Records from 2016 to 2024. Most recent: inspection, 26 December 2024.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 23
26 December 2024
PSC B · Deficiency Check · COC-GAS Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8050422
18 December 2023
COC-GAS Annual · PSC B · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7836849
20 September 2023
In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7795851
8 September 2023
Deficiency Check · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7787585
8 September 2023
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7789302
24 December 2022
In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7612755
14 December 2022
COC-GAS Renew · PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7601107
25 January 2022
In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7385749
8 December 2021
Administrative Inspection · PSC B · COC-GAS Annual
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7360356
1 December 2021
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7360353
23 June 2021
PSC B
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7226282
3 December 2020
PSC B · COC-GAS Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7099118
26 January 2019
ISPS II Exam · COC-GAS Renew · Administrative Inspection · Ballast Water Examination · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6613517
28 March 2018
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6380768
7 February 2018
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6351014
6 February 2018
ISPS II Exam · COC-GAS Annual · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6342890
6 February 2018
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6355898
21 August 2017
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6247127
29 June 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6190878
3 February 2017
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6080673
3 February 2017
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6093353
25 October 2016
NPV Safety Exam
Physical examination · Liquefied Gas Carrier National Center of Expertise · Activity 6061021
12 January 2016
ISPS II Exam · Administrative Inspection · COC-GAS Annual · Ballast Water Examination · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5794143
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 December 2024
Resolved
ON SHIPS CARRYING FLAMMABLE OR TOXIC PRODUCTS OR BOTH, A WATER-SPRAY SYSTEM FOR COOLING, FIRE PREVENTION AND CREW PROTECTION SHOULD BE INSTALLED TO COVER: EXPOSED CARGO TANK DOMES AND ANY EXPOSED PARTS OF CARGO TANKS. WHILE CONDUCTING OPERATIONAL TEST OF WATER SPRAY SYSTEM, PSCO OBSERVED LARGE HOLE IN SPRINKLER SYSTEM WATER LINE, PREVENTING SUFFICIENT WATER PRESSURE ON CARGO TANK DOMES. VESSEL SHALL NOT CONDUCT CARGO IN THE UNITED STATES PRIOR TO RECTIFICATION OF DEFICIENCY.
74 SOLAS (20) VII/13.1 IGC (93) 11.3.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2024
Resolution: Received satisfactory class report. PSCO reattended vessel and verified proper operation of Deck Water Spray.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 December 2024
Resolved
ELECTRICAL INSTALLATIONS SHOULD BE SUCH AS TO MINIMIZE THE RISK OF FIRE AND EXPLOSION FROM FLAMMABLE PRODUCTS. PSCO OBSERVED MULTIPLE LIGHTS ON DECK AND IN DECK WORKSHOP WITHOUT PROPER LABELING CERTIFYING THE MEETING OF ELECTRICAL STANDARDS IN HAZARDOUS AREAS. VESSEL SHALL NOT CONDUCT CARGO IN THE UNITED STATES PRIOR TO RECTIFICATION OF DEFICIENCY.
74 SOLAS (20) VII/13.1 IGC (93) 10.1.2
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2024
Resolution: Received satisfactory class report and visually confirmed replacement of lights.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 December 2024
Resolved
GAS DETECTION - WHEN SUCH EQUIPMENT IS LOCATED IN A GAS-SAFE SPACE THE FOLLOWING CONDITIONS SHOULD BE MET: EXHAUST GAS FROM THE DETECTOR SHOULD BE DISCHARGED TO THE ATMOSPHERE IN A SAFE LOCATION. THE GAS TIGHT STEEL CABINET THAT HOUSES THE FIXED GAS SAMPLING INSTRUMENTS HAS MULTIPLE SMALL HOLES AND A LARGE CUT OUT FOR A FAN. VESSEL SHALL NOT CONDUCT CARGO IN THE UNITED STATES PRIOR TO RECTIFICATION OF DEFICIENCY.
74 SOLAS (20) VII/13.1 IGC (93) 13.6.5.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 December 2024
Resolution: Received satisfactory class report and visually verified the fan was removed from the cabinet and the cutout was sealed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 26 December 2024
Resolved
AFTER ANY SURVEY OF THE SHIP UNDER REGULATIONS 7,8,9,19 HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN STRUCTURAL ARRANGEMENTS, MACHINERY EQUIPMENT AND OTHER ITEMS COVERED BY THE SURVEY, WITHOUT THE SANCTION OF THE ADMINISTRATION. PSCO OBSERVED A SOFT PATCH REPAIR TO THE MARINE SANITATION DEVICE.
74 SOLAS (20) I/11(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 January 2026
Resolved 9 January 2025
Resolution: Received satisfactory class report with photos of repair.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 December 2023
Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products. Four explosion proof lights were found with cracked lenses in the cargo compressor and one above the starboard compressor.
74 SOLAS (20) VII/13.1 - IGC (93) 10.1.2
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Resolved 27 December 2023
Resolution: Class verified that the lights were removed and electrically isolated, issued a condition of class for 90 days to allow the vessel to procure replacements in kind.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 December 2023
Resolved
Gas Detection - When such equipment is located in a gas - safe space the following conditions should be met: Exhaust gas from the detector should be discharged to the atmosphere in a safe location. The gas-tight steel cabinet that houses the fixed gas-sampling instruments has over 30 holes drilled into the door.
74 SOLAS (20) VII/13.1-IGC(93)13.6.5.2
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Resolved 27 December 2023
Resolution: Crew used epoxy putty to seal the drilled holes in the cabinet.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 December 2023
Resolved
Decontamination shower/eyewash - The showers and eyewash should be operable in all ambient conditions. The STBD eyewash was clogged, and the port station did not have water available.
74 SOLAS (20) VII/13.1 - ICG(93) 14.4.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 December 2023
Resolution: Crew cleaned the lines on the STBD eyewash, replaced the valve on the PORT side, tested sat by class.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 18 December 2023
Resolved
The fire resistance of doors shall, as far as practicable, be equivalent to that of the division in which they are fitted. Multiple fire doors in the accommodation space were not marked with the fire rating, and others showed signs of on board repair. Class should review all fire doors to ensure they are equivalent to the division they are fitted.
74 SOLAS (97)II-2/47.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 December 2023
Resolution: Class verified all doors met the standard outlined in the FCP and doors were labeled appropriately.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 18 December 2023
Resolved
Hot fresh water or means of heating water shall be available in all communal wash places. Hot water was tested in multiple areas around the ship and never warmed higher than room temperature.
46 USC 70002 - ILO-147 Pg. 37
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 December 2023
Resolution: Heating coil was replaced by the engineering crew.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 January 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. While attempting to transit outbound from the Oxychem cargo terminal on 25Jan2022, the vessel was unable to maintain propulsion and engine control after taking in mooring lines. The onboard Pilot directed the vessel to return to Oxychem. Vessel is required to conduct a satisfactory power trial with class attendance and provide a class report to ensure proper operation of all propulsion machinery and associated control systems.
74 SOLAS (20 Cons.) I/11(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 January 2022
Resolution: The incident is the result of an operational error, by the person in charge. The main engine and propeller pitch control system are operating satisfactorily.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 8 December 2021
Resolved
09209 - Electrical equipment, cables and wiring should not be installed in hazardous locations unless is conforms with the standards not inferior to those acceptable to the organization. PSCO observed loose wiring on cargo tank #4 overfill sensor. In compressor room 03 gauges has loose wiring and 03 light fixtures has fractures on lenses. - 74 SOLAS (20) VII/13.1, IGC 1993 10.1.4 - 17b/c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 December 2021
Resolved 8 December 2021
Resolution: crew corrected deficiency prior to Coast Guard departure
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 8 December 2021
Resolved
11108 - Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Starboard side life raft was discovered to have cracked housing. - 74 SOLAS (97) III/19.2 - 17b/c
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 8 December 2021
Resolved 10 December 2021
Resolution: Vessel submitted technical report attesting to repair of liferaft.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 26 January 2019
Resolved
Each flammable gas detection system must have an audible and visual alarm for power failure and loss of gas sampling flow. Unable to test low flow alarm from sample points on fixed gas detection system.
46CFR154.1350(f) 17c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 January 2019
Resolution: While class attendance was not required by PSCO, class attested to satisfactory operation of low flow alarm during annual survey. See documents.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 7 February 2018
Resolved
2045; ESD valves in liquid piping should fully close under all services conditions within 30 secs. Portside aft liquid valve at cargo manifold closed at 40 secs after valve setting adjustment made. DNV-GL Condition of class Id No. GL09251, Job Id. 1118729
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 21 March 2018
Resolved 28 March 2018
Resolution: Received class report attesting to proper operation of ESD valve.
Electrical › Lighting (service) › Lighting Fixture
Issued 6 February 2018
Resolved
2099- Intrinsically safe electrical equipment and wiring may be fitted in all gas danergous zones. The lights at the PORT side compressor room access door and STBD side deck flood light mounted next to compressor room exhaust were not intrinsically safe. 74SOLAS(2014)VII/12...IGC Code (93 ed.)10.2.1
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2018
Resolution: Deficiency Rectified to the satisfaction of the U.S. Coast Guard.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 6 February 2018
Resolved
0799- On ships carrying flammable or toxic products, a water spray system for cooling, fire prevention, and crew protection should be installed to cover exposed cargo tank domes and any exposed parts of cargo tanks. The #1 cargo tank dome and entrance to compressor room did not have working deck water spray. 74SOLAS(2014)VII/12...IGC Code (93ed.)11.3.1
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2018
Resolution: Deficiency Rectified to the satisfaction of the U.S. Coast Guard.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 6 February 2018
Resolved
2045- Emergency Shutdown (ESD) valves in liquid piping should fully close under all service conditions within 30 seconds of activation. The STBD sdie ESD valves took 40 seconds to close and the PORT side ESD valves took 50 seconds to close. 74SOLAS(2014)VII/12...IGC Code (93ed.)5.6.4
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 February 2018
Resolution: Submitted class report
Construction/Loadline › Structures › Door
Issued 6 February 2018
Resolved
1270- All access openings in bulkheads at ends of enclosed superstructures shall be weathertight when closed. 03 doors for cargo compressor room were found not weathertight. ICLL(88) Reg.12(1).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2018
Resolution: Deficiency Rectified to the satisfaction of the U.S. Coast Guard.
Personnel › Training › Cargo Safety
Issued 6 February 2018
Resolved
2550- The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requriements which may be established by the company. The vessel was required to use span gas for testing gas sample points. During the exam, it was discovered that the vessel tests gas sampling points using propane from a propane torch. 74SOLAS(2014)IX/3...ISM Code 10.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2018
Resolution: Deficiency Rectified to the satisfaction of the U.S. Coast Guard.
Accommodation/Occupational Safety › Ventilation › General
Issued 6 February 2018
Resolved
1138- Protection Screens of not more than 13mm square mesh should be fitted in outside openings of ventilation ducts. The compressor room ventilation ducts were missing sections of mesh wire. 74SOLAS(2014)VII/12...IGC Code(93ed.)12.1.11
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2018
Resolution: Deficiency Rectified to the satisfaction of the U.S. Coast Guard.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 12 January 2016
Resolved
0700- Fire fighting appliances- In all ships general arrangements plans shall be permanently exhibited showing clearly the fire extinguishing appliances, plans, and booklets shall be kept up to date. Fire [name withheld] indicating two foam-fixed nozzles in purifier room does not coincide with actual arrangements. 74 SOLAS (01 cons) II-2/20.1 - 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 12 January 2016
Resolved 13 January 2016