MAURY USCG vessel records Sign in
← All vessels

MIRANDA ROSE

MIRANDA ROSE is a 1984 freight ship. The Coast Guard has recorded 20 inspections since 1984, most recently in February 2007, along with 30 deficiencies — 1 with no resolution recorded —.

Records from 1984 to 2007. Most recent: inspection, 25 February 2007.

Built
1984
Last inspected
25 February 2007
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8307973 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
240429
Flag
UNITED KINGDOM
—
Maury page id
psix-240429

Inspections, by type

…with no type recorded16
…past their stated due date1
Years with a record 15 calendar years (1984–2007)
The 20 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 19 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it26195 - Regulatory (Subpart C or D), Gross Ton
13683 - Regulatory (Subpart C or D), Net Ton
42131 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 20

25 February 2007 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2877326
3 February 2005 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2283138
11 October 2004 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2218499
4 September 2002 Annual Inspection · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1670405
13 September 2000 Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 282142
3 June 1998 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 417074
5 October 1996 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 396075
28 January 1996 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 387365
3 August 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 381020
3 August 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 381780
22 July 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 647637
20 July 1993 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 359580
3 February 1992 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 348539
8 February 1991 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 341764
19 January 1989 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 327849
16 March 1987 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 314886
24 October 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 304934
10 May 1985 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 471928
29 April 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 501070
1 December 1984 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 299243

Deficiency record · 30

Fire Fighting › Nozzles › Type
Issued 3 February 2005 Resolved
Replace the jet type nozzles in the engine room with SOLAS approved dual purpose fire nozzles. SOLAS 74 I/II. To the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2005
Resolution: Nozzles replaced.
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 3 February 2005 Resolved
Correct to the satisfaction of the Class the pipe connecting the sludge pump to the bunker tanks. Identify and correct the reason why the C/E must pump sludge back into the bunker tanks. MARPOL 73/78 ANNEX I/17.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 February 2007
Resolution: BOARDED VESSEL AND FOUND ENGINETO BE IN ROOM IN FULL COMPLIANCE.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 3 February 2005 Resolved
Remove the excessive oil in the engine room. SOLAS 74 I/II. To the satisfaction of the Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 February 2007
Resolution: BOARDED VESSEL AND FOUND ENGINE ROOM TO BE IN FULL COMPLIANCE.
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 October 2004 Resolved
Repair/replace to the main engine cooling line salt water inlet three patches were noted. SOLAS 74 (83) AMD II-1 / 26.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: repaired the main engine cooling line
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 October 2004 Resolved
Repair/Replace the generator cooling line three patches were noted. SOALS 74 (83) AMD II-1 / 26.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: line is repaired
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 11 October 2004 Resolved
Repair/replace the main engine jacket water steam heating return line. SOLAS 74 (83) ADM II-1/26.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: line is repaired
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 October 2004 Resolved
Repair/replace generator cooler inlet line. SOLAS 74 (83) ADM II-1/26.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: line is repaired
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 October 2004 Resolved
Repair/replace salt water inlet auxiliary boiler condensor line. SOLAS 74 (83) ADM II-1/26.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: line is replaced
Lifesaving › Launching Appliances › Davit
Issued 11 October 2004 Resolved
Repair/Replace starboard davit upper aft wire sheeve. SOALS 74 (83) III / 19
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: wire sheeve repaired
Lifesaving › Lifeboat › Propulsion Transmission
Issued 11 October 2004 No resolution recorded
Replace missing port lifeboat mast stays. SOLAS 74 III / 11 (vi).
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 December 2004 — due date passed with no resolution recorded
Resolution: mast stays replaced
Lifesaving › Lifeboat › Handholds/Handrails
Issued 11 October 2004 Resolved
Replace port and starboard lifeboat under belly grab lines.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 December 2004
Resolved 12 December 2004
Resolution: lines replaced
Deck/Cargo › Ballast › Segregated Ballast Tank
Issued 11 October 2004 Resolved
During the visual inspection of number 5 cargo hold it was noticed that a section of the aft Port Wing Ballast Tank was leaking. A temporary repair will be done by the crew. The Master must make arrangements to have the Classification Society Representative prior to the vessels return to the US from an overseas port.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 December 2004
Resolved 12 December 2004
Resolution: survey completed
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 11 October 2004 Resolved
The crew has not been maintaining the Sewage Treatment Plant as per the manufacturers reequirements. 33 CFR 159.57
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 December 2004
Resolved 3 February 2005
Resolution: Sewage Treatment Plan is being maintained
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 11 October 2004 Resolved
The arms used during heavy weather which are connected to the cargo holds are non operational. ILO 147.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 December 2004
Resolved 12 December 2004
Resolution: arms are operational
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 11 October 2004 Resolved
The bunker line on the port side has been patched. SOLAS 74 (83) AMD II-1 / 26.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 December 2004
Resolved 22 December 2004
Resolution: patch is fixed
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 October 2004 Resolved
Install anti slip paint and or railings in the steering flat.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 December 2004
Resolved 3 February 2005
Resolution: installed anti slip paint and or railings in steering flat
Construction/Loadline › Penetrations › Pipe Flange
Issued 11 October 2004 Resolved
In the steering flat on the port side there is a ballast line leading into the aft peak tank. The pipe is starting to show signs of leakage. There are several small pin holes in the line which are bleeding rust. This was pointed out to the [name withheld] and he was advised of it's condition.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 December 2004
Resolved 12 December 2004
Resolution: pipe is repaired
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 9 September 2002 Resolved
Hydrostatic test on all fixed CO2 system bottles and jumper hoses. All bottles are stamped 1984, and original (first date) is 1977. SOLAS chapter I, regulation 11.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 12 October 2004
Resolution: Inspected and found corrected. System inspected in August of 2004.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 4 September 2002 Resolved
Provide proof of valid hydrostatic test on all fixed CO2 system bottles and jumper hoses. All bottles are stamped 1984, and original (first date) is 1977. Complete this item prior to departure to satisfaction of class. LEGACY COMPONENT DESC: Tanks
Action required: 705 - Other - as specified
Resolved 9 September 2002
Lifesaving
Issued 3 August 1995 Resolved
Make permanent repairs to the wasted air hose to the lifeboat raising air motor prior to departure from Coos Bay per SOLAS Chpt III reg 48 (2.3).
Condition: Unknown
Due 4 August 1995
Resolved 4 August 1995
Deck/Cargo
Issued 3 August 1995 Resolved
Make permanent repairs to all leaking hatch cover hydraulic rams and leaking anchor windlasses on bow & stern (stbd) windlass drive prior to return to a U. S. port per 33 CFR 151.10(b). Clean oil to prevent it from entering the water._x001C_
Condition: Unknown
Due 29 January 1996
Resolved 29 January 1996
Electrical
Issued 3 August 1995 Resolved
Replace the broken light bulbs in the forecastle space per SOLAS Chpt II-1 Reg 41 (2.1).
Condition: Unknown
Due 4 August 1995
Resolved 4 August 1995
Construction/Loadline
Issued 3 August 1995 Resolved
Repair the warped ladder hatch cover (aft) to #5 cargo hold. Prove water tight integrity with a chalk test. Complete prior to departure per ICLL Chpt II Reg 18(1).
Condition: Unknown
Due 4 August 1995
Resolved 4 August 1995
Fire Fighting
Issued 3 August 1995 Resolved
Remove the hold back hook on the fire door to the steering gear room per SOLAS Chpt II-2 Reg 45(3).
Condition: Unknown
Due 4 August 1995
Resolved 4 August 1995
Lifesaving
Issued 3 August 1995 Resolved
Provide weak link arrangements on all 4 liferafts prior to departure from Coos Bay per SOLAS Chpt III Reg 29.
Condition: Unknown
Due 4 August 1995
Resolved 4 August 1995
Deck/Cargo
Issued 3 August 1995 Resolved
Ref: Item 4 / PS95073828 - Master followed up to PORMS that leaking oil waslong term accumulation from "sweating" on rams & procedures were established to clean this. Verify at next boarding. If hydraulic leaks still evedient from ram seals, permanent repairs should be required.
Condition: Unknown
Due 6 October 1996
Resolved 6 October 1996
Navigation
Issued 20 July 1993 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 20 July 1993
Resolved 20 July 1993
Documentation
Issued 19 January 1989 Resolved
OIL TRANSFER PROCEDURES INCOMPLETE.
Condition: Unknown
Due 19 January 1989
Resolved 19 January 1989
Navigation
Issued 1 December 1984 Resolved
CHARTS AND PUBLICATIONS FOR AREA NAVIGATED NOT CORRECTED UP-TO-DATE. VESSEL NEEDS SUMMARY OF CORRECTIONS AND NEW EDITION OF U.S. COAST PILOT #7.
Condition: Unknown
Due 1 December 1984
Resolved 1 December 1984
Documentation
Issued 1 December 1984 Resolved
VESSEL HAD NO OIL TRANSFER PROCEDURES ON BOARD.
Condition: Unknown
Due 1 December 1984
Resolved 1 December 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.