WHEELER is a 1980 public vessel, unclassified. The Coast Guard has recorded 142 inspections since 1982, most recently in June 2026, along with 160 deficiencies and 1 operational control.

Records from 1982 to 2026. Most recent: inspection, 1 June 2026.

Built
1980
Last inspected
1 June 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7923184 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
229061
Flag
UNITED STATES
—
Maury page id
psix-229061

Inspections, by type

…with no type recorded25
Years with a record 43 calendar years (1982–2026)
The 142 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 1979.

Documentation record

Tonnage as PSIX records it10614 - Regulatory (Subpart C or D), Gross Ton
8135 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 142

1 June 2026 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8385439
12 April 2025 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8110448
24 January 2025 Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8086520
17 January 2025 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8064884
3 June 2024 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7926342
22 February 2024 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7844881
23 January 2023 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7629187
17 January 2023 Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7626080
17 October 2022 Internal Structural Exam · Permit to Proceed · Drydock Exam · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7578579
3 March 2022 Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7405366
21 December 2021 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7371197
4 November 2021 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7345265
14 April 2021 Examination of Repairs · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7174949
18 February 2021 Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7142523
19 October 2020 Administrative Inspection · Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7080068
22 August 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7039790
7 August 2020 Examination of Repairs · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7025954
14 July 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7006420
2 June 2020 MTSA Verification · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6966128
15 January 2020 Administrative Inspection · Permit to Proceed · Special
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6929891
15 August 2019 MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6785100
26 November 2018 Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6586908
16 October 2018 Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6562556
23 May 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6421851
15 March 2018 Administrative Inspection · DAPI Audit · Annual Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6372284
26 September 2017 Internal Structural Exam · Hull Examination · Examination of Repairs · Welding Related Inspections Qualification Testing · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6281524
2 March 2017 MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6093956
13 October 2016 Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6022651
19 October 2015 Hull Examination · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5752776
30 August 2015 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5231010
30 August 2015 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5231419
23 May 2014 Periodic Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4849017
9 July 2012 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4377604
8 July 2012 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4377432
27 June 2012 Annual Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4336625
27 September 2011 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4300605
9 December 2010 COI Inspection · Hull Examination · Deficiency Check · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3907449
9 November 2010 Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3882994
20 October 2010 Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3873736
14 April 2009 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3436206
17 November 2008 Drydock Exam · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3402148
28 July 2008 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3282274
9 June 2008 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3231612
21 May 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3212850
10 April 2008 Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3166711
3 April 2008 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3176685
27 February 2008 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3152973
29 January 2008 Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3138071
15 October 2007 Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3080635
16 June 2007 Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2963202
15 June 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2963237
15 June 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2968364
15 May 2007 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2926666
12 March 2007 Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2886389
13 March 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2608955
16 February 2006 Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2586172
10 January 2006 COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2561937
12 May 2005 Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2356015
23 February 2005 Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2296760
27 November 2004 Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 2273511
18 February 2004 Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1991307
29 April 2003 Examination of Repairs · Damage Survey · In-Service Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1783594
29 April 2003 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1787252
16 April 2003 In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1774624
25 February 2003 Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1747643
27 November 2002 Internal Structural Exam · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1701974
20 September 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1704438
13 May 2002 Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1609484
2 April 2002 Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1598021
7 January 2002 In-Service Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1475605
17 January 2001 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1430964
24 February 2000 Examination of Repairs · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1401119
12 April 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1122388
22 March 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1122692
8 February 1999 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 791998
26 January 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 791242
6 January 1999 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1408228
22 December 1998 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1393050
7 May 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1125525
30 March 1998 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1388498
10 February 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 774525
6 January 1997 COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1427294
11 November 1996 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1385852
14 April 1996 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1081144
18 January 1996 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1466951
18 December 1995 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1422616
14 March 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 864023
14 February 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1424054
27 January 1995 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1139786
20 December 1994 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 878248
20 December 1994 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1403878
14 November 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 7171
28 July 1994 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1387577
19 January 1994 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 854576
21 December 1993 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 849834
1 December 1993 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1407230
26 July 1993 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 848576
11 March 1993 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 838742
12 February 1993 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1356216
25 January 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 50719
18 December 1992 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1136975
20 November 1992 COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1136718
1 September 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1249254
19 August 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 939944
31 July 1992 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431150
19 May 1992 Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1261657
17 May 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 77523
28 April 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1267615
27 March 1992 Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 951344
23 March 1992 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1254463
21 March 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 26797
3 February 1992 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1254435
8 January 1991 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 900752
13 December 1990 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1236640
4 December 1990 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 906025
17 October 1990 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 924138
29 August 1990 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 915723
17 August 1990 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1236633
15 May 1990 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 930137
15 May 1990 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 930287
20 March 1990 Re-Inspection · Excursion Permit · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 903312
9 March 1990 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1233166
22 August 1989 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1200428
31 July 1989 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 886655
28 December 1988 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 887653
27 July 1988 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1341195
12 May 1988 Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1347593
5 April 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1343795
14 March 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1336686
13 February 1988 Hull Examination · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1025280
10 November 1987 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1000621
8 September 1987 Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1311138
24 February 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1317313
21 December 1986 Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1000668
18 December 1985 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 995066
25 September 1985 Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297104
13 September 1985 Damage Survey
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1298689
14 February 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286344
19 December 1984 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 972701
30 July 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974667
16 January 1984 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 973660
22 October 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 973478

Deficiency record · 160

03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 17 January 2025 Resolved
Except under paragraph (a)(2) of this section, vessels that operate in salt water must be examined in accordance with the intervals set forth in Table 91.40-3(a)of this section. Where Table 91.40-3(a) indicates a 2.5 year examinations interval, its means a vessel must undergo two examinations within any five year period. No more than three years may elapse between any two examinations. Vessel shall complete a credit dry-dock and internal examination prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Due 17 January 2025
Resolved 13 May 2026
Resolution: DD and ISE credited
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 31 January 2023 Resolved
Each cargo vessel must carry at least one rescue boat. The vessel does not have a rescue boat or launching appliance that meet the requirement of 46 CFR 199.262. USACE shall ensure a rescue boat and launching appliance is installed meeting the above reference or provide a letter IAW the MOU that the USACE District Commander has made a decision to allow the vessel to operate with its current rescue boat configuration, which is not in compliance with the applicable regulation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 February 2023
Resolved 3 February 2023
Resolution: Cleared until further review/determination can be made.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Vessel must remove Temporary repair in #3 Stbd Void slope Weld seam leak, to include aft doubler.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Wasted plate on port shaft tube must be repaired.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Wasted Hull plate in Auxiliary Machinery Room must be repaired.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Wasted plate on watertight bulkhead in #4 Center void must be repaired.
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Wasted Hull plating in #2 Void must be repaired.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Port side #3 void fuel tank deck insert must be repaired.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs.Wasted dredge collection pipes in the #5 port and stbd void must be repaired.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Failed hose test hatch repairs must be made and NDT'd.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 16 December 2022 Resolved
If, during an internal structural damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the OCMI may require the vessel to be drydocked or taken out of service to further assess damage and to effect permanent repairs. Complete repairs to S-17 fan room bulkhead and deck
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 1 February 2023
Resolution: Items repaired to the satisfaction of the attended MI/ABS Surveyor.
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 25 February 2022 Resolved
Vessels in ocean, coastwise, or Great Lakes service, except unmanned barges, shall be fitted with anchors, chains, and hawsers in general agreement with the Standards established by the American Bureau of Shipping. Starboard windless motor brake failed and the drum clutch casing structurally failed during anchor deployment. This event rendered that system incapable of raising the starboard anchor during mooring or anchoring operations. Repair starboard windless system, replace clutch and test system to the satisfaction of the attending USCG Marine Inspector. Also have the Portside windless clutch casing non destructively tested to ensure casing is not structurally compromised or damaged.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 October 2022
Resolved 19 December 2022
Resolution: Repair completed at Detyens Shipyard, Charleston, SC and satisfactory opeerational test witnessed.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 25 February 2022 Resolved
All enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. (b) Means shall be provided for stopping all fans in ventilation systems serving machinery and cargo spaces and for closing all doorways, ventilators and annular spaces around funnels and other openings to such spaces, from outside these spaces, in case of fire. Replace or repair inoperable engine room supply fan motor to the satisfaction of th attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2022
Resolved 22 March 2022
Resolution: Intake fan motor replaced new. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 February 2022 Resolved
Electric installations on vessels must ensure: (1) Maintenance of services necessary for safety under normal and emergency conditions. (2) Protection of passengers, crew, other persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc.) to which plan review has been approved. Properly tag out electrical power switch and secure exposed dead end wires to previously installed space vent fan motor.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2022
Resolved 22 March 2022
Resolution: Dead wire removed and electrical power switch was capped off.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 February 2022 Resolved
Arrangements shall be made whereby water in the compartments will drain to the suction pipes. Efficient means shall be provided for draining water from all tank tops, other watertight flats and insulated holds. Peak tanks, chain lockers and decks over peak tanks may be drained by eductors, ejectors, or hand pumps. Provide repair plan detailing repairs to, non functioning, fore and aft peak tank de-watering system remote control valves.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2022
Resolved 14 December 2022
Resolution: Witnessed op test of aft peak remote control bilge pump valve.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 8 March 2021 Resolved
Ships port davit failed to lift lifeboat after man overboard drill. Davit shall be in proper operation at all times, show proper operation in the presence of Marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2021
Resolved 10 March 2021
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 8 March 2021 Resolved
Ships rudder angle indicator is not properly indicating at the local operating station and the Bridge. Show proper operation of the rudder angle indicator and steering gear. Show proper operation in the presence of Marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 April 2021
Resolved 19 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 8 March 2021 Resolved
Each cargo vessel must carry at least one rescue boat. Vessel's crew stated that they do not have a designated rescue boat. Provide proof of exemption or alternative to the regulations.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 April 2021
Resolved 3 February 2023
Resolution: Cleared until further review/determination can be made.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 March 2021 Resolved
Fuel oil purifier has leaking hoses. Repair leaks to the satisfaction of attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2021
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 March 2021 Resolved
Marine cable transit in the Engine Room had cable pulled and not blocked with appropriate blank. Replace with blank or reinstall cable to make water and vapor tight.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 8 March 2021 Resolved
Starboard steering gear hydraulic hose has damage exposing the interior braided metal. Repair/replace hose to the satisfaction of attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 March 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 March 2021 Resolved
Flexible hoses attached to two of the CO2 bottles in the emergency generator space have hoses that are exhibiting dry-rot and kinked. Provide servicing/repair report from an approved fire servicing company to the satisfaction of a Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 August 2020 Resolved
Port steering motor inop.
Action required: 60 - Rectify deficiencies prior to movement
Due 19 September 2020
Resolved 22 August 2020
Resolution: Boland Marine & Industrial LLC provided report stating that coupling dogs had been completely sheered. Technician aligned and installed new coupling. Operational tested for 45 minutes along with testing steering from all stations.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 11 June 2020 Resolved
Fire Dampers located on exhaust stack for machinery space pinned-open and prevent closure of space for fire protection. Provide safe/efficient means of closure and/or demonstrate satisfactory operation of protective fire dampers in presence of CG Marine Inspector. 46 CFR 92.15-10(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Verified original inspector check downdraft louvers, not dampers. Inspected dampers for satisfactory operation.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 11 June 2020 Resolved
Conduct satisfactory Fire & Abandon Ship drills in presence of CG Marine Inspector prior to departure. 46CFR 96.06-1 46 CFR 199.780(c)(2)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Witnessed satisfactory Fire & Boat drills.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 11 June 2020 Resolved
Vessel does not maintain a Weekly Inspection checklist for Lifesaving Equipment (Lifeboat maintenance). Create and provide to satisfaction of CG Marine Inspector. 46CFR 96.06-1 46 CFR 199.190(d)(2)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Vessel created weekly lifeboat inspection isntruction and log entry standard including weekly requirements.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 11 June 2020 Resolved
Vessel does not have record of Annual servicing for Lifeboats. Provide annual servicing report that Lifeboats have been inspected & serviced to satisfaction of CG Marine Inspector. 46CFR 96.06-1 46 CFR 199.190(f)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Vessel provided letter for annual inspection and servicing of both lifeboats.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 June 2020 Resolved
Start air system contains a 250mawp Pressure Vessel with a 275mawp relief valve, system operates at 250psi. Replace relief valve with that of proper setting and prove proper operation of system at safe working pressure to satisfaction of CG Marine Inspector. 46 CFR 96.03-1(a) 46 CFR 54.15-10(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Pressure relief valve replaced with 250psi valve, system regulated down to 245psi, does not affect start air capabilities.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 11 June 2020 Resolved
Galley doors located on "A" Class bulkheads are missing self-closing devices and have hold-back hooks installed. Install properly adjusted self-closing devices and remove hold-back hooks to satisfaction of CG Marine Inspector. 46 CFR 92.07-10(d)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Hold-backs have been removed and self-closing devices have been added and adjusted.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 11 June 2020 Resolved
Multiple spaces FWD of vessel that are CO2 protected have failed hatch gaskets. Repair/replace gaskets to satisfaction of CG Marine Inspector. 46 CFR 92.05-1(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Hatch gaskets on FWD machinery space doors have been replaced and chalk tested.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 11 June 2020 Resolved
Multiple spaces FWD of vessel that are CO2 protected have open bulkhead penetrations. Correct to satisfaction of CG Marine Inspector. 46 CFR 92.05-1(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: 3 bulkhead penetrations in FWD machinery spaces have been plugged with threaded fittings.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 11 June 2020 Resolved
Bow thruster space has access plates that are open and missing hardware posing free communication between anchor locker and space. Repair to satisfaction of CG Marine Inspector. 46 CFR 97.15-7(a) 46 CFR 93.01-1 46 CFR 170.165(a) 46 CFR 42.15(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Chain link access plates in bow thruster space have been installed with all hardware.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 11 June 2020 Resolved
FWD Pump Motor Room has access door with additional dogs/locks restricting safe means of escape. Correct to satisfaction of CG Marine Inspector. 46 CFR 92.10-20(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Dogs and hinges have been lubricated and adjusted for easier use. Special note has been added that Vessel plans to switch to QAWTD's at next shipyard availability.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 11 June 2020 Resolved
No signage instructing crew/personnel with location of Lifeboat Embarkation Areas from nearby accommodations. Install signage to satisfaction of CG Marine Inspector. 46 CFR 97.37-42 46 CFR 199.80(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Muster location and lifeboat signage has been added in adjacent passageways/accomodation areas.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 June 2020 Resolved
FWD Lamp Locker shares space for paint locker ventilation motor. Verify system meets Class 1 Division 1 Hazardous Location installation to satisfaction of CG Marine Inspector. 46 CFR 96.05-1(a) 46 CFR 111.101-21 46 CFR 111.105-11(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2020
Resolution: Verified motor/fan unit in lamp locker ventilation duct is non-sparking/intrinsically safe. Explosion proof light fixture has been ordered for space.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 11 June 2020 Resolved
Log weekly soundings of appropriate tanks associated with the storage of oils and use of Oily Water Separator in the vessels Oil Record Book. 46 CFR 97.35-3(b) 33 CFR 151.25(d)
Action required: 10 - Deficiency Rectified
Resolved 11 June 2020
Resolution: Logged weekly soundings.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 11 June 2020 Resolved
Remove storage of corrosives found in paint locker and separate to satisfaction of CG Marine Inspector. 46 CFR 91.25-50(a)
Action required: 10 - Deficiency Rectified
Resolved 11 June 2020
Resolution: Corrosives removed from paint locker.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 11 June 2020 Resolved
Lifeboats are required to be lowered every 3 months and launched annually. Conduct maintenance and log to satisfaction of CG Marine Inspector. 46 CFR 96.06-1 46 CFR 199.180(d)(6)
Action required: 10 - Deficiency Rectified
Resolved 11 June 2020
Resolution: Lifeboats were lowered and maintenance was conducted.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 August 2019 Resolved
01) Currently the EDG shuts down on high J/W temp. 46CFR 112.50(g) states alarm only not shutdown. Correct issue so the EDG does not shut down on high J/W temp. 30 Day Compliance date (15Sep2019) to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified EDG now only alarms and does not shut down for high J/W temp.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 August 2019 Resolved
02)Currently the EDG has no Audible alarm in the EDG room, nor in the engine control room. IAW 46CFR 112.50(h). Until the issue is resolved when the EDG is run, the EDG room must be manned by a qualified engineer. 30 Day Compliance date (15Sep2019) to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified an audible alarm has been installed in the EDG room and now alarms in the ECR.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 August 2019 Resolved
03)Currently the EDG PTSP states “Check Valve to Remain Closed” for the L/O testing. This check valve cannot be found. Correct the procedures or find the check valve. 30 Day Compliance Date (15Sep2019) to the satisfaction of the Coast Guard.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified the PSTP has been amended and the check valve portion has been removed.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 August 2019 Resolved
04)Currently the EDG L/O test did not go IAW the procedures, no Low L/O alarm happened only the shutdown did and that was above where the low alarm should have gone off. Correct the EDG alarm and shutdown for the low L/O. 30 Day Compliance Date (15Sep2019) to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified and tested the L/O alarm and shutdown are functioning as designed
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 15 August 2019 Resolved
05)Currently at the EDG CO2 release station, there is no sign to state there are manual closures to be closed when activating the CO2 system. Install signage to include these closures. 46CFR95.15-10(h). This has been rectified prior to completion of today’s inspection. Issued and Cleared same date.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 15 August 2019
Resolved 15 August 2019
Resolution: Deficiency rectified same day, signs installed.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 August 2019 Resolved
06)This goes along with deficiency number 2 issued today. In the engine control room there is in the view screen the previous EDG’s alarm system and controls, the current new EDG is not installed there. Only lacking a computer code to get it re installed. Correct this monitoring issue so alarms work in the control room. 46CFR112.50(h) 30 Day Compliance Date (15Sep2019) to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verfied the EDG alarms and monitoring system now works in the ECR.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 August 2019 Resolved
07)Currently the PTSP’s for the SS/DG’s are not complete IAW 46CFR61.40-10. The step by step instructions are missing. Correct this part of the PTSP’s for the ships SS/DG’s. 30 Day Compliance Date (15Sep2019) to the satisfaction of the Coast Guard.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified the PSTP have been updated with step by step instructions for the SSDGs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 August 2019 Resolved
08)Currently on the STBD SS/DG there is a F/O leak at a F/O high pressure injection line at the #4 inboard head. Correct this issue by the end of today’s inspection. This has been corrected. Issued and cleared same day.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 August 2019
Resolved 15 August 2019
Resolution: F/O Line has been sealed and tightened.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 August 2019 Resolved
09)Currently fire stations #29 and #35 are in need of PMS, green corrosion covers the blank cap on the “Y” gate and the main stop valves for the stations. Correct before the end of today’s inspection. This has been corrected. Issued and cleared same day.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 August 2019
Resolved 15 August 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 August 2019 Resolved
10)Currently the Galley roll top door will not close completely. This fire door must close completely. Correct issue with the door. The ¾” to 1” gap at the bottom needs to be filled. 30 Day compliance Date (15Sep2019) to research possible new door. To the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified the galley rolltop door closes fully.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 August 2019 Resolved
11)Currently the following deck penetrations are wasted and in serious need of replacement. Cable penetrations boxes PORT side main deck number F2, F3, and the PORT Trunnion winch penetrations. STBD side the F4, F5, F6, and the STBD Trunnion winch penetrations, crop and renew, replace all. 46CFR171.111(e). This item is to be completed at the scheduled shipyard period in September 2019. 90 Day Compliance date (15Nov2019) To the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified all deck penetrations in question have been rectified.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 15 August 2019 Resolved
12)Currently the High L/O temp alarm on the Port SS/DG is not working, correct problem and retest. Due to the constantly manned engine room a 30 Day Compliance Date (15Sep2019) To the satisfaction of the Coast Guard.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified and tested the portside generator high L/O temp alarm has been replaced and is functioning properly
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 August 2019 Resolved
13)Currently the Center SS/DG’s reverse power relay is not working. Repair and call USCG to witness testing. This repair is required to be completed prior to sailing. A 30 Day Compliance Date (15Sep2019) to the Satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 16 August 2019
Resolved 16 August 2019
Resolution: Reverse Power repaired and notification received.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 15 August 2019 Resolved
14)Currently in the AMR upper FWD BLKHD Rox Box has been repaired with in correct rubber blocks, miss matched manufactures. Correct the previous repairs to the box and use correct manufactures blocks. A 30 Day Compliance Date (15Sep2019) to the satisfaction of the Coast Guard. 46CRF171.111(e)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified the bulkhead penetrations have been repaired using the proper non mismatched blocks
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 15 August 2019 Resolved
15)Currently FWD Generator room BLKHD penetrations (Stuffing Tube Type) not securing wires in the penetrations and also the wires at the same location are not properly attached to the BLKHD. A 30 Day Compliance Date (15Sep2019) to the satisfaction of the Coast Guard. 46CFR171.111(e).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2019
Resolved 4 November 2019
Resolution: Verified all wires in question have been secured properly
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 August 2019 Resolved
16)Currently in the AMR STBD BLKHD a Fixed CO2 system nozzle is being blocked by boxes, Remove the obstruction prior to the close of today’s inspection. This deficiency has been corrected prior to the end of today’s inspection. Issued and cleared the same day.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 August 2019
Resolved 15 August 2019
Resolution: All material removed from the space blocking the nozzle.
Engineering › Steering Gear System › Power Unit
Issued 28 March 2018 Resolved
Prior to departure from Sector Mobile Zone, provide a technician report from SPERRY and CAPT conducting steering test under load while underway.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 28 March 2018
Resolution: Ballasted ship to loaded condition, in heavy seas, with engines full ahead, conducting repeated 20-degree course changes and holding various courses, in all modes of steering, for one hour. The steering system is performing correctly.
Engineering › Steering Gear System › Power Unit
Issued 28 March 2018 Resolved
Prior to departure from port, vessel is required to provide tug assist.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 28 March 2018
Resolution: Tug assist provided for vessel departure.
Electrical › Electrical Distribution System (service) › Wiring
Issued 28 March 2018 Resolved
Make permanent repairs to the main cable transit in the emergency generator room on the bulkhead behind the switchboard to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 April 2018
Resolved 23 May 2018
Resolution: Fire caulk replaced with rox blocks by contractor ([name withheld]).
Construction/Loadline › Hull › Hull Plating
Issued 18 December 2017 Resolved
All leaks in the vessel shall be repaired and tested to the satisfaction of the attending marine inspector prior to movement. Vessel shall notify USCG Sector Mobile prior to any movemnet outside of the shipyard. Master shall ensure the safety of the vessel is maintained at all times. IAW 46 CFR 91.40-3
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 January 2018
Resolved 5 February 2018
Resolution: All repairs were made and tested sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 2 March 2017 Resolved
Provide annual servicing report for fixed CO2 system.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 9 March 2017
Resolution: Received, reviewed, and accepted annual fire servicing report.
Communications › Radio Communications › VHF Radiotelephone
Issued 2 March 2017 Resolved
Provide GMDSS and Radio annual servicing report.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 9 March 2017
Resolution: Received, reviewed, and accepted annual servicing report.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 2 March 2017 Resolved
Vessel reported inoperative OWS, make proper repairs to installed OWS.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 April 2017
Resolved 4 May 2017
Resolution: Received, reviewed, and accepted statement from master that OWS was operating as designed.
Lifesaving › Lifeboat › Handholds/Handrails
Issued 2 March 2017 Resolved
Replace damaged cotter pin on turnbuckle on starboard lifeboat aft.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 9 March 2017
Resolution: Received, reviewed, and accepted masters statement/report.
Fire Fighting › Fixed Deck Foam System › Hose Connection
Issued 2 March 2017 Resolved
Vessels helo deck feeder tubes were damaged.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 March 2017
Resolved 9 March 2017
Resolution: Received, reviewed, and accepted masters statement/report.
Construction/Loadline › Structures › Deck Plating
Issued 2 March 2017 Resolved
Starboard trunnion service frame was damaged. Crop and renew inkind.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 April 2017
Resolved 9 March 2017
Resolution: Received, reviewed, and accepted masters statement that the damaged portion of the trunnion was cropped and renewed inkind.
Construction/Loadline › Structures › Deck Plating
Issued 2 March 2017 Resolved
provide and submit repair plan for replacement of damaged and corroded decking around the exterior walk way of bridge. See narrative for details.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 April 2017
Resolved 4 May 2017
Resolution: Received, reviewed, and accepted statement from master that the proper repairs had been carried out the the catwalk gratings.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 12 February 2016 Resolved
Show proper operation of pneumatic, remotely operated bilge valves for independent suction for Aux Mach and E/R spaces.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 16 February 2016
Resolution: Vessel's C/E removed valves, and replaced seals. Tested sat.
Engineering › Steering Gear System › Follow-up Assembly
Issued 11 February 2016 Resolved
Correct excessisive surging of steering gear while in follow-up mode.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 16 February 2016
Resolution: Tech rep from Sperry, Inc. adjusted gain for steering gear.
Electrical › Electrical Distribution System (emergency) › Overcurrent Device
Issued 11 February 2016 Resolved
Breaker #5 on the emergency switchboard for sliding door #5 inop. Provide replacement and satisfactory test.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 16 February 2016
Resolution: Breaker was replaced with new OCD and tested sat.
Electrical › Electrical Distribution System (service) › Switch
Issued 11 February 2016 Resolved
Show proper operation of remote ventilation shutdowns for E/R, Aux space, and E-Generator room.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 16 February 2016
Resolution: Vessel's electrician provided PM to electric board and showed proper operation of shutdowns.
Engineering › Steering Gear System › Linkage
Issued 30 August 2015 Resolved
30Aug2015: Coupling failure on stbd steering gear system due to age of rubber materials.
Due 30 August 2015
Resolved 30 August 2015
Resolution: 30Aug2015: Replaced rubber coupling from o/b stock. Received 2692 and statement from Chief Engineer satisfying discrepancy.
Lifesaving › Lifeboat › Hull
Issued 23 May 2014 Resolved
Port and Starboard lifeboats show evidence of hull warpage, delaminating of fiberglass and water intrusion damage. Both lifeboats are not in serviceable condition and are in need of repaired or replacement to the satisfaction of the attending marine inspector. If repaired, a report attesting to satisfactory condition from the approved servicing facility is required.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 January 2016
Resolved 16 February 2016
Resolution: P/S Lifeboats were replaced with in kind open boats.
Lifesaving › Launching Appliances › Davit
Issued 23 May 2014 Resolved
Port and Starboard lifeboat davits show evidence of corrosion, metal loss and lack of maintenance. Both davits are not in serviceable condition and are in need of repaired or replacement. Third party report attesting to satisfactory condition or installation of the davit system is required prior to conducting, in the presence of marine inspector, load test for the system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 January 2016
Resolved 16 February 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 13 July 2012 Resolved
Prior to movement, prove proper operation of port main engine to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 15 - Rectify deficiencies by next port
Resolved 16 July 2012
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (air motor)
Issued 27 June 2012 Resolved
The starters for the ship service generators are leaking fuel used to lubricate them, causing the fuel to spray and pool around the generators and creating a safety hazard. Make repairs to prevent the leakage and test to the satisfaction of the attending CG Marine Inspector.
Action required: 705 - Other - as specified
Due 28 July 2012
Resolved 16 July 2012
Resolution: Satisfactory repairs were made and starters and SSDG tested SAT.
Communications › Alarms/Indicators › General Alarm
Issued 9 December 2010 Resolved
General alarm bells in forward motor room starboard side inop; Repaired.
Condition: Improper/Lack of Maintenance
Due 11 March 2011
Resolved 11 March 2011
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 14 April 2009 Resolved
Engineering automation procedures do not reflect the updated equipment onboard. Revise and submit for approval the Engineering Automation Procedures.
Action required: 705 - Other - as specified
Due 14 July 2009
Resolved 4 May 2010
Construction/Loadline › Hull › Hull Plating
Issued 28 July 2008 Resolved
Your vessel is allowed to operate IAW the letter dated 02Apr08 from the [name withheld] This requirement will expire and be re-evaluated on 04Sep08. Keep a copy of the authorization letter with this 835 requirement.
Action required: 705 - Other - as specified
Due 4 September 2008
Resolved 5 February 2009
Resolution: Vessel completed drydock at Bender Shipbuilding in Mobile AL. A summary of work on hopper plate is listed under Activty# 3402148.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 10 April 2008 Resolved
Provide instructions for operation and simple line diagrams for all CO2 pull stations IAW 46 CFR 95.15-10(h).
Action required: 705 - Other - as specified
Due 10 June 2008
Resolved 5 June 2008
Construction/Loadline › Hull › Hull Plating
Issued 3 April 2008 Resolved
Your vessel is allowed to operate IAW the Letter Dated 02Apr08 from the [name withheld] This requirement will expire and be re-evaluated on 04Jun08. Keep a copy of the authorization letter with this 835 requirement.
Condition: Unknown
Action required: 705 - Other - as specified
Due 4 June 2008
Resolved 4 June 2008
Resolution: Re issued requirement on 28Jul08 to expire 04Sep08
Construction/Loadline › Structures › End Bulkhead
Issued 4 February 2008 Resolved
1. Requirement will expire on 04Apr08: This vessel is restricted in its operations to the LMR and its passes for dredging operations. To comply with this restriction all Weir heights will remain at 34.9' above the base line and water below the keel whil dredging will be at a minimum of 5'. this authorization to dredge will remain in effect for 60 days and will expire on 04Apr08.
Condition: Unknown
Action required: 705 - Other - as specified
Due 4 April 2008
Resolved 3 April 2008
Construction/Loadline › Hull › Hull Plating
Issued 31 January 2008 Resolved
Regarding the hopper bay bulkheads, provide a copy of the ABS scantling reassessment along with a proposal for repairs to the cognizant OCMI for review and approval. Dredging operations are permitted on a case by case basis with prior approval from the cognizant OCMI.The loading capacity of the hopper bay is restricted to a maximum depth of 37 feet until the integrity of the bulkheads is proven.
Action required: 705 - Other - as specified
Resolved 5 February 2009
Resolution: Provided repair proposal and completed drydock and ISE at Bender Shipbuilding, Mobile AL.
Construction/Loadline › Hull › Hull Plating
Issued 11 January 2008 Resolved
Due to the steel wastage in the hopper bay blkhds indicated in gauging report dated 30OCT2007 this vsl is not authorized to conduct dredging operations until the results of the ABS scantling reassessment & a proposal for necessary repairs are provided to the cognizant OCMI for approval & repairs are carried out. A credit drydock amendment to the COI will not be issued until any repairs are made.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 February 2008
Resolved 31 January 2008
Resolution: As a result of MSC''s review of the vessel''s proposal for limited operations, authorization to operate was granted with certain restrictions. A new deficiency was issued outlining the conditions of operation as agreed upon with Sector New Orleans.
Stability › Watertight Integrity › General
Issued 11 January 2008 Resolved
Repair vent pipes IWO the main deck where temporary fiberglass repairs are in place
Action required: 705 - Other - as specified
Due 26 February 2008
Resolved 27 February 2008
Resolution: Witnessed satisfactory repair of vent pipe.
Construction/Loadline › Structures › Superstructure
Issued 11 January 2008 Resolved
Repair the angle iron stiffeners on the weather deck IWO the house to include the under deck transverse angle iron stiffeners and the bulwarks stiffeners.
Action required: 705 - Other - as specified
Due 26 February 2008
Resolved 27 February 2008
Resolution: Verfied that all new stiffeners were properly installed.
Stability › Watertight Integrity › General
Issued 11 January 2008 Resolved
Repair port cargo hatch on the forecastle.
Action required: 705 - Other - as specified
Due 26 February 2008
Resolved 27 February 2008
Resolution: Port cargo hatch was properly repaired.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 16 June 2007 Resolved
Auxilliary switchboard (ventillation, dredge controls, eng rm auxilliary panel) caught fire. All breakers need replace. Burnt cable needs to be cropped back to good cable or replaced if the cable is not long enough. Vsl is restricted to the Venice Anchorage, Venice, LA
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 July 2007
Resolution: New breakers installed and tested sat using existing cabling.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 12 March 2007 Resolved
Prior to operating, test all alarms and safeties on port main in presence of CG Marine Inspector.
Action required: 705 - Other - as specified
Due 15 May 2007
Resolved 15 May 2007
Resolution: Witnessed satisfactory overspeed, LO, and high temp shutdowns.
Electrical › Electric Supply System (service) › Cable
Issued 12 March 2007 Resolved
Complete prior to next dry dock completion, survey weather deck and make all repairs to electrical junction boxes, bulk head penetrations, deck penetrations, supports, etc.
Action required: 705 - Other - as specified
Resolved 4 February 2008
Resolution: Cleared, this deficiency was written in general terms and nothing specific to inspect.
Electrical › Electrical Distribution System (service) › Busway
Issued 13 January 2006 Resolved
Provide electrical cable and piping supports along the hopper catwalk as needed.
Due 13 February 2006
Resolved 9 February 2006
Resolution: Inspected satisfactory installation of electrical and piping supports along the hopper catwalk.
Engineering › Bilge Water Management System › Not Operational
Issued 13 January 2006 Resolved
Prove proper opertion of the #4 double bottom void center tank non-machinery bilge alarm.
Action required: 705 - Other - as specified
Due 13 February 2006
Resolved 9 February 2006
Resolution: Witnessed satisfactory operation of the #4 double bottom void center tank non-machinery bilge alarm.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 12 May 2005 Resolved
Oily Water Separator unit does not function as per design. Unit consistently function in the recirculating mode. Do not operate the unit unit repaired or replaced and tested to the satifaction of the attending Marine Inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 May 2005
Resolved 13 January 2006
Resolution: Witnessed satisfactory operation of the oily water separator.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 23 February 2005 Resolved
Vessel is not properly documenting the overboard discharge of the oily water separator into the Oil Record Book.
Due 23 April 2005
Resolved 12 May 2005
Resolution: View oil record book, oily water separator entry are being properly logged.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 23 February 2005 Resolved
Bow thruster circuit breaker is faulty and needs to be repaired/replaced.
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 April 2005
Resolved 12 May 2005
Resolution: Circuit breaker was replaced and tested , test sat.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 23 February 2005 Resolved
Port ship service generator governor is hunting.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 April 2005
Resolved 12 May 2005
Resolution: Generator governor was overhauled and tested, test sat.
Electrical › Electric Generation Source (service)
Issued 29 April 2003 Resolved
Prove proper operation of the ship service generators. LEGACY COMPONENT DESC: Power Requirement
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 30 April 2003
Resolution: Witnessed a satisfactory test of all generators.
Electrical › Electric Generation Source (service)
Issued 25 April 2002 Resolved
Make repairs to #1ship service diesel generator low lube oil shutdown audible alarm and have test in the present of the Coast Guard attening Marine Inspector. LEGACY COMPONENT DESC: audible alarm
Condition: Unknown
Due 25 May 2002
Resolved 13 May 2002
Resolution: Audilble alarm circuit card for the port generator low lube oil shutdown system was repaired and tested, test satisfactory.
Electrical › Electrical Distribution System (service)
Issued 2 April 2002 Resolved
Calibrate/replace number two switchboard meters as required: voltage, frequency, kilowatt and ampage. LEGACY COMPONENT DESC: Meters
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 25 April 2002
Resolution: Meters were replaced, calibrated and tested
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 2 April 2002 Resolved
Replace number three Ship Service Diesel generator drive end bearing and conduct a test in the present of a Coast Guard Marine Inspector. LEGACY COMPONENT DESC: Bearing
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 25 April 2002
Resolution: Bearing was replaced and generator tested carrying ship''s load, test sat. In addition, conducted reverse power relay test and automation shutdown devices (i.e. low lube and overspeed), test sat
Electrical › Electric Generation Source (service)
Issued 2 April 2002 Resolved
Replace/repair the Ship Service Diesel Generator Automated alarm system (overspeed and Low lube oil shutdown devices) and conduct a test in the present of the attending Coast Guard Marine Inspector.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 25 April 2002
Resolution: Ship service diesel generators automated alarm system was properly wired as per ships electrical drawings and tested, test sat.
Engineering › Compressed Air System (control)
Issued 2 April 2002 Resolved
Replace the Ship Service air (control) relief vale at the regulation station (valve assembly missing) LEGACY COMPONENT DESC: Valve
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 25 April 2002
Resolution: Relief valves were replaced and calibrated.
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 2 April 2002 Resolved
Make affective repairs to the Ships Service Boiler or disable and remove unit. If repairs are made, unit should be tested in the present of a Coast Guard Marine Inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 25 April 2002
Resolution: Performed hydro test of the ship service boiler with satisfactory results.
Electrical
Issued 6 January 1999 Resolved
MAKE REPAIRS TO #3 SHIP SERVICE GENERATOR TO ALLOW THE DEVELOPMENT OF PROPER VOLTAGE.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999 Resolved
REPAIR OR RENEW STARBOARD BILGE ALARM SENSOR IN THE DREDGE PUMP MOTOR ROOM AND PROVE PROPER OPERATION TO AN ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Accommodation/Occupational Safety
Issued 6 January 1999 Resolved
PROVIDE SERVICING REPORTS FOR THE REPAIR OF THE ELEVATOR TO AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Navigation
Issued 6 January 1999 Resolved
PROVIDE UPDATED DEVIATION CARD FOR THE MAGNETIC COMPASS.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Fire Fighting
Issued 6 January 1999 Resolved
PROVIDE COPY OF FOAM ANALYSIS OF FIXED FIREFIGHTING SYSTEM AND PROOF OPERATIONAL TESTS WERE CONDUCTED UNDERWAY.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Deck/Cargo
Issued 6 January 1999 Resolved
MAKE PERMANENT REPAIRS TO SPLASH GUARDS OVER THE PORT AND STARBOARD LANDER PIPES TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Construction/Loadline
Issued 6 January 1999 Resolved
PROVE PROPER OPERATION OF WTD #7 BETWEEN THE GENERATOR ROOM AND ENGINE ROOM.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Navigation
Issued 6 January 1999 Resolved
REPAIR AND DEMONSTRATE THE PROPER OPERATION OF THE ENGINE ORDER TELEGRAPH POWER FAILURE ALARM ON THE NAVIGATION BRIDGE LOCATED ON THE AUXILIARY ALARMCONSOLE.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Engineering
Issued 6 January 1999 Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR SYSTEM TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR PRIOR TO OPERATING THE SYSTEM.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Lifesaving
Issued 6 January 1999 Resolved
REPAIR GENERAL ALARM BELL LOCATED AT MID-LEVEL IN THE AUXILIARY MACHINERY ROOM AND PROVE PROPER OPERATION TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Engineering
Issued 6 January 1999 Resolved
INSTALL PROPER BOILER SAFETY VALVE ON THE AUXILIARY BOILER AND TEST SAFETY VALVES TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINE INSPECTOR, PRIOR TO OPERATING THE AUXILIARY BOILER.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Lifesaving
Issued 6 January 1999 Resolved
REPAIR OF GENERAL ALARM BELL LOCATED AT CENTER OF THE MID-LEVEL GENERATOR ROOM. PROVE PROPER OPERATION TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Engineering
Issued 6 January 1999 Resolved
INSTALL REQUIRED POLLUTION PREVENTION PLACARDS NEAR OILY WATER SEPARATOR AND SEWAGE SYSTEM.
Condition: Unknown
Due 6 January 1999
Resolved 6 January 1999
Engineering
Issued 30 March 1998 Resolved
PROVE PROPER OPERATION OF PORT MAIN ENGINE GOVERNOR OVERSPEED TRIP.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Accommodation/Occupational Safety
Issued 6 January 1997 Resolved
DEMONSTRATE PROPER OPERATION OF BATTERY COMPARTMENT VENTILATION SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Documentation
Issued 6 January 1997 Resolved
PROVIDE APPROVED PLANS TO [name withheld] FOR INSTALLATION OF ELECTRICAL LUBE OIL PUMPS VICE GEAR DRIVEN LUBE OIL PUMPS FOR BOTH PORT AND STBD REDUCTION GEARS.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Fire Fighting
Issued 6 January 1997 Resolved
UPGRADE, REPLACE OR DEMONSTATE SATISFACTORY CONTINUOS OPERATION OF ANSUL SMOKE DETECTOR CABINET.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Accommodation/Occupational Safety
Issued 6 January 1997 Resolved
PROPERLY LABEL "OPEN" AND "CLOSE" ON ALL FIRE DAMPERS.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Electrical
Issued 6 January 1997 Resolved
ENSURE ALL ELECTRICAL DISTRIBUTION PANELS ARE PROPERLY LABELED AND CIRCUIT DIRECTORIES ARE UPDATED AND LABELED CORRECTLY.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Engineering
Issued 6 January 1997 Resolved
OPEN BOILER MOUNTS FOR 5 YEAR INSPECTION._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Construction/Loadline
Issued 6 January 1997 Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR, INCLUDING BILGE MONITOR.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Engineering
Issued 6 January 1997 Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP ON STBD DREDGE ENGINE.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Engineering
Issued 6 January 1997 Resolved
PROVE PROPER OPERATION OF BOILER SAFETY VALVE, AND HAVE SEALED BY A COAST GUARD MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Documentation
Issued 6 January 1997 Resolved
PROVIDE LETTER OF NO OBJECTION FROM MANUFACTURER (PHILADELPHIA) FOR NEW INSTALLATION OF ELECTRICAL LUBE OIL PUMPS FOR BOTH PORT AND STBD REDUCTION GEARS.
Condition: Unknown
Due 6 January 1997
Resolved 6 January 1997
Construction/Loadline
Issued 11 November 1996 Resolved
MAKE AVAILABLE THE UPPER ONE THIRD OF THE HOPPER BAY FOR INSPECTION. THIS ITEM TO BE COMPLETED BY THE COMPLIANCE DATE OF 19 DECEMBER 1996.
Condition: Unknown
Due 11 November 1996
Resolved 11 November 1996
Accommodation/Occupational Safety
Issued 18 December 1995 Resolved
INSTALL BUNK LIGHT COVERS IN EACH STATEROOM.
Condition: Unknown
Due 18 December 1995
Resolved 18 December 1995
Engineering
Issued 18 December 1995 Resolved
INSTALL REMOTE FUEL SHUTOFF DEVICE ON EMERGENCY GENERATOR FUEL SUPPLY.
Condition: Unknown
Due 18 December 1995
Resolved 18 December 1995
Accommodation/Occupational Safety
Issued 18 December 1995 Resolved
INSTALL ELECTRICAL AND AUDIO OUTLET COVER PLATES IN EACH STATEROOM.
Condition: Unknown
Due 18 December 1995
Resolved 18 December 1995
Unknown
Issued 18 December 1995 Resolved
ESTABLISH A CHEMICAL DRUG TESTING PROGRAM WHICH COMPLIES WITH THE REQUIREMENTS OF 46 CFR PART 16.
Condition: Unknown
Due 18 December 1995
Resolved 18 December 1995
Lifesaving
Issued 18 December 1995 Resolved
INSTALL KICK OUT PLATE IN AFT CO2 DOOR FOR EGRESS OR REVERSE DOOR TO PROVIDE ESCAPE IN CASE OF ACCIDENTAL CO2 RELEASE.
Condition: Unknown
Due 18 December 1995
Resolved 18 December 1995
Engineering
Issued 14 February 1995 Resolved
SET AND SEAL BOILER SAFETY VALVE IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 14 February 1995
Resolved 14 February 1995
Engineering
Issued 20 December 1994 Resolved
PRIOR TO PLACING THE BOILER IN SERVICE, CONDUCT A HYDROSTATIC TEST OF THE CLAYTON HEATING BOILER IN THE PRESENCE OF A CG MARINE INSPECTOR. THE SAFETYVALVE MUST BE SET AND SEALED FOLLOWING THE HYDROSTATIC TEST.
Condition: Unknown
Due 20 December 1994
Resolved 20 December 1994
Electrical
Issued 21 December 1993 Resolved
REPAIR EXPLOSION PROOF LIGHT FIXTURE LOCATED IN THE FWD PAINT LOCKER.
Condition: Unknown
Due 21 December 1993
Resolved 21 December 1993
Navigation
Issued 1 December 1993 Resolved
REPAIR SOUND POWERED TELEPHONE/BELL ON BOW LOOKOUT STATION.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Electrical
Issued 1 December 1993 Resolved
REPAIR EXPLOSION PROOF LIGHT FIXTURE LOCATED IN THE FWD PAINT LOCKER.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Engineering
Issued 1 December 1993 Resolved
PROVE PROPER OPERATION OF THE MAIN ENGINE OVERSPEED TRIPS.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 20 November 1992 Resolved
PROVIDE APPROVED PLANS FOR CO2 SYSTEM INSTALLATION LOCATED IN THE LAUNCH DAVIT POWER UNIT ROOM AND PROVE INSTALLATION IAW SAID PLANS.
Condition: Unknown
Due 20 November 1992
Resolved 20 November 1992
Engineering
Issued 19 May 1992 Resolved
STBD MAIN PROPULSION ENGINE SHALL NOT BE OPERATED UNTIL PROPER REPAIRS ARE MADE TO THE SATISFACTION OF ATTENDING USCG INSPECTOR.
Condition: Unknown
Due 19 May 1992
Resolved 19 May 1992
Engineering
Issued 3 February 1992 Resolved
PROVE SATISFACTORY OPERATION OF STBD DREDGE PUMP GENERATOR ENGINE AND RELATED SAFETIES.
Condition: Unknown
Due 3 February 1992
Resolved 3 February 1992
Deck/Cargo
Issued 13 December 1990 Resolved
UPON COMPLETIONS OF REPAIRS TO PORT DREDGE ENGINE, PRIOR TO PLACING IT INTOOPERATION, MAKE AVAILABLE FOR INSPECTION BY COAST GUARD.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Engineering
Issued 13 December 1990 Resolved
REMOVE OILY WASTE ACCUMULATION AND CLEAN BILGES_x001C_ IN AFTER MACHINERY COMPARTMENTS.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Fire Fighting
Issued 13 December 1990 Resolved
PROVIDE COPY OF THE FIREFIGHTING FOAM LAB TEST RESULTS_x001C_ TO [name withheld], LA.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Engineering
Issued 13 December 1990 Resolved
PROVIDE COPY OF THE COAST GUARD INSPECTOR WITNESSED SHOP/BENCH TEST_x001C_ AFTER NEW AIR RECEIVER RELIEF VALVES ARE INSTALLED AND_x001C_ MAKE AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Lifesaving
Issued 13 December 1990 Resolved
MAKE BOTH LIFEBOATS AVAILABLE FOR COAST GUARD INSPECTOR TO_x001C_ WITNESS WEIGHT TEST AS REQUIRED IN 46CFR91.25-15.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Engineering
Issued 20 March 1990 Resolved
PROVIDE DATA LOGGER TO PRINT OUT ALARM MODES AS PER THE AUTOMATION TEST PROCEDURES AND MAKE AVAILABLE FOR TEST TO THE SATISFACTION OF THE COGNIZANTOCMI BY BELOW DATE.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 20 March 1990 Resolved
PROVIDE FUEL OIL PURIFIERS TO FUNCTION AS PER THE AUTOMATION TEST PROCEDURES AND MAKE AVAILABLE FOR TEST TO THE SATISFACTION OF THE COGNIZANTOCMI BY BELOW DATE.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS AND TEST STARBOARD OVERBOARD SPOOL PIECE NUMBER 224 NO LATER THAN 13 FEB 93 TO THE SATISFACTION OF THE COGNIZANT OFFICER IN CHARGE MARINE INSPECTION.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Electrical
Issued 31 July 1989 Resolved
UPON COMPLETION OF THE INSTALLATION OF THE PORT SHIP SERVICE GENERATOR PRIME MOVER, PERFORM THE REQUIRED TESTING TO THE SATISFACTION OF THE ATTENDING INSPECTOR. 46 CFR 111.12-1
Condition: Unknown
Due 31 July 1989
Resolved 31 July 1989
Construction/Loadline
Issued 13 February 1988 Resolved
PROVIDE COPY OF ABS LOADLINE ENDORSEMENT.
Condition: Unknown
Due 13 February 1988
Resolved 13 February 1988
Deck/Cargo
Issued 13 February 1988 Resolved
PROVIDE COPY OF ABS ENDORSEMENT OF CARGO GEAR CERTIFICATE.
Condition: Unknown
Due 13 February 1988
Resolved 13 February 1988
Deck/Cargo
Issued 13 February 1988 Resolved
PROVIDE EVIDENCE OF ANNUAL HYDROSTATIC TEST OF FLEXIBLE FUEL HOSE.
Condition: Unknown
Due 13 February 1988
Resolved 13 February 1988
Engineering
Issued 10 November 1987 Resolved
REPLACE OR REPAIR BLADES (FOUR) TO STARBOARD PROPELLER. REPLACEMENT OR RE- RAIRS MUST BE DONE TO SATISFACTION OF ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 10 November 1987
Resolved 10 November 1987
Engineering
Issued 21 December 1986 Resolved
PROVIDE ON BOARD A STANDARD DISCHARGE CONNECTION FOR BILGE SLOPS.
Condition: Unknown
Due 21 December 1986
Resolved 21 December 1986
Deck/Cargo
Issued 21 December 1986 Resolved
WEIGHT TEST NEW DAVITS FOR PERSONNEL LAUNCH AFTER FALL DRUMS ARE REPLACED AND HYDRAULIC LINES REROUTED. THIS IS TO BE ACCOMPLISHED PRIOR TO BRINGING PERSONNEL LAUNCH ON BOARD.
Condition: Unknown
Due 21 December 1986
Resolved 21 December 1986
Unknown
Issued 13 September 1985 Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL WHEELER, O.N.CG000438.
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Unknown
Issued 13 September 1985 Resolved
PERFORM TEMPORARY REPAIRS BY MEANS OF A CEMENT BOX PATCH OVER DAMAGE TO BOTTOM PLATING IN WAY OF #3 VOID STBD SIDE BETWEEN FRAMES #97 & #98. MAKE PERMANENT REPAIRS AT NEXT SCHEDULED DRYDOCK, BUT PRIOR TO COMMENCING OPERATION, BUT IN NO CASE LATER THAN 15OCT85. REPAIRS ARE TO BE INSPECTED
Condition: Unknown
Due 13 September 1985
Resolved 13 September 1985
Electrical
Issued 19 December 1984 Resolved
PERFORM OPERATIONAL TESTS TO CENTER (#2) SHIPS SERVICE GENERATOR INCLUDING;OVERSPEED TEST, LOW L.O. CUT-OUT TEST, PARRALLEL TEST, & REVERSE POWER TEST.
Condition: Unknown
Due 19 December 1984
Resolved 19 December 1984
Engineering
Issued 19 December 1984 Resolved
PROVIDE EVIDENCE OF APPROVED AUTOMATION TEST PROCEDURE.
Condition: Unknown
Due 19 December 1984
Resolved 19 December 1984
Construction/Loadline
Issued 16 January 1984 Resolved
MAKE PERMANENT REPAIRS TO THE IMPROPER WELD AREA, IN WAY OF THE #1 PORT DEEP FUEL TANK.
Condition: Unknown
Due 16 January 1984
Resolved 16 January 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.