MAURY USCG vessel records Sign in
← All vessels

AMBROSIO

AMBROSIO is a 1983 tank ship. The Coast Guard has recorded 58 inspections since 1984, most recently in August 2002, along with 75 deficiencies and 2 operational controls.

Records from 1984 to 2002. Most recent: inspection, 13 August 2002.

Built
1983
Last inspected
13 August 2002
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8114998 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
229502
Flag
VENEZUELA
—
Maury page id
psix-229502

Inspections, by type

…with no type recorded47
Years with a record 18 calendar years (1984–2002)
The 58 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 24 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it71867 - Dead Weight, Ton
27310 - Simplified, Net Ton
48263 - Simplified, Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

PENNY V Commercial Fishing Vessel · MISLE 177682 · 15 August 1992 · activity 187576

Inspection history · 58

13 August 2002 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 1661048
6 March 2002 Tank Vessel Examination · MARPOL Annex I Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 1490688
2 March 2001 Port Security Assessment
Type not classified · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 633560
22 February 2001 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 287299
22 January 2001 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 286226
25 September 2000 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 279933
25 September 2000 Tank Vessel Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 822333
20 April 2000 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 276991
1 April 2000 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 33071
7 February 2000 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 483335
3 August 1999 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 431318
3 August 1999 Tank Vessel Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 782512
24 February 1999 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 425836
17 August 1998 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 419024
26 June 1997 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 405083
26 June 1997 Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 777942
16 January 1997 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 451238
29 May 1996 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 391556
2 January 1996 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 528432
25 June 1995 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 380477
12 December 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 694840
6 December 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 458977
1 September 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 370008
5 May 1994 Tank Vessel Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1423922
22 October 1993 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 361780
28 July 1993 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 359806
15 July 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 359447
27 April 1993 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 357830
12 April 1993 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 357569
12 April 1993 Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1405377
31 March 1993 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 357080
16 February 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 356302
16 November 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 354457
3 September 1992 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 352880
15 August 1992 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 187576
24 July 1992 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 352092
13 April 1992 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 349944
29 April 1990 Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1234427
28 April 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 336789
28 November 1989 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 477545
28 November 1989 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 914755
12 April 1989 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 329567
12 April 1989 Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 894613
18 November 1988 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 534227
19 July 1988 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1031926
21 March 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 322018
2 September 1987 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 451994
20 March 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 314926
1 March 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 314533
9 October 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 494407
28 March 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 498156
14 March 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 307339
19 February 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 307019
16 November 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 511549
2 May 1985 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 301709
6 February 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 300281
6 February 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1281977
31 October 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 477848

Deficiency record · 75

Deck/Cargo
Issued 6 March 2002 Resolved
Prior to it's use, renew starboard aft mooring winch foundation
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Engineering
Issued 6 March 2002 Resolved
Prior to its use, make repairs to the aft diesel line forward of the pump room
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make repairs to six starboard water ballast tank P/V valve.
Condition: Improper/Lack of Maintenance
Due 10 April 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Repair 5AS attachement to tank top where soft patched.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew 3BS attachment to the tank top where wasted.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Engineering
Issued 6 March 2002 Resolved
Renew diesel oil pipe as original over 4C cargo tank.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Construction/Loadline
Issued 6 March 2002 Resolved
Renew cargo deck starboard side ladder fasteners.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew as original 4S water ballast tank pressure vacuum valve.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew ladder step in the vicinity of the starboard crane and as needed throughout the vessel.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew pipe hangers and standoffs as needed
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Fire Fighting
Issued 6 March 2002 Resolved
Renew emergency pump control box mounted in the vicinity of the forecastle storage locker
Condition: Improper Installation
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Repair as original the wasteage to 3C Ullage.
Condition: Improper/Lack of Maintenance
Due 10 March 2002
Resolved 6 March 2002
Construction/Loadline
Issued 6 March 2002 Resolved
Renew cat walk support aft of the deck cranes
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew starboard deck crane safety rails.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew starboard deck crane operating pressure gage
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew port deck crane deck.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew port deck crane operating pressure gage
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew port deck crane safety rails
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew starboard manifold command box
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew number two cargo line where soft patched at drop valve.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew number one cargo manula drop valve starboard side through valve fastener
Due 10 March 2002
Resolved 10 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew pump room deck fasteners
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make proper repairs to the deck water seal.
Due 10 March 2002
Resolved 6 March 2002
Construction/Loadline
Issued 6 March 2002 Resolved
Renew walkway, port side above number four center cargo tank.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make proper repairs to inert gas deck line check valve, downstream of deck seal.
Due 10 March 2002
Resolved 10 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew IGS regulating valve cover plate.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew range select switch for oxygen analyzer on the IGS.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make proper repairs to inert gas fan drain lines on pipe connection to fan housing.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew cracked scrubber water level plastic gauge glass
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make proper repairs to cooling water line to scrubber where holed.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make proper repairs to inert gas deck branch line to number four center cargo tank where holed.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew port cargo manifold guard railing where fractured.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew high velocity PV Relief valves where wasted.
Due 10 March 2002
Resolved 6 March 2002
Construction/Loadline
Issued 6 March 2002 Resolved
Renew bent guard rails around stbd hawse pipe on forecastle.
Due 10 March 2002
Resolved 6 March 2002
Navigation
Issued 6 March 2002 Resolved
Renew forecastle center mooring winch foundation.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew crude oil washing deck line where holed
Due 10 March 2002
Resolved 6 March 2002
Construction/Loadline
Issued 6 March 2002 Resolved
Renew protective checker plate over hydraulic tubing for number three center cargo tank cargo valves.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make proper repairs to TLGS deck connection for no 5A port cargo tank where wasted in bottom flange connection to main deck.
Due 10 March 2002
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew emergency cargo shutdown located house front port side. LEGACY COMPONENT DESC: Transfer system
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Make repairs to the pinhole leak in high velocity 5B pipe.
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Deck/Cargo
Issued 6 March 2002 Resolved
Renew as original port side forecastle winch motor platform.
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Fire Fighting
Issued 6 March 2002 Resolved
Provide spanner wrench for hose box in vicinity of 6P #2 fire monitor as counted from bow. LEGACY COMPONENT DESC: Spanner Wrench
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Engineering › Steam System (auxiliary) › Valve, Control
Issued 6 March 2002 Resolved
Make reparis and prove operation of # 1 boiler relief valve controls.
Action required: 15 - Rectify deficiencies by next port
Resolved 11 March 2002
Fire Fighting
Issued 6 March 2002 Resolved
Make repairs and prove operation of the aft foam main isolation valve. LEGACY COMPONENT DESC: Foam Line Isolation Valve
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Fire Fighting › Automatic Sprinkler System
Issued 6 March 2002 Resolved
Renew as original purifier room sprinkler head. LEGACY COMPONENT DESC: Sprinklers
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Electrical
Issued 6 March 2002 Resolved
Renew electrical control knobs in purifier room. LEGACY COMPONENT DESC: Control Knobs
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 6 March 2002 Resolved
Make repairs and prove operation of exterior hospital door. LEGACY COMPONENT DESC: Door
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Engineering › Steam System (auxiliary)
Issued 6 March 2002 Resolved
Make repairs to the sight glass drain controls to the number one boiler.
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2002
Deck/Cargo
Issued 22 January 2001 Resolved
Noted doubler on IGS distribution line in way of flange for port side slop tank.
Condition: Unknown
Due 28 February 2001
Resolved 28 February 2001
Electrical
Issued 25 September 2000 Resolved
REMOTE FUEL SHUT DOWN VALVE WOULD CLOSE OFF FUEL SUPPLY COMPLETELY
Condition: Unknown
Due 23 January 2001
Resolved 23 January 2001
Deck/Cargo
Issued 25 September 2000 Resolved
SOFT PATCH ON IGS LINE ON UPPER DECK
Condition: Unknown
Due 23 January 2001
Resolved 23 January 2001
Deck/Cargo
Issued 25 September 2000 Resolved
HIGH LEVEL ALARM ON CARGO TANKS NON EXISTANT, IAW 33CFR 155.480 IN COMPLIANCE WITH 46CFR 39.20-7 (b)2&3. TO BE CORRECTED DURING NEXT DRY DOCK OR NLT 30NOV00 OR NEXT US PORT.
Condition: Unknown
Due 30 November 2000
Resolved 25 September 2000
Deck/Cargo
Issued 25 September 2000 Resolved
OVERFILL ALARM ON CARGO TANKS NON-EXISTING. IAW 33CFR155.480 THAT COMPLIES WITH 46CFR39.20-7(d)1-4, TO BE CORRECTED DURING NEXT DRY DOCK OR NLT 30NOV00, OR NEXT US PORT.
Condition: Unknown
Due 30 November 2000
Resolved 25 September 2000
Construction/Loadline
Issued 25 June 1995 Resolved
Paint load line plimsol mark in a contrasting color prior to next US port.
Condition: Unknown
Due 11 July 1995
Resolved 8 August 1995
Documentation
Issued 25 June 1995 Resolved
Insure onboard, ORIGINAL Solas safe manning certificate.
Condition: Unknown
Due 11 July 1995
Resolved 8 August 1995
Documentation
Issued 5 May 1994 Resolved
Provide a letter from the administration certifying that all persons onboard have satisfactory / current medical certificates. Provide at next U.S. port to U.S. Coast Guard.
Condition: Unknown
Due 5 June 1994
Resolved 6 June 1994
Electrical
Issued 5 May 1994 Resolved
Make repairs to the emergency generator cooling coils. The coils have a leak 2/3 of the way up (fwd side). Make repairs prior to next U.S. Port.
Condition: Unknown
Due 5 June 1994
Resolved 6 June 1994
Navigation
Issued 12 April 1993 Resolved
NO U.S. COAST PILOT FOR AREA TRANSITED.
Condition: Unknown
Due 22 October 1993
Resolved 22 October 1993
Documentation
Issued 12 April 1993 Resolved
Provide to the U.S. Coast Guard a copy of the vessels safe manning certificate prior to cargo operations at the next U.S. port.
Condition: Unknown
Due 12 April 1993
Resolved 12 April 1993
Lifesaving
Issued 13 April 1992 Resolved
PROVIDE ON BOARD 1 (ONE) ADDITIONAL PORTABLE OXYGEN/EXPOLSIVEMETER.
Condition: Unknown
Due 24 July 1992
Resolved 24 July 1992
Construction/Loadline
Issued 21 March 1988 Resolved
PROVIDE ON BOARD PERMANANT REPAIRS TO THE LEAKING BALLAST PIPING IN THE CARGO PUMPROOM TO SATIFICATION OF VESSELS CLASS SOCEITY PRIOR TO NEXT U.S. VOYAGE
Condition: Unknown
Due 5 May 1988
Resolved 21 March 1988
Fire Fighting
Issued 21 March 1988 Resolved
PROVIDE ON BOARD PROPERLY STENCILED FIRE CONTROL PLANS WITH THE LOCATION OF THE FOURTH FIREMANS OUTFIT MARKED ON SAME IN ACCORDANCE WITH SOLAS 74
Condition: Unknown
Due 5 May 1988
Resolved 21 March 1988
Deck/Cargo
Issued 21 March 1988 Resolved
PROVIDE ON BOARD AN INERT GAS ANALYIZER CALIBRATED TO THE PROPER ALARM SETTING OF 8% FOR OXYGEN ALARM IN ACCORDANCE WITH 46 CFR 32.53-70(B)(I) PRIOR TO NEXT U.S. VOYAGE
Condition: Unknown
Due 5 May 1988
Resolved 21 March 1988
Documentation
Issued 1 March 1987 Resolved
PROVIDE WARNING SIGN AND POST AT GANGWAY IN ACCORDANCE WITH 46CFR35.30-1.
Condition: Unknown
Due 1 March 1987
Resolved 1 March 1987
Deck/Cargo
Issued 1 March 1987 Resolved
PROVIDE SPAN GAS TO CALIBRATE IGS SYSTEM AND DEMONSTRATE PROPER OPERATION OF ALARMS FOR LOW PRESSURE WATER SUPPLY TO SCRUBBER AND WATER LEVEL IN DECKSEAL.
Condition: Unknown
Due 1 March 1987
Resolved 1 March 1987
Fire Fighting
Issued 1 March 1987 Resolved
PROVIDE FIREPROOF LIFELINES FOR FOUR (04) FIREMANS OUTFITS ON BOARD.
Condition: Unknown
Due 1 March 1987
Resolved 1 March 1987
Deck/Cargo
Issued 19 February 1986 Resolved
THE VESSEL ENTERED THE PORT OF LAKE CHARLES, LOUISIANA AND DID NOT MAINTAINTHE INERT ATMOSPHERE IN ALL CARGO TANKS AS REQUIRED BY 46CFR32.53-5. CARGO TANKS FOUND AT APPROX. 12% O2 CONTENT AND LESS THAN 20 MM H2O.
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Deck/Cargo
Issued 19 February 1986 Resolved
RENEW FLAME SCREENS FOR THE PUMPROOM VENTILATION WEATHER HOOD.
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Deck/Cargo
Issued 19 February 1986 Resolved
MAKE PERMANENT REPAIRS TO THE #1 AND #2 CARGO PUMPS IWO LEAKING SEALS.
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Fire Fighting
Issued 19 February 1986 Resolved
PROVIDE A DUPLICATE SET OF FIRE CONTROL PLANS PERMANENTLY STORED IN A WEATHER TIGHT CONTAINER ON THE WEATHER DECK AS REQUIRE BY SOLAS CHAPTER II-2 REG 20, 1981 AMEND.
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Deck/Cargo
Issued 19 February 1986 Resolved
PROVIDE AN OPERABLE/RELIABLE PORTABLE INSTRUMENT FOR MEASURING OXYGEN CONTENT IN AN INERT ATMOSPHERE AS REQUIRED BY 46CFR32.53-65.
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Deck/Cargo
Issued 19 February 1986 Resolved
VESSEL DID NOT CONDUCT ANNUAL TESTS OF CARGO PIPING AS REQUIRED BY 33CFR156.710(F)(2)&(C)(4); NO RECORD OF TEST WAS ON BOARD AS REQUIRED BY 33CFR155.820(B).
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Deck/Cargo
Issued 19 February 1986 Resolved
VESSEL DID NOT HAVE PV FLAME SCREENS ON BOARD AS REQUIRED BY 46CFR32.20-5. VESSEL WAS LOADING CARGO OF CRUDE OIL.
Condition: Unknown
Due 19 February 1986
Resolved 19 February 1986
Fire Fighting
Issued 6 February 1985 Resolved
SOLAS CHAPTER II-2 ALL SHIPS SHALL CARRY AT LEAST TWO FIREMANS OUTFIT. REQ. 17-3.1(2) IN ADDITION, THERE SHALL BE PROVIDED; IN TANKERS 33USC1602/1608 TWO FIREMANS OUTFIT.
Condition: Unknown
Due 6 February 1985
Resolved 6 February 1985
Fire Fighting
Issued 6 February 1985 Resolved
SOLAS CHAPTER II-2 IN ALL SHIPS A DUPLICATE SET OF FIRE CONTROL PLAN REQ.20-2 PERMANTLY STORED IN A PROMINETLY MARKED WEATHER- 33USC1602/1608 TIGHT ENCLOSURE OUTSIDE THE DECKHOUSE.
Condition: Unknown
Due 6 February 1985
Resolved 6 February 1985

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.