Records from 2001 to 2012. Most recent: inspection, 12 June 2012.
Documentation record
Tonnage as PSIX records it81472 - Regulatory (Subpart C or D), Gross Ton
81472 - Convention (Subpart B), Gross Ton
24442 - Regulatory (Subpart C or D), Net Ton
24442 - Convention (Subpart B), Net Ton
68206 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Inspection history · 7
12 June 2012
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 4341152
22 August 2011
ISPS II Exam · Ballast Water Examination · PII Safety Exam · COC-GAS Annual
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4124213
15 October 2002
Periodic Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1687807
31 August 2001
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 445951
26 April 2001
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 151346
25 April 2001
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 289149
25 April 2001
Letter of Compliance (Initial/Renewal)
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1062730
Engineering › Diesel Engine (auxiliary) › Governor
Issued 22 August 2011
Resolved
Class issued condition for stbd side diesel engine to be repaired.
Due 30 November 2011
Resolved 12 June 2012
Resolution: Permanent repair, documented by Class (BV).
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 22 August 2011
Resolved
No change shall be made in the structural arrangements, machinery, equipments covered by the survey. The fuel oil vent located on the port side bow was missing its screen.
Action required: 705 - Other - as specified
Due 24 September 2011
Resolved 12 June 2012
Resolution: Verified sat.
Engineering › Sea-water System (primary cooling) › Piping
Issued 22 August 2011
Resolved
No change shall be made in the structural arrangements, machinery, equipments, covered by the survey. On the piping for the salt water cooler there is a soft patch. The piping for this section needs to be renewed or repaired.
Action required: 705 - Other - as specified
Due 24 September 2011
Resolved 12 June 2012
Resolution: Verified installation of new length of pipe on salt water cooler pipe on vessel''s starboard "turbo alternator" diesel generator. The written discrepancy does not identify the actual location, it was deduced following conversations with vsl engineers.
Engineering › Generator (propulsion-electric) › Battery
Issued 22 August 2011
Resolved
NO change shall be made in the structural arrangements, machinery, equipments, covered by the survey. The outboard diesel generator is inoperable.
Action required: 705 - Other - as specified
Due 24 September 2011
Resolved 12 June 2012
Resolution: Verified proper operation of all installed diesel generators. All sat.
Engineering › Freshwater Generation System › Valve, Dump
Issued 22 August 2011
Resolved
No change shall be made in the structural arrangements, machinery, equipments covered by the survey. There is a steam leak at the valve flange located above the evaporator.
Action required: 705 - Other - as specified
Due 24 September 2011
Resolved 12 June 2012
Resolution: Steam leake at specified valve flange inspected and found to be satisfactory. No leaks identified.
Engineering › Freshwater Generation System › Piping
Issued 22 August 2011
Resolved
No change shall be made in the structural arrangements, machinery, equipments covered by the survey. The evaporator is missing a 2 ft. section of insulation on the steam supply line.
Action required: 705 - Other - as specified
Due 24 September 2011
Resolved 12 June 2012
Resolution: New insulation installation verified satisfactory this date.
Deck/Cargo › Mooring/Anchoring › Brake
Issued 22 August 2011
Resolved
No change shall be made in the structural arrangements, machinery, equipments covered by the survey. The bow thrusters are inoperable. Provide technician report to the Coast Guard.
Action required: 705 - Other - as specified
Due 24 September 2011
Resolved 12 June 2012