Records from 2012 to 2017. Most recent: inspection, 22 May 2017.
Inspection history · 5
22 May 2017
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6152001
14 July 2016
Deficiency Check · MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5940122
2 June 2016
Hull Examination
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 5894732
12 April 2016
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5852282
3 March 2016
Internal Structural Exam · Hull Examination · Underwater Inspection in lieu of Drydock
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5825992
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 29 July 2016
No resolution recorded
Measures shall be taken to the satisfaction of the Administration to ensure that equipment is functioning in a reliable manner & that satisfactory arrangements are made for regular inspections & routing tests to ensure continuous reliable operation. There is no record of OCMI and/or ABS witnessing PSTP’s for Revision 6.
Action required: 705 - Other - as specified
Due 29 September 2016 — due date passed with no resolution recorded
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 29 July 2016
No resolution recorded
Measures shall be taken to the satisfaction of the Administration to ensure that the equipment is functioning in a reliable manner and that satisfactory arrangements are made for regular inspections and routing tests to ensure continuous reliable operation. Several PSTP step-by-step descriptions are generic, with several steps associated with specific machinery missing or vague.
Action required: 705 - Other - as specified
Due 29 September 2016 — due date passed with no resolution recorded
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 29 July 2016
No resolution recorded
Measures shall be taken to the satisfaction of the Administration to ensure that the equipment is functioning in a reliable manner and that satisfactory arrangements are made for regular inspections and routing tests to ensure continuous reliable operation. Standard Procedure PRS-2 of the vessel’s PSTP’s does not fully describe the means of identifying the local parameters to be tested.
Action required: 705 - Other - as specified
Due 29 September 2016 — due date passed with no resolution recorded
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 29 July 2016
No resolution recorded
Measures shall be taken to the satisfaction of the Administration to ensure that the equipment is functioning in a reliable manner and that satisfactory arrangements are made for regular inspections and routing tests to ensure continuous reliable operation. PSTP’s do not indicate at what intervals the required tests are to be conducted.
Action required: 705 - Other - as specified
Due 29 September 2016 — due date passed with no resolution recorded
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 29 July 2016
Resolved
Measures shall be taken to the satisfaction of the Administration to ensure the equipment is functioning in a reliable manner & that satisfactory arrangements are made for regular inspections and routing tests to ensure continuous reliable operation. Crewmembers were unable to complete required Standard Procedures PRS-3, PRS-4, & TMP-2 because the required testing equipment was not onboard.
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 29 July 2016
Resolution: Test equipment purchased locally.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 29 July 2016
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Wilden pump installed on the Gray Water piping before the educator. Restore as original or submit proposal to ABS to modify pumping & piping arrangements.
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 29 July 2016
Resolution: Piping re-installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 July 2016
Resolved
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. Found a dead-end electrical wire located in the overhead below the purifier room.
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 12 August 2016
Resolution: Junction box installed.
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 29 July 2016
Resolved
Any main and auxiliary steering gear control system operable from the bridge shall, in the event of failure of electrical power supply to the control system, an audible and visual alarm shall be given on the bridge. When testing the loss of power function, the audible alarm was not functioning.
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 29 July 2016
Resolution: Corrected.