CHEM FORTUNE

CHEM FORTUNE is a 1984 tank ship. The Coast Guard has recorded 15 inspections since 1987, most recently in October 1999, along with 45 deficiencies.

Records from 1987 to 1999. Most recent: inspection, 21 October 1999.

Built
1984
Last inspected
21 October 1999
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8318752 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
240426
Flag
PANAMA
—
Maury page id
psix-240426

Inspections, by type

…with no type recorded10
Years with a record 7 calendar years (1987–1999)
The 15 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 27 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it3793 - Regulatory (Subpart C or D), Gross Ton
1811 - Regulatory (Subpart C or D), Net Ton
6164 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 15

21 October 1999 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 433814
1 October 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 433337
17 September 1999 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 432803
8 August 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 419084
8 August 1998 Letter of Compliance (Initial/Renewal) · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 809250
21 April 1993 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1153574
1 March 1993 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 356650
1 March 1993 Certificate of Compliance
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1447217
25 May 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 469332
3 July 1991 Certificate of Compliance
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 940098
16 October 1989 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 333075
16 October 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1352134
23 November 1987 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 319816
23 November 1987 Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1025709
18 November 1987 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 525643

Deficiency record · 45

Navigation
Issued 1 October 1999 Resolved
NO.1 STEERING PUMP BRIDGE CONTROL NOT IN CALIBRATION WITH NO.2 STEERING PUMP (NO.1 PUMP CAN ONLY ACHIEVE 28 DEGREES PORT IN BRIDGE CONTROL). PROVIDE CLASS REPORT PROVING SATISFACTORY OPERATION PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Construction/Loadline
Issued 1 October 1999 Resolved
REPAIR WASTED AND HOLED AIR ESCAPE PIPE FOR STEERING FLAT AFT SECTION OF WHEELHOUSE PORT SIDE.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Electrical
Issued 1 October 1999 Resolved
REPAIR LIGHT FIXTURE ABOVE STEERING PUMPS INSTEERING FLAT PRIOR TO NEXT U.S. PORT
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Lifesaving
Issued 17 September 1999 Resolved
Complete boat drills to the satisfaction of the attending CG Inspector prior to departing St. Croix.
Condition: Unknown
Due 17 September 1999
Resolved 1 October 1999
Engineering
Issued 17 September 1999 Resolved
4. Make repairs to open thermometer port in the fuel-settling tank.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Accommodation/Occupational Safety
Issued 17 September 1999 Resolved
Clean grill vent hood.
Condition: Unknown
Due 17 October 1999
Resolved 1 October 1999
Accommodation/Occupational Safety
Issued 17 September 1999 Resolved
Renew hospital lights.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Fire Fighting
Issued 17 September 1999 Resolved
8. Provide fire hoses and spanner for firebox 3,4 and 6 prior to departure from St. Croix.
Condition: Unknown
Due 17 October 1999
Resolved 1 October 1999
Accommodation/Occupational Safety
Issued 17 September 1999 Resolved
Make repairs to toilets.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Electrical
Issued 17 September 1999 Resolved
3. Provide electrical non-conducting mat for the switchboard in engine control room.
Condition: Unknown
Due 17 October 1999
Resolved 1 October 1999
Electrical
Issued 17 September 1999 Resolved
2. Provide light covers as needed throughout the vessel. Noted missing covers above the O.W.S. and the ballast pump controls.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Lifesaving
Issued 17 September 1999 Resolved
Complete fire drill to the satisfaction of the attending CG inspector priorto departure from St. Croix.
Condition: Unknown
Due 17 September 1999
Resolved 1 October 1999
Lifesaving
Issued 17 September 1999 Resolved
14. Make repairs to port lifeboat davit to satisfaction of class prior to departure from St. Croix.
Condition: Unknown
Due 17 September 1999
Resolved 1 October 1999
Construction/Loadline
Issued 17 September 1999 Resolved
13. Make repairs to cargo pump room bilge pump shaft bearing priot to _x001C_ departing St. Croix.
Condition: Unknown
Due 22 October 1999
Resolved 22 October 1999
Fire Fighting
Issued 17 September 1999 Resolved
9. Remove approximately one-inch rubber hose attached to number six fire hydrant.
Condition: Unknown
Due 17 September 1999
Resolved 1 October 1999
Engineering
Issued 17 September 1999 Resolved
Prove operation of the O.W.S. prior to departure from St. Croix.
Condition: Unknown
Due 17 September 1999
Resolved 1 October 1999
Lifesaving
Issued 17 September 1999 Resolved
11. Make emergency exit from steering space operable from both sides. Properly label exterior of exit.
Condition: Unknown
Due 17 September 1999
Resolved 1 October 1999
Lifesaving
Issued 17 September 1999 Resolved
12. Make repairs to port and starboard gangway to satisfaction of class.
Condition: Unknown
Due 6 December 1999
Resolved 6 December 1999
Engineering
Issued 17 September 1999 Resolved
Make repairs to main engine fuel expansion tank return funnel located in the vicinity and forward of the top of the aux. Boiler on the main deck level in the engine room.
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Lifesaving
Issued 8 August 1998 Resolved
Have class review the condition of both lifeboats as they are heavily patched with doublers and fiberglass. Make repairs as necessary and providea report to the USCG prior to the vessels departure._x001C_ SOLAS 74 III/5
Condition: Unknown
Due 8 November 1998
Resolved 10 December 1998
Navigation
Issued 8 August 1998 Resolved
Make permanent repairs to the wasted reefer cooling line about the steeringgear controls prior to return to a U. S. port. _x001C_ _x001C_ SOLAS 74 I/11
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Fire Fighting
Issued 8 August 1998 Resolved
Overhaul the fire main valves to the foam monitors. Several leak past during operation and most are difficult to operate with out a valve wrench.Complete prior to return to a U. S. port. _x001C_ SOLAS 74 II-2/61
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Engineering
Issued 8 August 1998 Resolved
Repair the fuel leaks about the ship's incinerator and the control system for the fuel heater on the ship's auxiliary boiler prior to return to a U.S. port._x001C_ SOLAS 74 I/11
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Engineering
Issued 8 August 1998 Resolved
Renew the wasted piping on the M/E L/O heat exchanger prior to return to a U. S. port._x001C_ _x001C_ SOLAS 74 II-1/28
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Fire Fighting
Issued 8 August 1998 Resolved
Repair the packing on the main fire pumps as they both are leaking excessively prior to return to a U. S. port. _x001C_ _x001C_ SOLAS 74 II-2/52(b)
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Construction/Loadline
Issued 8 August 1998 Resolved
Repair the holes in the deck framing about the hatch covers to #1 stbd & #4port cargo tanks prior to return to a U. S. port._x001C_ _x001C_ ICLL 66 I/1
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Deck/Cargo
Issued 8 August 1998 Resolved
Repair the holes in the covers to the temperature sensors on #5 stbd and #4port/stbd cargo tanks prior to return to a U. S. port._x001C_ _x001C_ BCH 2.15
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Accommodation/Occupational Safety
Issued 8 August 1998 Resolved
Renew the wasted decking about the port/stbd cargo manifold valves prior toreturn to a U. S. port._x001C_ _x001C_ BCH 2.10
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Construction/Loadline
Issued 8 August 1998 Resolved
Repair the hole in the fwd vent on the forecastle prior to return to a U. S. port._x001C_ _x001C_ ICLL 66 II/19
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Engineering
Issued 8 August 1998 Resolved
Make permanent repairs to the wasted bunker station lines (fwd of main deckhouse) prior to future use or remove from service. Complete prior to return to a U. S. port. _x001C_ 33 CFR 155.430
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Fire Fighting
Issued 8 August 1998 Resolved
Have class review the location of the emergency fire pump exhaust line and make modifications as necessary. Stern becomes inaccessible during operation of the engine due to the exhaust. Complete prior to return to a U. S. port. SOLAS 74 II-2/52(b)
Condition: Unknown
Due 1 October 1999
Resolved 1 October 1999
Fire Fighting
Issued 8 August 1998 Resolved
Repair the fire main leaks in the cargo pump room prior to return to a U. S. port. _x001C_ _x001C_ SOLAS 74 II-2/52(b)
Condition: Unknown
Due 17 September 1999
Resolved 17 September 1999
Navigation
Issued 1 March 1993 Resolved
U.S. COAST PILOT FOR AREA TRANSITTED NOT ONBOARD.
Condition: Unknown
Due 10 December 1998
Resolved 10 December 1998
Navigation
Issued 1 March 1993 Resolved
USCG LIGHT LIST FOR AREA TRANSITED NOT ONBOARD.
Condition: Unknown
Due 10 December 1998
Resolved 10 December 1998
Navigation
Issued 1 March 1993 Resolved
CHART FOR AREA TRANSITED NOT CURRENTLY CORRECTED.
Condition: Unknown
Due 10 December 1998
Resolved 10 December 1998
Lifesaving
Issued 1 March 1993 Resolved
Install non-conductive matting or grating in front of electrical switchboards in engine room control room.
Condition: Unknown
Due 1 March 1993
Resolved 1 March 1993
Deck/Cargo
Issued 1 March 1993 Resolved
Install missing blanks on all used cargo hoses in accordance with Title 33 Code of Federal Regulations Part 156.120.
Condition: Unknown
Due 1 March 1993
Resolved 1 March 1993
Documentation
Issued 1 March 1993 Resolved
Provide accurate oil transfer procedures in accordance with Title 33 Code_x001C_ of Federal Regulations, Part 155.750.
Condition: Unknown
Due 1 March 1993
Resolved 1 March 1993
Deck/Cargo
Issued 1 March 1993 Resolved
Install mechanical means of closing deck scuppers. Remove cement and wooden plugs.
Condition: Unknown
Due 1 March 1993
Resolved 1 March 1993
Documentation
Issued 1 March 1993 Resolved
Submit a vessel response plan to the Coast Guard prior to 18 August 1993.
Condition: Unknown
Due 21 April 1993
Resolved 21 April 1993
Engineering
Issued 1 March 1993 Resolved
Make proper repairs to number 2 fuel oil tank containment where cracked.
Condition: Unknown
Due 1 March 1993
Resolved 1 March 1993
Deck/Cargo
Issued 16 October 1989 Resolved
VESSEL HAS NO CARGO EMERENCY SHUT DOWN DEVICES ON DECK.
Condition: Unknown
Due 25 May 1992
Resolved 26 May 1992
Fire Fighting
Issued 23 November 1987 Resolved
PROVIDE ADEQUATE DOCUMENTATION OF SATISFATORY FOAM ANALYSIS,AS REQUIRED.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Unknown
Issued 23 November 1987 Resolved
PROVIDE ONBOARD TWO (2) ADDITIONAL CHEMICAL SUITS FOR A TOTAL OF FOUR, AS REQUIRED.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Fire Fighting
Issued 23 November 1987 Resolved
PROVIDE ONBOARD TWO (2) ADDITIONAL FIREMAN OUTFITS FOR A TOTAL OF FOUR, AS REQUIRED.
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.