Records from 2016 to 2026. Most recent: inspection, 5 January 2026.
Inspection history · 29
5 January 2026
Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8267695
18 June 2025
Vessel Attendance · Damage Survey · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8161395
16 June 2025
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8160681
6 June 2025
Damage Survey · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8153942
16 April 2025
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8064868
14 October 2024
Plan Review (Other than "T") · Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8018528
1 October 2024
Plan Review (Other than "T") · Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7843511
15 June 2024
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7888865
6 February 2024
Examination of Repairs · Plan Review (Other than "T")
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7901670
24 January 2024
Hull Examination · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7775196
18 November 2023
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7822045
27 September 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7605226
17 May 2023
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7675575
20 December 2022
Examination of Repairs · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7611587
7 July 2022
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7466220
9 March 2022
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7301894
20 September 2021
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7316624
2 September 2021
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7301944
2 November 2020
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7081578
19 October 2020
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7079977
4 March 2020
Deficiency Check · Drydock Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6903547
17 September 2019
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6774920
25 June 2018
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6455828
11 April 2018
Drydock Exam · Deficiency Check · Administrative Inspection · Internal Structural Exam · Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6389850
11 July 2017
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6163774
9 April 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6123241
20 October 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6019987
22 July 2016
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5952521
20 April 2016
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5856788
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 5 January 2026
Resolved
Each window and its means of attachment to the hull or deck house must be capable of withstanding the maximum load from wave and wind conditions expected due to it’s location on the vessel. During dry dock inspection, forward lounge port window had stress cracks (3”-6”) radiating from fittings, and a forward lounge starboard window was missing most of its bolts from the frame.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 February 2026
Resolved 28 January 2026
Resolution: 23 JAN operator provided photos of starboard window fastenings re-added. 28 JAN MI observed in person hose test of port window with no leaks.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 April 2025
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaced located below the main deck. Vessel did not have adequate emergency lighting along 01 of the escape routes from the galley.46 CFR 120.432(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 April 2025
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 April 2025
Resolved
Each vessel that relies on electricity to power... the vital systems listed in 119.710 of this chapter must be arranged so that the loads can be energized from two sources of electricity... A vessel with batteries of adequate capacity to supply the loads for three hours. Vessel's fire detection panel battery backup did not last more than 1 hour. Vessel must provide proof that fire detection panel battery backup will last for three hours.46 CFR 120.310(a)(1)
46 CFR 120.310(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 April 2025
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 16 April 2025
Resolved
Area of refuge means an area that is separated from the effects of fire and flooding where passengers and crew can gather to await disembarking in the event of fire or flooding. Vessel was storing chairs and other objects in the designated area of refuge, making it not operational as required in the event of emergency.46 CFR 114.400
Action required: 10 - Deficiency Rectified
Resolved 16 April 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 October 2024
Resolved
Vessel experienced a mechanical failure on the port main engine while underway. The error code indicated a “Microcommander” fault.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 21 October 2024
Resolved 18 October 2024
Resolution: MI conducted successful sea trail following attendance by technician for replacement of microprocessor and throttle cables.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 October 2024
Resolved
All microprocessor or computer based propulsion engine control systems must meet the requirements of part 62 in subchapter F of this chapter. A qualitative failure analysis (QFA) of the vessel’s propulsion engine control system (throttle) shall be submitted to MSC. A DVT Procedure (DVTP) document that incorporates all failure modes identified on the QFA should also be submitted for review to MSC. The QFA should specifically address the failure of the microprocessor based control system hardware and those inputs to the control system whose failure could affect the propulsion system’s ability to default to the required conditions in 46 CFR 121.620(c). The QFA must indicate continued compliance with 46 CFR 121.620 so that power failure to the processor or processor failure will not result in an increase of shaft speed or propeller pitch. The QFA should be based on single, non-concurrent system failures (including loss of power). Plans shall be submitted to [email withheld], submittal shall indicate vessel project number (P016675). Following approval from MSC the DVTP testing shall be accomplished to the satisfaction of the attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2024
Resolved 27 February 2025
Resolution: MI witnessed operator demonstrate MSC approved DVTPs. Uploaded to MISLE, operator also understands to maintain a copy of QFA/DVTPs onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 October 2024
Resolved
Nonmetallic flexible hose may be used in lube oil, fuel oil and fluid power systems only where flexibility is required and in lengths not exceeding 30 inches. Nonmetallic flexible hose must have factory-assembled end fittings and must comply with SAE J1475. Appx 10 feet of a 15 plus foot run of flexible Aeroquip 2556-8 (1/2”) SAE 20R2, 250 psi lube oil hose is hanging between overhead and bow thruster tunnel. While this does not meet requirements, it appears satisfactory for its service on the pressure head tank to bowthruster. Concern is hanging 10' section with nearly 90 degree bend. Review and install per manufacturer specification 5" radius and supported along run per distributor website, which operator shall verify.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 28 October 2024
Resolution: Duty Marine Inspector witnessed onboard.
07 - Fire Safety › N/A - No Subsystem › Main Vertical zone
Issued 1 October 2024
Resolved
General construction of the vessel shall be such as to minimize fire hazards. Vessels constructed on or after 1 JUL 1961 which carry more than 150 passengers shall meet the requirements of subpart 72.05. Stairway enclosures adjacent to public spaces over 500 square feet, or adjacent to machinery spaces, or boundaries of main vertical zones shall be A-60. Wire penetration at top of machinery space vestibule (looking forward from door) is incomplete.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 18 October 2024
Resolution: Duty Marine Inspector witnessed onboard and provided photo.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 October 2024
Resolved
All cable and wire must be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support. MI identified hanging wires not supported by metal supports for the following: Bilge float switch located in steering gear space, light wiring located in steering gear, wire runs in port galley, wire runs aft of stbd main engine shaft seal access plate.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 18 October 2024
Resolution: Duty Marine Inspector witnessed onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. MI identified the following unsafe electrical conditions: loose power outlet located in lazarette, loose power outlet located on port side 02 deck, and port fwd head distribution panel door not secured near port storage entry.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 18 October 2024
Resolution: Duty Marine Inspector witnessed onboard.
07 - Fire Safety › N/A - No Subsystem › Main Vertical zone
Issued 1 October 2024
Resolved
A door in A-class fire control boundary in a stairtower must be the self closing type. Self closing door in galley stair access to main deck does not fully close.
Gap less than 1/2" may continue operations until fixed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 18 October 2024
Resolution: Duty Marine Inspector witnessed onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 October 2024
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Penetrations in A Class fire control boundaries for electrical cables, pipes, trunks, ducts, must be constructed to prevent the passage of flame and smoke for one hour. MI identified wire penetration between steering gear space and aft storage space (a MWTB listed on vessels stability letter) bulk head not watertight or smoke/fume tight.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2024
Resolved 18 October 2024
Resolution: Duty Marine Inspector witnessed onboard.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 October 2024
Resolved
A power driven vessel underway shall exhibit a stern light as required by 33 CFR 83.20. Stern light inoperable during inspection.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 October 2024
Resolved 1 October 2024
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 1 October 2024
Resolved
Means of escape. The dimensions of a means of escape must be such as to allow easy movement of persons when wearing life jackets. There must be no protrusions in means of escape that could cause injury, ensnare clothing, or damage life jackets. Galley escape had tray rack, extinguishing pipe with 1” cable run hanging from tape in place, and wood dunnage obstructing the egress. The fixed extinguishing pipe presents a low overhead but could be adequate by keeping the space open, and the section of piping (at head level for 6’ person) could be fitted with highly visible markings and no cables hanging or objects that could snag clothing or life jackets. 177.15-1 All vessels shall be provided two avenues of escape from all general areas accessible or where the crew may be mornally employed, so located if one is not available the other may be.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 1 October 2024
Resolved 1 October 2024
Resolution: Resolved during inspection. Discussed with Captain, crew and vessel rep present the importance of egress and recent vessel modifications which are in this vicinity and the avenue of escape needs to remain clear.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 September 2023
Resolved
Bilge pumping line. During operational test, bilge discharge pipe had leak.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2023
Resolution: Video provided satisfactory (unable to upload)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 September 2023
Resolved
Electrical cables and fixtures. Each connection to a connector or terminal connection must be made within an enclusre. Stbd galley service pway found to have two loose pigtails and a refrigerator pump connectors exposed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2023
Resolution: Photo provided with safety enclosure provided.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 27 September 2023
Resolved
Lighting systems guards. Port galley in vicinity of water heater, and lower head(restroom) light fixtures were missing covers.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2023
Resolution: Photo provided, fixture removed (base visible in ceiling) and new lighting enclosure installed.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 27 September 2023
Resolved
Mess deck and galley spaces. Upper metal outboard of ovens found lowered and zip tied in place, defeating heat deflecting properties. Secure as designed.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 October 2023
Resolution: Photo provided of metal flashing installed behind ovens.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 September 2023
Resolved
A vessel inspected for compliance with the standards required by this subchapter may be inspected in accordance with standards acceptable to the OCMI as good marine practice. During annual inspection, port rudder post found with wastage, which made a hole through a support strut at the upper connection to rudder post. 705 C defer to drydock (MAR 2024).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 January 2024
Resolution: During drydock, noted wasted rudder post and it was repaired in follow up visit JAN 29.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 20 December 2022
Resolved
The master shall determine that the vessel complies with all applicable stability requirements. Vessel is currently awaiting approval of stability test and fire load analysis from MSC. Vessel may only operate with up to 300 maximum passengers until the plans are approved.
Action required: 705 - Other - as specified
Due 1 June 2023
Resolved 17 May 2024
Resolution: MSC issued stability letter 17 MAY 2024. COI adjusted to 460 max persons.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 28 April 2022
Resolved
Upon completion of the current alterations, a stability test(either deadweight survey or inclining) should be conducted on the vessel and revised loading conditions / stability calculations be prepared as necessary to demonstrate that the vessel’s stability remains adequate for the intended service. Sewage tank between frames 12 and 21 is wider than original; and a gray water collection tank (appx 2.5'x3'x15') was added aft of frame 46 and has not been documented. This change to the sewage tank and addition of collection tank should be included in stability calculations. Vessel may
operate with reduced passenger count, reduced from 600
to 500 (475 passengers, 8 crew, 17 other persons in crew
crew), through scheduled COI renewal of 7 JUL 2022.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 July 2022
Resolved 16 May 2023
Resolution: Vessel has conducted satisfactory stability test and new pax count has been assigned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2022
Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. The owner or managing operator shall submit drawings, sketches, or written specifications describing details of alterations to the cognizant [name withheld] pumps, piping and a grey water collection tank, approx- imately 2.5'x3'x15', were discovered during drydock,
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 May 2022
Resolution: Grey water collection system, pumps and flexible PVC have been removed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 4 April 2022
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered, the cognizant OCMI may conduct an internal structureal examination in any affected space and may require the vessel to be dry-docked or taken out of service to assess the extent of the damage and to effect permanent repairs. The OCMI may decrease the dry-dock examination intervals to monitor the vessels structural condition. Prior to relaunch, ensure marine inspectors witness satisfactory Non-destructive Testing (NDT) of the affected 17'9"x11' bottom plate, framing, and tank top repairs.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 April 2022
Resolution: Final NDT of 17'9"x11' port and stbd bottom inserts, framing, deck beams and tank top (encompassing integral sewage tank replacement) between frames 12 and 21 completed. Vessel authorized relaunch to continue drydock requirements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 September 2021
Resolved
Bilge alarms did not alarm visually or audibly during operational test of system for clearing of prior CG-835v
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 September 2021
Resolved 20 September 2021
Resolution: Vessel renewed fuse and properly connected wires.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 2 September 2021
Resolved
All observed unsafe practices, fire hazards, and other situations must be corrected. Electrical wiring under the pilot house steering console was found to have dead end wires and exposed connections.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2021
Resolved 20 September 2021
Resolution: Vessel completed repairs.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 September 2021
Resolved
Spanner wrench must be provided for each fire hydrant. Two spanner wrenches were found to be missing.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2021
Resolved 20 September 2021
Resolution: Vessel procured and installed missing wrenches.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 2 September 2021
Resolved
Vessel did not have updated copies of FCC certificates onboard.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 3 September 2021
Resolved 3 September 2021
Resolution: Vessel provided updated and posted copies from technician.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 September 2021
Resolved
Vessel had a 70 amp breaker installed into the galley panel and was using it as a blank.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 3 September 2021
Resolved 3 September 2021
Resolution: Vessel removed and installed blank.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 September 2021
Resolved
Vessel had a damaged power strip installed with a junction box, which showed a ground when tested.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 3 September 2021
Resolved 3 September 2021
Resolution: Vessel removed power strip and installed junction box.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 September 2021
Resolved
top/open deck aft the vessel had 2 outlet boxes 1 one each side that had the steel piping rotted through leaving wires exposed to element as well as water intrusion into the electric boxes.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 3 September 2021
Resolved 3 September 2021
Resolution: Vessel installed conduit and made connections weather tight.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 October 2020
Resolved
Your vessel must undergo an annual inspection within 3 months before or after each anniversary date. The vessel has not completed a satisfactory annual inspection. Vessel cannot carry passengers until a satisfactory annual inspection is completed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 October 2020
Resolved 2 November 2020
Resolution: Conducted annual inspection.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 September 2019
Resolved
A spanner wrench must be provided at each fire hydrant. Provide spanner wrench for hydrant #4.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 17 September 2019
Resolved 17 September 2019
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector prior to departing the vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 July 2018
Resolved
The vessel COI was found posted in the vessel's pilothouse where passengers could not view the certificate. Post COI in a location where it can be seen by all passengers.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2018
Resolved 26 July 2018
Resolution: COI was posted under glass on main deck.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2018
Resolved
The lifebuoys had crew installed line that was not proven to be UV resistant and of an unknown breaking strength. Provide 60' of line that meets UV and strength requirements.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2018
Resolved 13 August 2018
Resolution: Manufacturer's specifications provided showing line used was adequate strength and UV-resistance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 June 2018
Resolved
During the inspection it was discovered that the steering tie rod pin connecting the tie rod end to the STBD rudder arm was missing a cotter pin.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 June 2018
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 25 June 2018
Resolved
During the inspection it was discovered that the sewage overboard discharge valve was outfitted with a chain and lock, however the lock was not closed. The valve was closed at the time of the inspection.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 25 June 2018
Resolved 25 June 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 June 2018
Resolved
A discrepancy in the the vessels drug and alcohol testing program was discovered when one of the deckhands was not listed on the testing enrolment crew list.
Action required: 10 - Deficiency Rectified
Due 25 June 2018
Resolved 25 June 2018
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 25 June 2018
Resolved
During the inspection it was discovered that the vessel's anchor light was extinguished.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 June 2018
Resolved 25 June 2018
Construction/Loadline › Hull › Hull Plating
Issued 22 July 2016
Resolved
Due to vsl alliding with the ground underwater, the vessel requires internal structural exam prior to carrying passnegers. Vessel is no sailed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 July 2016
Resolution: Duty MI conducted internal bilge/structure inspection with NEGRES.
Construction/Loadline › Hull › Bottom Plating
Issued 22 April 2016
Resolved
Crop and renew bottom plating aft of port rudder post and forward of stbd rudder post.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Vessel cropped and rewelded two insert plates (49"x41" and 48"x11") in way of wasted areas. Witnessed satisfactory NDT.
Construction/Loadline › Hull › Stiffener
Issued 20 April 2016
Resolved
Crop and renew inboard support pole for starboard side rudder post as marked, in kind.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Vessel replaced pole with a new support rod.
Construction/Loadline › Hull › Stiffener
Issued 20 April 2016
Resolved
Crop and renew aft support pole and stantion as marked for port rudder post, in kind.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 April 2016
Resolution: Vessel replace pole/stantion with new support rod and frame.
Construction/Loadline › Hull › Hull Plating
Issued 20 April 2016
Resolved
Grind to good metal and provide gaging report for hul plating under port and starboard ruder posts, as marked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 22 April 2016
Resolution: Vsl provided gage report with severely wasted bottom plating in need of crop/renew.