MAURY USCG vessel records Sign in
← All vessels

AMERICAN EAGLE

AMERICAN EAGLE is a 1984 passenger vessel (inspected). The Coast Guard has recorded 150 inspections since 1985, most recently in October 2025, along with 230 deficiencies, 2 operational controls and 7 casualty investigations between 2000 and 2018.

Records from 1985 to 2025. Most recent: inspection, 13 October 2025.

Built
1984
Last inspected
13 October 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE5396
232702
Flag
UNITED STATES
367366120
Maury page id
psix-232702

Inspections, by type

…with no type recorded24
Years with a record 37 calendar years (1985–2025)
The 150 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)78.9 ft × 28.5 ft × 9.0 ft
Registered tonnagegross 78 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNICHOLS BROTHERS BOAT · FREELAND, WA, UNITED STATES · built 1984
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationTwin Hull
Hailing portJUNEAU, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 2 February 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it62 - Simplified, Net Ton
78 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDE5396MMSI 367366120 · active · compulsorily equipped · granted 2 May 2018, expires 1 July 2028
WDB6537MMSI 366926080 · expired · compulsorily equipped · granted 19 February 2004, cancelled 26 April 2014
WDB2375MMSI 366875240 · expired · compulsorily equipped · granted 23 November 2002, cancelled 26 January 2013
WAH4744MMSI not assigned · expired · compulsorily equipped · granted 19 October 1998, cancelled 29 November 2008 · licensed under a name not among this hull’s recorded names (not shown)
WCW9231MMSI not assigned · expired · compulsorily equipped · granted 29 October 1996, cancelled 30 December 2006 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 150

13 October 2025 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8254220
5 August 2025 Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8203073
19 July 2025 Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8189189
19 May 2025 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8139432
10 May 2024 COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7910998
16 September 2022 Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7565318
28 May 2020 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6962935
28 February 2020 Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6917921
22 October 2019 Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6842189
18 August 2019 Administrative Inspection · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6788813
12 June 2019 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6712273
10 June 2019 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6710611
18 May 2019 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6688947
30 April 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6674704
12 April 2019 COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6661584
6 November 2018 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6576028
16 August 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6515186
23 April 2018 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6398899
19 April 2018 Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6399600
4 April 2018 Type not recorded
No type recorded · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6386935
13 March 2018 Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6370592
31 January 2018 Deficiency Check · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6347412
9 January 2018 Permit to Proceed
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6335210
11 October 2017 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6285929
8 August 2017 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6234485
16 May 2017 Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6147067
14 November 2016 In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6039787
13 October 2016 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6022169
2 July 2016 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5931895
16 May 2016 Administrative Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5878887
29 April 2016 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5868327
14 April 2016 DAPI Audit · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5854178
11 April 2016 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859828
9 February 2016 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859822
26 January 2016 Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5803898
7 August 2014 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5019618
27 June 2014 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4931677
22 June 2014 Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4898307
7 June 2012 Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4337901
11 May 2012 Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4308900
2 February 2012 Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4348353
7 July 2011 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4073164
26 February 2010 Internal Structural Exam · Annual Inspection · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3686659
23 April 2009 COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3459134
28 July 2008 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3282332
11 June 2008 Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3234296
10 March 2008 Drydock Exam · Plan Review "T" Boat · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3161443
4 May 2007 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2924350
19 April 2007 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2911352
13 April 2007 Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2906883
7 August 2006 Damage Survey · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2738907
26 July 2006 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2726031
26 July 2006 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2726728
30 May 2006 Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2665261
16 May 2006 Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2652489
16 May 2006 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2653405
1 May 2006 Annual Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2637884
23 January 2006 Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2571974
18 January 2006 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2569038
21 July 2005 Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2435219
23 June 2005 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2400818
31 May 2005 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2396673
23 May 2005 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2366197
16 May 2005 MTSA Verification · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2343650
21 April 2005 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2356204
2 November 2004 Examination of Repairs · Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2233330
7 July 2004 Damage Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2124983
1 June 2004 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2085318
27 April 2004 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2042650
9 March 2004 Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2021283
30 January 2004 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2005675
22 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1970878
11 July 2003 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1842973
2 January 2003 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1727014
2 January 2003 Damage Survey · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1739468
10 December 2002 Annual Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1722015
3 December 2001 Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1456045
15 November 2001 COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1435301
31 January 2001 Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1057591
20 October 2000 COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1408625
6 October 2000 Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1386905
20 December 1999 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 811812
23 August 1999 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1114004
25 May 1999 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1442878
7 May 1999 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 799174
28 April 1999 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 106711
23 April 1999 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1449186
3 May 1998 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 791038
4 March 1998 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1119568
12 December 1997 Deficiency Check · Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1406224
28 October 1997 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 780633
11 October 1997 Deficiency Check · Examination of Repairs
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1421404
26 September 1997 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 779566
24 September 1997 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 97478
23 September 1997 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1445267
29 May 1997 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1428761
29 April 1997 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1089244
1 April 1997 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1396694
9 January 1997 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1097521
6 December 1996 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 878582
29 November 1996 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 874141
22 November 1996 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 870963
19 October 1996 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1165425
13 October 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 164944
13 October 1996 Damage Survey
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1380669
28 September 1996 Deficiency Check · Damage Survey · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1377821
25 September 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 96905
4 June 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 64934
14 May 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 230300
9 April 1996 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1079747
22 January 1996 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1098709
22 September 1995 COI Inspection · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1360270
2 August 1995 Examination of Repairs · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1363333
30 July 1995 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 48284
22 July 1995 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1355367
17 January 1995 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1174845
12 December 1994 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 835047
28 September 1994 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 867446
14 February 1994 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 852807
23 November 1993 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 664041
1 October 1993 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1158192
1 October 1993 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1395992
27 September 1993 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 214558
18 December 1992 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1133349
30 October 1992 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1257195
19 February 1992 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1382473
30 October 1991 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1466257
29 May 1991 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1214363
14 January 1991 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 915280
23 October 1990 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 923167
22 February 1990 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1239722
16 January 1990 Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 930950
19 October 1989 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 915332
3 October 1989 COI Inspection · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 898139
26 June 1989 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1207202
30 March 1989 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 889616
11 January 1989 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1198633
16 December 1988 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 902188
9 December 1988 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 896286
2 December 1988 COI Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 896992
21 March 1988 Hull Examination · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 985168
24 December 1987 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1008069
7 October 1987 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1320644
31 December 1986 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1331203
10 October 1986 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1007320
11 September 1986 Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1309315
25 June 1986 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1020409
30 May 1986 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1301637
28 June 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1295418
10 May 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1295413

Deficiency record · 230

07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 August 2025 Resolved
Means of escape must be widely separated and, if possible, at opposite ends or sides of the space. 46 CFR 177.500 Mark forward door with "Emergency Exit" placard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2025
Resolved 6 August 2025
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 5 August 2025 Resolved
An inflatable liferaft or inflatable buoyant apparatus must be serviced at a facility specifically approved by the Commandant no later than the month and year on its servicing sticker. 46 CFR 185.730. Provide servicing report for all liferafts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2025
Resolved 12 August 2025
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 5 August 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards and electrical shock. 46 CFR 183.200 Provide protection on 24 volt lugs in Port Engine room at 30 amp breaker.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2025
Resolved 13 October 2025
Resolution: Suitable protection for wiring lugs was provided.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 5 August 2025 Resolved
Operation of transmittal ship station must be performed by a person holding a commercial operator license or permit. 47 CFR 80.155. Provide evidence of FCC Radio Operator Permit.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 August 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 July 2025 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. It was reported that one of the engines on vessel was overheating. Repair the engine in kind and demonstrate the proper operation of the engines to the satisfaction of the attending marine inspector. 46 CFR 182.200 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 July 2025
Resolution: Raw water pump replaced; all sat. Conducted sat sea trial.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 July 2025 Resolved
A vessel must be provided with a main steering gear that is:(1) Of adequate strength and capable of steering the vessel at all service speeds;(2) Designed to operate at maximum astern speed without being damaged or jammed; and(3) Capable of moving the rudder from 35 degrees on one side to 30 degrees on the other side in not more than 28 seconds with the vessel moving ahead at maximum service speed. It was reported that the vessel lost steering when securing an overheating engine. Identify the cause of loss of steering repair/restore steering. Demonstrate the proper operations of steering under all conditions designed to the satisfaction of attending marine inspector. 46 CFR 182.610 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 July 2025
Resolution: Replaced stbd steering pump and hydraulic control valved; all sat. Conducted sat sea /steering trial.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 19 May 2025 Resolved
Lifesaving- (b) Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Vessel is currently limited to carry 146 passengers and 4 crew members or 150 persons total on board until the 6 person life raft has received servicing and returned to vessel. 46CFR 176.808(b)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 4 June 2025
Resolution: Rectified
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 May 2024 Resolved
The minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The pump outlet must be fitted with a pressure gauge. Starboard fire pump only achieved 40psi at testing. 46 CFR 181.300(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Fire pump was retested and achieved 60PSI at the pump.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 May 2024 Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Vessels fixed fire fighting system pressure switches did not shut down the generators at testing. 46 CFR 176.810(a) 46 CFR 176.810(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Pressure switches secured both generators at retesting.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 10 May 2024 Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Fire detection system had not been serviced. 46 CFR 176.810(a)(7)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Local fire system servicing company inspected the fire detection system.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 10 May 2024 Resolved
Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material. Port hull overhead light was extinguished and was missing the required guard. 46 CFR 183.410(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Light was replaced and a guard was installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 May 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Pump in port hull CO2 space has wires exposed and is missing the cover plate. 46 CFR 183.200(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Cover plate was installed on the electrical enclosure for the pump.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 May 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Electrical panel on the bridge and in the port engine room had open spaces inside the panel. 46 CFR 183.200(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Blanks were installed in openings.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 10 May 2024 Resolved
For vessels other than those covered in paragraphs (b) and (c) of this section, the name of the vessel must be marked on some clearly visible exterior part of the port and starboard bow and the stern of the vessel. The hailing port of the vessel must be marked on some clearly visible exterior part of the stern of the vessel. Vessel did not have name on the bow or stern. 46 CFR 67.123
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2024
Resolution: Vessel name was placed on bow and stern of the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 May 2024 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Anchor light had significant UV damage and was showing an amber color and not white. 46 CFR 183.420
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 May 2024
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 10 May 2024 Resolved
Prior to carrying passengers, mob, fire and abandon ship drills must be conducted to the satisfaction CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 May 2024 Resolved
Prior to carrying passengers, prove proper operation of the vessels propulsion and steering systems to the satisfaction of a CG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 28 February 2020 Resolved
Watertight hatch seal on Port side CO2 room is cracked and worn.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2024
Resolution: Watertight hatch gasket was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 October 2019 Resolved
Prove proper operation of all Starboard ventilation and port lower aft ventilation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2024
Resolution: Port and starboard ventilation functions properly.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Make port engine room ventilation trunk vapor tight.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2020
Resolution: vessel has repaired ventilation trunk, all sat
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Prove port side time delays meets 30 seconds. Time delay tripped at 26 seconds
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2024
Resolution: Time delay tested sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 October 2019 Resolved
Prove port side engine secures when CO2 is activated
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2024
Resolution: Port engine secures properly when tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 October 2019 Resolved
Repair exhaust leak on starboard engine prior to operating engine.
Action required: 705 - Other - as specified
Due 22 February 2020
Resolved 24 February 2020
Resolution: Vessel has temp repaired.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 22 October 2019 Resolved
Make port side engine room trunk weather/vapor tight during this years Drydock.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2024
Resolution: Trunk was made water/vapor tight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 October 2019 Resolved
Make permanent repairs starboard engine exhaust bellows prior to carrying passengers. Vessel has spot welded pinhole in top of bellows.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2024
Resolution: exhaust bellow were replaced in kind.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 29 April 2019 Resolved
Submit fire detection system plans to Commanding Officer MSC for review.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2019
Resolved 12 June 2019
Resolution: Fire dection plans reviewed and approved by MSC.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 April 2019 Resolved
A space containing propulsion machinery which is not manned or contain a fixed system that can not automatically discharge upon detection of heat must be equipped with a fire detection system; no detection system is provided.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 May 2019
Resolved 29 April 2019
Resolution: Verified installation and witnessed a function test of the newly installed fire detection system. Provided a seperate def to submit plans to MSC.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 12 April 2019 Resolved
CO2 sirens must be clearly marked "When alarms sound-Vacate at once. Carbon dioxide being released."; no signs were provided for either engine room.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified signs were provided in the vicinity of the siren.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 April 2019 Resolved
A vessel must be provided with arrangement for draining a watertight compartment; the fwd bilge manifold valve handle in the starboard engine room was wasted off of the stem.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified a valve handle was provide and witnessed a satisfactory function test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 April 2019 Resolved
A vessel must have visual and audible alarm to indicate a bilge high water level; both port and starboard engine room bilge alarms were inoperable.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 29 April 2019
Resolution: Witnessed a satisfactory function test for the bilge alarms in both engine rooms.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 12 April 2019 Resolved
A space storing CO2 cylinders must be conspicuously marked "Carbon dioxide gas can cause injury or death. Ventilate the area before entering. A high concentration can occur in this area and can cause suffocation."; no signs were provided at p&s voids storing the cylinders.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified signs were provided at the entrance to both voids storing CO2 cylinders.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 12 April 2019 Resolved
The most current stability letter must be posted at the operating station; the existing posted stability letter had been superceded.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified the most current stability letter was provided and posted in the operating station.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 12 April 2019 Resolved
Vessel with passenger limitations on upper decks must be indicated at entranceway to that deck; passenger limitation signs were improperly located and not reflective of the number on the stability letter.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verfied the second and third deck passenger limitations were provided at the entry of each deck.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 12 April 2019 Resolved
Exposed hazards must be properly protected by a cover; the port engine fuel pump rotary drive was exposed.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verfied the rotating machinery was provided with a cover.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 April 2019 Resolved
Electrical components used in a machinery space must be dripproof; the 110V distribution panel at the base of the entryway ladder in the port engine room was not provided with a drip shield.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified the identified panel was provided with a drip shield.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 April 2019 Resolved
Life jacket storage locations must be marked with size and quantity; adult and children life jacket storage on the second deck was not properly marked.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified the identified life jacket storage locations were properly marked.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 12 April 2019 Resolved
EPIRB's must have a current registration; the vessel's EPIRB registration was expired.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 26 April 2019
Resolution: Verified the vessel's EPIRB was provided with a current NOAA registration.
02 - Structural Conditions › N/A - No Subsystem › Marking of IMO number
Issued 12 April 2019 Resolved
The vessel's name must be clearly visible on the exterior part of the port and starboard bow; the vessel's name was was worn and illegible.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 18 May 2019
Resolution: Vessel has remarked both bows, all sat
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 12 April 2019 Resolved
Conduct underway drills prior to seasonal operations.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 30 April 2019
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 19 April 2018 Resolved
A pressure relief valve or equivalent set between 2400 and 2800psi must be installed in the distribution manifold, a relief device is not currently provided.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 August 2018
Resolution: Vessel hads installed pressure relief valve
Documentation › Certificates/Documents › Stability Letter
Issued 13 March 2018 Resolved
Post the most current stability letter in the operating station.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 23 April 2018
Resolution: Verified the most current stability letter was provided and posted onboard.
Documentation › Markings/Placards › Capacity Marking
Issued 13 March 2018 Resolved
Provide signs reflecting proper stability letter passenger quantity restrictions for both upper decks at the entrance to each deck. 80 persons on the second deck and 30 for the third.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 23 April 2018
Resolution: Verified second and third decks were appropriately marked.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 13 March 2018 Resolved
Provide serviced liferafts of sufficient capacity.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 23 April 2018
Resolution: Verified appropriate primary lifesaving equipment was provided.
Engineering › Steering Gear System › Actuator
Issued 13 March 2018 Resolved
Repair and conduct operational test of the vessel's steering system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 23 April 2018
Resolution: Vessel was outfitted with a new port and starboard engine driven hydraulic steering system to include pumps, flow controls, and hoses. Operational test sat.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 13 March 2018 Resolved
Repair and conduct an operational test of the vessel's starboard main diesel engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 23 April 2018
Resolution: Witnessed an opeational test of the starboard main diesel engine, all sat.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 13 March 2018 Resolved
Provide non-conductive matting on the deck in front of the vessel's switchboard.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 23 April 2018
Resolution: Vessel's switchboard was provided with a non-conducttive mat.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 March 2018 Resolved
Repair the port main deck handrail in way of the forward cabin.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 23 April 2018
Resolution: Verfied port deck rail was repaired.
Stability › Weathertight Integrity › General
Issued 13 March 2018 Resolved
Make stbd lazarette hatch weather tight.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 23 April 2018
Resolution: Verfied hatch was properly serviced and adjusted.
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 March 2018 Resolved
Conduct underway drills.
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 17 August 2018
Resolution: Conducted u/w drills all sat.
Engineering › Bilge Water Management System › Pump
Issued 13 March 2018 Resolved
Troubleshoot, repair, and conduct an operational test of the bilge pumping system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2018
Resolved 23 April 2018
Resolution: Port bilge pump was identified as wired backwards. Witnessed an operational test of the vessel's bilge pumping system; all, sat.
Construction/Loadline › Hull › Keel Plate
Issued 31 January 2018 Resolved
Identified inadequate hull repair and suspected fracture located along the upper stem in the #1 void of the port hull. Provide proposal to conduct permanent repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 8 February 2018
Resolution: Affected area was cropped and renewed.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 31 January 2018 Resolved
Provide proper bilge level sensor wiring bulkhead penetrations for the bulkhead separating the #2 and #3 void in both hulls.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 8 February 2018
Resolution: Verfied installation of wiring penetration.
Construction/Loadline › Structures › Superstructure
Issued 31 January 2018 Resolved
Provide missing mounting hardware for the two forward vibration isolator superstructure mounts.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 May 2018
Resolved 8 February 2018
Resolution: Previous hardware was identified to have backed out. Verified installation of new hardware.
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 11 October 2017 Resolved
Starboard time delay failed twice with tripping at 23 sec. and 24.5 under required 30 seconds.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2018
Resolution: Witnessed installation and testing of a new CO2 fire suppression system for both the port and starboard engine rooms.
Lifesaving › Inflatable Buoyant Apparatus › Capacity
Issued 16 May 2017 Resolved
Provide a sufficient number of IBA's for the permitted crew and passengers. Maximum occupancy limited to 150.
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 17 May 2017
Resolution: Witnessed properly installed 6 man IBA.
Communications › Radio Communications › EPIRB
Issued 16 May 2017 Resolved
Affix NOAA registratio sticker to EPIRB
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 17 May 2017
Resolution: Witnessed EPIRB registration sticker fixed to EPIRB.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 16 May 2017 Resolved
Provide current Certificate of Documentation
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2017
Resolved 17 May 2017
Resolution: Witnessed current COD onboard.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 16 May 2017 Resolved
Provide current nautical charts and Coast Pilot for the vessel's area of operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2017
Resolved 17 May 2017
Resolution: Witnessed new charts for operating area prior to conducting drills.
Operations/Management › Drills/Instruction › Not Conducted
Issued 16 May 2017 Resolved
Conduct drills as required by attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2017
Resolved 17 May 2017
Resolution: Conducted drills in Auke Bay.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 16 May 2017 Resolved
Affix SPV Decal at a place readily visible to passengers.
Action required: 705 - Other - as specified
Due 30 May 2017
Resolved 17 May 2017
Resolution: Winessed Decal affixed to vessel window.
Engineering › Bilge Water Management System › Pump
Issued 16 May 2017 Resolved
Demonstrate operation of the port bilge pump and hull cross connect.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2017
Resolved 17 May 2017
Resolution: Witnessed bilge pump and cross connect operated properly.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 16 May 2017 Resolved
Vessel operator provide proof of license.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 May 2017
Resolved 17 May 2017
Resolution: Witnessed master's license prior to conducting drills.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 13 October 2016 Resolved
Relocate the two pressure switches for the fixed CO2 suppression system for the Port & STBD engineroom as per MTN 01-04 - 16715 22 Sept 2004 & Marine Safety Alert Inspections & Compliance Directorate Alert 05-12 & 6-15.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 April 2017
Resolved 16 May 2017
Resolution: Verified pressure switch relocation to the lazzarette for both hulls.
Engineering › Bilge Water Management System › Pump
Issued 14 April 2016 Resolved
Stbd side bilge pump has been removed for repairs. This renders the crossover capabilities of the bilge system inoperable and also removes its use as a back up fire pump.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 May 2016
Resolved 16 May 2016
Resolution: Owner installed a brand new bilge/fire pump in place of the defective pump - Tested SAT.
Fire Fighting › Fire Main › Pressure
Issued 14 April 2016 Resolved
Fire main appears to have a blockage. The pump makes pressure but no water is available to the hoses. Vessel must prove proper operation of the fire main system and test the hoses to a USCG marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 May 2016
Resolved 29 April 2016
Resolution: A valve was found to be closed limiting the flow of water to the hydrants. Hydrants and hoses all tested sat.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 14 April 2016 Resolved
Complete first aid kit not present. Referred Port Captain to Q Spec 160.041 for list of required items.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2016
Resolved 16 May 2016
Resolution: Owner replaced missing and/or expired items in vsl's first aid kit - SAT.
Lifesaving › Lifebuoys › Serviceable
Issued 14 April 2016 Resolved
Replace deteriorated life ring Retro Reflective tape on 2 of the life rings.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 2 May 2016
Resolved 29 April 2016
Resolution: New tape was added to life buoys.
Engineering › Steering Gear System › Rudder
Issued 9 February 2016 Resolved
Port rudder freely moves due to wasted control arm. Replace wasted control arm and prove proper operation of steering. 46CFR176.802
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 21 April 2016
Construction/Loadline › Hull › Weld
Issued 26 January 2016 Resolved
Assess leak located in starboard lazarette, 3rd void from stern, located in shaft alley, inboard side near most foward bulkhead.
Action required: 705 - Other - as specified
Due 9 February 2016
Resolved 3 March 2016
Resolution: Leak has been located and repaired by cropping and renewing hull plating.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 26 January 2016 Resolved
Assess splash zone patch located in starboard lazarette, 3rd void from the stern, outboard side, on the aft bulkhead near port side corner.
Action required: 705 - Other - as specified
Due 9 February 2016
Resolved 18 February 2016
Resolution: Examined 3" circular splash zone patch and identified that it covered 1/2" watertight bulkhead penetration between aft two starboard voids.
Construction/Loadline › Hull › Weld
Issued 22 June 2014 Resolved
A pin hole was found in the weld alond the port side aft keel. Gouge out damaged weld and repair properly.
Action required: 705 - Other - as specified
Resolved 22 June 2014
Construction/Loadline › Hull › Hull Plating
Issued 7 June 2012 Resolved
Temporarily repair pinhole leak located in the portside compartment foward of the collisoin bulkhead by peening, Splash-zone poxy, and provide an extra pump and equipment to complete one scheduled trip on June 8, 2012 at 0915. Make permananent repairs to the pinhold leak. Master is directed to ensure hourly rounds are mad eon the condition of the temporary repair.
Action required: 705 - Other - as specified
Due 9 June 2012
Resolved 10 June 2012
Resolution: Repairs made at dry dock in Sitka, AK.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 23 April 2009 Resolved
Removed 63 (55 adult and 8 child) vest-type lifejackets due to failure of air bladders. The serviceable lifejackets remaining total 134 and the total PAX allowed is reduced from 150 to 134. Provide 16 additional serviceable lifejackets to total 150 as stated on the COI.
Action required: 705 - Other - as specified
Due 23 May 2009
Resolved 8 May 2009
Electrical › Electrical Distribution System (service) › Panelboard
Issued 23 April 2009 Resolved
Bridge breaker panel door doesn't close. Install new latch or replace.
Action required: 705 - Other - as specified
Due 23 May 2009
Resolved 8 May 2009
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 23 April 2009 Resolved
Removed 63 vest type lifejackets from service due to failure in air bladders. Due to large failure, replace remaining vest type lifejackets by 30 APRIL2010.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 10 May 2010
Stability › Weathertight Integrity › General
Issued 23 April 2009 Resolved
Pilot house has cracked windshield. Replace.
Action required: 705 - Other - as specified
Due 23 May 2009
Resolved 8 May 2009
Documentation › Certificates/Documents › Stability Letter
Issued 10 March 2008 Resolved
Provide new stability letter from results of deadweight survey conducted 16MAY2008 due to vessel completing major modifications to hull.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2008
Resolution: Recieved new stability letter 06Jun08 from MSC.
Lifesaving › Inflatable Buoyant Apparatus › Not on Board
Issued 13 April 2007 Resolved
Provide current inflatable primary lifesaving appliances for passenger count and prove proper installation prior to carriage of passengers for hire. Rafts are off vessel for servicing.
Condition: Improper/Lack of Maintenance
Due 27 April 2007
Resolved 4 May 2007
Resolution: Verified proper installation of all IBA''s. Vessel carries (03) 50-person IBA''s.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 13 April 2007 Resolved
Renew sewage vent line elbow that is wasted portside aft lazzarette.
Due 27 April 2007
Resolved 4 May 2007
Resolution: Verified renewed.
Fire Fighting › Structural - A Class Divisions › Aux Spaces (moderate fire risk)
Issued 13 April 2007 Resolved
Restore A-60 insulation identified in port and stbd engine rooms and main passenger 1st deck overhead behind false ceiling.
Due 27 April 2007
Resolved 4 May 2007
Resolution: Vessel has changed service of vessel to Subchapter "T", no longer requiring the structural fire protection per this reqt.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 April 2007 Resolved
Weld-repair broken rail stanchion fwd bow port side bottom weld to deck.
Due 27 April 2007
Resolved 4 May 2007
Resolution: Verified stanchion repair, sat.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 13 April 2007 Resolved
Repair stbd generator fuel injector adapter.
Due 1 September 2007
Resolved 18 October 2007
Construction/Loadline › Penetrations › Pipe Flange
Issued 13 April 2007 Resolved
Make watertight fittings located on deck STBD side lazarette inboard hatch cover & a red hose penetration by the HW tank.
Condition: Improper/Lack of Maintenance
Due 13 April 2007
Resolved 13 April 2007
Resolution: Done, sat.
Electrical › Electrical Distribution System (service) › Cable
Issued 13 April 2007 Resolved
Secure loose wiring for camera STBD engineroom inboard side.
Condition: Placed in Improper Service
Due 13 April 2007
Resolved 13 April 2007
Resolution: Done, sat.
Construction/Loadline › Hull › Keel
Issued 7 August 2006 Resolved
Complete & satisfy permanent repair worklist dated 3-4 August 2006 prior to carrying passengers. These items are cracks & fractures to vessel hull & Port rudder repairs that are being done at Petersburg Shipwrights. Check this activity for details, 2738907.
Action required: 705 - Other - as specified
Due 14 August 2006
Resolved 7 August 2006
Resolution: Vessel rep [name withheld], confirmed all repairs completed. Fuel Oil Tank re-filled 1000 gallons, check again for leaks, none. Port rudder re-enforce, same as STBD rudder & re-welded crack. Vessel on a way back to Juneau, sat.
Construction/Loadline › Hull › Hull Plating
Issued 26 July 2006 Resolved
Provide repair proposal for review and approval to Sector Juneau Insp. Div.
Due 1 August 2006
Resolved 3 August 2006
Resolution: Done after vessel''s visit at Petersburg Shipwrights.
Construction/Loadline › Hull › Hull Plating
Issued 26 July 2006 Resolved
Complete permanent repairs of hull plate crack IWO fm 13 inboard chine area of stbd side engineroom to the satisfaction of the attending marine inspector.
Due 28 August 2006
Resolved 3 August 2006
Resolution: Cleared & issued a new one after vessel drydock at Petersburg Shipwrights.
Construction/Loadline › Hull › Hull Plating
Issued 16 May 2006 Resolved
Two inch crack IWO starboard pontoon, inboard aft end of engineroom at engineroom deck plating level. Behind location of bilge piping manifold. Make permanent repairs.
Action required: 705 - Other - as specified
Due 30 June 2006
Resolved 31 May 2006
Resolution: Witnessed satisfactory permanent repairs. Witnessed NDT via hose test (pressure washer), all sat.
Communications › Radio Communications › EPIRB
Issued 1 May 2006 Resolved
Replace hydrostatic release for EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2006
Resolved 1 May 2006
Resolution: New hydrostatic release installed, sat.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 1 May 2006 Resolved
Remove 3 inservicable lifejackets.
Action required: 705 - Other - as specified
Due 1 May 2006
Resolved 1 May 2006
Resolution: 3 inserviceabl lifejackets were removed, sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 May 2006 Resolved
Install wire supports every 24" in place of plastic supports.
Action required: 705 - Other - as specified
Due 1 May 2006
Resolved 1 May 2006
Resolution: Crew installed new metal wire supports, sat.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 May 2006 Resolved
Replace damaged light covers.
Action required: 705 - Other - as specified
Due 1 May 2006
Resolved 1 May 2006
Resolution: New light covers were installed, sat.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 1 May 2006 Resolved
Replace emergency broadcast placard.
Action required: 705 - Other - as specified
Due 1 May 2006
Resolved 1 May 2006
Resolution: New emergency broadcast placard was installed, sat.
Engineering › Steering Gear System › Rudder
Issued 23 January 2006 Resolved
Rework & repair STBD rudder.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 January 2006
Resolved 31 January 2006
Construction/Loadline › Hull › Keel
Issued 23 January 2006 Resolved
Gouge & reweld weld crack in way of Port bilge keel 5-6 feet forward of the rudder and outboard side Port Hull approximately 10-15 feet forward of the rudder.
Condition: Improper Installation
Due 30 January 2006
Resolved 31 January 2006
Construction/Loadline › Hull › Hull Plating
Issued 23 January 2006 Resolved
Crop & renew to good metal spider fracture in a way of Port Hull inboard side 10-15 feet forward of the rudder below waterline.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 January 2006
Resolved 31 January 2006
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 23 January 2006 Resolved
Re-paint draft markings.
Condition: Improper/Lack of Maintenance
Due 30 January 2006
Resolved 31 January 2006
Electrical › Electrical Distribution System (service) › Cable
Issued 23 January 2006 Resolved
Remove or discard Unused bilge sensor alarm & cable Aft Lazarette.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 30 January 2006
Resolved 31 January 2006
Construction/Loadline › Penetrations › Valve Flange
Issued 23 January 2006 Resolved
Seal wires penetrating forward STBD Lazarette, secure loose wires in STBD E/R bottom ladder, and secure loose wires Forward Bulkhead Port E/R.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 January 2006
Resolved 31 January 2006
Engineering › Steering Gear System › Hydraulic Hose
Issued 23 January 2006 Resolved
Closed Hydraulic lines located forward STBD Lazarette, rudder compartment.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 January 2006
Resolved 31 January 2006
Construction/Loadline › Hull › Side Shell
Issued 21 July 2005 Resolved
Fracture in shell plating is adjacent to recent welded repair. Aluminum side shell was TIG welded in the area adjacent to the repair, but MIG welded elsewhere.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 July 2005
Resolved 25 July 2005
Resolution: Satisfactory Temporary Repair observed
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 May 2005 Resolved
Replace broken window glazing located stbd/aft in the upper passenger lounge.
Action required: 705 - Other - as specified
Due 16 June 2005
Resolved 23 June 2005
Resolution: New glazing was installed on subj. window, sat.
Communications › Alarms/Indicators › Bilge Alarm
Issued 16 May 2005 Resolved
Remount and demonstrate the operation of all required bilge alarms.
Action required: 705 - Other - as specified
Due 23 May 2005
Resolved 23 May 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 May 2005 Resolved
Locate all cut and dead-ended wires, and remove them or terminate them in a junction box.
Action required: 705 - Other - as specified
Due 16 June 2005
Resolved 23 May 2005
Engineering › Bilge Water Management System › Piping
Issued 16 May 2005 Resolved
Blank unused open sea water pipes located inboard of sea valves in the port and starboard engine rooms.
Action required: 705 - Other - as specified
Due 16 June 2005
Resolved 23 May 2005
Electrical › Electrical Distribution System (service) › Panelboard
Issued 16 May 2005 Resolved
Install blank covers on unused circuit breaker openings in the port engine compartment power panel.
Action required: 705 - Other - as specified
Due 16 June 2005
Resolved 23 June 2005
Resolution: New covers were installed in openings in power panel, sat.
Construction/Loadline › Hull › Weld
Issued 2 November 2004 Resolved
Effect permanent repairs to 4 cracks found in 4 different welds. See narrative for specific locations.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 5 November 2004
Resolved 5 November 2004
Resolution: All 4 cracks were repaired.
Construction/Loadline › Hull › Side Shell
Issued 2 January 2003 Resolved
V/W gussett IWO crack in Port Fwd Pontoon Forepeak
Condition: Damaged By Earlier Event
Due 2 January 2003
Resolved 4 January 2003
Construction/Loadline › Hull › Side Shell
Issued 2 January 2003 Resolved
V/W sideshell IWO Fwd seam in Port pontoon Forepeak (2 cracks)
Condition: Damaged By Earlier Event
Due 2 January 2003
Resolved 4 January 2003
Construction/Loadline › Hull › Side Shell
Issued 2 January 2003 Resolved
C/R damaged sideshell and support members and deck plating IWO damage to Port Pontoon Forepeak.
Condition: Damaged By Earlier Event
Due 2 January 2003
Resolved 4 January 2003
Construction/Loadline › Structures › Deck Plating
Issued 2 January 2003 Resolved
Make permanent repairs to framing and deck plating (approx. 10 ft x 2 ft) IWO Port passageway amidships.
Condition: Damaged By Earlier Event
Due 2 January 2003
Resolved 4 January 2003
Communications › Radio Communications
Issued 10 December 2002 Resolved
Provide proper documentation for proof of registration of EPIRB - Vsl restricted to NMT 3 NM from coastline until requirement is met. LEGACY COMPONENT DESC: EPIRB
Due 17 December 2002
Resolved 18 December 2002
Communications › Alarms/Indicators
Issued 10 December 2002 Resolved
Repair and prove proper operation of all bilge high level alarms - While carrying passengers, must make rounds and check all spaces every 15 minutes and log in Ship's Log until requirement is met. LEGACY COMPONENT DESC: Bilge Alarm
Condition: Improper/Lack of Maintenance
Due 17 December 2002
Resolved 18 December 2002
Resolution: Witnessed satisfactory test of blige alarms and reviewed ship''s log. ALL SAT.
Construction/Loadline › Structures
Issued 3 December 2001 Resolved
Provide list of all repairs and modifications to MSC via Activities New York to determine if major overhaul occurred placing vessel under new sub- chapter K vice retaining grand fathering on issues such as area of refuge. LEGACY COMPONENT DESC: Modifications
Condition: Unknown
Due 1 January 2002
Resolved 6 March 2002
Resolution: Received e-mail from MSC indicating that the vessel did not undergo a major modification and that it will remain inspected under subchapter T.
Engineering › Bilge Water Management System
Issued 3 December 2001 Resolved
Replace submersible bilge pump hose in port hull with good marine hose suitable for the service. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Due 3 January 2002
Resolved 11 February 2002
Resolution: Submersible bilge pump hose replaced.
Engineering › Bilge Water Management System
Issued 3 December 2001 Resolved
Install positive stop valve at through hull penetration for submersible pump discharge in both hulls. LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 3 January 2002
Resolved 11 February 2002
Resolution: Positive stop closure valves installed.
Communications › Audible Communications
Issued 3 December 2001 Resolved
Provide 300 mm (11.8") bell in accordance with inland Nav rules. LEGACY COMPONENT DESC: Ships Bell
Condition: Unknown
Due 3 January 2002
Resolved 11 February 2002
Resolution: Proper size bell installed.
Engineering › Compressed Air System (control)
Issued 3 December 2001 Resolved
Replace air receiver under bridge with one constructed to ASME U or UM standards. LEGACY COMPONENT DESC: Receiver/Bottle
Condition: Improper Installation
Due 3 January 2002
Resolved 11 February 2002
Resolution: Air receiver replaced with an approved UM air receiver.
Fire Fighting › Structural - A Class Divisions
Issued 3 December 2001 Resolved
Reinstall structural fire protection (insulation) where missing/removed in engine room. Use NVIC 9-97 as guide for proper reinstallation. Vessel limited to carriage of not more than 150 passengers until completed. ** Not completed - vsl issued COI for 149 pax. LEGACY COMPONENT DESC: Decks - Accommodation Spaces
Condition: Improper Installation
Due 3 January 2002
Resolved 6 March 2002
Resolution: Per phone conversation with [name withheld] (vsl rep), the AMERICAN EAGLE will continue to carry 150 or less passengers. The vsl will continue to be inspected undersubchapter T.
Stability › Incline Test
Issued 3 December 2001 Resolved
Vessel is limited to the carriage of 150 passengers pending results of deadweight survey to determine if stability changes have occurred due to addition of equipment and rebuild.
Condition: Unknown
Due 3 January 2002
Resolved 27 February 2002
Resolution: MSC ltr C1-0200411 dtd 27 Feb 02 states that repairs only had 1% weight change on vsl, so old stability letter OK. However, vsl still limited to 150 pax or less due to structural fire protection problems.
Construction/Loadline › Structures
Issued 3 December 2001 Resolved
Replace resilient mounts at forward, outboard locations on port & starboard. LEGACY COMPONENT DESC: Resilient Mounts
Condition: Unknown
Due 3 January 2002
Resolved 11 February 2002
Resolution: Resilient mounts replaced.
Electrical › Lighting (service)
Issued 3 December 2001 Resolved
Replace light fixture cover on the aft most light in the stbd engine room. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Due 3 January 2002
Resolved 11 February 2002
Resolution: Light fixture cover replaced.
Construction/Loadline › Hull
Issued 3 December 2001 Resolved
Replace wooden plug in overhead of stbd Halon compartment with welded insert. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Due 3 January 2002
Resolved 11 February 2002
Resolution: aluminum plate inserted
Fire Fighting › Structural - A Class Divisions
Issued 3 December 2001 Resolved
Separate operating station from passenger compartment with an A-60 bulkhead. Submit plans for approval prior to commencing work. Vessel is limited to the carriage of not more than 150 passengers until completed. ** Bulkhead not installed, Vsl issued COI for 149 pax. LEGACY COMPONENT DESC: Bulkheads - Control Stations
Condition: Unknown
Due 3 February 2002
Resolved 6 March 2002
Resolution: Received a phone call from [name withheld] (vsl rep) who stated that the vessel will continue to remain a Tvsl that is inspected under subchapter T, Vsl dose not require a bulkhead between accoms and control station.
Fire Fighting
Issued 15 November 2001 Resolved
INSTALL GAUGES ON FIRE PUMPS.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Electrical
Issued 15 November 2001 Resolved
PROPERLY MOUNT ELEC. BOX ON MAIN DECK PORT SIDE.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Electrical
Issued 15 November 2001 Resolved
REPLACE LIGHT COVER IN MEN'S HEAD.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Electrical
Issued 15 November 2001 Resolved
SUPPORT WIRES AND PROPERLY WIRE LIGHTS IN PORT ENG. RM.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Lifesaving
Issued 15 November 2001 Resolved
MAKE VSL AVAILABLE FOR U/W DRILLS PRIOR TO CARRYING PASS. FOR HIRE
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Accommodation/Occupational Safety
Issued 15 November 2001 Resolved
LABEL "MAX 16 PERSONS ALLOWED" ON TOP DECK.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Documentation
Issued 15 November 2001 Resolved
PROVIDE A VALID RADIO OPERATORS PERMIT.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Documentation
Issued 15 November 2001 Resolved
PROVIDE A WASTE MANAGEMENT PLAN.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Electrical
Issued 15 November 2001 Resolved
REMOVE LIVE DEAD END WIRES UNDER BRIDGE CONSOL.
Condition: Unknown
Due 19 November 2001
Resolved 19 November 2001
Unknown
Issued 20 October 2000 Resolved
UPDATE FIRST AID KIT AND RENEW ALL EXPIRED MATERIAL.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Lifesaving
Issued 20 October 2000 Resolved
INSTALL PLACARD ON OUTER STORAGE DOOR TO DENOTE FIRST AID KIT LOCATION.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Engineering
Issued 20 October 2000 Resolved
REPIAR STBD NEUTRAL THROTTLE TO ALLOW PROPER OPERATION OF FIRE PUMP PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Fire Fighting
Issued 20 October 2000 Resolved
TIGHTEN/RENEW PORT FIRE PUMP DRIVE BELT PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Construction/Loadline
Issued 20 October 2000 Resolved
RELOCATE ENGINE ROOM BILGE ALARMS TO ALLOW FOR ROUTINE TESTING.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Stability › Incline Test
Issued 20 October 2000 Resolved
PROVIDE NEW STABILITY LETTER FOR EXPOSED WATERS NO LATER THAN 20 APRIL 2001 LEGACY COMPONENT DESC: Conduct test
Condition: Unknown
Due 20 April 2001
Resolved 3 December 2001
Resolution: Reissued with input from MSC
Documentation
Issued 20 October 2000 Resolved
PROVIDE CPR CERTIFICATION FOR AT LEAST 50% OF THE CREW NO LATER THAN 20NOV00.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Unknown
Issued 20 October 2000 Resolved
PROVIDE EVIDENCE THAT ALL MEMBERS OF THE CREW ARE IN COMPLIANCE WITH CHEMICAL TESTING REQUIREMENTS IAW 46 CFR 16 NO LATER THAN 20NOV00.
Condition: Unknown
Due 20 October 2000
Resolved 20 October 2000
Lifesaving
Issued 20 October 2000 Resolved
MAKE AVAILABLE LIFERAFT SERVICING CERTIFICATES PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Navigation
Issued 20 October 2000 Resolved
PROVIDE ALL REQUISITE CHARTS AND NAVIGATION PUBLICATIONS IAW 46 CFR 184.420PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Documentation
Issued 20 October 2000 Resolved
PROVIDE UPDATED LOGBOOK TO INCLUDE ALL VESSEL MOVEMENTS, PASSENGER COUNTS, MAINTENANCE OF FIREFIGHTING AND LIFESAVING EQUIPMENT, AND ANY VESSEL CASUALTIES PRIOR TO COMMENCEMENT OF OPERATIONS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Documentation
Issued 20 October 2000 Resolved
PROVIDE SAFETY MANAGEMENT SYSTEM FOR VESSEL IAW SOLAS CH IX PRIOR TO THE ISSUANCE OF AN INTERNATIONAL ROUTE.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Electrical
Issued 20 October 2000 Resolved
REMOVE UNUSED WIRES UNDER GALLEY COUNTER NO LATER THAN 13NOV00.
Condition: Unknown
Due 13 November 2000
Resolved 8 November 2000
Navigation
Issued 20 October 2000 Resolved
PRIOR TO COMMENCEMENT OF VESSEL OPERATIONS PROVIDE A BELL IAW COLREGS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Lifesaving
Issued 20 October 2000 Resolved
REGISTER EPIRB WITH NEW VESSEL AND OWNERSHIP DATA.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Lifesaving
Issued 20 October 2000 Resolved
COMPLETE INSTALLATION OF LIFEFLOAT WITH PROPER PAINTER AND WEAKLINK ASSEMBLIES PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 13 November 2000
Resolved 8 November 2000
Lifesaving
Issued 20 October 2000 Resolved
INSTALL LIFERAFT LAUNCHING INSTRUCTIONS AT ALL LAUNCHING STATIONS.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Lifesaving
Issued 20 October 2000 Resolved
INSTALL ADDITIONAL LIFEJACKET DONNING INSTRUCTIONS ON ALL DECKS AT EACH STORAGE AREA.
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Lifesaving
Issued 20 October 2000 Resolved
INSTALL LIFERING LIGHTS AND SAFETY LINES IAW 46 CFR 180.70
Condition: Unknown
Due 8 November 2000
Resolved 8 November 2000
Lifesaving
Issued 25 May 1999 Resolved
Provide 406mHz EPIRB registered to vessel.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Fire Fighting
Issued 25 May 1999 Resolved
Mount Bridge B-I portable extinguisher.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Fire Fighting
Issued 25 May 1999 Resolved
Provide proper bracket for B-I extinguisher on bridge at top of stairs.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Documentation
Issued 25 May 1999 Resolved
Provide current documentation sticker.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Accommodation/Occupational Safety
Issued 25 May 1999 Resolved
Clean galley exhaust fans.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Lifesaving
Issued 25 May 1999 Resolved
Provide 60 ft lifeline around ringbuoy.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Engineering
Issued 25 May 1999 Resolved
Provide flame screen for fuel tank vent poort side.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Navigation
Issued 28 April 1999 Resolved
None
Condition: Unknown
Due 28 May 1999
Resolved 3 December 2001
Resolution: Deleted requirement with unknown problem
Navigation
Issued 12 December 1997 Resolved
PROVIDE CURRENT OR CORRECTED CHARTS AND PUBLICATIONS.
Condition: Unknown
Due 20 January 1998
Resolved 20 January 1998
Electrical
Issued 12 December 1997 Resolved
REPLACE BATTERY IN STBD ENGINE ROOM.
Condition: Unknown
Due 12 December 1997
Resolved 12 December 1997
Electrical
Issued 12 December 1997 Resolved
PROVIDE DRIP GUARDS FOR ELECTRICAL PANELS IN BOTH ENGINE ROOMS.
Condition: Unknown
Due 20 January 1998
Resolved 20 January 1998
Lifesaving
Issued 12 December 1997 Resolved
PROVIDE APPROPRIATE DECKING OVER BOTH ENGINE SHAFTS AND INSTALL REACH RODS FOR VALVES IN BILGE NEXT TO SHAFTS.
Condition: Unknown
Due 20 January 1998
Resolved 20 January 1998
Fire Fighting
Issued 12 December 1997 Resolved
SERVICE HALON SYSTEM IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 20 January 1998
Resolved 20 January 1998
Construction/Loadline
Issued 12 December 1997 Resolved
CORRECTLY LABEL BILGE MANIFOLD.
Condition: Unknown
Due 12 December 1997
Resolved 12 December 1997
Lifesaving
Issued 12 December 1997 Resolved
PROVIDE PRIMARY LIFESAVING GEAR (LIFEFLOATS) FOR LAKES, BAYS, AND SOUNDS ROUTE PRIOR TO CARRYING PASSENGERS ON LAKES, BAYS, AND SOUNDS ROUTE AND MORE THAN ONE MILE FROM SHORE ON RIVERS ROUTE.
Condition: Unknown
Due 12 December 1997
Resolved 12 December 1997
Engineering
Issued 11 October 1997 Resolved
RENEW LOWER OUTBOARD HOSE ON PORT MAIN DIESEL ENGINE KEEL COOLER PIPING PRIOR TO OPERATION.
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Electrical
Issued 11 October 1997 Resolved
PROPERLY SUPPORT ALL ENGINE ROOM WIRE AND CABLE RUNS WITH METAL CLIPS.
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Engineering
Issued 11 October 1997 Resolved
ALIGN PIPES FROM STARBOARD MAIN DIESEL ENGINE TO KEEL COOLER, AND RENEW ASSOCIATED HOSES PRIOR TO OPERATION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Electrical
Issued 11 October 1997 Resolved
CLEAN PORTSIDE BATTERIES AND BOX PRIOR TO OPERATION.
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Electrical
Issued 11 October 1997 Resolved
PROVIDE NEW COVER FOR PORTSIDE BATTERY BOX PRIOR TO OPERATION.
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Engineering
Issued 11 October 1997 Resolved
PROPERLY CLEAN ENGINE ROOM BILGES AND REMOVE ALL LOOSE GEAR.
Condition: Unknown
Due 22 October 1997
Resolved 22 October 1997
Engineering
Issued 11 October 1997 Resolved
MOUNT BILGE PUMP TO STARBOARD ENGINE, CONNECT TO BILGE SYSTEM, AND PROVE PROPER OPERATION, PRIOR TO OPERATION.
Condition: Unknown
Due 7 November 1997
Resolved 7 November 1997
Engineering
Issued 24 September 1997 Resolved
Piston on S/S main engine seized secondary to poor maintenance. This I/O spoke with MIs for GREAT RIVERS II. MIs expressed concerns w/ very poor maintenance procedures & practices by O/O and that the masters are not trained/concerned on engine procedures. See MCNS for further info.
Condition: Unknown
Due 24 October 1997
Resolved 3 December 1999
Resolution: New Operator
Engineering
Issued 23 September 1997 Resolved
Prior to operation, repair both filter systems for the automatic transmission, so they do not leak ATF overboard._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 September 1997
Resolved 23 September 1997
Electrical
Issued 1 April 1997 Resolved
INSTALL DRIPPROOF ELECTRICAL RECEPTACLES IN THE ENGINE COMPARTMENT TO REPLACE EXISTING RECEPTACLES.
Condition: Unknown
Due 1 April 1997
Resolved 1 April 1997
Electrical
Issued 1 April 1997 Resolved
PROVE PROPER OPERATION OF THE GENERATORS.
Condition: Unknown
Due 1 April 1997
Resolved 1 April 1997
Construction/Loadline
Issued 1 April 1997 Resolved
CLEAN OUT THE BILGE STRAINER WHERE SEDIMENT COLLECTION PREVENTS PROPER WATER FLOW.
Condition: Unknown
Due 1 April 1997
Resolved 1 April 1997
Engineering
Issued 13 October 1996 Resolved
The vessels fuel oil line was worn and the C/E from the prior day had installed a clamp over the leak. On the day of the incident, just after getting underway, a different C/E noticed that the line was leaking again and replaced the line.
Condition: Unknown
Due 13 October 1996
Resolved 13 October 1996
Resolution: New Fuel Line
Engineering
Issued 13 October 1996 Resolved
C/E replaced a leaking F.O. line and came in every 10-15 minutes to check the line. The C/E thought the line was under approximately 30 psi and usedan air hose to replace it. The line was actually under much higher pressureand chafed and eventually fuel oil leaked into turbo/manifold and ignited.
Condition: Unknown
Due 13 October 1996
Resolved 13 October 1996
Resolution: New Fuel Line
Engineering
Issued 13 October 1996 Resolved
MAKE PERMANENT REPAIRS TO THE STBD MAIN ENGINE FUEL SYSTEM AND ASSOCIATED WIRE THAT WAS DAMAGE IN FIRE TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Fire Fighting
Issued 13 October 1996 Resolved
HAVE STBD ENGINE SPACE FIRE DETECTION SYSTEM INSPECTED AND READY FOR TEST FOR THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Fire Fighting
Issued 13 October 1996 Resolved
SERVICE STBD ENGINEROOM FIXED EXTINGUISHING SYSTEM AND PROVIDE SERVICE REPORT TO THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Electrical
Issued 13 October 1996 Resolved
MAKE PERMANENT REPAIRS TO THE PORT GENERATOR ENGINE F/W PUMP, EXCESSIVE LEAKAGE FROM SEAL. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Electrical
Issued 13 October 1996 Resolved
MAKE PERMANENT REPAIRS TO ASSOCIATED WIRING RUNNING THROUGH STBD ENGINE SPACE THAT WAS DAMAGED BY FIRE, TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING C.G. MARINE INSPECTOR.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Lifesaving
Issued 28 September 1996 Resolved
CONDUCT ANNUAL SERVICE OF ALL INFLATABLE LIFERAFTS.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Lifesaving
Issued 28 September 1996 Resolved
PROVE PROPER OPERATION OF PORT E/R GENERAL ALARM LIGHT.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Electrical
Issued 28 September 1996 Resolved
PROVE PROPER OPERATION OF STARBOARD GENERATOR SET.
Condition: Unknown
Due 19 October 1996
Resolved 25 October 1996
Construction/Loadline
Issued 28 September 1996 Resolved
REPLACE BROKEN ANTENNAE MOUNT AND USE PROPER STUFFING TUBE MATERIAL ON ANTENNAE WIRE.
Condition: Unknown
Due 19 October 1996
Resolved 30 October 1996
Lifesaving
Issued 28 September 1996 Resolved
PROVIDE PROOF OF CURRENT NOAA REGISTRATION FOR 406 EPIRB.
Condition: Unknown
Due 28 September 1996
Resolved 28 September 1996
Documentation
Issued 28 September 1996 Resolved
PROVIDE CURRENT FCC SAFETY CERTIFICATE.
Condition: Unknown
Due 28 September 1996
Resolved 28 September 1996
Engineering
Issued 28 September 1996 Resolved
"V" AND WELD 3 INCH CRACK IN STBD SIDE DECK IN WAY OF FORWARD FUEL VENT.
Condition: Unknown
Due 28 September 1996
Resolved 28 September 1996
Lifesaving
Issued 28 September 1996 Resolved
PROPERLY MARK ALL RING BUOYS WITH RETROREFLECTIVE MATERIAL.
Condition: Unknown
Due 28 September 1996
Resolved 28 September 1996
Construction/Loadline
Issued 28 September 1996 Resolved
PROVIDE DIVER'S UNDERWATER SURVEY REPORT TO LOCAL OCMI FOR SATISFACTORY REVIEW PRIOR TO OPERATING VESSEL WITH PASSENGERS.
Condition: Unknown
Due 25 October 1996
Resolved 30 September 1996
Documentation
Issued 22 September 1995 Resolved
PROVIDE AN EXPOSED WATERS STABILITY LETTER FOR 154 TOTAL PERSONS. IF VESSEL'S PRESENT STABILITY LETTER WAS CALCULATED FOR EXPOSED WATERS, SUBMITTHE CALCULATIONS TO [name withheld].
Condition: Unknown
Due 22 September 1995
Resolved 22 September 1995
Engineering
Issued 22 September 1995 Resolved
PROVIDE BELT GUARD FOR SHIPS SERVICE AIR COMPRESSOR.
Condition: Unknown
Due 6 October 1995
Resolved 2 October 1995
Lifesaving
Issued 22 September 1995 Resolved
PROVIDE SOLAS APPROVED LIGHTS FOR ALL LIFE PRESERVERS.
Condition: Unknown
Due 6 October 1995
Resolved 2 October 1995
Construction/Loadline
Issued 22 September 1995 Resolved
DOUBLE CLAMP ALL SEA WATER HOSES LEADING TO AND FROM REDUCTION GEAR COOLING
Condition: Unknown
Due 6 October 1995
Resolved 2 October 1995
Electrical
Issued 30 July 1995 Resolved
The battery switch for the starboard main engine failed. The problem was not diagnosed until the vessel returned to Seattle on the port engine.
Condition: Unknown
Due 30 August 1995
Resolved 3 December 2001
Resolution: New Switch
Fire Fighting
Issued 22 July 1995 Resolved
MAKE PERMANENT REPAIRS TO PORT ENGINE DRIVEN FIRE PUMP SUCTION LINE.
Condition: Unknown
Due 9 August 1995
Resolved 9 August 1995
Fire Fighting
Issued 28 September 1994 Resolved
REPLACE FIRE MAIN PUMP PRESSURE GAUGE IN ENGINE ROOM, STARBOARD SIDE.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Lifesaving
Issued 28 September 1994 Resolved
REPLACE HYDROSTATIC RELEASES ON BUOYANT APPARATUS.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Navigation
Issued 28 September 1994 Resolved
PROVIDE BINNACLE LIGHT ON MAGNETIC COMPASS.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Fire Fighting
Issued 28 September 1994 Resolved
INSTALL NFPA AND UL APPROVED MAIN ENGINE SHUT-DOWNS AS REQUIRED BY NAVIGATION AND VESSEL INSPECTION CIRCULAR 6-72 DATED 28FEB77.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Accommodation/Occupational Safety
Issued 28 September 1994 Resolved
REMOVE NON APPROVED AIR RECIEVER IN AFT STARBOARD MACHINERY SPACE. PRESSUREVESSEL IS NOT IN COMPLIANCE WITH 46 CFR 54.01-3(C)(4). MAWP IS NOT SHOWN AND PRESSURE VESSEL HAS BEEN WELDED ON SINCE THE ORIGINAL MANUFACTURING.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Accommodation/Occupational Safety
Issued 30 October 1992 Resolved
PROVIDE PROPOSAL TO RESOLVE REOCCURING CRACKS IN RAW SEWAGE TANK
Condition: Unknown
Due 30 October 1992
Resolved 30 October 1992
Fire Fighting
Issued 30 October 1992 Resolved
REPLACE GLASS IN FIXED FIREFIGHTING SYSTEM PULL STATION STBD AFT.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Construction/Loadline
Issued 19 February 1992 Resolved
REPLACE SHOCK MOUNTS ON THE INBOARD SIDE OF EACH PONTOON AT NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 19 February 1992
Resolved 19 February 1992
Electrical
Issued 23 October 1990 Resolved
INSTALL ADEQUATE GUARDS OVER THE DRIVE BELTS OF BOTH PORT AND STARBOARD AUXILIARY GENERATOR PRIME MOVERS.
Condition: Unknown
Due 23 October 1990
Resolved 23 October 1990
Documentation
Issued 23 October 1990 Resolved
PERMANENTLY DISPLAY THE PROPER HAILING PORT ON THE STERN.
Condition: Unknown
Due 23 October 1990
Resolved 23 October 1990
Fire Fighting
Issued 3 October 1989 Resolved
VESSEL'S FIXED FIRE EXTINGUISHING SYSTEM REQUIRED TO BE SERVICED AND TESTED
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Lifesaving
Issued 3 October 1989 Resolved
PROVIDE A USCG APPROVED WATER LIGHT FOR EACH BUOYANT APPARATUS. FOR TWO BUOYANT APPARATUS.
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Construction/Loadline
Issued 3 October 1989 Resolved
SUBMIT PLANS FOR DESIGN AND PROVIDE INSPECTION ACCESS COVERS IN COMPARTMENTS LOCATED AFT OF THE LAZARETTES.
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Fire Fighting
Issued 3 October 1989 Resolved
DEMONSTRATE VESSEL'S FIRE PUMP CAPABILITY TO PRODUCE A WATER PRESSURE OF 60PSI AT THE PUMP OUTLET OR REPLACE THE PUMP WITH ONE THAT WILL.
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Lifesaving
Issued 3 October 1989 Resolved
PROVIDE ONE 20 MAN USCG APPROVED BUOYANT APPARATUS.
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Engineering
Issued 3 October 1989 Resolved
THREE PRESSURE VESSELS TO BE INTERNALLY EXAMINED OR HYDROSTATICLY TESTED INCLUDING THEIR SAFETY VALVES.
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Electrical
Issued 3 October 1989 Resolved
DEMONSTRATE PROPER OPERATION OF THE EMERGENCY LIGHTING SYSTEM, INCLUDES 3 LIGHTS.
Condition: Unknown
Due 3 October 1989
Resolved 3 October 1989
Fire Fighting
Issued 2 December 1988 Resolved
DEMONSTRATE SATISFACTORY CONTINUOUS OPERATION OF THE PORT AND STARBOARD FIRE PUMP AND RELIEF VALVES WITH ALL FIRE STATION HYDRANT VALVES CLOSED. THIS ITEM IS TO BE COMPLETED PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 2 December 1988
Resolved 2 December 1988
Fire Fighting
Issued 2 December 1988 Resolved
REPLACE THE STRUCTURAL FIRE PROTECTION INSULATION LOCATED IN THE PORT ENGINEROOM TO AS ORIGINAL. THE VESSEL IS LIMITED TO THE CARRIAGE OF NOT MORE THAN 150 PASSENGERS UNTIL THIS ITEM IS COMPLETE.
Condition: Unknown
Due 2 December 1988
Resolved 2 December 1988
Accommodation/Occupational Safety
Issued 2 December 1988 Resolved
REPLACE THE FRACTURED ACCOMODATION WINDOWS.
Condition: Unknown
Due 2 December 1988
Resolved 2 December 1988
Fire Fighting
Issued 24 December 1987 Resolved
INSTALL BELT GUARDS ON FIRE PUMP PULLEYS AND VIBRATION DAMPENERS, ON PORT AND STARBOARD MAIN DIESEL ENGINES. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR BY 01APR88.
Condition: Unknown
Due 24 December 1987
Resolved 24 December 1987
Navigation
Issued 24 December 1987 Resolved
COMPENSATE COMPASS AND PROVIDE NEW DEVIATION TABLE. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR BY 01JAN88.
Condition: Unknown
Due 24 December 1987
Resolved 24 December 1987
Construction/Loadline
Issued 10 October 1986 Resolved
1. MAKE PERMENANT REPAIRS IN WAY OF TEMPORARY REPAIRS MADE TO THE FORWARD LAZERETTE BULKHEAD 2 FEET ABOVE THE BOTTOM OF THE KEEL AT THE NEXT SCHEDULED DDX AND IN NO CASE LATER THAN 01NOV86. REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 10 October 1986
Resolved 10 October 1986
Construction/Loadline
Issued 11 September 1986 Resolved
1. MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS MADE TO THE FORWARD LAZARETTE BULKHEAD 2 FEET ABOVE THE BOTTOM OF THE KEEL AT THE NEXT SCHEDULED DDX AND IN NO CASE LATER THAN 10OCT86. REPAIRS ARE TO BE MADE TOTHE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 11 September 1986
Resolved 11 September 1986
Fire Fighting
Issued 30 May 1986 Resolved
CHANGE OUT PORTABLE FIRE EXTINGUISHERS IN GALLEY TO B-II SIZE
Condition: Unknown
Due 30 May 1986
Resolved 30 May 1986
Deck/Cargo
Issued 30 May 1986 Resolved
REINSTALL GUARD AROUND COMPRESSOR FLY WHEEL
Condition: Unknown
Due 30 May 1986
Resolved 30 May 1986
Fire Fighting
Issued 30 May 1986 Resolved
STENCIL VESSEL NAME ON FIRE AXE
Condition: Unknown
Due 30 May 1986
Resolved 30 May 1986
Electrical
Issued 30 May 1986 Resolved
REMOVE WATER FROM BATTERY BOXES IN BOTH ENGINE ROOMS
Condition: Unknown
Due 30 May 1986
Resolved 30 May 1986
Fire Fighting
Issued 30 May 1986 Resolved
REPAIR/INSTALL ELECTRIC CLUTCH ON PORT FIRE PUMP
Condition: Unknown
Due 30 May 1986
Resolved 30 May 1986

Casualty record · 7

17 December 2000Major Marine Casualty · role: Involved in a Marine Casualty · activity 111216
21 April 2005Routine · role: Involved in a Marine Casualty · activity 2356204
31 May 2005Routine · role: Involved in a Marine Casualty · activity 2396673
16 May 2006Routine · role: Involved in a Marine Casualty · activity 2653405
26 July 2006Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2726728
17 August 2009Routine · role: Involved in a Marine Casualty · activity 3575744
4 April 2018Routine · role: Acknowledged Pollution Source · activity 6386935
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.