MAURY USCG vessel records Sign in
← All vessels

BEKIR KALKAVAN

BEKIR KALKAVAN is a 1974 freight ship. The Coast Guard has recorded 13 inspections since 1984, most recently in August 1995, along with 13 deficiencies.

Records from 1984 to 1995. Most recent: inspection, 15 August 1995.

Built
1974
Last inspected
15 August 1995
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7380502 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
240714
Flag
NORWAY
—
Maury page id
psix-240714

Inspections, by type

…with no type recorded13
Years with a record 10 calendar years (1984–1995)
The 13 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 31 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it12304 - Regulatory (Subpart C or D), Net Ton
18642 - Regulatory (Subpart C or D), Gross Ton
35224 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 13

15 August 1995 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 713192
17 July 1995 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 380801
12 July 1995 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 380461
14 October 1992 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 353777
19 July 1991 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 344810
18 September 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 339351
1 June 1989 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 330724
15 November 1988 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 326790
16 March 1987 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 315220
10 July 1986 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 310122
27 June 1986 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 309703
1 July 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 484455
9 December 1984 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 299273

Deficiency record · 13

Electrical
Issued 12 July 1995 Resolved
Vessel was found to be in non compliance with Solas Ch(2), section I-44. _x001C_ Missing primary starting equipment on emergency fire pump and generator.
Condition: Unknown
Due 15 August 1995
Resolved 15 August 1995
Electrical
Issued 12 July 1995 Resolved
Vessel was found not to be in compliance with Solas ch(2), section I. The emergency fire pump and generators did not have safety covers on the pulleys.
Condition: Unknown
Due 15 August 1995
Resolved 15 August 1995
Navigation
Issued 12 July 1995 Resolved
A violation of 33 CFR 164.112 in that the M/V DENIZATI transitted in the Puget Sound Vessel Traffic Zone without channel 5-A capabilities.
Condition: Unknown
Due 15 August 1995
Resolved 15 August 1995
Lifesaving
Issued 12 July 1995 Resolved
Vessel was found not to be in compliance with Solas ch(3), section III-26. The safety lines on the port and starboard life boats were wasted and_x001C_ needed replacing.
Condition: Unknown
Due 15 August 1995
Resolved 15 August 1995
Navigation
Issued 19 July 1991 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Navigation
Issued 19 July 1991 Resolved
VESSELS ARPA WAS INOPERARTIVE
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Navigation
Issued 19 July 1991 Resolved
CHARTS WERE NOT CORRECTED TO DATE
Condition: Unknown
Due 24 July 1991
Resolved 24 July 1991
Navigation
Issued 18 September 1990 Resolved
A vio of 33CFR164.30 in that the U.S. Coast Pilot vol.3 used by the vsl wasnot currently corrected to NTM 27/90 which was reasonably available and contained corrections applicable to the vsl's route from Cape Henlopen DE to Camden NJ._x001C_
Condition: Unknown
Due 18 May 2002
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Navigation
Issued 16 March 1987 Resolved
VESSEL TRANSITED THE COLUMBIA RIVER TO LONGVIEW, WASHINGTON, WITHOUT HAVINGONBOARD A BLOCK DIAGRAM AND SIMPLE OPERATING INSTRUCTIONS FOR STEERING GEARCHANGE OVER.
Condition: Unknown
Due 16 March 1987
Resolved 16 March 1987
Navigation
Issued 16 March 1987 Resolved
VESSEL TRANSITED THE COLUMBIA RIVER TO LONGVIEW, WASHINGTON, WITH CHARTS OFTHE AREA NAVIGATED NOT CURRENTLY CORRECTED UP TO DATE.
Condition: Unknown
Due 16 March 1987
Resolved 16 March 1987
Documentation
Issued 16 March 1987 Resolved
VESSEL TRANSITED THE COLUMBIA RIVER TO LONGVIEW, WASHINGTON, WITHOUT HAVINGOIL TRANSFER PROCEDURES THAT WERE APPLICABLE TO LUBE OIL TRANSFERS AND THATWERE MISSING MEANS OF COMMUNICATIONS AND PROCEDURES FOR REPORTING SPILLS.
Condition: Unknown
Due 16 March 1987
Resolved 16 March 1987
Navigation
Issued 16 March 1987 Resolved
VESSEL TRANSITED THE COLUMBIA RIVER TO LONGVIEW, WA, WITHOUT HAVING ONBOARDA LABEL ON THE LORAN-C DEVICE.
Condition: Unknown
Due 15 August 1995
Resolved 15 August 1995
Accommodation/Occupational Safety
Issued 27 June 1986 Resolved
VIOLATION OF 33 CFR 159.7(C) FOR OPERATING AN EXISTING VESSEL EQUIPPED WITHINSTALLED TOILET FACILITIES WHILE NOT EQUIPPED WITH A CERTIFIED TYPE I,II, OR III MARINE SANITATION DEVICE.
Condition: Unknown
Due 27 June 1986
Resolved 27 June 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.