MAURY USCG vessel records Sign in
← All vessels

BARANOF WIND

BARANOF WIND is a 1984 passenger vessel (inspected). The Coast Guard has recorded 135 inspections since 1985, most recently in January 2026, along with 202 deficiencies, 1 operational control and 6 casualty investigations between 2005 and 2013.

Records from 1985 to 2026. Most recent: inspection, 31 January 2026.

Built
1984
Last inspected
31 January 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE5369
234484
Flag
UNITED STATES
367365630
Maury page id
psix-234484

Inspections, by type

…with no type recorded22
Years with a record 38 calendar years (1985–2026)
The 135 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)78.8 ft × 28.5 ft × 9.0 ft
Registered tonnagegross 77 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNICHOLS BROTHERS BOAT BUILDERS INC · FREELAND, WA, UNITED STATES · built 1984
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationTwin Hull
Hailing portGUSTAVUS, AK
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 22 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it77 - Simplified, Gross Ton
62 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDE5369MMSI 367365630 · active · compulsorily equipped · granted 11 April 2018, expires 28 June 2028
WCZ3482MMSI 366768080 · expired · compulsorily equipped · granted 22 June 1999, cancelled 22 August 2009
WBH6421MMSI not assigned · expired · compulsorily equipped · granted 20 March 1997, cancelled 19 August 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 135

31 January 2026 Vessel Attendance · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8305267
9 October 2025 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8250080
9 May 2025 Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8131787
21 August 2024 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7986429
29 November 2023 Examination of Repairs · Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7832538
22 August 2023 Annual Inspection · Deficiency Check · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7774179
13 July 2023 Examination of Repairs · Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7741893
24 May 2023 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7696076
8 April 2023 Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7664882
15 June 2022 COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7455006
27 September 2021 Hull Examination · Deficiency Check · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7321590
30 March 2021 Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7165854
28 May 2020 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6962923
22 October 2019 Administrative Inspection · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6842173
9 October 2019 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6832232
11 September 2019 Deficiency Check · In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6810447
8 June 2019 Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6710181
30 May 2019 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6702113
30 April 2019 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6684171
1 April 2019 Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6653975
13 November 2018 Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6580176
9 November 2018 In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6577844
27 August 2018 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6525634
16 August 2018 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6515210
10 May 2018 Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6411960
8 May 2018 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6410337
1 May 2018 Liferaft Servicing
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6412245
11 October 2017 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6285935
8 August 2017 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6234389
3 August 2017 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6233509
22 May 2017 Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6152783
14 November 2016 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6039783
13 October 2016 In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6022167
27 May 2016 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5888672
3 May 2016 Administrative Inspection · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5868412
2 October 2014 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4997839
7 May 2014 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4853015
28 June 2012 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4359630
28 June 2012 Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4360054
27 June 2012 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4368430
17 May 2012 Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 4314431
15 July 2009 Construction Oversight · Internal Structural Exam · Deadweight Survey · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 3535607
28 October 2008 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3353311
27 March 2008 Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3172627
7 September 2007 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3052140
12 July 2007 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2992676
23 April 2007 COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2911986
15 April 2007 Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2900749
7 July 2006 Examination of Repairs · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2704688
2 July 2006 Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2699890
8 June 2006 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2674369
30 May 2006 Annual Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 2665355
5 May 2006 Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2637966
7 September 2005 Administrative Inspection
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2487611
6 September 2005 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2497967
2 July 2005 Examination of Repairs
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2414349
24 June 2005 Examination of Repairs · Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2404979
23 June 2005 MTSA Verification
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2400391
23 June 2005 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2473358
23 May 2005 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2365897
22 April 2005 Annual Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 2342819
5 April 2004 Annual Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2038058
22 March 2004 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2029320
30 January 2004 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2005606
22 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1970873
19 August 2003 Damage Survey
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1882231
22 April 2003 Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1778681
27 March 2002 Hull Examination · COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1611505
26 April 2001 Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1068313
24 July 2000 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 819876
14 May 2000 Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 819072
11 May 2000 Hull Examination · Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1373043
24 April 2000 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 817072
17 April 2000 Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 817140
3 December 1999 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 813623
4 November 1999 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 800855
3 November 1999 Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 797702
25 October 1999 Deficiency Check
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1429235
16 June 1999 Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 809540
8 April 1999 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1126225
23 February 1999 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 796227
9 December 1998 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 805554
17 June 1998 Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1126300
1 June 1998 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1126905
20 May 1997 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1108182
14 April 1997 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1095775
14 April 1997 Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1383494
18 March 1997 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1097033
28 February 1997 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1105794
9 April 1996 Deficiency Check · COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1080285
13 April 1995 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1178462
7 March 1995 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 97891
28 February 1995 Hull Examination · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 853941
15 April 1994 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 857604
4 August 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 842612
18 June 1993 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1132636
12 May 1993 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1132634
12 May 1993 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1133232
27 April 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 833026
16 April 1993 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 837736
22 March 1993 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1147079
24 February 1993 Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 837157
23 February 1993 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 836653
30 October 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 723920
24 August 1992 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 946369
10 June 1992 Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 945140
13 May 1992 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1267980
3 May 1992 Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 944743
1 May 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 186541
17 April 1992 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1260610
15 April 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 125259
15 September 1991 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 941016
12 August 1991 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 934991
20 June 1991 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1214908
17 June 1991 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1246465
3 June 1991 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1231881
22 July 1990 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1224154
3 June 1990 Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 901615
22 May 1990 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 906656
11 May 1990 COI Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1220930
12 July 1989 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1346231
2 May 1989 Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 894312
22 May 1988 COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1198665
17 May 1988 Hull Examination · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1350146
7 April 1988 Examination of Repairs
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 993967
21 November 1987 Damage Survey
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1337519
21 July 1987 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1021951
26 May 1987 Examination of Repairs · Hull Examination · COI Inspection · Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1008359
25 October 1986 Credit Drydock
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1313134
18 September 1986 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1310606
14 July 1986 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 984832
18 April 1986 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 999542
29 July 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 990361
18 July 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1298218
2 July 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1298704

Deficiency record · 202

09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 9 May 2025 Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records have not been properly maintained, a qualified servicing facility must perform the required inspections, maintenance procedures, and hydrostatic pressure tests. A tag issued by a qualified servicing organization, and attached to each extinguisher, may be accepted as evidence that the necessary maintenance procedures have been conducted. Fixed CO2 system and fire extinguishers are due for annual inspection. 46 CFR 176.810
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2025
Resolution: Resolved
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 9 May 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to:(a) Provide services necessary for safety under normal and emergency conditions;(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock;(c) Minimize accidental personnel contact with energized parts; Multiple wires under helm need to be properly dead ended. PA panel has an open space that needs to be filled. 46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2025
Resolution: RESOLVED
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 26 August 2024 Resolved
Training and drills (1) Every crewmember with emergency duties assigned on the muster list must be familiar with their assigned duties before the voyage begins. Vessel's crew was not on board to conduct drills. Provide visual evidence of drills prior to loading passengers. 46 cfr 199.180b1
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Received video evidence of regular crew conducting drills.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 26 August 2024 Resolved
Stowage and care of cylinders. (1) Cylinders must always be secured and, when not in use, they must be stowed in a rack in an upright position, with the valve protection cap in place. Oxygen tanks must be secured in a non-electrical space. 46 cfr 147.60b1
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 September 2024
Resolution: Oxygen tanks were properly secured.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 August 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. The junction box on the port blower, fwd of the main engine, above gen set needs a cover, power lugs need to be installed above the port gen set and battery panel, the electric panel in the port aft bulkhead has a reset pulley that is not readily available. 46 cfr 183.200b
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 September 2024
Resolution: All items listed were properly rectified.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 26 August 2024 Resolved
An exposed hazard such as gears or rotating machinery, must be properly protected by a cover, guard or rail. Install a guard at the rotating shaft on the port main. 46 cfr 177.960
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 September 2024
Resolution: Guard was properly installed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 26 August 2024 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Stairwell railing on the second deck is loose and needs to be tightened. Refrigerator needs to be secured to the vessel. 46 cfr 177.100
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 September 2024
Resolution: Hand rail was properly mounted and refridgerator was properly secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 August 2024 Resolved
Each fixed power bilge pump must be self priming. It may be driven off the main engine or other source of power. It must be permanently connected to the bilge manifold and may also be connected to the fire main. If of sufficient capacity, a power bilge pump may also serve as a fire pump. Bilge crossover is inoperable from both port and stbd side. Port side bilge has no suction. 46 cfr 182.520c
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Resolved
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 August 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. Stbd fire pump has a small leak and was unable to attain 60 psi when tested. 46 cfr 182.100
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Resolved
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 August 2024 Resolved
Fixed gas fire extinguishing systems. A storage cylinder must be securely fastened, supported, and protected against damage. The CO2 storage tank on the port side has a damaged bracket. 46cfr 181.410c4
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Resolved
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2024 Resolved
Electrical equipment on a vessel must be installed and maintained to: (b) Protect passengers, crew, other persons and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Junction box cover not installed in the MSD space. 46 cfr 183.200b
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Resolved
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 21 August 2024 Resolved
An exposed hazard such as gears or rotating machinery, must be properly protected by a cover, guard or rail.Port side fire pump is missing a guard around the shaft. Stbd side main engine belt is missing a guard. Provide cover or guard as required to the satisfaction of the attending Marine Inspector. 46 cfr 177.960
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Resolved
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 August 2024 Resolved
System design and installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the Commandant. Charge indicator valve on the stbd CO2 system is indicating system is pressurized. 46 cfr 181.410 a 3
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2024
Resolution: Resolved
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 21 August 2024 Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray. Secure both port and stbd engine room battery banks to prevent shifting. Ensure straps are securing battery covers. 46 cfr 183.350
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 August 2024
Resolution: Resolved
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 August 2024 Resolved
A vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required. Aft stbd ring buoy waterlight did not energize when activated. 46 cfr 180.70d
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 21 August 2024
Resolution: Rectified on the spot
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 August 2023 Resolved
A device must be provided to automatically shut down power ventilation serving the protected space and engines that draw intake air from the protected space prior to release of the extinguishing agent into the space. Port side engine did not shut down upon activation of the CO2 pressure switch. 46CFR181.410(b)(10)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2023
Resolution: Wiring was re-installed. System was tested and M/E shut down occured.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 August 2023 Resolved
System design and installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the Commandant. Charge indicator valve on the stbd CO2 system is indicating system is pressurized. 46CFR181.410(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2023
Resolution: Charge vavle was reset. Service tech confirmed system is operational and ready.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 August 2023 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Stbd engine turbo oil supply line has an excessive oil leak. 46CFR182.200(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2023
Resolution: Gasket on supply line was replaced. M/E was turn on for leak verification. None observed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 August 2023 Resolved
Fire hoses ...lined commercial fire hose that conforms to UL 19 (incorporated by reference, see 46 CFR 175.600) or hose that is listed and labeled by an independent laboratory... Upper deck fire hose has multiple holes. 46CFR181.320(b)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2023
Resolution: Fire hose was replaced and placed under pressure. No leaks observed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 August 2023 Resolved
All engines must have at least two means for stopping the engine(s) under any operating conditions. The fuel oil shutoff required at the engine by § 182.455(b)(4) will satisfy one means of stopping the engine. Stbd fuel shutoff does not fully close (aprox 90% closed) the fuel shutoff ball valve. 46CFR182.200
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 August 2023
Resolution: Fuel shutoff wire was re-routed. New configuration closed the ball valve to fule tank 100%.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 August 2023 Resolved
Complete but simple instructions for the operation of a fixed gas fire extinguishing system must be located in a conspicuous place at or near each pull box. Stbd CO2 activation station (pull box) does not have instruction on how to activate the CO2 system. 46CFR185.612(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 August 2023
Resolution: Instructions for CO2 system wes re-mounted at pull station.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 22 August 2023 Resolved
There must be a means of accurately determining the amount of fuel in each fuel tank either by sounding, through a separate sounding pipe or a fill pipe, or by an installed marine type fuel gauge. Port side fuel tank has an inoperable fuel gauge. 46CFR182.445(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Fuel tank sending device was replaced with a marine WEMA S3U fuel tank sensor, w/ 14 gauge wiring.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 August 2023 Resolved
Each child size life jacket must be stowed in a location that is appropriately marked. Child life jackets are not marked with the exact amount of life jackets stored on-board. 46CFR180.78(a)(5)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 September 2023
Resolution: Marking of lifejackets was updated to reflect adult and child lifejackets in designated compartment.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 August 2023 Resolved
The stowage locations of the personal flotation devices carried in addition to life jackets under § 180.72, must be separate from the life jackets... Excess adult life jackets are storesd in same compartment as in service life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 September 2023
Resolution: Excess lifejackets in storage compartment were removed and placed in designated area; all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 August 2023 Resolved
Each portable fire extinguisher on a vessel must be of an approved type. Fire extinguished bracket at operating station cannot fully secure mounted fire extinguisher. 46CFR181.500(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 September 2023
Resolution: Operating station fire extinguisher was replaced with a new fastening bracket accommodating a 10BC fire extinguisher; all sat.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 22 August 2023 Resolved
Where the station power does not exceed 250 watts carrier power or 1500 watts peak envelope power, the radio operator must hold a marine radio operator permit or higher class license. Vessel captain could not provide marine radio operator license upon request. 47CFR80.159(e)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 August 2023
Resolution: Marine Radio Permit was provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 22 August 2023 Resolved
A hatch cover must: (1) Have securing devices. Hatch leading to port and stbd engine room spaces cannot be secured. ***To be rectified by next dry dock.*** 46CFR179.360(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Broken handles were replaced. Hatch can be secured.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 22 August 2023 Resolved
A hatch cover must: (2) Be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Hatch to stbd fuel tank space does not a chain or other device to prevent the loss of hatch when not secured.***To be rectified by next dry dock.*** 46CFR179.360(b)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 September 2023
Resolution: Port and stbd hatch installed with securing line; all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 August 2023 Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Electrical cables support in port side CO2 space have detached from ceiling. ***To be rectified by next dry dock.*** 46CFR183.340 (b)(4)
Action required: 705 - Other - as specified
Resolved 28 September 2023
Resolution: Cable mount was re-attached to celling.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 August 2023 Resolved
Equipment, materials, and arrangements not covered by standards in this subchapter may be inspected...as good marine practice. Mechanical seal on port side fire pump is leaking excessively. ***To be rectified by next dry dock.*** 46CFR176.800(a)
Action required: 705 - Other - as specified
Resolved 28 September 2023
Resolution: Mechanical seal was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2022 Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Electrical outlet in galley, port side aft, below the serving counter did not have a cover plate and was not properly secured to the bulkhead. 46 CFR 183.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 June 2022
Resolved 16 June 2022
Resolution: Outlet has been properly secured and a cover plate has been added.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 June 2022 Resolved
A fire pump must be capable of both remote operation from the operating station and local operations at the pump. Starboard side local operation switch is inoperable. 46 CFR 181.300(e)
Action required: 10 - Deficiency Rectified
Resolved 15 June 2022
Resolution: Electrician replaced switch and tested SAT.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 June 2022 Resolved
Spanner wrenches must be provided where a 40 millimeter (1.5 inch) diameter firehose is required by § 181.320(b). Main deck aft fire station was missing the spanner wrench. 46 CFR 181.310(d)
Action required: 10 - Deficiency Rectified
Resolved 15 June 2022
Resolution: Spanner wrench was placed at the fire station.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 22 October 2019 Resolved
Prove proper operation of the port fwd engine room fan.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2022
Resolution: Port FWD E/R fan is operable.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 October 2019 Resolved
Both port and starboard engines have exhaust leaks at the turbos.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 June 2022
Resolution: All exhaust leaks repaired SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 October 2019 Resolved
All cable must be installed with metal supports spaced not more than 24 inches apart. In the port engine room, a cable run near the aft end of the engine was held in place with rope. Remove rope and support cables with metallic supports.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 June 2022
Resolution: Wire runs have been properly supported.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 October 2019 Resolved
All machinery must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure and personal injury. The heat detector over the port engine was held in place with a plastic wire tie. Remove plastic wire tie and remount heat detector with appropriate hardware.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 June 2022
Resolution: Heat detector has been properly mounted.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 October 2019 Resolved
Fire pipe discharge pipe in starboard engine room was wasted and leaking excessively. Wasted hole was covered up with electrical tape as a repair. Repair/renew pipe to original condition.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 9 October 2019
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 11 September 2019 Resolved
Vessel Captain and crew were not familiar with the vessel fire suppression system on board and how it operated.
Action required: 30 - Ship detained
Resolved 9 October 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019 Resolved
Both port and starboard engines have exhaust leaks at the turbos.
Condition: Damaged By Earlier Event
Action required: 30 - Ship detained
Resolved 9 October 2019
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 11 September 2019 Resolved
Both bilge areas have excessive oil and fuel accumulation to present a significant fire hazard to the vessel.
Action required: 30 - Ship detained
Resolved 10 October 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 September 2019 Resolved
Fuel leak found on port side generator prior to operating unit.
Action required: 10 - Deficiency Rectified
Resolved 11 September 2019
Resolution: Repairs were made to correct the fuel leak while inspectors were on nearby vessels. Inspectors attended the vessel and found that the fittings were repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 September 2019 Resolved
Port side fwd engine room fan was found to be completely inoperable and provided no ventelation to the space. The space was being filled with engine exhaust at the time of the inspection making it hard to breath inside.
Action required: 10 - Deficiency Rectified
Resolved 11 September 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2019 Resolved
Guard on starboard side aft engine room fan was worn to the point it was missing and could easily cause bodily harm to an individual in the machinery space.
Action required: 10 - Deficiency Rectified
Resolved 11 September 2019
Resolution: New fan guard material was fitted over the fan to protect persons from rotating machinery.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019 Resolved
Both port and starboard engines were found to have minor jacket water leaks on the exhaust system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 June 2022
Resolution: Jacket water leaks were repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2019 Resolved
Oil cap was found to be missing on the starboard main engine causing oil mist and blow by air to be existing the engine in a constant manner.
Action required: 10 - Deficiency Rectified
Resolved 11 September 2019
Resolution: A new cap was fitted.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 April 2019 Resolved
The fire pump outlet must be fitted with a pressure gauge; no gauge was provided.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified a gauge was provided on the discharge side of the pump and witnessed an operational test.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 1 April 2019 Resolved
Piping exceeding 150 degrees must be suitably insulated to prevent injury; part of the stbd engine lagging was removed.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified lagging was provided.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2019 Resolved
All cable and wire be installed with metal supports not more than 24" apart, plastic tie wraps are limited to bundling, the inboard main wire run in the stbd engine room relies solely on zip ties for support.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified identified cables were properly supported.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 1 April 2019 Resolved
Penetrations in a watertight bulkhead must be made watertight; sealant for the CO2 piping penetrations in the stbd engine room aft bulkhead was missing.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified identified watertight bulkhead openeings were properly sealed.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 1 April 2019 Resolved
Remote fuel shutoff valves stations must be clearly marked; provided labels were faded and unreadable.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verified appropriate lables were provided.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2019 Resolved
Each electrical motor must be mounted above the bilge to avoid damage by splash and avoid low lying vapors; identified an msd pump in the bilge of the stbd msd void.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 10 April 2019
Resolution: Verfied identified motor was mounted higher above the bilge.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 1 April 2019 Resolved
Conduct drills prior to seasonal operations.
Action required: 705 - Other - as specified
Due 1 May 2019
Resolved 30 April 2019
Resolution: Completed underway drills all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 August 2018 Resolved
Prove proper operation of the starboard engine to the USCG inspector attending.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2019
Resolution: Witnessed an operational test of the stbd main diesel engine.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 August 2018 Resolved
make Starboard exhaust pipping water tight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2019
Resolution: Witnessed an operational test of the stbd main diesel engine and observed no water intrusion through the exhaust piping.
Fire Fighting › Fire Pumps › Arrangement
Issued 10 May 2018 Resolved
A fire pump must be capable of remote operation from the operating station, there are no means to energize fire pump from the bridge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 16 August 2018
Resolution: Tested remote start of fire pump from the operating station
Navigation › Piloting/Steering › Marine Charts
Issued 10 May 2018 Resolved
Provide up-to-date nautical charts.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 11 May 2018
Resolution: Verified up-to-date marine charts were provided
Fire Fighting › Fire Hoses › Condition
Issued 10 May 2018 Resolved
Fire hose length cannot exceed 50', provide proper hose for the main deck station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 May 2018
Resolved 11 May 2018
Resolution: Verified a proper fire hose was provided.
Construction/Loadline › Penetrations › Pipe Flange
Issued 10 May 2018 Resolved
Sluice valves are not permitted in watertight bulkheads, remove and cap valves on the on both port and starboard collision bulkheads and port and starboard fwd engine room bulkheads.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 11 May 2018
Resolution: Verified valves were removed and through bulkhead penetrations were capped.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 10 May 2018 Resolved
Flexible pipe sections of fuel fill and sounding pipes must be bonded to protect against static charge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 11 May 2018
Resolution: Verified flexible pipe sections of both fuel tanks were bonded.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 8 May 2018 Resolved
Provide MSC approval of submitted CO2 Suppression system plans
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 August 2018
Resolution: Vessel has RCVD MSC approval.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 8 May 2018 Resolved
A pressure relief valve or equivalent set between 2400-2800 psi must be installed in the distribution manifold. A relief devices is not currently installed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 August 2018
Resolution: vessel has installed pressure releif valve.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 8 May 2018 Resolved
Install proper markings for spaces storing carbon dioxide
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2018
Resolution: Verified proper warning sings were provided for the discharge and storage spaces.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 8 May 2018 Resolved
Install schematic diagram of system and instructions detailing alternate methods of releasing extinguishing agent should local manual valve controls fail to operate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 August 2018
Resolution: Vesselhas installed diagram and releasing instructions.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 8 May 2018 Resolved
Install dirt traps after the siren in both engine rooms.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2018
Resolution: Verified dirt traps were provided.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 11 October 2017 Resolved
Both time delay bottles failed Port side tripped at 15 seconds and Starboard side at 12.5.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 May 2018
Resolution: System was renewed.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 13 October 2016 Resolved
Relocate the two pressure switches for the fixed CO2 suppression system for the port & STBD engineroom as per MTN 01-04 - 16715 22 Sept 2004 & Marine Safety Alert Inspections & Compliance Directorate Alert 05-12 & 6-15.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 April 2017
Resolved 22 May 2017
Resolution: Verified switches were relocated. Switches and disturbed plumbing tested by servicing company, all sat.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 3 May 2016 Resolved
Annual service all onboard portable fire extinguishers. All found past due for annual service/inspection.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 May 2016
Resolved 27 May 2016
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 3 May 2016 Resolved
Renew batteries on all onboard e-lighting. Lights are required to have 2 hr capacity. Found most not working or dying within 10 mins of testing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 May 2016 Resolved
Replaced missing electrical junction box cover on the forward, stbd side, engine room ventilation fan motor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 3 May 2016 Resolved
Properly label engine room ventilation dampers and provide training on the system since crew was unable to explain how they operate or how to close the same.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 May 2016
Resolved 27 May 2016
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 May 2016 Resolved
Properly plug sluice valves in the collision bulkhead both port and stbd hulls.
Condition: Invalid
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 May 2016 Resolved
Replace missing cover for the MSD pump electrical motor which exposes high speed fan on the back side of the electrical motor creating a safety hazard for occupants.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Fire Fighting › Remote Fuel Shutoff › General
Issued 3 May 2016 Resolved
Properly repair the stbd engine room remote emergency fuel shut off valve which is sticking/binding.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 May 2016
Resolved 27 May 2016
Engineering › Bilge Water Management System › Interface Detector
Issued 3 May 2016 Resolved
Properly mount broken bilge alarm float switch in the stbd hull MSD void.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 3 May 2016 Resolved
Place placard next to typhone alarms in both engine rooms stating "WHEN ALARM SOUNDS-VACATE AT ONCE HALON BEING RELEASED".
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 May 2016 Resolved
Renew two broken windows in the vessels pilot house port and stbd side. Drop down windows...
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Resolution: Owner renewed windows with proper safety glass hose tested SAT.
Navigation › Piloting/Steering › Binnacle
Issued 3 May 2016 Resolved
Properly repair or renew vsl's compass which is low on fluid. Ethelyn Glycol Distilled Water.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Resolution: Install new compass.
Communications › Radio Communications › EPIRB
Issued 3 May 2016 Resolved
Renew vessels NOAA registration. Vsl ltd to no more than 3 miles fm shore until this is resolved.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 3 May 2016 Resolved
Repair broken railing on the port side bow, courses broken off making more than 4"s of space between courses.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 3 May 2016 Resolved
Properly repair exhaust water leak on exhaust flange port MDE.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 May 2016 Resolved
Properly plug/seal two bulk head penetrations on the port side transverse bulk head in steering gear room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 May 2016 Resolved
Replace missing bolt on manhole cover (acces plate) in the port engine room to make water tight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Electrical › Electric Supply System (service) › Battery Charger
Issued 3 May 2016 Resolved
Permanently hard wire battery charger, charging leads in the port side engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 May 2016 Resolved
Install missing electrical junction box cover port engine room exhaust fan.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 27 May 2016
Construction/Loadline › Hull › Bottom Plating
Issued 3 May 2016 Resolved
At the vsl's next dry dock remove bilge pumps and gauge hull under stainless steel bilge pump suction strainers that are in contact with the aluminum hull with notable pitting starting around the hull in area of contact.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2016
Resolved 18 November 2016
Resolution: Gauging indicated 3/8" plate and a visual inspection of the areas revealed surface pitting with a max depth of around 1/16".
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 2 October 2014 Resolved
Replace corroded Halon cylinder on port side. 46 CFR 181.410
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2015
Resolved 8 May 2015
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 2 October 2014 Resolved
Replace pressure switches for FF system in the engine room on both the port and STBD sides. 46 CFR 181.410
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2015
Resolved 8 May 2015
Fire Fighting › Fixed Halon Fire Extinguishing System › Piping
Issued 2 October 2014 Resolved
Replace piping and corner pulleys for remote hand pull cables on the port side FF system. Check condition on hand pull cables themselves and replace if necessary. 46 CFR 181.410
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2015
Resolved 8 May 2015
Accommodation/Occupational Safety › Ventilation › General
Issued 2 October 2014 Resolved
Repair/replace port side exhaust fan in engine room. 46 CFR 182.465
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2015
Resolved 12 May 2015
Resolution: Exhaust fan repaired.
Accommodation/Occupational Safety › Ventilation › General
Issued 2 October 2014 Resolved
Repair/replace STBD side intake fan and exhaust fan in engine room. 46 CFR 182.465
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2015
Resolved 12 May 2015
Resolution: Exhaust fan replaced.
Construction/Loadline › Hull › Side Shell
Issued 28 June 2012 Resolved
Repair crack on the inboard side of the starboard hull prior to departure from Sitka to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2012
Resolved 29 April 2013
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 27 March 2008 Resolved
Create and maintain monthly EPIRB test log
Due 28 April 2008
Resolved 16 April 2008
Navigation › Piloting/Steering › Marine Charts
Issued 27 March 2008 Resolved
Replace 2 old charts (from 2002 and 2001)
Due 28 April 2008
Resolved 16 April 2008
Navigation › Piloting/Steering › Magnetic Compass
Issued 27 March 2008 Resolved
Demonstrate illumination of magnetic compass.
Due 28 April 2008
Resolved 16 April 2008
Communications › Radio Communications › VHF Radiotelephone
Issued 27 March 2008 Resolved
Place emergency broadcast placard near primary VHS.
Due 28 April 2008
Resolved 16 April 2008
Construction/Loadline › Structures › Door
Issued 27 March 2008 Resolved
Renew cracked bridge window (port side).
Due 28 April 2008
Resolved 16 April 2008
Construction/Loadline › Penetrations › Gasket
Issued 27 March 2008 Resolved
Renew gaskets on foredeck hatches (forwardmost on port side, second from forwardmost on starboard side).
Due 28 April 2008
Resolved 16 April 2008
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 27 March 2008 Resolved
Secure or remove freezer, ice maker and coffee pot containers.
Due 28 April 2008
Resolved 16 April 2008
Engineering › Gasoline Engine (propulsion) › Exhaust Piping (4 cycle)
Issued 27 March 2008 Resolved
Install lagging on exhaust in port engine room near bulkhead.
Due 28 April 2008
Resolved 16 April 2008
Accommodation/Occupational Safety › Ventilation › General
Issued 27 March 2008 Resolved
Make both engine rooms vapor tight for fixed fire-fighting system (specifically, seal major conduits running through fore and aft bulkheads)
Due 28 April 2008
Resolved 16 April 2008
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 27 March 2008 Resolved
Provide proof of servicing for Type II MSD.
Due 28 April 2008
Resolved 16 April 2008
Communications › Radio Communications › EPIRB
Issued 27 March 2008 Resolved
When new EPIRB is installed, show proof of valid registration and unexpired battery & hydro-release.
Due 31 May 2008
Resolved 30 May 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 April 2007 Resolved
Open bow area of vessel is restricted from passenger access until bow rail installation is completed to the satisfaction of the attending marine inspector.
Due 18 June 2007
Resolved 7 September 2007
Construction/Loadline › Hull › Hull Plating
Issued 7 July 2006 Resolved
Permanently repair 3rd fracture found STBD side inboard aft pontoon 2nd transverse web frame sewage room. Fracture temporarily repaired with concrete "JET SET". Monitor space routinely for flooding & record daily checks. Report to [name withheld] any changes to the fracture condition or any water seepage. Weekly report needed to local OCMI either by FAX or email.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 2 October 2006
Resolved 13 December 2006
Resolution: Witnessed satisfactory permanent repair of affected area.
Construction/Loadline › Hull › Hull Plating
Issued 30 May 2006 Resolved
Permanently repair fracture STBD side aft pontoon inboard in a way of the MSD room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 October 2006
Resolved 13 December 2006
Resolution: Witnessed satisfactory permanent repair of affected area.
Stability › Weathertight Integrity › General
Issued 30 May 2006 Resolved
Renew gaskets on all front windows passenger area. Gaskets shrinkage due to weather cause glass without proper seal & secured in place.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 12 July 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 30 May 2006 Resolved
Replace crack window glass second panel from portside forward house & port bridge side window upper half.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 12 July 2007
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 30 May 2006 Resolved
Fix emergency light (half) main deck aft port in a way of GENSET switchboard.
Condition: Unknown
Due 2 June 2006
Resolved 1 June 2006
Resolution: New light installed, sat.
Lifesaving › Lifebuoys › Serviceable
Issued 30 May 2006 Resolved
Replace the retro-reflective tape on all ringbouys.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 October 2006
Resolved 6 December 2006
Resolution: Witnessed new retro tape installation on all ring buoys.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 30 May 2006 Resolved
Install missing blanks in switchboard panel P3 No.30 & sewage board with holes.
Condition: Unknown
Due 2 June 2006
Resolved 1 June 2006
Resolution: Completed prior to departure, sat.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 30 May 2006 Resolved
Cover holes (total 8) in Main Deck bulkhead behind fire screen doors port & STBD.
Condition: Unknown
Due 2 June 2006
Resolved 1 June 2006
Navigation › Piloting/Steering › Marine Charts
Issued 30 May 2006 Resolved
Update electronic charts & charts for area of operation with the latest Notice to Mariners. Last update 2001.
Condition: Improper/Lack of Maintenance
Due 2 June 2006
Resolved 1 June 2006
Resolution: Completed via the internet, sat.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 30 May 2006 Resolved
Secure the ice machine for sea.
Condition: Unknown
Due 2 June 2006
Resolved 1 June 2006
Resolution: Tied with bungee cords, sat.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 30 May 2006 Resolved
Remove food stored under the sink in the galley (sanitary).
Condition: Unknown
Due 2 June 2006
Resolved 1 June 2006
Resolution: Done, sat.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 30 May 2006 Resolved
Secure dead end wires located storage room port aft inside panel.
Condition: Unknown
Due 2 June 2006
Resolved 1 June 2006
Resolution: Done, sat.
Construction/Loadline › Structures › Deck Plating
Issued 5 May 2006 Resolved
Repair loose (bouncy) deck Aft STBD passenger area in a way of STBD Engine access plate.
Condition: Improper Installation
Due 7 May 2006
Resolved 7 May 2006
Resolution: Deck re-welded & carpet installed, sat.
Engineering › Steering Gear System › Rudder Bearing
Issued 5 May 2006 Resolved
Repair both Port & STBD Dip Rudder bushings & bearings. Too much play face of both rudders hitting the sides & showed of scrapings.
Condition: Improper/Lack of Maintenance
Due 7 May 2006
Resolved 7 May 2006
Resolution: Done by the yard, sat.
Engineering › Thrusters › Blade
Issued 5 May 2006 Resolved
Renew Port & STBD propeller. Blades root found to have deep electrolysis problems.
Condition: Unknown
Due 7 May 2006
Resolved 7 May 2006
Resolution: Replaced with 5 bladed propeller 38 X 38 RH G 32318 and LH E 3219, sat.
Construction/Loadline › Hull › Hull Plating
Issued 8 September 2005 Resolved
9-7-2005 Operator reported finding water in the bow void of the starboard pontoon, after pumping water returned to same level approximately 8 inches. Operator discovered small crack in bow void and provided CG-2692 describing the event. Vessel required to make monitor starboard bow void daily and make temporary repairs.
Condition: Unknown
Action required: 705 - Other - as specified
Due 16 September 2005
Resolved 5 May 2006
Resolution: Fixed during this drydock period, sat.
Construction/Loadline › Hull › Hull Plating
Issued 2 July 2005 Resolved
Crop & renew temporary repaired 10" crack weld STBD aft pontoon MSD room. Vessel scheduled laid up 30SEPT05. Vessel to complete permanent repairs prior to carrying passengers after 2005 season by 22 APRIL06 or next scheduled drydock whichever comes first. Continue monitor crack, standby pump in place, & send weekly status report.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 April 2006
Resolved 5 May 2006
Resolution: Fixed during this drydock period.
Construction/Loadline › Hull › Weld
Issued 27 June 2005 Resolved
Make temporary repairs to the Crack located inboard STBD Aft pontoon (MSD Room). Submit propose temp repairs in a form of simple drawing showing arresting crack ends and the method to stop the leak. Sketch shoring details of leak area. Show areas of frames, longitudinal, transverse, & main frames.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 July 2005
Resolved 2 July 2005
Resolution: Completed by Bob Patronsky - Port Engineer, sat. no leaks.
Construction/Loadline › Hull › Weld
Issued 27 June 2005 Resolved
Make permanent repairs to a 10" crack corner weld seam in a way of inboard STBD aft pontoon (MSD Room)) between middle main web frame to the next aft transverse frame. At Master's discretion, continue to monitor space for leak & flooding. Place a standby dewatering pump by MSD room ready for emergency use. Master to notify local OCMI once a week on the status & condition weld crack via email/fax.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 October 2005
Resolved 2 July 2005
Resolution: Re-issued new 835 to expire on next schedule drydock or 22 APRIL 2006 whichever comes first.
Operations/Management › Drills/Instruction › Not Conducted
Issued 22 April 2005 Resolved
Conduct man overboard, fire and abandon ship drills.
Action required: 705 - Other - as specified
Due 17 June 2005
Resolved 22 May 2005
Resolution: Completed at Bartlett Cove Station Glacier National Park Preserve Dock, Gustavus, all sat.
Construction/Loadline › Hull
Issued 19 August 2003 Resolved
Effect permanent repairs to the 2 inch crack in the starboard hull, amidship, on the inboard side in way of the main diesel engine to the satisfaction of the attending USCG marine inspector. LEGACY COMPONENT DESC: Side Shell
Condition: Unknown
Due 19 September 2003
Resolved 30 January 2004
Electrical › Electric Supply System (service) › Transformer
Issued 22 April 2003 Resolved
Removed dead end wires located STBD side bridge area in a way of instrument panel by the speaker.
Condition: Placed in Improper Service
Due 23 April 2003
Resolved 23 April 2003
Resolution: Cleared
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 April 2003 Resolved
Send for two medical oxygen bottles with expired due dates for servicing.
Condition: Improper/Lack of Maintenance
Due 23 April 2003
Resolved 23 April 2003
Resolution: Removed from the vessel. Not required onboard equipment.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 April 2003 Resolved
Update first aid kit to comply with the required CG approved first aid kit.
Condition: Improper/Lack of Maintenance
Due 23 April 2003
Resolved 23 April 2003
Resolution: Ordered new ones, a fax/receipt order on file.
Operations/Management › Passenger Operations
Issued 22 April 2003 Resolved
Install missing maximum number of passengers sign allowed on the upper deck area.
Condition: Unknown
Due 23 April 2003
Resolved 23 April 2003
Resolution: Made a new one.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 22 April 2003 Resolved
Removed dead end wires located instrument panel bridge area.
Condition: Placed in Improper Service
Due 23 April 2003
Resolved 23 April 2003
Resolution: Completely removed.
Construction/Loadline › Hull › Sheerstrake
Issued 22 April 2003 Resolved
Install missing plug forward port side rake area of the hull.
Condition: Unknown
Due 23 April 2003
Resolved 23 April 2003
Resolution: New plug installed.
Construction/Loadline › Structures › Door
Issued 22 April 2003 Resolved
Install missing rubber seal on the bottom area of the forward weatherdeck WTD.
Condition: Improper/Lack of Maintenance
Due 23 April 2003
Resolved 23 April 2003
Resolution: Renew rubber seal.
Engineering › Steering Gear System › Linkage
Issued 22 April 2003 Resolved
Install self locking nuts or lockwire to P & S steering linkage located in the lazarrette.
Condition: Improper Installation
Due 23 April 2003
Resolved 23 April 2003
Resolution: Install self locking nuts.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 22 April 2003 Resolved
Tighten & secure CO2 siren in the STBD side E/R fixed firefighting system.
Condition: Improper Installation
Due 23 April 2003
Resolved 23 April 2003
Resolution: Tighten & secure.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 22 April 2003 Resolved
Add blanks & label each breaker switch located STBD side E/R aft bulkhead.
Condition: Unknown
Due 23 April 2003
Resolved 23 April 2003
Resolution: Completed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 27 March 2002 Resolved
Blank off open breaker slots on panel P4 and panel in stbd engine room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 March 2002 Resolved
Provide metal supports not more than 24 inches apart on loosely supported wiring throughout vessel as per 46 CFR 183.340 (a)(4).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Engineering › Steering Gear System › Piping
Issued 27 March 2002 Resolved
Replace missing support bracket for hydraulic piping in overhead of stbd lazerette.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 27 March 2002 Resolved
Service or provide evidence of year 2001/2002 servicing of both B-II extinguishers on main deck. LEGACY COMPONENT DESC: Service
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Fire Fighting › Fire Main
Issued 27 March 2002 Resolved
Plastic pipe connected to firemain (stbd engine room) must be replaced with metallic piping as per 46 CFR 182.710. LEGACY COMPONENT DESC: Material
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Lifesaving
Issued 27 March 2002 Resolved
Replace expired EPIRB hydrostatic release. LEGACY COMPONENT DESC: EPIRB Hydrostatic Release
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Engineering › Bilge Water Management System › Valve
Issued 27 March 2002 Resolved
Repair reach rod connection to port engine room bilge suction valve.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 27 March 2002 Resolved
Repair leaking sewage piping in stbd lazerette.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Fire Fighting › Nozzles › Condition
Issued 27 March 2002 Resolved
Repair/replace nozzle on #2 firestation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Engineering › Fuel Oil Service System › Filter
Issued 27 March 2002 Resolved
Provide metal bowls for all Racor fuel filters.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 April 2002
Resolved 29 April 2002
Fire Fighting
Issued 26 April 2001 Resolved
Modify stairway fire door do that it does not jam prior to closing.
Condition: Unknown
Due 10 May 2001
Resolved 1 June 2001
Electrical
Issued 26 April 2001 Resolved
Remove and or encase exposed and dead end wires in various spaces, including stbd lazarette, port engine compt, and port "crew only" mooring station.
Condition: Unknown
Due 10 May 2001
Resolved 1 June 2001
Construction/Loadline
Issued 11 May 2000 Resolved
VEE AND WELD FRACTURED BUTT-JOINTS IN BOTTOM LONGITUDINAL TEES/BARS AT THE FOLLOWING 4 LOCATIONS: STBD/AFT LAZZARETTE (2 LOCATIONS), PORT/AFT LAZARETTE, AND PORT/FWD LAZARRETTE.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Construction/Loadline
Issued 11 May 2000 Resolved
PROVIDE PROPOSAL TO PROVIDE INSPECTION ACCESS FOR OUTER SIDE SHELL AREAS OPPOSITE OF RUB RAIL IN WAY OF P/S ENGINEROOMS AND P/S FUEL TANKS.
Condition: Unknown
Due 19 May 2000
Resolved 19 May 2000
Construction/Loadline
Issued 11 May 2000 Resolved
VEE AND WELD DAMAGED INNER SHELL PLATING, OPPOSITE RUB RAIL MOUNTING WELDS,IN #1 P/S VOIDS, #2 P/S VOIDS, AND P/S LAZARETTES. (NOTE: BASED ON LATER INVESTIGATION, REQUIRED REPAIR AREA WAS EXPANDED ON 19MAY00 TO INCLUDE WELD-DAMAGED SHELL PLATING ON P/S ENGINEROOMS AND P/S FUEL TANKS.)
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Construction/Loadline
Issued 11 May 2000 Resolved
GRIND AND REWELD FRACTURED FULLET WELDS IN WT SUBDIVISION BULKHEAD IN THE STBD HULL BETWEEN THE ENGINEROOM AND LAZARETTE, OUTBOARD/UPPER CONNECTION TO SHELL PLATING.
Condition: Unknown
Due 19 May 2000
Resolved 19 May 2000
Construction/Loadline
Issued 11 May 2000 Resolved
COMPLETE FILLET WELDS IN WT SUBDIVISION BULKHEAD BETWEEN #2 AND #3 VOIDS INWAY OF CONNECTION TO THE OUTBOARD SIDESHELL INSERT ABOVE THE WATERLINE.
Condition: Unknown
Due 19 May 2000
Resolved 19 May 2000
Construction/Loadline
Issued 17 April 2000 Resolved
Fractures around hinges on bow access weathertight access door.
Condition: Unknown
Due 18 May 2000
Resolved 22 May 2000
Construction/Loadline
Issued 17 April 2000 Resolved
Engine seawater cooling intake flexible cooling hose requires double clampson each end.
Condition: Unknown
Due 18 May 2000
Resolved 21 April 2000
Documentation
Issued 17 April 2000 Resolved
Provide original stability letter and post on vessel.
Condition: Unknown
Due 18 May 2000
Resolved 21 April 2000
Documentation
Issued 17 April 2000 Resolved
Provide FCC Bridge to Bridge and Safety Radio Telephony Certificates.
Condition: Unknown
Due 18 May 2000
Resolved 21 April 2000
Construction/Loadline
Issued 17 April 2000 Resolved
Port #2 void space watertight junction box cover missing compromising watertight integrity between bulkheads.
Condition: Unknown
Due 18 May 2000
Resolved 21 April 2000
Lifesaving
Issued 25 October 1999 Resolved
ISOLATE RADIATION HAZARD AREA FOR A HORIZONTAL DISTANCE OF 6'6" FROM THE POINT OF ROTATION FOR THE FORWARD RADAR, SO THAT PASSENGERS ON THE UPPERMOST DECK CANNOT EXCEED THE EXPOSURE LIMITS OF 29 CFR 1910.16(a)(2)(vii).
Condition: Unknown
Due 25 October 1999
Resolved 25 October 1999
Lifesaving
Issued 16 June 1999 Resolved
ROUND-OFF SHARP CORNERS ON MAIN DECK ACCESS COVERS SERVING BILGE MANIFOLD REMOTE REACH RODS.
Condition: Unknown
Due 16 June 1999
Resolved 16 June 1999
Lifesaving
Issued 16 June 1999 Resolved
PROVIDE MACHINERY GUARDS FOR P/S AIR COMPRESSORS AND FOR SEWAGE PUMP SHAFT COUPLING.
Condition: Unknown
Due 16 June 1999
Resolved 16 June 1999
Construction/Loadline
Issued 16 June 1999 Resolved
REGASKET PORT ENGINEROOM HATCH COVER TO MAKE WEATHERTIGHT. CORRECT PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 16 June 1999
Resolved 16 June 1999
Accommodation/Occupational Safety
Issued 16 June 1999 Resolved
PROVIDE PLACARD AT ENTRY TO UPPERMOST DECK NOTING THE MAXIMUM NUMBER OF PASSENGERS ALLOWED (110). CORRECT PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 16 June 1999
Resolved 16 June 1999
Lifesaving
Issued 16 June 1999 Resolved
PROVIDE DOCUMENTATION FROM A RELIABLE SOURCE TO ATTEST TO THE LIMITS OF ANYHAZARD AREA AROUND RADARS IN THE VICINITY OF THE UPPERMOST DECK; DO NOT ALLOW PASSENGERS ON THE UPPERMOST DECK WHILE THE LOWER RADAR IS OPERATED UNTIL ANY HAZARD AREA IS IDENTIFIED AND ANY REQ'D PRECAUTIONS ARE OBSERVED.
Condition: Unknown
Due 16 June 1999
Resolved 16 June 1999
Construction/Loadline
Issued 14 April 1997 Resolved
GRIND AND REPAIR FRACTURED WELDS IN WAY OF TRANSOM AND SIDE SHELL BOTH PORTAND STARBOARD SIDE.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Construction/Loadline
Issued 28 February 1997 Resolved
#2 VOID STBD, CRACKED WELD AT FR 10-11 IN OVHD OUTBOARD
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Accommodation/Occupational Safety
Issued 9 April 1996 Resolved
PROPERLY MOUNT MICROWAVE OVEN AND CASH REGISTER IN MAIN DECK GALLEY TO PREVENT DISLODGEMENT.
Condition: Unknown
Due 17 April 1996
Resolved 18 April 1996
Construction/Loadline
Issued 9 April 1996 Resolved
IN PORT ENGINE COMPT, PROPERLY REPAIR CRACKED WELD IN FIRST FRAME FWD OF AFT BLKHD AT TURN OF CHINE, PORT SIDE.
Condition: Unknown
Due 17 April 1996
Resolved 18 April 1996
Accommodation/Occupational Safety
Issued 9 April 1996 Resolved
SECURE MAIN DECK GALLEY REGRIGERATOR DOORS TO PREVENT SWINGING OPEN IN ROUGH WATERS.
Condition: Unknown
Due 17 April 1996
Resolved 18 April 1996
Construction/Loadline
Issued 13 April 1995 Resolved
REPAIR DAMAGE TO #2 STBD SPACE, INBOARD SIDE, SECOND FRAME BAY FROM FWD BULKHEAD BETWEEN DECK LONGITUDINAL AND NEXT LOWER LONGITUDINAL (CRACKS IN HULL AND WELDS)._x001C_ _x001C_
Condition: Unknown
Due 13 May 1995
Resolved 11 May 1995
Construction/Loadline
Issued 28 February 1995 Resolved
HOLE IN DECK ABOVE FWD STBD VOID
Condition: Unknown
Due 14 March 1995
Resolved 2 March 1995
Engineering
Issued 28 February 1995 Resolved
REPLACE RACOR FILTER TOP ON PORT GEN. SET
Condition: Unknown
Due 14 March 1995
Resolved 2 March 1995
Engineering
Issued 28 February 1995 Resolved
INSTALL FLAME BOWLS ON STBD MN. FUEL FILTERS
Condition: Unknown
Due 14 March 1995
Resolved 2 March 1995
Construction/Loadline
Issued 16 April 1993 Resolved
PROVIDE HATCH DOG FOR DOOR ON FWD STBD OF VESSEL.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Documentation
Issued 16 April 1993 Resolved
PROVIDE RADIO TELEPHONY CERTIFICATE.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Construction/Loadline
Issued 23 February 1993 Resolved
PROVIDE GUAGINGREPORT FOR VESSEL.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Navigation
Issued 23 February 1993 Resolved
REPLACE STBD RUDDER BUSHING.
Condition: Unknown
Due 22 March 1993
Resolved 26 February 1993
Unknown
Issued 23 February 1993 Resolved
REPLACE RAW WATER COOLING DISCHARGE PIPE FOR MUFFLER AND STERN FLUSHING TUBE ON THE PORTAND STBD SIDE OF E/R.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Engineering
Issued 23 February 1993 Resolved
REPLACE STBD CUTLASS BEARINGS.
Condition: Unknown
Due 22 March 1993
Resolved 26 February 1993
Construction/Loadline
Issued 23 February 1993 Resolved
REPAIR AS PROPOSED DAMAGE TO HULL ON THE PORT PONTOON AMID SHIPS.
Condition: Unknown
Due 22 March 1993
Resolved 26 February 1993
Construction/Loadline
Issued 23 February 1993 Resolved
SECURE STBD ENGINE ROOM BILGE PUMP HANDLETO THE #1 HOLD (valve).
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Construction/Loadline
Issued 23 February 1993 Resolved
TIGHTEN E/R BILGE PUMP HANDLE ON STBDSIDE.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Construction/Loadline
Issued 23 February 1993 Resolved
REPAIR HAIR LINE FRACTURE ON PLATE OVERLAP TO MSD ON AFT BOTTOM OF VSL.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Construction/Loadline
Issued 3 May 1992 Resolved
REPAIR CRACKED WELD IN STBD PONTOON BOW TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 14 May 1992
Resolved 14 May 1992
Accommodation/Occupational Safety
Issued 3 May 1992 Resolved
REPAIR FRACTURED STANCHIONS ON FORECASTLE AREA TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 14 May 1992
Resolved 14 May 1992
Construction/Loadline
Issued 3 May 1992 Resolved
INSTALL VALVES IN COLLISION BULKHEAD DRAIN LINES IN PLACE OF CAPS.
Condition: Unknown
Due 14 May 1992
Resolved 14 May 1992
Fire Fighting
Issued 17 April 1992 Resolved
PROVIDE APPROVAL NUMBER FOR HALON SYSTEM.
Condition: Unknown
Due 17 April 1992
Resolved 17 April 1992
Engineering
Issued 17 April 1992 Resolved
PERFORM A SATISFACTORY OPERATIONAL TEST OF THE PORT MAIN ENGINE DEMONSTRATING OPERATION IN AHEAD AND ASTERN PROPULSION.
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Electrical
Issued 20 June 1991 Resolved
PROVIDE COVERS FOR ALL FLOURESCENT LIGHTS IN PORT AND STARBOARD ENGINE ROOM
Condition: Unknown
Due 20 June 1991
Resolved 20 June 1991
Construction/Loadline
Issued 3 June 1991 Resolved
MAKE PERMANENT REPAIRS TO SIDESHELL AND MAIN DECK PORT SIDE IN WAY OF THIRDCLEAT AFT OF BOW. WATERTIGHT INTEGRITY HAS BEEN BREACHED BY IMPROPER_x001C_ INSTALLATION.
Condition: Unknown
Due 3 June 1991
Resolved 3 June 1991
Accommodation/Occupational Safety
Issued 22 May 1988 Resolved
EXTEND VENTILATION EXHAUST DUCT TO BELOW THE DECK PLAT LEVEL IN THE ENGINE ROOMS BOTH PORT AND STARBOARD.
Condition: Unknown
Due 22 May 1988
Resolved 22 May 1988
Unknown
Issued 22 May 1988 Resolved
PROVIDE FLAMMABILITY INFORMATION ON NEWLY INSTALLED AIRCRAFT TYPE SEATS.
Condition: Unknown
Due 22 May 1988
Resolved 22 May 1988
Construction/Loadline
Issued 7 April 1988 Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS MADE ON INBOARD SIDE OF STBD HULL AT THE STERN FWD OF LAST TRANSVERSE FRAME ABOUT THREE INCHES UP FROM CHINE.
Condition: Unknown
Due 7 April 1988
Resolved 7 April 1988
Construction/Loadline
Issued 7 April 1988 Resolved
MAKE PERMANENT REPAIRS TO PORT AND STBD HULLS IN WAY OF TEMPORARY REPAIRS MADE ON THE INBOARD SIDE OF PORT HULL AT THE STERN FWD OF THE LAST TRANS- VERSE FRAME ALONG THE FIRST LONGITUDINAL UP FROM THE CHINE.SEE NEXT ITEM.
Condition: Unknown
Due 7 April 1988
Resolved 7 April 1988
Electrical
Issued 26 May 1987 Resolved
REPAIR EMERGENCY LIGHTS.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Lifesaving
Issued 26 May 1987 Resolved
PROPERLY STOW BOUYANT APPARATUS.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Engineering
Issued 26 May 1987 Resolved
INSTALL VENT DUCTING IN ENGINE COMPARTMENTS FROM BILGE AREA.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Accommodation/Occupational Safety
Issued 26 May 1987 Resolved
FASTEN DOWN MICRO-WAVE, COFFEE MAKER AND TILL.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Lifesaving
Issued 26 May 1987 Resolved
RENEW BATTERY IN E.P.I.R.B.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Navigation
Issued 26 May 1987 Resolved
PROVIDE 12" SHIP'S BELL.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Fire Fighting
Issued 26 May 1987 Resolved
PROVIDE AND MOUNT SCHEMATICS AND INSTRUCTIONS AT EACH FIXED FIRE FIGHTING OPERATING STATION.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Construction/Loadline
Issued 18 September 1986 Resolved
DRYDOCK VSL NOT LATER THAN 28SEP86 AND MAKE PERMANENT REPAIRS IN WAY OF ALLTEMP DOUBLERS ON THE PORT AND STBD HULLS. VSL OPERATOR IS TO MAKE HOURLY INSPECTION ROUNDS OF THE PORT AND STBD ENGINE ROOMS AND LAZERETTES AND LOG FINDINGS IN THE VESSEL LOG.
Condition: Unknown
Due 18 September 1986
Resolved 18 September 1986
Accommodation/Occupational Safety
Issued 29 July 1985 Resolved
PROVIDE APPROVED RAILING ON THE BOW.
Condition: Unknown
Due 29 July 1985
Resolved 29 July 1985

Casualty record · 6

23 June 2005Routine · role: Involved in a Marine Casualty · activity 2473358
6 September 2005Routine · role: Involved in a Marine Casualty · activity 2497967
2 July 2006Routine · role: Involved in a Marine Casualty · activity 2699890
27 June 2012Routine · role: Involved in a Marine Casualty · activity 4368430
19 August 2012Routine · role: Involved in a Marine Casualty · 1 injured · activity 4417352
2 August 2013Routine · role: Involved in a Marine Casualty · activity 4678275
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.