Records from 2020 to 2025. Most recent: inspection, 12 August 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 August 2025
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Anchor light wiring was pinched and light was inoperable. Vessel is restricted to daytime operations until light is operational.
46 CFR 183.420
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 August 2025
Resolved 9 September 2025
Resolution: Received satisfactory photo of anchor light.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 5 August 2024
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. Starboard fuel shutoff valve was not marked legibly. Mark the fuel shutoff valve to the satisfaction of the Marine Inspector.
46 CFR 185.608
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2024
Resolved 7 August 2024
Resolution: Operator provided picture of new fuel shutoff valve label - see documents tab.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 5 August 2024
Resolved
Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. The life float was not supplied with two paddles. Operator provided two paddles with markings and the deficiency was corrected on the spot.
46 CFR 180.175 (d)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 5 August 2024
Resolved 5 August 2024
Resolution: Deficiency was rectified on the spot. Operator provided two paddles.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 September 2023
Resolved
A pre-engineered fixed gas fire extinguishing system must: Automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. Vessel operator could not simulate shutdown of engine during Fireboy testing. The vessel must demonstrate that the pre-engineered fixed gas fire extinguishing system is working according to regulations.
46 CFR 181.420(a)(3)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2023
Resolved 11 October 2023
Resolution: vessel representative sent video of fire suppression system working correctly. Unable to download video, video was uploaded to youtube and avialable at
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 26 September 2023
Resolved
Except as provided in paragraph (b) of this section, the weather deck on a flush deck vessel must be watertight and have no obstruction to overboard drainage. Engine room hatch was not watertight. Make repairs to hatch to ensure watertight integrity.
46 CFR 178.410(a)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2023
Resolved 2 July 2024
Resolution: MI witnesssed engine room hatch to be watertight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 September 2023
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. STBD fuel filter is leaking. Identify source of leak and repair to satisfaction of CG marine inspector.
46 CFR 176.800(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 October 2023
Resolved 12 June 2024
Resolution: Rcvd Photo of corrected def.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2023
Resolved
All cable and wire must: Have stranded copper conductors with sufficient current carrying capacity for the circuit in which they are used. STBD battery had exposed wiring on terminal. Port battery bank has corrosion and melted battery terminal cables. Repair or replace to satisfaction of CG marine inspector.
46 CFR 183.340(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 12 June 2024
Resolution: Rcvd photo of corrected def.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 26 September 2023
Resolved
Each survival craft must be: Secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. Life float does not have float free link attached to vessel. Attached life float to vessel as per regulation.
46 CFR 180.130(a)(1)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 12 June 2024
Resolution: Rcvd photo of corrected Def.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 26 September 2023
Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Valve installation did not shield from flames. Install appropriate valve protection
46 CFR 182.455(b)(4)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2023
Resolved 2 July 2024
Resolution: MI witnessed satisfactory valve protection for shut off valve.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 26 September 2023
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Significant pitting identified on interior hull beneath accommodation space compartment, located centerline between 3rd and 4th frames. There is also pitting and corrosion in forward compartment, inside of chain locker. Measure wastage and repair during next credit dry-dock.
46 CFR 176.800(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 2 July 2024
Resolution: Operator repaired pitting and corrosion area to the satisfaction of MI.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 31 January 2023
Resolved
In addition to meeting § 180.130, each life float and buoyant apparatus must be stowed as required under this section: (b) The float-free link required by § 180.130(a)(1) must be: (1) Certified to meet § 160.073 in subchapter Q of this chapter, or other standard specified by the Commandant; (2) Of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag; and (3) Secured to the painter at one end and to the vessel on the other end. The means used to attach the float-free link to the vessel must: (1) Have a breaking strength of at least the breaking strength of the painter; (2) If synthetic, be of a dark color or of a type certified to be resistant to deterioration from ultraviolet light; and (3) If metal, be corrosion resistant. - In current arrangement, life float is attached to the vessel with no weak link.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 February 2023
Resolved 3 May 2023
Resolution: Received satisfactory photograph of float free link.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 31 January 2023
Resolved
Life floats. Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light.The light must be a floating waterlight approved under approval series 161.010 or other standard specified by the Commandant. The floating waterlight must be attached around the body of the life float or buoyant apparatus by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length. Currently, life float installed in subject vessel does not have paddles or the light required by the reference.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2023
Resolved 3 June 2023
Resolution: Received satisfactory photograph of paddles and water light.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 31 January 2023
Resolved
Each unpressurized fuel tank must be fitted with a vent pipe connected to the highest point of the tank. Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942. Where a flexible vent pipe section is necessary, suitable flexible tubing or hose having high resistance to salt water, petroleum oils, heat and vibration, may be used. Such hose must overlap metallic pipe ends at least 11/2 times the pipe diameter and must be secured at each end by clamps. Flexible fuel vent hose installed in engine compartments shall be USCG Type A1, A1-15, or A2. - Currently, STBD side fuel vent hose is dry rotted and unserviceable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2023
Resolved 3 May 2023
Resolution: Received satisfactory photograph of fuel tank vent hose.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 January 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock - MI found unterminated wires with bare conductors in the following systems: PORT, CENTER, STBD windshield wipers, STBD VHF radio, bilge system alarm panel, and machinery space J-BOX behind fuel FO filters.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2023
Resolved 3 May 2023
Resolution: Received satisfactory photograph of terminated wires.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 31 January 2023
Resolved
Machinery and fuel tank spaces must be separated from accommodation spaces by boundaries that prevent the passage of vapors. Gasket currently installed in both engine room doors is damaged and in a non-servicable condition.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2023
Resolved 14 August 2023
Resolution: Received satisfactory photographs of hatch gasket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 January 2023
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation - STBD remote FO shut-off valve is not labeled IAW with the reference.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2023
Resolved 3 May 2023
Resolution: Received satisfactory photograph of fuel shutoff valve label.
01 - Certificates & Documentation › 011 - Ships Certificates › Passenger Ship Safety (including exemption)
Issued 31 January 2023
Resolved
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician in accordance with § 80.59 once every five years. The FCC-licensed technician must use the latest FCC Information Bulletin, How to Conduct an Inspection of a Small Passenger Vessel. If the ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony Certificate. Communications Act Radiotelephony Certificates may be obtained from the Commission's National Call Center - [phone withheld] - or from its forms contractor. Communications Act Safety Radiotelephony Certificate was not available for inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 April 2023
Resolved 28 August 2023
Resolution: Received satisfactory photograph of safety radiotelephony certificate.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 January 2023
Resolved
Annual inspection. Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel failed to undergo 2022 annual inspection.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 January 2023
Resolution: Completed annual inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 August 2022
Resolved
A vessel exposed to salt water more than three months in any 12 month period must undergo a drydock and internal structural examination at least once every two years. Vessel has failed to schedule drydock and internal structural examination within time period granted by drydock extension request.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 September 2022
Resolution: Completed dry dock inspection
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 June 2022
Resolved
A pre-engineered fixed gas fire extinguishing system must:
Be capable of manual actuation from outside the space in addition to automatic actuation by a heat detector. The pre-engineered Fireboy gas fire extinguishing system for the main machinery space, was not equipped with a means to manually activate the system from outside the space. Install a means to manually activate the system from outside the protected space.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 June 2022
Resolved 19 July 2022
Resolution: A new manual activation handle was properly installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 June 2022
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. The life float was not secured to the vessel with a painter or float-free link.
Secure the life float to the vessel using a painter that meets 46 CFR 180.175 (f) (i-iv), and a float free link that meets 46 CFR 180.130, and 46 CFR 160.073. (no float free link is required if the painter is longer than the maximum depth of water the vessel is certificated to operate in.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2022
Resolved 15 June 2022
Resolution: The life float was secured to the vessel using the proper painter.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 June 2022
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Identification of the items may be in words, or the appropriate symbols in IMO Resolution A.760(18) (incorporated by reference; see 46 CFR 175.600). Letters and numbers must be at least 50 millimeters (2 inches) high. Symbols must be at least 100 mm (4 inches) square. There were no markings indicating where the lifejackets were stowed. Provide markings that clearly indicate the number, and size of the lifejackets stowed inside the bench seats.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2022
Resolved 15 June 2022
Resolution: The location of the life jackets was properly marked.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 June 2022
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. There were no placards containing instructions for the donning and use of the life jackets posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Post placards containing instructions for the donning and use of the life jackets in conspicuous places that are regularly accessible and visible to the crew and passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 June 2022
Resolved 15 June 2022
Resolution: Placards containing instructions for the donning and use of the life jackets were posted in conspicuous places that are regularly accessible and visible to the crew and passengers.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 15 June 2022
Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF-DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2). The VHF Radio installation did not have functioning DSC. Provide VHF Radio installation with functioning DSC.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2022
Resolved 19 July 2022
Resolution: A VHF radio with operational DSC was installed.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 15 June 2022
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions and information, specific to the individual vessel. There was no emergency broadcast placard posted at the VHF Radio. Post a durable emergency broadcast placard next to all radiotelephone installations
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2022
Resolved 19 July 2022
Resolution: An emergency broadcast placard was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2022
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. The remote fuel shutoff locations are not marked. Mark the remote fuel shutoff stations in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2022
Resolved 19 July 2022
Resolution: The remote fuel shut-off valves were labled.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 15 June 2022
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. The port and starboard main propulsion shafts where they exit the reduction gear, are un-guarded and prevent a hazard to personnel. Provide guards to protect personnel from contacting the rotating propulsion shafts.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2022
Resolved 19 July 2022
Resolution: Protective guards were installed over the propulsion shafts.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 June 2021
Resolved
Employee Assistance Program. Each education program must include the following elements: display and distribution of a community service hot-line telephone number for crew member assistance. Vessel missing employee assistance phone number. Post help line number onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 July 2021
Resolution: Number posted on vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 June 2021
Resolved
Life Jackets. A number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided. Vessel missing one child life jacket. Provide adequate number of life jackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 August 2021
Resolution: Required life jackets obtained.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 28 June 2021
Resolved
Watertight integrity. A hatch exposed to the weather must be watertight. Anchor chain locker hatch is not watertight. Make hatch watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 July 2021
Resolution: Bow hatch made watertight.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 28 June 2021
Resolved
Vapor Barriers. Vapor barriers must be provided where insulation of any type is used in spaces where flammable and combustible liquids or vapors are present. Vessel lacking vapor tight integrity between E/R space and main void space. Provide adequate vapor tight integrity.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 July 2021
Resolution: Vapor tight intergrity maintained.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 28 June 2021
Resolved
Fuel piping. Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines. The shutoff valves at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. Vessel has inadequate fuel shutoff valve locations. Provide proper location for valves.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 July 2021
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 28 June 2021
Resolved
Vent pipes for fuel tanks. The discharge ends of fuel tank vent pipes must be fitted with removable flame screens or flame arresters. Vessel missing flame screens on discharge ends of fuel tank vent pipes. Provide adequate flame screens.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 July 2021
Resolution: Flame screens installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 June 2021
Resolved
Bilge high level alarms. On a vessel of at least 26' in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the normally unmanned spaces. Vessel's audio and visual bilge alarms inoperable. Provide adequate alarms.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 July 2021
Resolution: Bilge alarms tested ok.