MAURY USCG vessel records
← All vessels

MISS FORT PIERCE

MISS FORT PIERCE is a 1984 passenger vessel (inspected). The Coast Guard has recorded 17 inspections since 2016, most recently in July 2026, along with 37 deficiencies and 1 operational control.

Records from 2016 to 2026. Most recent: inspection, 22 July 2026.

Built
1984
Last inspected
22 July 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 22 July 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDI6304
232020
Flag
UNITED STATES
Maury page id
psix-232020

Documentation record

Registered dimensions (L × B × D)57.0 ft × 18.0 ft × 8.6 ft
Registered tonnagegross 61 / net 49
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEAST BAY BOAT WORKS, INC · HARKERS ISLAND, NC, UNITED STATES · built 1984
Hull materialWood
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portFORT PIERCE, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 31 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it49 - Simplified, Net Ton
61 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 17

22 July 2026 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8444401
14 October 2025 Internal Structural Exam · Administrative Inspection · In-Service Inspection · Hull Examination
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8251755
24 June 2025 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8166350
1 October 2024 Internal Structural Exam · Hull Examination · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8013135
25 June 2024 Administrative Inspection · Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7943009
18 October 2023 In-Service Inspection · Examination of Repairs · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7810784
13 July 2023 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7741934
5 November 2022 Drydock Exam · Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7589664
26 April 2022 COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7435880
29 December 2021 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7373445
22 June 2021 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7233172
24 May 2021 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7205072
5 August 2020 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7024452
22 April 2019 Deficiency Check · Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6667968
16 April 2018 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6392220
31 March 2017 COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6115073
4 April 2016 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5858854

Deficiency record · 37

11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 22 July 2026 Resolved
Each life float must be fitted with a lifeline, pendants, two paddles, a painter and a light. Painter line is severly deteriorated and parted. Pax count will be reduced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 July 2026
Resolution: Vessel installed new 100' painter.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 June 2024 Resolved
The employer shall provide EAP for all crew members. There is no evidence of a EAP program in place, no evidence of supervisory personnel receiving 60 min of training, no evidence of crew training and no displayed documentation listing the EAP program.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2024
Resolution: Marine Employer provided evidence of EAP training for all crew and supervisors.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 June 2024 Resolved
each life jacket must be marked with Type 1 retro-reflective material approved under 46 CFR 164.018 or other standards approved by the Commandant. Adult and children's life jacket's retro-reflective tape has deteriorated and has lost its reflective properties.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 July 2024
Resolution: All jakcets retro tape replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 25 June 2024 Resolved
Each launching appliance and each survival craft and rescue boat on a vessel must be in good working order and ready for immediate use before the vessel always leaves port and at all times while underway. Life float retro reflective tape is non functional. Repair or replace in accordance with manufacturers recommendations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 July 2024
Resolution: retro tape replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 25 June 2024 Resolved
The exhaust pipe cooling water system must comply with the requirements of this paragraph. (3) The part of the exhaust system between the point of cooling water injection and the engine manifold must be water-jacketed or effectively insulated in compliance with 177.405(b) and 177.970 of this chapter.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 July 2024
Resolution: Exhausts wrapped with new lagging.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2021 Resolved
Forepeak and second compartment bilge alarm switch connections require enclosure.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 June 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2021 Resolved
Dead end wire fwd of STBD engine needs enclosure or removal.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 September 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2021 Resolved
Dead end wiring under console required to be removed or enclosed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 September 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 5 August 2020 Resolved
Emergency fuel shutoff valves installed so as to close against the fuel flow. Emergency fuel shutoff valves for both MDE's were inoperable. Repair/Replace valves and prove proper operation. 46 CFR 182.20-40(b)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 August 2020
Resolved 7 August 2020
Resolution: Recieved photo of new valve installed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 August 2020 Resolved
The power fire pump shall be selfpriming and such size to discharge an effective stream from a hose. Vessel electric fire pump was inoperable. Repair/Replace and prove proper operation of fire pump to the satisfaction of attending Marine Inspector. 46 CFR 181.10-1
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 August 2020
Resolved 7 August 2020
Resolution: Recieved video of proper operation of Fire Pump
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 August 2020 Resolved
At each inspection for certification all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Vessel was missing guards around rotating machinery on both MDE's. 46 CF4 176.830
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2020
Resolved 6 January 2021
Resolution: Guards placed on rotating machinery on MDE's.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 5 August 2020 Resolved
Complete but simple instructions for operation of fixed CO2 system must be located in a conspicuous space at or near pull box and in CO2 room. Where CO2 cylinders are not within the space a schematic diagram must also be included. Vessel was missing schematic diagram and operating procedures in CO2 room. Provide diagram and operating instructions. 46 CFR 181.20-15(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 17 August 2020
Resolution: Recieved picture of diagram.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 August 2020 Resolved
A space that stores CO2 cylinders and a space protected by CO2 must be conspicuously marked as follows: SPACES STORING CO2: "CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFORE ENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCTATION". SPACES PROTECTED BY CO2: "CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. WHEN ALARM ACTIVATES, DO NOT ENTER UNTIL VENTILATED. LOCK OUT SYSTEM WHEN SERVICING". 46 CFR 185.612(g)(1)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 17 August 2020
Resolution: Recieved picture of proper label.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 August 2020 Resolved
Wiring joints and splices shall be mechanically secured and in junction boxes. Vessel's bilge pump/alarm wiring in all spaces were not in an enclosure. Provide enclosures for all bilge pump and alarm wiring. 46 CFR 183.05-30(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 6 January 2021
Resolution: Call vessel operator about outstanding def. Recieved picture of bilge wiring in enclosure.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 August 2020 Resolved
Remote fuel shutoff stations must be marked in clear legible letters at least 1 inch high indication purpose and direction of operation. Vessel emergency fuel shut off valves were not labeled. Label emergency fuel shut off valves. 46 CFR 185.608
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 17 August 2020
Resolution: Recieved picture of label
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 5 August 2020 Resolved
The number of persons allowed on each life float shall be marked or painted thereon in letters and mumbers of at least 1 1/2 inch high. Vessels life floats did notr have max person occupancy labeled on them. Label max persons of all life floats. 46 CFR 185.30-5(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 17 August 2020
Resolution: Recieved picture of PAX count on life float
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 5 August 2020 Resolved
Life float painter must be stowed in a way that it runs out freely when the life float floats away from a sinking vessel. Vessel painter was arranged that it would flow freely. Repair painter to flow freely. 46 CFR 180.15-5 (c)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 20 August 2020
Resolution: Recieved picture of proper mount of painter
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 5 August 2020 Resolved
Each life float must be fitted with a water light. Water light on aft life float was inoperable. Repair/Replace water light. 46 CFR 180.15-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2020
Resolved 17 August 2020
Resolution: Water light replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 April 2019 Resolved
VESSEL SHALL BE KEPT IN A SAFE, NON-HAZARDOUS CONDITION. THE VESSEL'S STARBOARD SHAFT SEAL WAS LEAKING A SIGNIFICANT AMOUNT OF WATER. 46CFR176.25-50(a) OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2019
Resolution: MI witnessed the shaft seal, in a non-leaking condition while underway doing figure 8 movements.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 22 April 2019 Resolved
ALL LIFE FLOATS/BOUYANT APPARATUS' SHALL BE EQUIPPED WITH A FLOATING WATERLIGHT APPROVED UNDER 161.010. THE LIGHT FOR THE VESSEL'S UPPER PORT B.A. WAS INOPERABLE. 46CFR180.175(f)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2019
Resolution: The vessel O/O replaced the floating waterlight.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 22 April 2019 Resolved
ALL LIFE FLOATS/BOUYANT APPARATUS' SHALL BE EQUIPPED WITH BUOYANT PADDLES THAT ARE LASHED TO THE B.A. ALL OF THE PADDLES FOR THE VESSEL'S BUOYANT APPARATUS' WERE NOT LASHED TO THE B.A. 46CFR180.175(f)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2019
Resolution: Vessel O/O lashed the paddles to the BA
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 22 April 2019 Resolved
ALL EPIRBS SHALL BE INSTALLED TO AUTOMATICALLY FLOAT FREE AND ACTIVATE. VESSEL'S EPIRB HYDROSTATIC RELEASE HAD EXPIRY DATES MARKED FOR 2017, WHICH THE OWNER STATED WERE THE INSTALL DATES. PROVIDE DOCUMENTATION ATTESTING TO THE DATE OF INSTALL FOR THE EPIRB HYDROSTATIC RELEASE. 46CFR180.64
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2019
Resolution: O/O replaced the hydrostatic release.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 22 April 2019 Resolved
ALL LIFE FLOATS/BOUYANT APPARATUS' SHALL BE STOWED IN A WAY THAT NEITHER THE SURVIVALCRAFT NOR ITS APPLIANCES WILL INTERFERE WITH THE LAUNCHING OF THE APPLIANCE. THE STOWAGE OF THE VESSEL'S TOPSIDE APPLIANCES WAS SUCH THAT THE LIFELINES, LIGHT LINES, AND THE PAINTERS (LEADING TO THE WEAK LINK) WERE TANGLED. 46CFR180.130(a)(7)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2019
Resolution: Vessel O/O had untangled the materials and placed them in an orderly fashion.
Navigation › Piloting/Steering › Marine Charts
Issued 16 April 2018 Resolved
Provide updated marine charts.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2018
Resolved 20 April 2018
Resolution: Received verification of corrective actions taken.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 16 April 2018 Resolved
Provide 2018 tide/current tables.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2018
Resolved 20 April 2018
Resolution: Received verification of corrective actions taken.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 16 April 2018 Resolved
Provide burn cream for first aid kit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2018
Resolved 18 April 2018
Resolution: Received documentation of purchased burn cream.
Engineering › Fuel Oil Service System › Valve, Control
Issued 16 April 2018 Resolved
Replace port fuel shut off valve handle.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 April 2018
Resolution: Received documentation of satisfactory shut off valve handle.
Engineering › Shafting/Propeller Arrangements › Intermediate Shaft
Issued 16 April 2018 Resolved
Replace port engine shaft brush grounding wire.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 May 2018
Resolved 19 April 2018
Resolution: Received verification of corrective actions taken.
Fire Fighting › Combustible Materials › Primary Deck Coverings
Issued 16 April 2018 Resolved
Provide specification sheet for carpet prior to installation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 April 2018
Resolved 18 April 2018
Resolution: Owner indicated he did not wish to install carpet anymore.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 16 April 2018 Resolved
Enclose wires for submersible bilge pump in laz space in a junction box.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 May 2018
Resolved 19 April 2018
Resolution: Received documentation of satisfactory junction box.
Lifesaving › Lifeboat Equipment › Oar
Issued 16 April 2018 Resolved
Provide paddles for (03) lifefloats with vessel name and attached to each float.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2018
Resolution: Received documentation of newly attached paddles to lifefloats.
Construction/Loadline › Hull › Transverse Frame
Issued 4 May 2017 Resolved
Engine Room: Frame STBD side IWO engine transmission to be replaced. Temp repair made DD/ISE 2017 by sistering frame. Perm repair to include scarf IAW NVIC 7-95.
Condition: Improper/Lack of Maintenance
Due 15 April 2018
Resolved 23 April 2019
Resolution: MI verified that frame had been repaired w/ a scarf.
Engineering › Bilge Water Management System › Valve
Issued 4 April 2016 Resolved
Need to install overboard discharge valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 22 April 2016
Resolution: Valve installed
Lifesaving › Hand Flares › Storage
Issued 4 April 2016 Resolved
Must provide hand flare in waterproof container
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 22 April 2016
Resolution: Container onboard vsl
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 4 April 2016 Resolved
Replace lifefloat light for 06 person lifefloat. Limited to daylight operations.
Action required: 705 - Other - as specified
Due 4 May 2016
Resolved 22 April 2016
Resolution: Lifefloat light replaced and tested.
Lifesaving › Lifefloat › Float-free Link
Issued 4 April 2016 Resolved
Replace weak link on lifefloat.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 April 2016
Resolved 22 April 2016
Resolution: Weak link replaced with approved type.
Communications › Alarms/Indicators › High Water Alarm
Issued 4 April 2016 Resolved
Repair high level alarms #1 and #4
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 May 2016
Resolved 22 April 2016
Resolution: High level alarms tested -- ALL SAT

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.