12 February 1985
Resolved
AIR PURGE OR RENEW WITH EXPLOSION PROOF FIXTURES, LOGGING EQUIPMENT ON THE DRILL FLOORS.
Condition: Unknown
Due 12 February 1985
Resolved 12 February 1985