MAURY USCG vessel records
← All vessels

JAMAICA

Built
1977
Last inspected
23 April 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 23 April 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WYC4431
244737
Flag
UNITED STATES
Maury page id
psix-244737

Documentation record

Registered dimensions (L × B × D)106.0 ft × 28.0 ft × 7.2 ft
Registered tonnagegross 87 / net 59
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderROBERT E DERECKTOR INC · MAMARONECK, NY, UNITED STATES · built 1977
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Endorsements, as the file codes themcw_un, fi
DocumentationValid · issued 20 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it87 - Regulatory (Subpart C or D), Gross Ton
59 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 27 inspections, each with its date, unit and type; 50 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

23 April 2026 Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8330193
19 November 2025 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8273719
8 May 2025 Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8130753
14 March 2025 Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8093986
14 March 2025 Drydock Exam · Plan Review "T" Boat · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8093991
19 November 2024 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8039689
12 November 2024 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8033815
25 March 2024 Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7882773
12 October 2023 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7810536
2 May 2023 Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7680236
2 March 2023 Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7643921
3 November 2022 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7588622
18 April 2022 COI Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7431878
4 April 2022 Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7424461
9 November 2021 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7347834
12 May 2021 Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7194665
4 March 2021 Deficiency Check · Internal Structural Exam · Plan Review "T" Boat · Drydock Exam · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7156643
8 January 2021 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7121551
10 March 2020 Internal Structural Exam · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6922939
2 October 2019 In-Service Inspection · Plan Review "T" Boat · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6826692
17 April 2019 DAPI Audit · Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6664839
25 March 2019 Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6648377
9 August 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6505791
3 April 2018 DAPI Audit · Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6383926
4 April 2017 Deficiency Check · COI Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6110970
9 March 2017 Administrative Inspection · Drydock Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6101570
12 April 2016 Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5852321

Deficiency record · 50

11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 May 2025 Resolved
Life floats, when stowed in tiers, the separate units must be kept apart by spacers. Aft life float tier did not have spacers separating life floats. 46 CFR 180.137f
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Spacers installed
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 May 2025 Resolved
Each paddle must be of at least 1,220 millimeters (4 feet) in length, lashed to the life float to which it belongs and buoyant. Aft life float tier has broken plastic paddle that needs replacement. 46 CFR 180.175f2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Paddles replaced
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 May 2025 Resolved
The name of the vessel must be marked or painted in clearly legible letters on each life float paddle. The forward tier of life floats contained two paddles without the vessel name marked, and three paddles on the aft life float tier were not marked with the vessels name. 46 CFR 182.604g
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Paddles properly labeled
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 8 May 2025 Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Vessel had no portable light at the engine room. 46 CFR 183.430
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Portable light mounted at E/R entrance
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 May 2025 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Port generator coils are covered in oil posing a fire risk. 46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Windings properly cleaned and serviced.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 8 May 2025 Resolved
The Coast Guard will issue a medical certificate to a mariner meeting the medical and physical standards for merchant mariners. Vessel master did not have a medical certificate. 705(c) Valid med certificate to be provided prior to crewmember acting as licensed mariner on vessels. 16 CFR 10.301
Action required: 705 - Other - as specified
Due 22 May 2025
Resolved 23 April 2026
Resolution: Verified valid medical card.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 8 May 2025 Resolved
The owner of a vessel subject to inspection under Section 3301 shall record in a log book information on all access and use of the vessel's master key, including A)dates and times of access; B)the room or location accessed; and C)the name and rank of the crew member that used the master key. Vessel had no record log for master key control. Provide master key control as required. 46 USC 3106
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: log created and includes crew who has access to key
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 8 May 2025 Resolved
Fire at sea, recommended emergency instructions. Cut off air supply to fire-close ventilators. Starboard aft engine room ventilation did not have damper to secure ventilation. 46 CFR 185.25-5(c)(1) OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Damper installed.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 May 2025 Resolved
The pump outlet shall be fitted with a pressure gauge. Vessel did not have a pressure gauge fitted at the fire pump outlet. 46 CFR 181.10-1c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2025
Resolved 22 May 2025
Resolution: Gauge installed and PSI verified.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 March 2025 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection. MI observed a hole in the port side overhead that penetrated from the galley to the boiler room. Submit Repair proposal to address the hole identified during inspection to the satisfaction of the MI. 46CFR177.100
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 April 2025
Resolution: Weld completed to satisfaction of MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 12 November 2024 Resolved
Machinery spaces shall be separated from accommodation spaces by watertight and/or vapor tight bulkheads. The machinery space, containing a boiler and furnace, aft of and communicating with the overnight passenger accommodations were separated by a non-tight partial bulkhead that did not extend to the deck or overhead. 46 CFR 182.35-1 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 December 2024
Resolved 23 April 2026
Resolution: Vessel is not operating with overnight accommodations until issue is resolved. Closed deficiency accordingly.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 12 November 2024 Resolved
An existing vessel with a ...a machinery space ...deck, composed of wood must comply with the requirements of § 181.400 of this part on or before March 11, 1999. The machinery space aft of the overnight passenger accommodations had a wooden deck and did not have fixed fire fighting or fire detection. 46 CFR 181.115 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 December 2024
Resolved 23 April 2026
Resolution: Vessel is not authorized to carry overnight accommodations until issue is resolved. Closed deficiency accordingly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 November 2024 Resolved
...heating equipment shall be suitable for marine use. Vessel had a residential style oil fired furnace in the machinery space aft of the overnight passenger accommodations. Vessel plans were not available at this unit. 46 CFR 184.05-1 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 December 2024
Resolved 23 April 2026
Resolution: Vessel is not authorized to carry overnight accommodations until issue is resolved. Closed deficiency accordingly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 November 2024 Resolved
..heating boilers and their associated piping and fittings will be given separate consideration and must meet the applicable requirements of subchapter F...of this chapter as determined necessary by the cognizant OCMI, except that heating boilers must be tested or examined every three years... Periodic inspection and testing requirements for boilers are contained in § 61.05 in subchapter F of this chapter. Evidence of the required testing was not available at the time. 46 CFR 182.310 46 CFR 176.182(b) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 December 2024
Resolved 23 April 2026
Resolution: Vessel is not authorized to carry overnight accommodations until issue is resolved. Closed deficiency accordingly.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 November 2024 Resolved
all general areas accessible to passengers to have no less than 2 independent avenues of escape that are- (I) constructed and arranged to allow for free and unobstructed egress from such areas; (II) located so that if one avenue of escape is not available, another avenue of escape is available; and (III) not located directly above, or dependent on, a berth;PLAN REQUIRED.—Not later than April 1, 2024, an operator of an overnight fishing charter not in compliance with such section 3306(n)(3)(A)(v) shall submit to the Commandant a plan for complying with such requirements. Plan provided 3/19/24 was inadequate.EXTENSION.—On and after April 1, 2024, with respect to an operator of an overnight fishing charter which has submitted a plan for compliance in accordance with subparagraph (B), a captain of the port may extend essels described by 46 CFR 175.110(d) must comply with the regulations in § 177.500 not later than January 1, 2026.NOTICE TO PASSENGERS.—Beginning on the date on which the requirements under section 3306(n)(3)(A)(v) of title 46, United States Code, take effect, the owner or operator of a vessel for which an extension is granted under paragraph (1)(C) shall provide on the website of such owner or operator of the vessel, the vessel, and each ticket for a passenger a prominently displayed notice that the vessel is exempt from meeting the Coast Guard safety compliance standards concerning egress as described in such section. Notice not on website.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 December 2024
Resolved 23 April 2026
Resolution: Vessel has modified the space IAW with final rule. Cleared deficiency accordingly.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 November 2024 Resolved
Vessels described by 46 CFR 175.110(d) must comply with the regulations in § 177.500. A ladder leading to a deck scuttle may not be used as a means of escape. The two required means of escape must be widely separated and, if possible, at opposite ends or sides of the space to minimize the possibility of one incident blocking both escapes. The secondary means of escape is a vertical ladder. Both escapes lead to the same enclosed space. 46 CFR 177.115 46 CFR 177.500(j) 46 CFR 177.500(b) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 December 2024
Resolved 23 April 2026
Resolution: Vessel is not authorized to carry overnight accommodations until issue is resolved. Closed deficiency accordingly.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 3 May 2023 Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. EPIRB hydrostatic release is due to expire at the end of the month. Install new hydrostatic release to the satisfaction of the attending inspector. 46 CFR 185.740(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 15 May 2023
Resolution: Hydrostatic release was renewed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 May 2023 Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child life jacket stowage on starboard side top deck was not segregated from adult life jackets. Segregate child and adult life jackets to the satisfaction of the attending marine inspector. 46 CFR 180.78
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 15 May 2023
Resolution: Vsl provided photos Life jackets are segregated.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 May 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to prevent electrical ignition of flammable vapors. Generator windings on both generators are saturated with oil. Clean windings to the satisfaction of attending marine inspector. 46 CFR 183.200(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 15 May 2023
Resolution: Vsl provided service report windings were cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 May 2023 Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray. Battery covers were not secured. Secure battery covers to the satisfaction of the attending inspector. 46 CFR 183.350(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 15 May 2023
Resolution: Vsl provided photos of secured covers.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 3 May 2023 Resolved
The monitoring device(s) must: (1) Ensure the wakefulness of the crew in the event that the watchman required in paragraph (a) of this section is unresponsive. Watchman device does not provide means to wake crew if unacknowledged. Submit plans for watch device that meets 46 CFR 185.410.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2023
Resolved 15 May 2023
Resolution: Vsl provided plans, unit will review.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 May 2023 Resolved
Wiring joints and splices. (1)Wiring joints and splices shall be mechanically secure and made in junction boxes. Wiring in bridge overhead has open junction box. Affix a junction box cover to the satisfaction of the attending inspector. 46 CFR 183.05-50(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 15 May 2023
Resolution: Vsl provided photos of wiring properly contained.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 April 2022 Resolved
Vessel missed required due date for plan submittal of monitoring device required by 3/28/2022. Granted 30 day extension for plan submittal. Failure to meet deadline will result in another 835 issued for no passenger overnight accommodations. 46 CFR 185.410(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2022
Resolved 20 April 2022
Resolution: O/O submitted plans. Plans saved in Teams Folder.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 12 May 2021 Resolved
The engine room emergency hatch enters a closet in the main deck accommodation area. Remove locks from closet door. Ensure gear stored in closet does not block this escape route. Mark the escape hatch and the closet door accessing the hatch with “Emergency Exit, Keep Clear” using at least 2-inch letters.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2021
Resolved 4 June 2021
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 12 May 2021 Resolved
The 6-man life float was not connected to the vessel. Attach the 6-man life float to its own float free link with a 100 ft painter OR attach the 6-man life float painter around the body of the last 25-man life float in the adjacent stack. 46 CFR 180.130(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2021
Resolved 4 June 2021
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 12 May 2021 Resolved
Several minor issues were found on the vessel life floats: -Life float paddles are cracked -Life float grab lines are coiled using electrical tape -The painter on the forward life float stack is bundled using a zip tie -Retroreflective tape is faded in areas. 46 CFR 176.808(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2021
Resolved 4 June 2021
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 12 May 2021 Resolved
Replace expired EPIRB hydrostatic release. 46 CFR 180.64
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2021
Resolved 4 June 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 12 May 2021 Resolved
Two openings were found in the forward engine room watertight bulkhead above the switchboard. Make openings watertight. 46 CFR “Old S” 171.114(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2021
Resolved 4 June 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2021 Resolved
The remote shutoff valve for the starboard outboard propulsion engine could not be operated from the weather deck. Repair or replace valve. 46 CFR “Old T” 182.20-40(b)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2021
Resolved 4 June 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 March 2021 Resolved
Repair holes and wasted area in port lazarette trunk.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 12 May 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 March 2021 Resolved
Re-route fuel sounding pipe to terminate at the same height as the fill.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 12 May 2021
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 10 March 2020 Resolved
Stow Ballast in a way that prevents it from shifting. Remove ballast from lazarette and stow in accordance with stability letter. 46 CFR "Old S" 170.235. 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2020
Resolved 12 May 2020
Resolution: Meets requirements in 46 CFR "Old S" 170.235
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 March 2020 Resolved
Repair/replace ammeter on starboard generator. 46 CFR "Old T" 183.10-5(g). 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2020
Resolved 12 May 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 March 2020 Resolved
:ine connecting water light to life ring shall be 3' to 6' long. It shall be connected to life ring body using a metallic clip. 46 CFR 180.79(d). 16c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 March 2020
Resolved 12 May 2020
01 - Certificates & Documentation › 012 - Crew Certificates › Training and qualification MLC - Personnel safety training
Issued 10 March 2020 Resolved
Draft a Station Bill for vessel detailing all requirements in 46 CFR 185.514. 46 CFR 185.514. 16c.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 May 2020
Resolution: Station Bill Emailed to unit.
01 - Certificates & Documentation › 012 - Crew Certificates › Training and qualification MLC - Personnel safety training
Issued 10 March 2020 Resolved
Designate all Senior Deckhands in writing in accordance with NVIC 01-91. 46 CFR 176.103. 50c.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2020
Resolved 12 May 2020
Resolution: Station Bill emailed to unit.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2019 Resolved
Remove dead end wires from under the operating station as discussed. - 46 CFR 183.200(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2019
Resolved 12 May 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2019 Resolved
Provide metal supports (no more than 24 inches apart) for the wiring underneath the operating station, so that it is no longer on the deck. - 46 CFR 183.340(b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2019
Resolved 12 May 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2019 Resolved
Provide simple line diagram, over current protection used, and length and type of wire used in the installation of emergency lighting in the lower accommodation space. - 46 CFR 176.700(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2019
Resolved 10 March 2020
Resolution: Vessel is using off the shelf emergency lighting system that is wired into the vessel 110VAC system. Installation is satisfactory.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018 Resolved
Vsl is broadcasting: : No static draft information and no dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 11 March 2020
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 3 April 2018 Resolved
AM01: Replace dry-rotted grablines on two liferings located on second deck.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 April 2018
Resolved 16 April 2018
Resolution: Observed new grablines on liferings.
Lifesaving › Hand Flares › Expired
Issued 3 April 2018 Resolved
AM02: Remove and replace expired flares.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 April 2018
Resolved 16 April 2018
Resolution: Observed new flares.
Electrical › Electric Generation Source (service) › Generator
Issued 4 April 2017 Resolved
46CFR176.830: Port side generator has oil leak and windings are oil soaked. Repair and clean to new condition. Do not use until cleared by Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 May 2017
Resolved 19 April 2017
Resolution: Verified in person by [name withheld]
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 4 April 2017 Resolved
Port inboard engine exhaust leaking water from weld joint. Must repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 May 2017
Resolved 19 April 2017
Resolution: Verified in person by [name withheld]
Fire Fighting › Fire Pumps › Pressure
Issued 13 April 2016 Resolved
Install pump outlet pressure gauge.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 20 April 2016
Resolution: Installed pressure gauge on fire pump. All sat
Stability › Watertight Integrity › General
Issued 13 April 2016 Resolved
Seal watertight bulkhead penetrations on aft bulkhead of engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 20 April 2016
Resolution: Sealed watertight bulkhead penetrations. All sat
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 April 2016 Resolved
Install proper wiring joints on bilge level alarm in engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 20 April 2016
Resolution: Installed proper wiring joints on bilge level alarm in engine room. All sat
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 13 April 2016 Resolved
Install proper length of painter
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 20 April 2016
Resolution: Installed proper length of painter. All sat
Navigation › Piloting/Steering › Marine Charts
Issued 13 April 2016 Resolved
Provide updated charts and Nav Rules
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 20 April 2016
Resolution: Provided updated charts and Nav Rules. All sat
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 13 April 2016 Resolved
Replace batteries in all float lights.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 20 April 2016
Resolution: Replaced batteries in all float lights.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.