← All vessels
SEA HAWK
Unclassified · Miscellaneous Vessel class · Built 1980s · USCG Northeast District (CGD-NE) · Other hulls named SEA HAWK
SEA HAWK is a 1983 unclassified. The Coast Guard has recorded 77 inspections since 1984, most recently in February 2005, along with 162 deficiencies.
Records from 1984 to 2005. Most recent: inspection, 8 February 2005.
- Built
- 1983
- Last inspected
- 8 February 2005
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 162 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
655183
WDA7350
236454
Flag
UNITED STATES
366842340 (licence lapsed)
Maury page id
psix-236454
Inspections, by type
…with no type recorded12
Years with a record
22 calendar years (1984–2005)
The 77 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 21 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 1979.
Documentation record
Registered dimensions (L × B × D)45.6 ft × 15.3 ft × 6.2 ft
Registered tonnagegross 31 / net 21
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA BAYCRAFT INC. · BELLE CHASE, LA, UNITED STATES · built 1983
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPALM BEACH, FL
Trade endorsementsRecreational
DocumentationValid · issued 9 July 2025 · expires 31 July 2026
Service, as the file records itUnclassified
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it21 - Regulatory (Subpart C or D), Net Ton
31 - Regulatory (Subpart C or D), Gross Ton
31 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDA7350MMSI 366842340 · expired · compulsorily equipped · granted 12 March 2002, cancelled 12 May 2012
WCP2534MMSI not assigned · expired · compulsorily equipped · granted 6 December 1994, cancelled 5 February 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 77
8 February 2005
Administrative Inspection
Administrative · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2288597
13 January 2005
Type not recorded
No type recorded · Station Provincetown · USCG Northeast District (CGD-NE) · Activity 2276081
13 September 2004
Re-Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 2195544
6 October 2003
Re-Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1922158
23 April 2003
Hull Examination
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1782132
24 September 2002
Deficiency Check
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1679682
8 August 2002
COI Inspection
Physical examination · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1658601
15 March 2002
Administrative Inspection
Administrative · MSFO BUCKSPORT · USCG Northeast District (CGD-NE) · Activity 1493975
10 August 2001
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1376749
7 June 2001
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1073060
18 April 2001
Deficiency Check · Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1452789
25 October 2000
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1421946
31 May 2000
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 820547
1 May 2000
Re-Inspection · Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1365925
14 October 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 787215
30 September 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1033691
30 July 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1108564
23 June 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 886016
16 June 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 809499
11 June 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 808287
8 June 1999
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 811016
29 April 1999
Hull Examination · COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1399099
19 October 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 801752
9 October 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 806725
18 September 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 799927
9 September 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 797884
17 July 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1129589
10 July 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1128130
19 June 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1127391
5 June 1998
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 793907
16 April 1998
Deficiency Check · Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1372210
2 February 1998
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1122055
26 September 1997
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 778599
13 August 1997
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 783092
15 July 1997
Re-Inspection · Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1378111
4 April 1997
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1383486
23 August 1996
Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1088999
13 May 1996
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1082081
22 April 1996
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1081020
2 April 1996
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1465241
16 January 1996
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1182916
5 June 1995
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 874974
5 June 1995
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1337706
6 September 1994
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 863015
30 August 1994
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1179061
15 June 1994
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1177274
21 December 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 849452
5 August 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 40606
14 July 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 214570
19 June 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 10216
29 March 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 71834
19 March 1993
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 832959
7 March 1993
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1147353
2 February 1993
COI Inspection · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1141051
6 January 1993
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 829430
8 September 1992
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 936524
7 May 1992
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 956634
16 September 1991
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 940413
8 July 1991
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1247635
29 April 1991
Deficiency Check · Hull Examination · Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1219002
6 June 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1233736
11 April 1990
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 925584
5 October 1989
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 886736
28 September 1989
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1000455
19 September 1989
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1202928
7 June 1989
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 891428
2 May 1989
COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 897234
6 December 1988
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1207641
27 September 1988
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1044719
13 April 1988
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1206997
8 December 1987
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1312601
5 November 1987
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1334510
7 October 1987
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1326004
9 September 1987
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1005150
13 May 1986
Credit Drydock · Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1304341
27 September 1985
Re-Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 992396
5 September 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282622
Deficiency record · 162
Stability › Watertight Integrity › General
Issued 13 September 2004
Resolved
HAUL OUT VESSEL TO MAKE PERMANENT REPAIRS TO HULL STRUCTURE
Engineering › Sea-water System (primary cooling) › Piping
Issued 13 September 2004
Resolved
REPLACE RAW WATER HOSES ON ENGINE
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 13 September 2004
Resolved
REPLACE (02) PFD'S
Lifesaving › Lifefloat › Painter
Issued 13 September 2004
Resolved
ATTACH SEA PAINTERS ON LIFE FLOATS TO WEAK LINKS
Operations/Management › Pollution › Retention of Oily Mixture
Issued 13 September 2004
Resolved
CLEAN ANTIFREEZE AND OIL FROM BILGES
Communications › Alarms/Indicators › High Water Alarm
Issued 13 September 2004
Resolved
INSTALL SEPERATE AUDIO/VISUAL HIGH LEVEL ALARMS
Stability › Watertight Integrity › General
Issued 13 September 2004
Resolved
DOUBLE CLAMP ENGINE MUFFLER JOINTS
Documentation › Logs/Records › Logbook (official)
Issued 13 September 2004
Resolved
MAINTAIN TRAINING AND MAINTENANCE LOGS
Engineering › Fuel Oil Service System › Piping
Issued 13 September 2004
Resolved
REPLACE WAISTED FUEL LINE AT MAIN TANK
Documentation › Logs/Records › Garbage Recordkeeping
Issued 13 September 2004
Resolved
MAINTAIN WASTE MANAGEMENT PLAN
Electrical › Electrical Distribution System (service)
Issued 28 April 2003
Resolved
Install proper stuffing tubes to seal aft engine room bulkhead stbd side where power cables for deck davit pass through. LEGACY COMPONENT DESC: Cable
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 28 April 2003
Resolved
Clean engines and engine room bilges.
Accommodation/Occupational Safety
Issued 28 April 2003
Resolved
Install aft deck rails.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 28 April 2003
Resolved
Replace flexible hose on port marine gear "gauge line".
Accommodation/Occupational Safety
Issued 28 April 2003
Resolved
Weld crack on stbd side embarkation gate.
Engineering › Bilge Water Management System
Issued 8 August 2002
Resolved
replace hose on electric bilge pump with a better quality product. LEGACY COMPONENT DESC: Hose
Operations/Management › Navigation Safety
Issued 8 August 2002
Resolved
install mast and stern navigation lights before operating at night or during low visability LEGACY COMPONENT DESC: Proper Use of Navigation/Anchor Lights
Lifesaving › Buoyant Apparatus
Issued 8 August 2002
Resolved
replace poly line on all lifefloats as pointed out by marine inspector.
Lifesaving › Visual Distress Signals (General)
Issued 8 August 2002
Resolved
install new battery in forward float light for lifefloat
Lifesaving
Issued 10 August 2001
Resolved
Welding on aft deck rail was noted to be fractured. Directed to repair.
Lifesaving
Issued 10 August 2001
Resolved
Light associated with lifefloat noted to be extinguished.
Construction/Loadline
Issued 10 August 2001
Resolved
Aft bilge alarm was noted to be inoperative.
Engineering
Issued 10 August 2001
Resolved
Noted hose connecting expansion tank to starboard engine was lacking a second hose clamp.
Construction/Loadline
Issued 18 April 2001
Resolved
Make penetrations in the lazarette bulkhead and overhead watertight.
Construction/Loadline
Issued 1 May 2000
Resolved
PERMANENTLY MOUNT FORWARD ELECTRIC BILGE PUMP.
Fire Fighting
Issued 1 May 2000
Resolved
REPAIR INSTALLED FIRE PUMP AS POINTED OUT BY THE MARINE INSPECTOR.
Deck/Cargo
Issued 1 May 2000
Resolved
TIGHTEN BELT TO POWER WINDLASS ON BOW.
Fire Fighting
Issued 1 May 2000
Resolved
REPLACE FIRE EXTINGUISHER IN PILOT HOUSE.
Electrical
Issued 1 May 2000
Resolved
PROPERLY DEAD END WIRES IN ACCOMMODATION SPACE AS POINTED OUT BY THE MARINEINSPECTOR.
Construction/Loadline
Issued 1 May 2000
Resolved
REPAIR CRACKS IN AFT DECK WATERTIGHT HATCH.
Construction/Loadline
Issued 1 May 2000
Resolved
WELD IN CRACKS ON AFT MAIN DECK AS POINTED OUT BY THE MARINE INSPECTOR.
Engineering
Issued 1 May 2000
Resolved
REPAIR EMERGENCY FUEL SHUT OFF REACH ROD.
Navigation
Issued 1 May 2000
Resolved
TIGHTEN STEERING RAM MOUNTING BRACKET.
Engineering
Issued 1 May 2000
Resolved
REPAIR OR REPLACE PORT EXHAUST MUFFLER (LEAKS WATER).
Electrical
Issued 1 May 2000
Resolved
INSTALL LENS COVERS ON INTERIOR LIGHTS IN ACCOMODATION SPACE.
Navigation
Issued 29 April 1999
Resolved
Provide a gauge reading of the port rudder cutlass.
Navigation
Issued 29 April 1999
Resolved
Tighten navigation light on cabin.
Accommodation/Occupational Safety
Issued 29 April 1999
Resolved
Grind and weld cracked welds on rail posts and courses as indicated by marine inspector.
Construction/Loadline
Issued 29 April 1999
Resolved
At the midbody, grind and weld cracked weld on 2nd frame portside.
Construction/Loadline
Issued 29 April 1999
Resolved
Grind/weld broken welds on deck beams as marked.
Construction/Loadline
Issued 29 April 1999
Resolved
Replace handle on 1/2" manifold gate valve in E/R.
Construction/Loadline
Issued 29 April 1999
Resolved
Provide proposal for bulkhead inserts in E/R- Lazerette._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 16 April 1998
Resolved
Label bilge manifold.
Electrical
Issued 16 April 1998
Resolved
Place a rubber mat at the switchboard.
Construction/Loadline
Issued 16 April 1998
Resolved
Clean up debris from fuel tank space.
Lifesaving
Issued 16 April 1998
Resolved
Provide 4 new weaklinks for life floats IAW 46 CFR 180.20 and 46 CFR 160.073.
Navigation
Issued 16 April 1998
Resolved
Put on board corrected nautical charts, Light List and nautical publications.
Accommodation/Occupational Safety
Issued 16 April 1998
Resolved
Make repairs to port side railing course.
Construction/Loadline
Issued 16 April 1998
Resolved
Make repairs to bottom longitudinal in the lazerette on the starboard side.
Construction/Loadline
Issued 16 April 1998
Resolved
Make repairs to vessels E/R bulkhead.
Lifesaving
Issued 16 April 1998
Resolved
Replace dead battery in life float.
Lifesaving
Issued 16 April 1998
Resolved
Place emergency lighting in entrance to the engine room.
Lifesaving
Issued 16 April 1998
Resolved
Replace two adult and one child life jacket.
Lifesaving
Issued 16 April 1998
Resolved
Place retro-reflective tape on ring buoy.
Deck/Cargo
Issued 16 April 1998
Resolved
Make capstan operable.
Lifesaving
Issued 15 July 1997
Resolved
Stencil lifejacket storage box located on stern of main deck.
Fire Fighting
Issued 15 July 1997
Resolved
Service all portable fire extinguishers onboard.
Engineering
Issued 15 July 1997
Resolved
Repair leak in starboard main engine exhaust.
Construction/Loadline
Issued 15 July 1997
Resolved
Provide extension hose for portable hand pump.
Lifesaving
Issued 15 July 1997
Resolved
Conduct satisfactory u/w emergency man overboard and fire drills in the presence of an attending USCG Marine Inspector.
Lifesaving
Issued 15 July 1997
Resolved
Replace retro reflective tape on five (5) APCO child PFD's and repair/replace retro on adult PFD's as needed.
Lifesaving
Issued 15 July 1997
Resolved
Replace hand/tag lines and netting on life floats, and paint as needed.
Fire Fighting
Issued 15 July 1997
Resolved
Provide proper, approved bracket for B-II portable fire extinguisher, port side of passenger cabin.
Documentation
Issued 15 July 1997
Resolved
Provide proper documentation of fully compliant chemical testing program. Marine employer is not authorized to operate after 15 August 1997, unless this requirement has been cleared to the satisfaction of an attending USCG Marine Inspector.
Documentation
Issued 15 July 1997
Resolved
Provide required logs for crew training and emergency drills.
Construction/Loadline
Issued 15 July 1997
Resolved
Repair broken bilge line midships below passenger cabin.
Engineering
Issued 15 July 1997
Resolved
Repair hole in engine room vent housing, port side, main deck.
Lifesaving
Issued 2 April 1996
Resolved
PLACE ONBOARD LIFE JACKET DONNING PLACARD._x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 2 April 1996
Resolved
REPLACE FUEL SUPPLY LINE NEAR PORT FUEL FILTER._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 April 1996
Resolved
REMOUNT WATERLIGHTS FOR LIFE FLOATS._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 April 1996
Resolved
SHOW PROOF OF MEDICAL REVIEW OFFICER QUALIFICATION, FOR DRUG TESTING._x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 2 April 1996
Resolved
REMOVE PET COCKS IN PORT AND STARBOARD FUEL FILTERS._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 April 1996
Resolved
REPLACE THREE NIGHT FLARES._x001C_ _x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 2 April 1996
Resolved
REPAIR NON OPERATIONAL ANCHOR WINDLASS._x001C_ _x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 2 April 1996
Resolved
REPAIR CLEAT ON WINDLASS._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 April 1996
Resolved
VESSEL REQUIRED TO PERFORM UNDERWAY DRILLS._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 2 April 1996
Resolved
SHOW PROOF OF MASTER LICS.
Lifesaving
Issued 2 April 1996
Resolved
PAINT FLARE STOWAGE CONTAINER BRIGHT COLOR, AND STENCILED "DISTRESS SIGNALS"._x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 April 1996
Resolved
PLACE ONBOARD EMERGENCY BROADCAST PLACARD._x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 2 April 1996
Resolved
DOUBLE CLAMP FUEL FILL LINE._x001C_ _x001C_ _x001C_ _x001C_
Accommodation/Occupational Safety
Issued 2 April 1996
Resolved
REPAIR PULPIT RAILING ON PORT SIDE, (CRACKED)._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 2 April 1996
Resolved
CLEAN BILGE UNDER ACCOMONDATION AREA._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 2 April 1996
Resolved
SHOW OPERATOR'S PERMIT FOR FCC._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 5 June 1995
Resolved
SEVEN ADULT PFD REQUIRE VESSEL'S NAME STENCIL._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 5 June 1995
Resolved
(04) LIFE FLOATS REQUIRE VESSEL'S NAME STENCIL AND POB'S NUMBER STENCIL._x001C_ _x001C_ _x001C_ _x001C_
Fire Fighting
Issued 5 June 1995
Resolved
PORTABLE FIRE EXTINGUISHER REQUIRES SAFETY DEVICE FOR PULL PIN._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 5 June 1995
Resolved
STEERING RAM CYLINDER REQUIRES NUTS FOR MOUNTING BOLTS FOR SECURING TO THE VESSEL._x001C_ _x001C_ _x001C_
Engineering
Issued 5 June 1995
Resolved
BONDING WIRE FOR FUEL FILL MISSING._x001C_ _x001C_ _x001C_ _x001C_
Accommodation/Occupational Safety
Issued 5 June 1995
Resolved
WELD AREAS OF RAILINGS ON PULPIT WHERE CRACKING HAS OCCURED._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 15 June 1994
Resolved
PORT, STBD, AND BOW LIGHTS OBSTRUCTED BY RADAR AND LIFEFLOAT STANCHIONS, CORRECT
Engineering
Issued 15 June 1994
Resolved
EFFECTIVELY INSULATE DRY EXHAUST SECTIONS OF EXHAUST SYSTEM
Navigation
Issued 15 June 1994
Resolved
PROVIDE CHAFING GEAR WHERE HYDRAULIC TUBING FOR STEERING SYSTEM IS CHAFING AGAINST STERN_x001C_ _x001C_ _x001C_
Lifesaving
Issued 15 June 1994
Resolved
REPLACE FADED RETRO TAPE ON ALL 4 LIFEFLOATS_x001C_ _x001C_ _x001C_ _x001C_
Fire Fighting
Issued 15 June 1994
Resolved
PROVIDE MARINE BRACKETS FOR PILOTHOUSE AND ACCOMONDATION SPACE FIRE EXTINGUISHERS_x001C_ _x001C_ _x001C_
Lifesaving
Issued 15 June 1994
Resolved
STENCIL LIFEJACKET LOCATIONS IN CABIN_x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
REPLACE FLEX HOSE CONNECTORS BETWEEN BILGE SUCTION PIPING SECTIONS_x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
DOUBLE CLAMP S/W FIRE PUMP INTAKE HOSE FROM FIRE PUMP TO SEA-CHEST_x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 15 June 1994
Resolved
REPLACE FUEL CROSS OVER LINE_x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
DOUBLE CLAMP BILGE DISCHARGE OVBD HOSE_x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
REPLACE BILGE STRAINER IN FWD COMPARTMENT, MISSING_x001C_ _x001C_ _x001C_ _x001C_
Accommodation/Occupational Safety
Issued 15 June 1994
Resolved
REPLACE MSD INTAKE & DISCHARGE HOSES AND DOUBLE CLAMP, MSD SYSTEM HULL VALVES TO REMAIN CLOSED UNTIL CORRECTED
Engineering
Issued 15 June 1994
Resolved
REPLACE FUEL VENT SCREENS WITH 30 X 30 SCREENS_x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 15 June 1994
Resolved
MAKE COLLISION BULKHEAD WATERTIGHT IN WAY OF HYDRAULIC HOSE PENETRATIONS, RESTRICTED TO CASCO BAY AND TRIBUTARIES UNTIL CORRECTED_x001C_ _x001C_ _x001C_
Documentation
Issued 15 June 1994
Resolved
PROVIDE FCC SAFETY CERTIFICATE
Engineering
Issued 15 June 1994
Resolved
CAP UNUSED FUEL LINE CONNECTIONS IN E/R_x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 15 June 1994
Resolved
REPLACE 2 SETS OF LIFEFLOAT PADDLES, CURRENTLY CRACKED/DAMAGED_x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 7 May 1992
Resolved
Provide EPIRB (class "A" after 01OCT88 or Catagory 1)
Lifesaving
Issued 7 May 1992
Resolved
provide 9 additional PFD lights.
Deck/Cargo
Issued 7 May 1992
Resolved
Provid ehold backs for E.R. hatches.
Lifesaving
Issued 7 May 1992
Resolved
Re-stencil ringbuoy with vessels name.
Lifesaving
Issued 7 May 1992
Resolved
Re-stencil lifefloats with vessels name and capacity.
Electrical
Issued 7 May 1992
Resolved
Remove 120vac generator and wiring.
Engineering
Issued 7 May 1992
Resolved
Repair exhaust leak on port engine inboard manifold.
Engineering
Issued 7 May 1992
Resolved
Install lagging on main engine exhaust piping & flanges
Engineering
Issued 7 May 1992
Resolved
Re-stencil emergency fule shutoffs.
Construction/Loadline
Issued 7 May 1992
Resolved
Rewire bilge pumps for E.R. & steering gear room uning junction boxes and good marine practice - also permanently mount E.R. bilge pump.
Deck/Cargo
Issued 7 May 1992
Resolved
Repair gasket for aft deck hatch.
Navigation
Issued 7 May 1992
Resolved
Repair radar.
Construction/Loadline
Issued 29 April 1991
Resolved
DEMONSTRATE PROPER OPERATION OF ENGINE DRIVEN BILGE PUMP.
Navigation
Issued 29 April 1991
Resolved
REPAIR OR REPLACE STERN LIGHT.
Lifesaving
Issued 29 April 1991
Resolved
PROVIDE 4 PADDLES FOR LIFEFLOATS.
Engineering
Issued 29 April 1991
Resolved
COMPLETE INSTALLATION OFLAGGING ON STBD ENGINE EXHAUST PIPING.
Navigation
Issued 29 April 1991
Resolved
DEMONSTRATE PROPER OPERATION OF SSB RADIO.
Engineering
Issued 29 April 1991
Resolved
RENEW CABLE FOR REMOTE SHUTDOWN ON STBD ENGINES.
Engineering
Issued 29 April 1991
Resolved
SECURE CABLE BRACKET FOR REMOTE SHUTDOWN ON PORT ENGINE.
Lifesaving
Issued 29 April 1991
Resolved
PROVIDE 2 ADDITIONAL ADULT PFD'S AND PROVIDE 5 PFD LIGHTS. VESSEL IS LIMITED TO 39 PASSENGERS ON OCEANS ROUTE OR 44 PASSENGERS COASTWISE ROUTES,LESS THAN 20 MILES FROM A HARBOR OF SAFE REFUGE UNTIL COMPLETED.
Lifesaving
Issued 11 April 1990
Resolved
PROVIDE 12 ADULT LIFEJACKETS. VESSEL IS LIMITED TO 36 ADULTS UNTIL JACKETS ARE PROVIDED.
Construction/Loadline
Issued 11 April 1990
Resolved
MAKE TEMPORARY REPAIRS TO THE HOLE IN THE MAIN DK PORT SIDE AFT, PRIOR TO CARRYING PASSENGERS.
Engineering
Issued 11 April 1990
Resolved
MAKE THE REMOTE FUEL SHUTOFFS OPERABLE FROM OUTSIDE THE FUEL TANK SPACE. (FWD FUEL TANK)
Accommodation/Occupational Safety
Issued 11 April 1990
Resolved
PROVIDE MEANS TO LOCK OR DISABLE THE STORAGE TANK OVERBOARD VALVE WHILE THE VESSEL IS IN U.S. TERRITORIAL WATERS.
Navigation
Issued 11 April 1990
Resolved
PROVE OPERATION OF SSB RADIO. VESSEL LIMITED TO 20 MILES FROM SHORE UNTIL PROPER OPERATION IS SHOWN.
Construction/Loadline
Issued 11 April 1990
Resolved
MAKE PERMANENT REPAIRS TO THE PORT SIDE AFT MN DK W/IN 15 DAYS.
Fire Fighting
Issued 11 April 1990
Resolved
PROVIDE MARINE BRACKETS FOR 3 B-II FIRE EXTINGUISHERS.
Construction/Loadline
Issued 28 September 1989
Resolved
DRYDOCK VSL FOR REPAIR TO HOLES AND CRACKING IN HULL PLT IWO KEEL COOLER PORT SIDE UNDER PASS. CABIN. ALSO FRACTURE IN AFT DECK HATCH RING PRIOR TOCARRYING PASSENGERS.
Documentation
Issued 7 June 1989
Resolved
COMPLETE ITEMS 13, 14 AND 7 ISSUED 02MAY89.
Deck/Cargo
Issued 7 June 1989
Resolved
REPAIR WATERTIGHT HATCH TO LAZARETTE. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Navigation
Issued 2 May 1989
Resolved
RENEW ALL STEERING LINKAGE BETWEEN RUDDERS AND RAM. MUST BE COMPLETED PRIORTO CARRYING PASSENGERS.
Engineering
Issued 2 May 1989
Resolved
TIGHTEN STBD SHAFT PACKING. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS
Engineering
Issued 2 May 1989
Resolved
REPAIR PORT ENGINE GOVERNOR LINKAGE SUPPORT. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Engineering
Issued 2 May 1989
Resolved
PORT ENGINE DIPSTICK MISSING.
Navigation
Issued 2 May 1989
Resolved
INSTALL STERN LIGHT. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 2 May 1989
Resolved
PROPERLY STOW LIFEFLOATS. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS. A. INSTALL 1X2 SEPARATORS (WOOD). B. SECURE 2 PADDLES IN EACH FLOAT. C. GET WATER JUGS AND FISHING REELS OUT & KEEP ALL UNREQUIRED OBJECTS OUT.
Documentation
Issued 2 May 1989
Resolved
DRYDOCK DUE 12OCT90. PLEASE CONTACT USCG PRIOR TO THIS DATE TO SCHEDULE THIS EXAM.
Deck/Cargo
Issued 2 May 1989
Resolved
PROVIDE PORTABLE BILGE PUMP WITH SUFFICIENT HOSES. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Navigation
Issued 2 May 1989
Resolved
PROVIDE EPIRB IN WORKING ORDER WITH ANTENNA. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS. ROUTE IS RESTRICTED TO 2O MILES COASTWISE UNTIL COMPLETED.
Lifesaving
Issued 2 May 1989
Resolved
PROVIDE WATERTIGHT FLARE CONTAINER.
Construction/Loadline
Issued 2 May 1989
Resolved
REPAIR STEP TO 2ND DECK STBD AFT. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Navigation
Issued 2 May 1989
Resolved
REPAIR MASTHEAD AND ANCHOR LIGHTS. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Lifesaving
Issued 2 May 1989
Resolved
PROVIDE 6 LIFEJACKET LIGHTS. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Fire Fighting
Issued 2 May 1989
Resolved
PROVIDE 1 B-I AND 2 B-II FIRE EXTINGUISHERS.
Engineering
Issued 2 May 1989
Resolved
CLEAN ALL OIL FROM BILGES IN E/R, LAZARETTE AND SPACE FWD OF E/R.
Deck/Cargo
Issued 2 May 1989
Resolved
INSTALL VALVE AND CAP ON OLD GENERATOR OVERBOARD DISCHARGE. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Engineering
Issued 2 May 1989
Resolved
REMOVE VICE GRIPS FROM BATTERY POST. USE APPROVED TERMINALS.
Lifesaving
Issued 2 May 1989
Resolved
PROVIDE 1 ORANGE FLARE. MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Accommodation/Occupational Safety
Issued 27 September 1988
Resolved
PROVE OPERATION OF INSTALLED AC GENERATOR.
Navigation
Issued 9 September 1987
Resolved
REPLACE WORN, UNDERSIZED CLEVIS PINS IN HYDRAULIC RAM ARMS IN STEERING COMPARTMENT.
Lifesaving
Issued 9 September 1987
Resolved
REPAIR OR REPLACE EPIRB.
Lifesaving
Issued 9 September 1987
Resolved
STENCIL CAPACITY ON ALL BUOYANT APPARATUS.
Engineering
Issued 9 September 1987
Resolved
REPAIR OR REPLACE LEAKING/CRACKED EXHAUST PIPES ON BOTH MAIN ENGINES. RELAG SAME FROM EXHAUST MANIFOLD TO WATER INJECTION PORT.
Documentation
Issued 9 September 1987
Resolved
PROVIDE EVIDENCE OF PROPER FCC STATION LICENSE FOR NEW OWNER.
Documentation
Issued 9 September 1987
Resolved
PROVIDE EVIDENCE OF NEW VESSEL DOCUMENTATION ON BOARD.
Engineering
Issued 9 September 1987
Resolved
INSTALL FLAME SCREENS ON FUEL TANKS VENT.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.