MAURY USCG vessel records Sign in
← All vessels

USNS PFC EUGENE A OBREGON

USNS PFC EUGENE A OBREGON is a 1983 freight ship. The Coast Guard has recorded 173 inspections since 1985, most recently in April 2024, along with 248 deficiencies — 9 with no resolution recorded —, 3 operational controls and 9 casualty investigations between 2004 and 2018.

Records from 1985 to 2024. Most recent: inspection, 25 April 2024.

Built
1983
Last inspected
25 April 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7823463 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
244856
Flag
UNITED STATES
366257000 (licence lapsed)
Maury page id
psix-244856

Inspections, by type

…with no type recorded68
…past their stated due date2
Years with a record 34 calendar years (1985–2024)
The 173 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it25477 - Dead Weight, Ton
45408 - Convention (Subpart B), Gross Ton
29091 - Regulatory (Subpart C or D), Gross Ton
13622 - Convention (Subpart B), Net Ton
18895 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WHAQMMSI 366257000 · expired · compulsorily equipped · granted 11 July 2006, cancelled 22 October 2016
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 173

25 April 2024 Load Line/Change of Employment
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7901398
16 February 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7141196
14 August 2020 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7032961
15 June 2020 Annual Inspection · Administrative Inspection · ACP Annual Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6957929
10 March 2020 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6923849
2 December 2019 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6866047
25 November 2019 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6863819
30 September 2019 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6826429
18 September 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6814909
18 July 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6753867
6 June 2019 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6709875
16 May 2019 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6683847
16 May 2019 ACP Periodic Oversight · ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6684556
18 March 2019 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6644185
7 February 2019 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6623613
30 September 2018 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6575775
29 September 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6552122
11 September 2018 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6537632
10 September 2018 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6541106
7 September 2018 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6535223
27 August 2018 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6542283
15 June 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6445247
10 April 2018 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6390329
10 April 2018 Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6390373
6 April 2018 Periodic Inspection · ACP Annual Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6385616
20 March 2018 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6375766
29 January 2018 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6347874
8 September 2017 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6272747
23 May 2017 ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6153381
1 December 2016 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6056139
5 October 2016 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6016968
17 December 2015 Drydock Exam · ACP COI Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5795412
14 December 2015 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5781202
22 July 2015 Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5192224
2 June 2014 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4878122
1 June 2014 Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4877376
31 May 2014 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4878196
30 May 2014 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4877036
17 March 2014 ACP Annual Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 4809973
3 January 2011 Drydock Exam · ACP COI Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3919455
17 December 2010 In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4239811
13 December 2010 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3909628
3 December 2009 MTSA/ISPS Verification · Administrative Inspection · ACP Annual Oversight · Annual Inspection
Physical examination · Activities Europe · Activity 3643882
29 July 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3549673
9 January 2009 ACP COI Oversight · COI Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 3391784
9 October 2008 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 3443380
10 March 2008 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3161800
11 February 2008 ACP Annual Oversight · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3141406
3 January 2008 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3124447
24 October 2007 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3086293
5 June 2007 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2952420
5 March 2007 MTSA/ISPS Verification · MARPOL Annex I Examination · MARPOL Annex V Examination · ACP Periodic Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 2886759
21 February 2006 Administrative Inspection
Administrative · Activities Europe · Activity 2807701
7 December 2005 ACP Annual Oversight · Annual Inspection
Physical examination · Activities Europe · Activity 2538856
21 July 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2434109
29 December 2004 ACP COI Oversight
Administrative · Activities Europe · Activity 2255085
7 November 2004 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2251494
3 November 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2233887
12 October 2004 Administrative Inspection · ACP COI Oversight
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2228472
8 October 2004 Deficiency Check
Physical examination · Activities Europe · Activity 2229909
9 August 2004 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2169980
27 July 2004 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2146419
16 June 2004 MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 2067477
14 May 2004 Type not recorded
No type recorded · Activities Europe · Activity 2076507
18 March 2004 Annual Inspection
Physical examination · Activities Europe · Activity 2020988
6 February 2004 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2004921
23 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1976150
6 December 2003 Type not recorded
No type recorded · Activities Europe · Activity 1978870
11 September 2003 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1902509
24 July 2003 Administrative Inspection
Administrative · Activities Europe · Activity 1867096
26 February 2003 Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1747573
19 November 2001 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1440601
24 August 2000 Type not recorded
No type recorded · Activities Europe · Activity 281620
24 August 2000 COI Inspection
Physical examination · Activities Europe · Activity 1361677
24 July 2000 Administrative
Administrative · Activities Europe · Activity 820221
1 June 2000 Administrative
Administrative · Activities Europe · Activity 1450497
23 March 2000 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 816432
7 October 1999 Type not recorded
No type recorded · Activities Europe · Activity 275523
6 October 1999 Re-Inspection
Physical examination · Activities Europe · Activity 1369374
6 August 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 452263
6 July 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1451432
21 May 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 799479
25 March 1999 Type not recorded
No type recorded · Activities Europe · Activity 170245
22 January 1999 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 786974
21 October 1998 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 103550
17 September 1998 COI Inspection
Physical examination · Activities Europe · Activity 1372363
27 August 1998 Type not recorded
No type recorded · Activities Europe · Activity 651597
27 May 1998 Deficiency Check
Physical examination · Activities Europe · Activity 792394
21 April 1998 Type not recorded
No type recorded · Activities Europe · Activity 1124190
10 March 1998 Deficiency Check
Physical examination · Activities Europe · Activity 1120328
13 February 1998 Deficiency Check
Physical examination · Activities Europe · Activity 776786
28 January 1998 Deficiency Check
Physical examination · Activities Europe · Activity 1117926
22 December 1997 Deficiency Check
Physical examination · Activities Europe · Activity 781592
12 December 1997 Deficiency Check
Physical examination · Activities Europe · Activity 1116974
14 November 1997 Deficiency Check
Physical examination · Activities Europe · Activity 1121792
20 October 1997 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 776764
28 September 1997 Re-Inspection
Physical examination · Activities Europe · Activity 1368425
10 June 1997 Type not recorded
No type recorded · Activities Europe · Activity 651600
22 October 1996 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 850634
15 October 1996 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1421208
8 September 1996 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 946466
26 June 1996 Type not recorded
No type recorded · Activities Europe · Activity 127348
26 June 1996 Type not recorded
No type recorded · Activities Europe · Activity 212895
13 April 1996 Type not recorded
No type recorded · Activities Europe · Activity 68848
13 April 1996 Type not recorded
No type recorded · Activities Europe · Activity 214725
8 April 1996 Type not recorded
No type recorded · Activities Europe · Activity 113228
5 November 1995 Deficiency Check
Physical examination · Activities Europe - OLD · USCG Northeast District (CGD-NE) · Activity 1355538
31 October 1995 Re-Inspection
Physical examination · Activities Europe - OLD · USCG Northeast District (CGD-NE) · Activity 1416200
16 October 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 180503
29 September 1995 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1193193
24 August 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 53008
12 July 1995 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1187172
6 July 1995 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 183055
12 January 1995 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 861855
22 November 1994 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1387643
28 June 1994 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 444877
24 June 1994 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1025310
17 June 1994 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1178558
6 June 1994 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1396128
6 May 1994 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 528980
6 May 1994 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1374046
23 March 1994 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 859631
22 March 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1016560
7 March 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1166369
2 March 1994 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1163480
15 December 1993 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 852208
10 May 1993 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 506007
5 March 1993 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 849985
12 December 1992 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 830180
23 November 1992 Examination of Repairs
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 963077
11 September 1992 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1258104
3 September 1992 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942124
22 May 1992 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 350897
14 April 1992 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1263801
14 February 1992 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1263961
10 January 1992 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 952415
8 January 1992 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1265197
3 January 1992 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 944780
24 December 1991 Hull Examination · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 958960
22 November 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 466249
22 November 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1249653
21 November 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1407053
26 April 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 913690
8 February 1991 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910234
31 January 1991 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 999897
30 January 1991 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 923540
19 December 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1221703
18 December 1990 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 915318
18 December 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1229825
20 June 1990 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 931226
6 February 1990 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 449950
31 January 1990 Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 920902
21 January 1990 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1240896
18 January 1990 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 927347
22 December 1989 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1232603
8 December 1989 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 912911
6 December 1989 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 494968
28 November 1989 Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1230666
7 March 1989 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1340969
2 March 1989 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1202051
18 December 1988 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1349772
24 January 1988 Deficiency Check · Re-Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1019043
30 November 1986 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1020712
26 November 1986 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1308337
23 November 1986 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1019592
18 November 1986 Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1018459
18 November 1986 Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1323261
2 October 1986 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1314110
2 April 1986 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1306124
3 February 1986 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1305913
12 September 1985 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 985558
4 March 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1286099
14 January 1985 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1284263

Deficiency record · 248

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020 Resolved
Emergency bus tie breaker switch broke on the main switch board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage comminuting and disinfecting system
Issued 15 June 2020 Resolved
Sewage line on main deck, starboard side, overhead leaks. Covered with absorbent pads and duct tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 June 2020 Resolved
Emergency fire pump packing was leaking excessively while operating.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 15 June 2020 Resolved
De-scale and prove proper operation of pressure relieving device on DC heater.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 15 June 2020 Resolved
Lagging was missing on orsin line (hot) on steam generator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020 Resolved
Junction boxes for controls on port and starboard engine room supply air were wasting and missing covers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 15 June 2020 Resolved
Penetrations in between hold 6 and stair tower IWO frame 75 were inproperly packed and not tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2020 Resolved
Starboard side engine room exhaust louver would not close.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 15 June 2020 Resolved
Investigate exhaust leak (possible) IWO DC heater.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 June 2020 Resolved
Starboard upper red navigation light not secure to the mast.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 June 2020 Resolved
Port lower red navigation light not secure to the mast.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage comminuting and disinfecting system
Issued 15 June 2020 Resolved
Sewage transfer motor controller wire to portside engine room needs to be supported.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 9 July 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 May 2019 Resolved
Means shall be provided for automatically giving audible warning of the release of fire-extinguishing gas into any space to which personnel normally have access. The alarm shall operate for a suitable period before gas is released. Pre-discharge delay setting does not allow enough time for personnel to safely egress from holds. Conduct servicing and set pre-discharge timers to the satisfaction of the attending CG Marine Inspector. 74 SOLAS II-2/8(g)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2019
Resolution: Vessel conducted sactisfactory pre-discharge timer tests in the presence of the attending Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 May 2019 Resolved
Fire-fighting systems and appliances shall be kept in good working order and ready for immediate use. Low pressure CO2 servicing shows multiple discrepancies between designed pre-discharge & discharge times and the results from the tests. Provide servicing and faulty timer repairs to the satisfaction of the Marine Inspector. 74 SOLAS (14) II-2/14.2.1.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 May 2019
Resolution: Timers were determined to not be faulty. The problem actually lay with the time delay settings for the adjustable pre-discharge delays. Cleared this deficiency and issued additional CG-835v, #43.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 May 2019 Resolved
Fire detection and fire alarm systems shall be kept in good order so as to ensure the required performance if a fire occurs. Smoke detection system on bridge and in fire control room are not operating properly. Provide servicing report and conduct testing to the satisfaction of the Marine Inspector. 74 SOLAS (14) II-2/14.2.1.1.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 May 2019
Resolution: Ship's personnel troubleshot panel, repaired, and tested in the presence of CG Marine Inspector; all sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 May 2019 Resolved
Means shall be provided for stopping ventilation fans and closing ventilators from outside the space in case of fire. Four out of six supply/exhaust automatic ventilator dampers do not properly close. Test all supply/exhaust ventilators in the presence of Coast Guard Marine Inspector and ABS. 74 SOLAS II-2/54(a) 701 a,c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 May 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Port bilge pump will not take suction. Prove proper operation to the Marine Inspector. 74 SOLAS (14) I/11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2019
Resolution: Port bilge pump was operated in the presence of CG Marine Inspector; all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 May 2019 Resolved
Maintenance, testing and inspections shall be carried out based on the guidelines developed by the Organization. The vessel does not have any servicing report for fixed foam fire fighting system, including foam analysis report. 74 SOLAS (14) II-2/14.2.2.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2019
Resolved 30 May 2019
Resolution: ABS report# NN36727
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 16 May 2019 Resolved
Manholes and flush scuttles in position 1 or 2 shall be closed by substantial covers capable of being made watertight. Scuttle #3 IWO ammo hold does not properly secure. Prove proper operation to the satisfaction of the Marine Inspector. ICLL 66 I/18(1)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2019
Resolution: Scuttle #3 in way of ammo hold was operated in the presence of CG Marine Inspector; all sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 May 2019 Resolved
Emergency lighting shall be at every boat station on deck and oversides. Port side lifeboats embarkation emergency lighting is inoperative. 74 SOLAS II-1/26(a)(ii)(1)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2019
Resolution: Lifeboat embarkation emergency lighting was tested in presence of CG Marine Inspector; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Vessel only has 103 serviceable immersion suits on board. Total persons on board limited to 95. 74 SOLAS (14) I/11
Action required: 705 - Other - as specified
Resolved 14 August 2019
Resolution: Received documentation, in the form of a CG-835, with ABS clearance of the deficiency under report #NN3672735.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Provide OEM report with approvals for repairs made to lifeboat davits 2, 3 & 4. 74 SOLAS (14) I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: ABS report # NN3672735
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. DC Lockers 1 & 2 have portable extinguishers that are not properly secured.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: ABS report # 3672735
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. WTD operating panel in cargo hold IWO cargo ramp has indicator light colors switched (should be green for closed and red for open). 74 SOLAS (14) I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: ABS report # NN3672735
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 May 2019 Resolved
Means for securing the weathertightness shall be capable of being maintained in all sea conditions. Bosun store hatch cover gasket on the forecastle needs to be renewed. ICLL 66 I/19(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: ABS report # NN3672735
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 16 May 2019 Resolved
Ventilator openings shall be provided with weathertight closing appliances. Bosun store aft bulkhead ventilation closure gasket needs to be renewed. ICLL 66 I/16(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: ABS report # NN3672735
09 - Working and Living Conditions › 092 - Working Conditions › Loading and unloading equipment
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Port fuel door main deck solenoid valve is leaking hydraulic oil leading to a substantial amount accumulating on the deck. 74 SOLAS (14) I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2019 Resolved
Each circuit shall be protected by an overload protective device of an appropriate type based on its current carrying capacity. Two breakers on the EDG panel are overrated for the circuit. 74 SOLAS II-1/27(a)(vii)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2019
Resolution: Received documentation, in the form of a CG-835, with ABS clearance of the deficiency under report #NN3672735
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 16 May 2019 Resolved
Ventilator openings shall be provided with weathertight closing appliances. Low pressure CO2 compartment forward bulkhead ventilation closure will not seal. ICLL 66 I/19(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2019
Resolution: Cleared by ABS. Report #NN3672735
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 May 2019 Resolved
Maintenance, testing and inspections shall be carried out based on the guidelines developed by the Organization. Portable extinguisher FR15 has not been serviced. 74 SOLAS (14) II-2/14.2.2.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: ABS report # NN3672735
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 16 May 2019 No resolution recorded
Ventilator openings shall be provided with weathertight closing appliances. House port side forward head ventilation closure missing. ICLL 66 I/19(4)
Action required: 16 - Rectify deficiencies w/in 14 days
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. One ammo hold sprinkler valve missing manual control. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 May 2019
Resolution: Received documentation, in the form of a CG-835, with ABS clearance of the deficiency under report #NN3672735.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 16 May 2019 No resolution recorded
Penetrations through structural fire protection shall be adequately protected to ensure the required performance if a fire occurs. One gyro room cable transit through the deck does not have cable penetration system installation for fire protection. 74 SOLAS (14) II-2/14.2.1.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 16 May 2019 No resolution recorded
Penetrations through structural fire protection shall be adequately protected to ensure the required performance if a fire occurs. Reproduction room overhead cable penetration does not have cable penetration system installation for fire protection. 74 SOLAS (14) II-2/14.2.1.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 May 2019 No resolution recorded
Lifebuoys shall be fitted with beckets securely seized. Multiple lifebuoys throughout the decks have grab lines that have sun rot, renew. SOLAS 74 III/21(d)
Action required: 50 - Rectify deficiencies w/in 30 days
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Starboard liferaft emergency lighting electrical cable needs to be renewed. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 July 2019
Resolution: Cleared by ABS. Report #NN3672735.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Bosun store aft bulkhead starboard exterior light needs to be renewed. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 July 2019
Resolution: Cleared by ABS. Report #NN3672735.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Mount for 10 man liferaft located on the port fantail is wasted, renew. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 July 2019
Resolution: Cleared by ABS. Report #NN3672735.
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 16 May 2019 No resolution recorded
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Port side accommodation ladder rail/supports are wasted, renew. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 16 May 2019 Resolved
Ventilator openings shall be provided with weathertight closing appliances. Upper low pressure CO2 compartment closure does not close properly. ICLL 66 I/19(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 August 2019
Resolution: Received documentation, in the form of a CG-835, with ABS clearance of the deficiency under report #NN3672735.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 16 May 2019 Resolved
Every lifeboat shall have one approved cover of a highly visible color capable of protecting the occupants against injury by exposure. Three out of four lifeboat canopies have wasted hardware, repair or replace. 74 SOLAS III/11(a)(xxvi)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 August 2019
Resolution: Received documentation, in the form of a CG-835, with ABS clearance of the deficiency under report #NN3672735.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Mess deck stairtower self-closing door does not close. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 July 2019
Resolution: Cleared by ABS. Report #NN3672735.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2019 Resolved
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Lighting fixtures at the top and bottom of cargo hold 4A stairtower are missing covers. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 July 2019
Resolution: Cleared by ABS. Report #NN3672735.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 16 May 2019 No resolution recorded
No change shall be made to the structural arrangements, machinery, equipment, etc. covered by the survey. Provide repair proposal for cargo hold 4A structural fire protection. Remove standing water and evaluate wastage of structural members. 74 SOLAS (14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 16 May 2019 Resolved
The normal equipment of every lifeboat shall consist of 3L of fresh water for each person the lifeboat is certificated to carry. Each lifeboat had approximately 2L of water per person, including the desalinization pumps. 74 SOLAS III/11(a)(xiii)
Action required: 10 - Deficiency Rectified
Resolved 23 May 2019
Resolution: ABS report # NN3672735
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 16 May 2019 Resolved
The normal equipment of every lifeboat shall consist of 10,000 kJ of food for each person the lifeboat is certificated to carry. Each lifeboat contained food rations with compromised vacuum seals. 74 SOLAS III/11(a)(xii)
Action required: 10 - Deficiency Rectified
Resolved 23 May 2019
Resolution: ABS report # NN3672735
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 16 May 2019 Resolved
Lifeboats shall be equipped to meet the requirements of SOLAS. Lifeboat equipment contained expired batteries & first aid items and inoperable flashlights. 74 SOLAS III/11(a)
Action required: 10 - Deficiency Rectified
Resolved 23 May 2019
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 16 May 2019 Resolved
All ships 500 GT and upwards shall be fitted with a gyro-compass and appropriate repeaters. Vessel gyro-compass repeaters were displaying a variety of headings at different stations. 74 SOLAS (14) V/19.2.5
Action required: 10 - Deficiency Rectified
Resolved 17 May 2019
Resolution: Tech rep attended vessel and reset system with correct latitude input.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 May 2019 Resolved
At least two lifebuoys fitted with self-activating smoke signals shall be capable of quick release from the bridge. Smoke signals were attached to lifebuoys with lanyards of incorrect length according to smoke signal installation instructions. 74 SOLAS III/21(g)
Action required: 10 - Deficiency Rectified
Resolved 17 May 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 May 2019 Resolved
All watertight doors shall always be ready to be immediately closed. Sliding watertight door located in shaft alley was not properly sealing. 74 SOLAS II-1/13(n)
Action required: 10 - Deficiency Rectified
Resolved 17 May 2019
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 16 May 2019 Resolved
Fire protection systems and fire-fighting system appliances shall be maintained ready for use. International shore connection components were stowed in separate locations w/in the DC Locker and the crew was unaware of their location (parts were located on random shelves mixed in with spare components). 74 SOLAS (14) II-2/14.1.1
Action required: 10 - Deficiency Rectified
Resolved 17 May 2019
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 16 May 2019 Resolved
Upon activation, vessel is to provide MMC's for all crew when vessel is fully manned IAW COI to the satisfaction of the attending Marine Inspector. 46 CFR 15.515(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 July 2019
Resolution: Crew documents verified during ROS activation inspection by the attending CG Marine Inspector.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 16 May 2019 No resolution recorded
Vessel does not keep up to date charts and publications while in ROS. Upon activation, provide up to date charts and publications to the satisfaction of the attending Marine Inspector. 33 CFR 164.33
Action required: 60 - Rectify deficiencies prior to movement
Resolution: Vessel charts and publication verified during ROS activation inspection by the attending CG Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 16 May 2019 Resolved
Every crew member shall participate in at least one abandon ship drill and one fire drill every month. When a new crew is engaged, these drills shall be held before sailing. Upon activation, vessel is to conduct abandon ship and fire drills to the satisfaction of the attending Marine Inspector. 74 SOLAS (14) III/19.3.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 July 2019
Resolution: Crew completed satisfactory fire and abandon ship drills during ROS activation inspection by the attending CG Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 16 May 2019 Resolved
Each boat shall be launched and maneuvered in the water by its assigned operating crew at least once every three months. Upon activation, each boat shall be launched and maneuvered in the water by its assigned operating crew. 74 SOLAS (14) III/19.3.3.3
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 July 2019
Resolution: Crew successfully launched lifeboat and maneuvered it in the water during ROS activation inspection by the attending CG Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 18 March 2019 Resolved
#3 lifeboat's hose between packing gland and shaft log is delaminating and cracking. Replace to OEMs recommendations. SOLAS74(14 Cons) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2019
Resolved 18 April 2019
Resolution: Hose has been replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 18 March 2019 Resolved
#3 lifeboat's engine appears to have an oil leak coming from head gasket, troubleshoot and repair to OEMs recommendations. Total persons limited to 48. SOLAS74(14 Cons) I/11
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2019
Resolved 18 April 2019
Resolution: Oil has been cleaned out and the engine was run for several minutes with no noticeable leaks.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 February 2019 Resolved
While conducting lowering operations of #3 lifeboat, the brake belt bolt sheared during the break test. The bolt from #4 lifeboat brake was installed on #3 lifeboat brake to recover safely. #4 lifeboat brake for winch is inoperable. Replace winch brake belt bolt to OEM approval. Total persons aboard is limited to 48. SOLAS74(14 Cons) I/11
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 May 2019
Resolution: Received a report from Palfinger (job number /VS12590) attesting to the new bolts and that they are approved for this service.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 7 February 2019 Resolved
Wastage was noted at the base of davit arms: #3 FWD, #4 AFT, and #2 FWD and AFT. #4 AFT top sheave mount has wastage as well. Provide ultasonic test report of areas from deck welds up two feet. Provide same testing for affected areas of #4 sheave mount. Provide OEMs approval of wastage or repair proposal. SOLAS74(14 Cons) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 May 2019
Resolution: PALFINGER provided report that is in vessel file and images in MISLE
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 February 2019 Resolved
#4 lifeboat's hose between packing gland and shaft log is delaminating and cracking. Replace to OEMs recommendations. SOLAS74(14 Cons) I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 April 2019
Resolution: hose replaced
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 30 September 2018 Resolved
Vessel experienced a loss of propulsion involving both the port and starboard boilers. Additionally, a port boiler f/o pressure switch leaked causing a fire in the engine room. Vessel shall provide a written report from its Classification Society that details the cause of the casualties and corrective action to prevent recurrence to the satisfaction of class prior to departure. 74 SOLAS I/11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2019
Resolution: Received ABS Survey Report # NN3569036 attesting to full repair.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 11 September 2018 No resolution recorded
Vessel experienced a casualty involving both port and starboard boilers. Vessel shall provide a report from its Classification Society detailing the cause of the casualty and corrective action to prevent recurrence to the satisfaction of Class. 74 SOLAS 14 I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 September 2018 — due date passed with no resolution recorded
Resolution: Received notification from ABS Class Surveyor [name withheld] that the port and stbd boilers have been rectified. USCG MI's conducted a visual examination of the boilers while lit off; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 11 September 2018 Resolved
Vessel shall be towed by a minimum of two tugs of at least 9,000 aggregate total horsepower, or; your vessel shall be towed by a minimum of two tugs of at least 90 ton aggregate bollard pull.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 September 2018
Resolved 14 September 2018
Resolution: Vessel safely transitted to Talton pier with required tug escort.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 7 September 2018 Resolved
The power available provided by the vessel's emergency diesel (EDG) generator shall be sufficient to supply all emergency loads necessary for the safety of all on board in an emergency with due regard to operate services simultaneously. Vessel's EDG is unable to carry immediate and simultaneous loads as such would be encountered while under normal underway operations. EDG demonstrates that the generator overcompensates when loads are put on and taken off the generator without self correction. Demonstrate proper operation of the EDG prior to departure to the satisfaction of the attending Coast Guard Marine Inspector and attending ABS Surveyor. SOLAS 74 II-1/26
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2018
Resolution: Cleared by class report with authorization from CID, [name withheld].
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 9 April 2018 Resolved
The Low pressure CO2 system level is below the amount required for the largest space. Add the proper amount of CO2 prior to loading cargo. To the satisfaction of Class and CG. 74 Solas (14) Chpt II-2/ Reg 14.2.1.2
Action required: 705 - Other - as specified
Due 9 April 2018
Resolved 10 April 2018
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 9 April 2018 No resolution recorded
The ships Fire Control Plan does not match shipboard arrangement. Update Fire Control Plan to the satisfaction of Class and CG. 74 Solas CHpt II-2/4
Action required: 705 - Other - as specified
Due 8 July 2018 — due date passed with no resolution recorded
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 9 April 2018 Resolved
Hospital Space does not have running hot water. Make repairs and demonstrate to Class and CG. US Supplement to ABS rules, Section III.8
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 10 April 2018
Engineering › Bilge Water Management System › Pump
Issued 9 April 2018 Resolved
The installed bilge system in the machinery space has unauthorized modifications, using pnuematic pumps to assist original centrifugal pumps. Obtain Class approval for modifications to the satisfaction of Class and CG. 74 Solas CDhapter 1/ Reg 10
Action required: 705 - Other - as specified
Due 8 July 2018
Resolved 8 September 2018
Resolution: Cleared by Class ABS with authorization by [name withheld].
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 9 April 2018 Resolved
Water tight door remote operating indicator located one deck above door is inoperative. Make repairs and demonstrate operation to the satisfaction of Class and CG. 74 Solas Chpt 1/10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 11 June 2018
Lifesaving › Lifeboat › Propulsion Engine
Issued 29 January 2018 Resolved
All 4 Lifeboats were found to have deficiencies that do not meet the requirements for life-saving appliance and were not in working order ready for immediate use. All four lifeboats required to complete annual servicing from a certified/licensed manufacturer’s representative. Reports shall be provided to ACS (Authorized Class Society) and the USCG Marine Inspector (MI).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 April 2018
Resolution: All lifeboats fixed and all gear accounted for.
Lifesaving › Inflatable Liferafts › Servicing
Issued 29 January 2018 Resolved
All life-rafts must be serviced and placed on station to the satisfaction of ACS and USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 March 2018
Resolution: All life rafts have been serviced and placed back into position
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 29 January 2018 Resolved
Ship’s smoke detection system disarmed and power secured. Provide approved third party servicing certificate and demonstrate proper operation to the satisfaction of ACS and the USCG MI.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2018
Resolution: Inspected smoke detection system and associated Harris Fire Protection servicing certificate dated 27MAR2018; all sat.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 29 January 2018 Resolved
Stair tower #501 self-closing door does not close. Repair to the satisfaction of ACS and USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 March 2018
Resolution: Tested sat.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 29 January 2018 Resolved
Power Panel doors across vessel are in general disrepair and do not allow easy access for securing power in case of emergency. Repair to the satisfaction of ACS and USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 29 January 2018 Resolved
Main deck passageway stair tower door has penetration next to fire damper #62 and General Alarm 47GA. Demonstrate proper operation to the satisfaction of ACS & USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 29 January 2018 Resolved
Stair tower door next to locker 513 and next to crew lounge found duct taped at kick-out panel. Repair to the satisfaction of ACS and USCG MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 29 January 2018 Resolved
Fire damper #13 inoperable (painted open). Demonstrate proper operation to the satisfaction of Class and USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 March 2018
Resolution: Tested SAT.
Stability › Watertight Integrity › General
Issued 29 January 2018 Resolved
Two ventilation trunks above the bow thruster space w/ substantiated metal wastage: major source of down flooding. Repair to the satisfaction of the ACS and USCG MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 April 2018
Resolution: New ventilation installed and all hardware installed.
Fire Fighting › Ventilation Systems › Fans
Issued 29 January 2018 Resolved
Supply & Exhaust Fans w/in the cargo holds (17 total fans) 5 are inoperable. Demonstrate proper operation of all supply and exhaust fans to ACS & USCG MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 April 2018
Resolution: All fans witnessed operational and all dampners verfied in operation.
Engineering › Bilge Water Management System › Not Operational
Issued 29 January 2018 Resolved
Bilge system is in a state of disrepair and inoperable due to missing sections and valves; Make approved repairs to installed bilge system in engine room to satisfy regulatory requirements and class rules, as well as to the satisfaction of attending ACS and USCG MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 April 2018
Resolution: Lifeboats have been repaired and all gear was found to be correct, Cleared item #1.
Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 29 January 2018 Resolved
Vessel is to provide MMC’s for all crew members when vessel is fully crewed IAW COI Manning to a USCG MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 April 2018
Resolution: MMC's inspected.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 29 January 2018 Resolved
Vessel does not keep up to date charts and publications due to ROS status. Vessel must provide charts and publications to USCG MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 April 2018
Resolution: New charts and pubs.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 29 January 2018 Resolved
Vessel is to conduct abandon ship and fire drill to the satisfaction of the USCG MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 April 2018
Resolution: Drills comducted to satisfaction CGMI.
Electrical › Electric Supply System (service) › Cable
Issued 29 January 2018 Resolved
Dead-end wires identified on PORT and STBD bridge wings, repair to the satisfaction of ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Electrical › Electric Supply System (service) › Cable
Issued 29 January 2018 Resolved
Dead-end wires identified atop bridge, repair to the satisfaction of ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Structural Fire Protection - General › Superstructure Construction
Issued 29 January 2018 Resolved
No fire stop installed in Electrical Equipment Room deck penetration on Bridge. Make appropriate repairs to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 February 2018
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Fixed Deck Foam System › Main Control Station
Issued 29 January 2018 Resolved
The #2 Fire Fighting Foam Station Supply Line supplying capabilities to the Helo Deck is compromised (hole). Provide repair proposal to ACS and USCG [name withheld] review and permission to proceed, repair to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Piping was replaced, All SAT.
Electrical › Electric Supply System (service) › Cable
Issued 29 January 2018 Resolved
On STBD aft end of Helo deck, hanging wires improperly secured. Repair to the satisfaction of ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 January 2018 Resolved
Lightbulb missing/damaged for Bridge watertight door indicator. Replace/demonstrate to the satisfaction of the ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Replacd, All SAT
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 29 January 2018 Resolved
Remove non-refillable refrigerant bottles from ship in RM 403 & LPCO2 room to the satisfaction of ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All Bottles removed.
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 29 January 2018 Resolved
Hospital Head – The hospital shall have a working toilet, bathtub/shower and washbasin. Demonstrate proper working facilities to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Toilet worked all sat.
Fire Fighting › Structural Fire Protection - General › Superstructure Construction
Issued 29 January 2018 Resolved
No Fire stop in deck penetrations in electrical trunk room 407. Repair to the satisfaction of the attending ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Construction/Loadline › Penetrations › Pipe Flange
Issued 29 January 2018 Resolved
U- bolt missing on piping at Frame 123. Replace/Repair to the satisfaction of ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected u-bolt pipe bracket; all sat
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 29 January 2018 Resolved
Mounting brackets found wasted for High Pressure CO2 for FWD BOSUN Storage space (2 Bottles). Repair/replace to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Brackets replaced, All SAT.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 29 January 2018 Resolved
Eye wash solution in dry stores passageway expired. Replace to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: New Bottle, with good expiration date installed, All SAT.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 29 January 2018 Resolved
All fire extinguishers in galley were expired/non-compliant. Provide compliant extinguisher in galley at all times to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Extinguishers were serviced, All SAT.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 January 2018 Resolved
Place cover on overhead light in locker 562 to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: New covers installed, All SAT.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 29 January 2018 Resolved
Standing water in Crew 7 SNR space. Remove all excess water from space to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Water removed, All SAT.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 29 January 2018 Resolved
Aft deck head has 2” of standing water on deck. Remove all excess water from space to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Water removed, ALL SAT.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 29 January 2018 Resolved
Emergency eye wash station in Battery Shop & Electrical Stowage room Remove securing directions and leave decon station in operation at all time to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: ALL SAT.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 29 January 2018 Resolved
Fuel overflow containment (12 for 104 port side) plug wasted. Repair/replace to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected fuel containment; new plug installed, all sat.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 29 January 2018 Resolved
Emergency Eye wash stations in all cargo holds inoperable. Ensure all eye wash stations are operable and have appropriate instructions to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 29 January 2018 Resolved
Nitrogen/refrigerant/O2 bottles adrift throughout vessel shall be properly stowed to the satisfaction of ACS and USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 9 April 2018
Resolution: All cylinders removed or secured.
Fire Fighting › Fire Hydrants › Condition
Issued 29 January 2018 Resolved
Fire stations 13, 50, & 51 on main deck stop valves experienced excessive leaking. Repair and make ready for immediate use to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected fire stations under pressure from emergency fire pump. No leaks detected; all sat.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
A/C line in room 403 found excessively corroded. Repair to original to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Lifesaving › Launching Appliances › Falls
Issued 29 January 2018 Resolved
Lifeboat #1 limit switch installed backwards. Install as designed and to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT
Engineering › Steering Gear System › Power Unit
Issued 29 January 2018 Resolved
Steering control failure alarm on Bridge. Demonstrate proper operation of steering console to the satisfaction of the ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 6 April 2018
Resolution: All required alarms witnessed sat.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 29 January 2018 Resolved
Smoke detection alarm on Bridge was found taped to not alarm in event of emergency. Demonstrate proper operation to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Tape removed; all sat.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 29 January 2018 Resolved
Ship does not have a current updated fire control plan. Provide an update Fire Control Plan to ACS and USCG MI for consideration and approval.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 9 April 2018
Resolution: CG-835 re-written under re-issued COI.
Construction/Loadline › Structures › Superstructure
Issued 29 January 2018 Resolved
Helo deck mountings loose and found corroded at dissimilar metal contact points. Provide report of inspection for Helo deck and connection points to vessel to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 6 April 2018
Resolution: Letter received verifying inspection fom Master
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 29 January 2018 Resolved
Cabin deck stair tower self-closing door does not close, minor adjustment. Prove proper operation to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAt.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
Hole in watertight door frame in refrigeration room (A/C room) 403. Provide repair proposal to ACS & USCG [name withheld] to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All Sat,
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
Watertight door in room 403 does not close. Demonstrate proper operation to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Ventilation Systems › Ducts
Issued 29 January 2018 Resolved
Ventilation duct in room 403 duct taped as patches. Repair to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
Room 403 fan drain line found broken and unsecured on deck. Repair to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 29 January 2018 Resolved
Instructions at lifeboat embarkation station missing at #3 lifeboat. Provide instructions to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected lifeboat instructions at embarkation station; all sat.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
Galley 480v power panel door doesn’t close (panel P57). Repair to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: New closing mechanism installed, All Sat.
Electrical › Electric Supply System (service) › Transformer
Issued 29 January 2018 Resolved
After market transformer installed in dry stores passage way provide proof of CG accepted third party approval of the installation: UL listed, FM, etc.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Transformer removed, All SAT.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 29 January 2018 Resolved
Forward sanitation wash unit in galley out of commission. Demonstrate proper operation to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Tested SAT.
Lifesaving › Immersion Suits › Quantity
Issued 29 January 2018 Resolved
Ship is missing seven immersion suits. Provide all required immersion suits for inspection to ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Crew showed 7 new immersion suits to inspectors and Class, All SAt.
Stability › Weathertight Integrity › General
Issued 29 January 2018 Resolved
Vents at lifeboat station #3 corroded and not watertight due to hole in steel bulkhead. Repair to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 4 April 2018
Resolution: New nut and wrench were provided so bolt closest to the bulkhead could be closed.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 29 January 2018 Resolved
Diesel service tank containment at #4 lifeboat station has hole next to drain plug. Repair to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Fire Fighting › Ventilation Systems › Ducts
Issued 29 January 2018 Resolved
In the Chemical Storage Room (CBRD), there is a Supply Vent Soft Patch (STBD side). Repair to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Soft Patch replaced with new metal ducting, ALL SAT.
Fire Fighting › Ventilation Systems › Ducts
Issued 29 January 2018 Resolved
In the CBRD locker, STBD aft above 2nd deck, there are holes in the ventilation. Repair to satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: New ducting installed, ALL SAT
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 29 January 2018 Resolved
Verify that the small air conditioning unit installed in the CBRD space has not compromised the structural fire protection boundary for that space. Provide information to ACS & USCG MI for further direction.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: A/C unit removed, new metal plated installed to seal bulkhead, All SAT.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 29 January 2018 Resolved
There is a penetration in the WTB – Frame 135 STBD side. Make WTB watertight to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Penetration sealed with approved material, All SAT.
Fire Fighting › Fixed High-Expansion Foam Fire Extinguishing System › Discharge Outlets
Issued 29 January 2018 Resolved
Fire Fighting Foam system nozzles sporadically missing throughout all cargo spaces. Verify operational readiness/good order of foam spray system throughout cargo holds to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: ALL SAT.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 29 January 2018 Resolved
Fire nozzle missing on spray system at Frame 95 PORT side. Verify operational readiness/ good order of spray system throughout cargo holds to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected spray nozzle installation; all sat.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 29 January 2018 Resolved
Random EEBDs off station- uncharged one in engine space. Ensure all EEBDs are on station and serviced throughout vessel to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 29 January 2018 Resolved
JP5 fuel tank vents wasted at deck & approx. 1.5’ above deck. Provide repair proposal to ACS & USCG [name withheld] review and approval to proceed, repairs must be to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Replaced, All SAt.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 29 January 2018 Resolved
Wasted gooseneck on PORT side. Provide repair proposal to ACS & USCG [name withheld] review and approval to proceed, repairs must be to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Replaced, All SAT.
Fire Fighting › Ventilation Systems › Ducts
Issued 29 January 2018 Resolved
Plywood & duct tape in vent trunk at FR-M on deck 4, Cargo Hold 4A. Complete repairs and demonstrate proper operations to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
WTD #11 Operating Station, oil soaked & leaking. Complete necessary repairs and demonstrate proper operation of station to ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Witnessed operation of WTD #11 and inspected associated hydraulics; all sat.
Engineering › Steam Boiler (propulsion) › Drum Support Tubes
Issued 29 January 2018 Resolved
Missing valve handle on the port boiler's steam drum near the sight glasses; install new handle to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: Replaced, All SAT.
Fire Fighting › Means of Escape › Blocked
Issued 29 January 2018 Resolved
Unrestricted access to escape ladder near emergency fire pump is hindered due to missing frame to support deck plate; reinstall framing and deck plate to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Electrical › Electric Generation Source (emergency) › Generator
Issued 29 January 2018 Resolved
Valve handle on EDG's hot start supply spins freely without valve actuation; replace valve to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected installation of EDG hot start supply valve; all sat.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
Water tight door remote operating station one deck above door was not producing an indication of the door being closed when it was in fact closed. Make repairs to manufactures specifications' and intended designed operation. Demonstrate proper operation to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 9 April 2018
Resolution: CG-835 re-written under re-issued COI.
Electrical › Lighting (service) › Lighting Fixture
Issued 29 January 2018 Resolved
Overhead light forward in shaft alley is permanently wired, but temporarily secured; mount light permanently and securely to prevent undue stress on wire to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Engineering › Steering Gear System › Cable
Issued 29 January 2018 Resolved
Bonding on top of rotary-vane steering system rubs when exercising steering system; mount to prevent chaffing to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: All SAT.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
A hole in the deck is allowing water to drip on two (2) separate motor controllers in the machinery space; one (1) aft of propulsion turbine on stbd side and one (1) port side that control a ballast pump. Once dripping water is stopped remove tarp and bags from motor controllers to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: ALL SAT.
Electrical › Electric Generation Source (service) › Generator
Issued 29 January 2018 Resolved
There is ballast piping in the port side SSDG space that is showing signs of potential leaks once pressurized; renew piping or satisfactorily hydro in the presence of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: ALL SAT.
Electrical › Electric Supply System (service) › Cable
Issued 29 January 2018 Resolved
Submersible pump in aft engine room is permanently wired, but is hanging from a rope and not mounted properly; remove or mount properly to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected permanent installation of submersible pump; all sat.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 29 January 2018 Resolved
Junction box for engine room supply air fire damper needs to be mounted and wire raised off the deck to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 29 March 2018
Resolution: Inspected permanent installation of junction box and associated wiring; all sat.
Electrical › Electric Generation Source (emergency) › Generator
Issued 29 January 2018 Resolved
Small hydraulic leak on EDG cranking system make repairs to the satisfaction of ACS & USCG MI.
Action required: 705 - Other - as specified
Due 17 March 2018
Resolved 20 March 2018
Resolution: ALL SAT.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 January 2018 Resolved
Vessel/Company is to complete an ISM audit to the satisfaction of ABS Surveyor and Attending USCG Marine Inspector.
Due 17 March 2018
Resolved 9 April 2018
Resolution: ISM completed by ABS.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 1 June 2017 Resolved
Vessel shall provide MMC's w/proper endorsements for minimum required manning as per vessels COI prior to activating IAW 46 CFR 15.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 February 2018
Resolved 8 September 2017
Resolution: Verified proper manning IAW the COI, all sat
Navigation › Piloting/Steering › Marine Charts
Issued 1 June 2017 Resolved
Navigation charts not corrected. Provide updated charts/ publications prior to vessel activation. Prior to departure. 33 CFR 164.33
Action required: 17 - Rectify deficiencies prior to departure
Due 12 February 2018
Resolved 8 September 2017
Resolution: Verified vessel had up to date charts and nautical publications, all sat
Operations/Management › Drills/Instruction › Fire
Issued 1 June 2017 Resolved
Vessel shall conduct fire and abandon ship drills, to include lowering and launching of all (4) lifeboats, in presence of CG Marine Inspector prior to activating. SOLAS 74, Chapter III, Regulation. 19
Action required: 17 - Rectify deficiencies prior to departure
Due 12 February 2018
Resolved 8 September 2017
Resolution: Witnessed the vessels crew preform a fire and abandon ship drill, all sat.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 13 February 2016 Resolved
Provide design verification testing procedures for the throttle control system and boiler automation. A copy fo each shall be retained on board.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2016
Resolved 16 March 2016
Resolution: Received report from ABS that the deficiency was cleared.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 13 February 2016 Resolved
Make necessary updates to the existing "Procedure for periodic testing of automation and vital systems." (PSTP). Refer to worklist issued under activity #5795412.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 1 June 2017
Resolution: Received and reviewed updated Periodic Safety Testing Procedures (PSTPs) dated 08-DEC-2016 from ABS Houston.
Electrical › Electric Generation Source (service) › Panelboard
Issued 13 February 2016 Resolved
Prove proper operation of the ship service turbo-generator.
Action required: 705 - Other - as specified
Resolved 16 March 2016
Resolution: ABS verified proper operation of the SSTG prior to the vessel's departure from drydock.
Lifesaving › Lifeboat › Propulsion Engine
Issued 14 December 2015 Resolved
Vessel's #4 lifeboat engine did not operate as designed. Vessel has since repaired the engine but has not proven proper operation to the satisfaction of class. Vessel is to prove proper operation of the #4 lifeboat to satisfaction of class. Vessel is restricted to 48 POB.
Action required: 705 - Other - as specified
Due 11 February 2016
Resolved 16 March 2016
Resolution: Received report from ABS verifying the proper operation of the #4 lifeboat engine on 13Feb2016
Operations/Management › Port and Waterways Safety › Notice of Hazardous Condition
Issued 1 June 2014 Resolved
Vessel suffered a reduction in shaft RPMs from clogged fuel strainers. Vessel is required to maintain an immediately available escort tug when transiting the Regulated Navigation Area of Hampton Roads/Chesapeake Bay Entrance.
Due 30 June 2014
Resolved 2 June 2014
Resolution: Vessel moored at home berth.
Lifesaving › Lifeboat › Propulsion Engine
Issued 17 March 2014 Resolved
#3 Lifeboat not ready for immediate use, engine inoperable. Repair to the satisfaction of the attending ABS classification surveyor. Prior to departure. 74SOLAS III/9
Action required: 705 - Other - as specified
Resolved 10 April 2014
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 17 March 2014 Resolved
Bridge fathometer/depth sounder inoperable. Repair to the satisfaction of the attending ABS classification surveyor.Prior to departure. 33 CFR 164.35
Action required: 705 - Other - as specified
Resolved 10 April 2014
Navigation › Piloting/Steering › Marine Charts
Issued 17 March 2014 Resolved
Navigation charts not corrected. Provide updated charts/ publications prior to vessel activation. Prior to departure. 33 CFR 164.33
Action required: 705 - Other - as specified
Resolved 30 May 2014
Resolution: Vessel provided corrected charts for the intended voyage, all sat.
Operations/Management › Drills/Instruction › Fire
Issued 11 February 2008 Resolved
Conduct fire & boat drills.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2008
Personnel › Certificates/Documents/Licenses › License, Master
Issued 11 February 2008 Resolved
Provide licenses/documentation for all personnel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 17 June 2004 Resolved
No requirement issued
Condition: Design Flaw
Due 17 June 2004
Resolved 17 June 2004
Lifesaving › Lifeboat › Markings
Issued 15 March 2004 Resolved
Replace SOLAS retro reflective tape on all four lifeboats LEGACY COMPONENT DESC: Markings
Due 18 April 2004
Resolved 18 April 2004
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 15 March 2004 Resolved
Replace lifeboat operating instructions for port side lifeboats
Due 18 April 2004
Resolved 18 April 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 15 March 2004 Resolved
Provide annual servicing for low pressure CO2 system; 46CFR97.15-60 LEGACY COMPONENT DESC: Quantity of CO2
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 April 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 15 March 2004 Resolved
Calibrate gauges located on low pressure CO2 system LEGACY COMPONENT DESC: Operating Controls
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 April 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 15 March 2004 Resolved
Hydrostatic test overdue CO2 bottles located in engine room; hose reel (2 bottles; last hydro 2/92) and emergency generator space (3 bottles; last hydro 2/92); 49CFR LEGACY COMPONENT DESC: Tanks
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 27 July 2004
Resolution: Sighted 5 CO2 in both locations stamped 7/04.
Fire Fighting › Fixed Deck Foam System › Main Control Station
Issued 15 March 2004 Resolved
Provide manufacturer certificates or analysis for AFFF tank (200 gallon), engine room foam tank 1 (50 gallon) and engine room foam tank 2 (50 gallon) LEGACY COMPONENT DESC: Main Control Station
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 April 2004
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 15 March 2004 Resolved
Provide procedure to test heat and smoke detection system
Due 18 April 2004
Resolved 18 April 2004
Fire Fighting › Structural Fire Protection - General
Issued 15 March 2004 Resolved
Repair inoperative fire damper 108B located in crew's laundry room LEGACY COMPONENT DESC: Accommodation Space Protection
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 March 2004
Resolution: Cleared prior to completion of inspection
Electrical › Electric Generation Source (emergency) › Switch
Issued 15 March 2004 Resolved
Repair inoperative emergency generator room main ventilation damper
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 April 2004
Engineering › Steam System (auxiliary) › Piping
Issued 15 March 2004 Resolved
Repair steam leak in the number 1 burner block, starboard boiler LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 April 2004
Engineering › Bilge Water Management System › Piping
Issued 15 March 2004 Resolved
Repair discharge flange on fire and bilge pump LEGACY COMPONENT DESC: Piping
Action required: 705 - Other - as specified
Due 18 April 2004
Resolved 18 April 2004
Engineering › Fuel Oil Service System
Issued 24 July 2003 Resolved
Vessel granted 90 day extension to SOLAS II-2 regulation 15.2.9 and 11; high pressure fuel line spray shields, leak off collection and alarms. Regulation must be meet by 01OCT03. See activity for details. LEGACY COMPONENT DESC: Piping
Due 1 October 2003
Resolved 18 March 2004
Resolution: Cleared via ABS survey report dated 19SEP04 (attached to MISLE activity) and verified by USCG inspector at annual exam.
Documentation
Issued 27 May 1998 Resolved
Master to provide certified copies or orginals of specified days of ships logs.
Condition: Unknown
Due 23 June 1998
Resolved 23 June 1998
Engineering
Issued 21 April 1998 Resolved
Open all port and stbd main boiler mounts for credit, to the satisfaction of an attending USCG Marine Inspector. Item was due 12DEC97.
Condition: Unknown
Due 21 April 1998
Resolved 21 April 1998
Lifesaving
Issued 28 September 1997 Resolved
REPAIR BROKEN HAND RAIL ON BOAT BOTTOM - LIFEBOAT #2.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Deck/Cargo
Issued 28 September 1997 Resolved
REPAIR/REPLACE P/V VALVE HOUSING (PIN HOLES) FOR MOGAS TANK, PORT SIDE FORWARD OF HOUSE.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Lifesaving
Issued 28 September 1997 Resolved
REPLACE EPIRB HYDROSTATIC RELEASE (EXP. MAY 97).
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Deck/Cargo
Issued 28 September 1997 Resolved
CUT (RE-SPLICE) FAILING/FRAYED MOORING LINE AFT. (FRAYED END OF LINE NOT TO BE USED UNTIL REPAIR IS MADE).
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Lifesaving
Issued 28 September 1997 Resolved
REPAIR BROKEN HAND RAIL on BOAT BOTTOM - LIFEBOAT # 1.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Documentation
Issued 28 September 1997 Resolved
PROVIDE DRUG TESTING PROGRAM.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Engineering
Issued 28 September 1997 Resolved
Install proper size (psi) relief valves for all 6 engineroom air receivers.Valves stamped/set more than MAWP.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Lifesaving
Issued 28 September 1997 Resolved
REPAIR HOLED HOSE FOR AIR INTAKE ON LIFEBOAT #4.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Construction/Loadline
Issued 28 September 1997 Resolved
Crop & renew wasted stbd bilge ovbd piping.
Condition: Unknown
Due 28 September 1997
Resolved 28 September 1997
Lifesaving
Issued 15 October 1996 Resolved
PERFORM OPERATIONAL TEST OF RELEASING GEAR FOR STBD LIFEBOATS. ALSO PERFORMOPERATIONAL TEST OF LIFEBOAT MOTOR. TESTS ARE TO BE PERFORMED UNDER "B" WEIGHT CONDITIONS.
Condition: Unknown
Due 15 October 1996
Resolved 21 October 1996
Deck/Cargo
Issued 15 October 1996 Resolved
PROVE PROPER OPERATION OF STARBOARD ANCHOR WINDLASS BRAKE. ANCHOR MUST FREEFALL WHEN BRAKE IS RELEASED.
Condition: Unknown
Due 15 October 1996
Resolved 15 October 1996
Accommodation/Occupational Safety
Issued 15 October 1996 Resolved
PROVIDE PROOF OF HYDROSTATIC TESTING OF OXYGEN BOTTLE IN HOSPITAL SPACE.
Condition: Unknown
Due 15 October 1996
Resolved 15 October 1996
Lifesaving
Issued 15 October 1996 Resolved
PRIOR TO DEPARTURE FROM THE PORT OF JACKSONVILL, MAKE PROPER REPAIRS TO LEAKING STERNTUBE I.W.O. STARBOARD LIFEBOAT #1.
Condition: Unknown
Due 15 October 1996
Resolved 15 October 1996
Engineering
Issued 31 October 1995 Resolved
MAKE PERMANENT REPAIRS TO WATERWALL TUBE RSS-3 ON STARBOARD BOILER.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Fire Fighting
Issued 31 October 1995 Resolved
AT THE NEXT DRYDOCK EXAM, COMPLETE SATISFACTORY TESTING OF THE SPRINKLER SYSTEM IN WAY OF #1, #2 AND #3 CONTAINER HOLDS.
Condition: Unknown
Due 31 October 1995
Resolved 31 October 1995
Fire Fighting
Issued 31 October 1995 Resolved
HYDROSTATICALLY TEST THE AFFF TANK IN THE AUX. MACHINERY SPACE TO 300 PSIG.
Condition: Unknown
Due 31 October 1995
Resolved 31 October 1995
Fire Fighting
Issued 12 July 1995 Resolved
MAKE PERMANENT REPAIRS TO LEAK IN STEEL PIPE BUSHING ON LOW PRESSURE CO2 TANK TO THE SATISFACTION OF THE ATTENDING ABS SURVEYOR USING APPROVED PROCEDURES. UPON COMPLETION OF REPAIRS FAX CONFIRMATION ENDORSED BY ABS TOOCMI NEW YORK, ATTN [name withheld].
Condition: Unknown
Due 10 August 1995
Resolved 10 August 1995
Deck/Cargo
Issued 22 November 1994 Resolved
RENEW THE FLAME SCREEN ON THE PORT AFT JP-5 VENT.
Condition: Unknown
Due 22 November 1994
Resolved 22 November 1994
Construction/Loadline
Issued 22 November 1994 Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN SHAFT ALLEY IN WAY OF OVERHEAD/BULKHEAD JOINT, STBD ABOUT FRAME 115 AT NEXT DRYDOCK, NOT LATER THAN 31DEC96.
Condition: Unknown
Due 22 November 1994
Resolved 22 November 1994
Fire Fighting
Issued 22 November 1994 Resolved
DEMONSTRATE OPERATION OF THE SPRINKLER SYSTEMS FOR CARGO HOLDS 1, 2 AND 3 AT THE FIRST OPPORTUNITY, BUT IN ANY CASE NOT LATER THAN 30JUN95.
Condition: Unknown
Due 30 June 1995
Resolved 1 December 1994
Construction/Loadline
Issued 6 May 1994 Resolved
EFFECT PERMANENT REPAIRS TO THE MAIN DECK FRACTURE FRAME 47 PORT, IN WAY OFTHE FIRST STRAKE INBOARD OF THE STRINGER PLATE AS DOCUMENTED BY ABS SURVEY REPORT OF 16DEC93._x001C_ _x001C_
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 7 March 1994 Resolved
RENEW BOTH 1.5 INCH EDWARDS TOP & BOTTOM SOOT BLOWDOWN VALVES TO PORT MAIN BOILER SERIAL # 37179-3.
Condition: Unknown
Due 7 March 1994
Resolved 7 March 1994
Fire Fighting
Issued 15 December 1993 Resolved
REMOVE ALL STAINLESS STEEL PORTABLE FIRE EXTINGUISHER AND REPLACE WITH AN APPROVED B-II FIRE EXTINGUISHER.
Condition: Unknown
Due 17 February 1994
Resolved 27 January 1994
Fire Fighting
Issued 15 December 1993 Resolved
CONDUCT OPERATIONAL TEST OF SPRINKER SYSTEM IN CONTAINER HOLDS.
Condition: Unknown
Due 15 December 1993
Resolved 15 December 1993
Electrical
Issued 15 December 1993 Resolved
REPAIR INDICATOR ALARN/LIGHT PANEL FOR # 2 DIESEL GENERATOR PRIME MOVER
Condition: Unknown
Due 15 December 1993
Resolved 15 December 1993
Engineering
Issued 15 December 1993 Resolved
CONDUCT INTERNAL EXAMINATION OF DC HEATER.
Condition: Unknown
Due 15 December 1993
Resolved 15 December 1993
Accommodation/Occupational Safety
Issued 12 December 1992 Resolved
MAKE PERMANENT REPAIRS TO MSD PIPING ABOVE MSD TANK.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Engineering
Issued 12 December 1992 Resolved
MAKE PRMANENT REPAIRS TO AUX. DRAIN TANK 2 INCH PIPING IN ENGINE ROOM LOCATED AT TANK TOP LEVEL CENTERLINE IN WAY OF DRAIN COLLECTING TANK PUMP.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Engineering
Issued 12 December 1992 Resolved
MAKE PERMANENT REPAIRS TO PORT GENERATOR SALT WATER COOLING RETURN LINE THAT HAS DOUBLER PLATE LOCATED AT COOLER OUTLET.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Lifesaving
Issued 12 December 1992 Resolved
RENEW RELIEF VALVES FOR STBD S/S AIR RECEIVER AND STBD STARTING AIR RECEIVER THAT HAVE PROPER IDENTIFICATION PLATE AFFIXED TO THEM.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Engineering
Issued 12 December 1992 Resolved
UPDATE ENGINE ROOM AUTOMATED/ REDUCED MANNING TEST PROCEDURES.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Fire Fighting
Issued 12 December 1992 Resolved
PROVIDE COPY OF RECENT FIREFIGHTING FOAM ANALYSIS.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Fire Fighting
Issued 12 December 1992 Resolved
BULK STORAGE TANKS FOR REFRIGERATED LIQUIFIED CO2 (4EA) SHALL BE HYDROSTATICALLY TESTED AND OPENED FOR INTERNAL EXAQMINATION IAW 46 CFR 61.10-5(g).
Condition: Unknown
Due 12 December 1992
Resolved 12 December 1992
Deck/Cargo
Issued 12 December 1992 Resolved
PROVIDE A MEANS OF DRAINING OR REMOVING DISCHARGED OIL OR HAZARDOUS MATERIAL FROM EACH DISCHARGE CONTAINMENT;AND A MECHANICAL MEANS OF CLOSING EACH DRAIN AND SCUPPER IN THE CONTAINER.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Engineering
Issued 12 December 1992 Resolved
RENEW PORT AND STBD BOILER MAIN STEAM STOP VALVES.
Condition: Unknown
Due 12 December 1992
Resolved 12 December 1992
Deck/Cargo
Issued 12 December 1992 Resolved
OPEN AND OVERHAUL P/V VALVES
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Deck/Cargo
Issued 12 December 1992 Resolved
PROVIDE STANDARD DISCHARGE CONNECTION IAW 33 CFR 155.430.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Deck/Cargo
Issued 12 December 1992 Resolved
PROVIDE CARGO TRANSFER HOSE DATE OF MANUFACTURE, BURST PRESSURE AND TEST PRESSURE IAW 33CFR155.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Lifesaving
Issued 12 December 1992 Resolved
INSTALL GENERAL ALARM IN PUMP ROOM IAW 46 CFR 113.25
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Accommodation/Occupational Safety
Issued 12 December 1992 Resolved
IDENTIFY, LABEL AND PROVE OPERATION OF REMOTE HANDWHEEL IN OVERHEAD OUTSIDEENTRANCE TO FAN ROOM 430 IN PASSAGEWAY.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Construction/Loadline
Issued 12 December 1992 Resolved
REPAIR OIL LEAKS TO RAMP DOOR HYDRAULIC POWER LOCATED IN HOLD #4 SECOND DECK.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Accommodation/Occupational Safety
Issued 12 December 1992 Resolved
INSTALL CG ACCEPTED NON-METALLIC FLEXIBLE HOSES ATTACHED TO RAMP DOOR HYDRAULIC POWER UNIT ABOVE #3 AND #4 MOTOR ASSEMBLY.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Construction/Loadline
Issued 12 December 1992 Resolved
PROVE OPERATION OF FACET BALLAST MONITOR LOCATED IN MOTOR ROOM
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Navigation
Issued 12 December 1992 Resolved
UPDATE EMERGENCY STEERING PROCEDURE PLACARD AND STEERING TRANSFER DIAGRAM.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Fire Fighting
Issued 12 December 1992 Resolved
REPAIR AND PROVE OPERATION OF AUTOMATIC FIRE DAMPER NO.17
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Fire Fighting
Issued 12 December 1992 Resolved
INSTALL ACCEPTABLE PIPE COUPLING TO CO2 FIRE SUPPRESSION DISCHARGE MANIFOLDIN NO. 4 HOLD SECOND DECK IAW 46CFR95.15-15.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Accommodation/Occupational Safety
Issued 12 December 1992 Resolved
MAKE PERMANENT REPAIRS TO AUXILIARY SALT WATER CUTOUT PIPING AT REDUCING ELL IN WAY OF LESLIE VALVE IN MOTOR ROOM.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Accommodation/Occupational Safety
Issued 12 December 1992 Resolved
RENEW 1/2 INCH STAINLESS STEEL TUBING FROM SEACHEST PILOT CONNECTION IN MOTOR ROOM.
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Accommodation/Occupational Safety
Issued 12 December 1992 Resolved
AUXILIARY SALTWATER MACHINERY INLET/OUTLET VALVE IN MOTOR ROOM SHALL BE REMOTELY OPERABLE FROM A POSITION ABOVE THE FREEBOARD DECK IAW 46CFR56.50- 95(d)(2).
Condition: Unknown
Due 12 January 1993
Resolved 30 July 1993
Fire Fighting
Issued 14 February 1992 Resolved
PROVIDE RECENT FOAM ANALYSIS REPORT.
Condition: Unknown
Due 14 March 1992
Resolved 11 August 1992
Deck/Cargo
Issued 14 February 1992 Resolved
REPAIR AND PROVE OPERATION OF REMOTE VALVE INDICATOR PANEL IN PUMPROOM FOR MOGAS TANK SUCTION VALVE.
Condition: Unknown
Due 14 February 1992
Resolved 14 February 1992
Accommodation/Occupational Safety
Issued 14 February 1992 Resolved
PROVIDE APPROVED PLANS FOR THE INSTALLATION OF INTRUSION ALARM SYSTEM. SEE 46CFR 113.25-6.
Condition: Unknown
Due 14 February 1992
Resolved 14 February 1992
Engineering
Issued 3 January 1992 Resolved
CONDUCT A 1-1/4 (MAWP) HYDROSTATIC TEST OF THE PORT BOILER IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR. THE TEST MUST BE COMPLETED TO THE SATISFACTION OF THE OFFICER IN CHARGE, MARINE INSPECTION, JAX, FL PRIOR TO DEPARTURE FROM JAX, FL AND IN NO CASE LATER THAN 15 JAN 1992.
Condition: Unknown
Due 3 January 1992
Resolved 3 January 1992
Construction/Loadline
Issued 21 November 1991 Resolved
MAKE PERMANENT REPAIRS TO DAMAGED WATERTIGHT DOOR FRAME, LOWER PORT SIDE, LOCATED AT FRAME 47 BETWEEN CARGO HOLD NO. 4 AND 3A.
Condition: Unknown
Due 26 November 1991
Resolved 26 November 1991
Lifesaving
Issued 8 February 1991 Resolved
REPLACE REVERE SIX MAN INFLATABLE LIFERAFT WITH USCG APPROVED VALID LIFERAFT AT NEXT AVAILABILITY OR NEXT U.S. PORT, WHICHEVER COMES FIRST. EXISTING RAFT TO BE CONDEMNED UPON FULFILLMENT OF THIS REQUIREMENT, OR FACTORY REPAIRED BY MANUFACTURER.
Condition: Unknown
Due 8 February 1991
Resolved 8 February 1991
Lifesaving
Issued 31 January 1991 Resolved
REPLACE REVERE 6-MAN INFLATABLE LIFERAFT WITH CG APPROVED VALID LIFERAFT ATNEXT U.S. PORT WHICHEVER COMES FIRST. EXISTING RAFT TO BE CONDEMNED UPON FULFILLMENT OF THIS REQUIREMENT, OR FACTORY REPAIRED BY MANUFACTURER.
Condition: Unknown
Due 31 January 1991
Resolved 31 January 1991
Lifesaving
Issued 18 December 1990 Resolved
PROVIDE 1,098 QUARTS OF APPROVED LIFEBOAT WATER RATIONS.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Lifesaving
Issued 18 December 1990 Resolved
PROVIDE ANNUAL SERVICING OF ALL (5) INFLATABLE LIFERAFTS AND HYDROSTATIC_x001C_ RELEASES.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Lifesaving
Issued 18 December 1990 Resolved
CONDUCT BI-ANNUAL WEIGHT TEST OF #1 MLB.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Engineering
Issued 18 December 1990 Resolved
MAKE BOTH BOILERS AVAILABLE FOR FIRESIDE/WATERSIDE EXAMINATION AND DC HEAT-ER AVAILABLE FOR INTERNAL EXAMINATION AT NEXT DRYDOCKING OR BY 18DEC91 _x001C_ WHICH EVER OCCURS FIRST.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Fire Fighting
Issued 18 December 1990 Resolved
PROVIDE A COPY OF A FIREFIGHTING FOAM ANALYSIS FOR PUMP ROOM, HELO PLATFORMAND LOWER MACHINERY SPACE FOAM SYSTEMS.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Lifesaving
Issued 18 December 1990 Resolved
RE-NEW ALL (4) EXPIRED LINE THROWING GUNS PRIME EJECTOR CARTRIDGES.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Lifesaving
Issued 18 January 1990 Resolved
RENEW FALLS FOR #3 & #4 LIFEBOATS. OPERATIONALLY WEIGHT TEST THE DAVIT BRAKES FOR BOTH BOATS TO THE SATISFACTION OF A USCG MARINE INSPECTOR PRIOR TO DEPARTING THE PORT OF HAMPTON ROADS AND IN NO CASE LATER THAN 25JAN90. THE VSL IS ALLOWED TO DEPART HAMPTON ROADS FOR SEA TRAILS ONLY 1/18 - 1/19.
Condition: Unknown
Due 18 January 1990
Resolved 18 January 1990
Construction/Loadline
Issued 22 December 1989 Resolved
ALL DOUBLE BTM, BALLAST, AND FUEL TANKS OVERDUE FOR INSP WITH EXCEPTION OF #5 WINGS AND THREE AFT PEAKS.
Condition: Unknown
Due 22 December 1989
Resolved 22 December 1989
Construction/Loadline
Issued 22 December 1989 Resolved
48 INCH MAIN SCOOP BUTTERFLY VALVE BOOT CRACKED AND LEAKING.
Condition: Unknown
Due 22 December 1989
Resolved 22 December 1989
Navigation
Issued 22 December 1989 Resolved
RUDDER STEADY BEARING CLEARANCES NOT TAKEN.
Condition: Unknown
Due 22 December 1989
Resolved 22 December 1989
Fire Fighting
Issued 28 November 1989 Resolved
PROVIDE [name withheld], AL. A COPY OF THE FIREFIGHTING FOAM ANALYSIS REPORT.
Condition: Unknown
Due 28 November 1989
Resolved 28 November 1989
Electrical
Issued 28 November 1989 Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR LOW LUBE OIL ALARM, HIGH JACKET WATER TEMPERATURE ALARM AND OVERSPEED TRIP.
Condition: Unknown
Due 28 November 1989
Resolved 28 November 1989
Navigation
Issued 18 December 1988 Resolved
PROVE PROPER OPERATION OF AUTOMATIC FOG HORN SYSTEM.
Condition: Unknown
Due 18 December 1988
Resolved 18 December 1988
Fire Fighting
Issued 18 December 1988 Resolved
PROVE PROPER OPERATION OF ENTIRE VESSELS FIXED SPRINKLER SYSTEM.
Condition: Unknown
Due 18 December 1988
Resolved 18 December 1988
Fire Fighting
Issued 18 November 1986 Resolved
PROVIDE A MEANS TO SATISFACTORY TEST SAFETY RELIEF VALVES ON (4) FOUR CO2 LIQUEFIED GAS BULK STORAGE TANKS BE FOR NEXT REGULAR INSPECTION FOR CERTIFICATION TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Engineering
Issued 18 November 1986 Resolved
PROVIDE OILY WATER SEPARATOR FOR TEST OF OPERATION TO THE SATISFACTION OF THE COGNIZANT [name withheld] 30 DAYS.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Electrical
Issued 14 January 1985 Resolved
PROVIDE LINE FOR LINE COMPARSION OF THE MFG. SPECS.TO U.L. STDS.ON 7 AMP FUSES ON CD TRANSFORMERS IN ALL SWITCHBOARDS.FUSES MFG. BY GOULDS CORP.REF.46 CFR SUBPART 111.53.
Condition: Unknown
Due 14 January 1985
Resolved 14 January 1985
Navigation
Issued 14 January 1985 Resolved
PROVE TO SATISFACTION OF USCG INSPECTOR THAT THE RED/WHITE/RED LIGHT DISPLAY AND DAYSHAPES CAN BE DISPLAYED PROPERLY AS PER COLREGS.
Condition: Unknown
Due 14 January 1985
Resolved 14 January 1985
Fire Fighting
Issued 14 January 1985 Resolved
PROVIDE AND POST PREMANENT METAL LABELS(LOWER CO2 ROOM MAIN DECK) FOR THE FOLLOWING CO2 PRESSURE SWITCHES, CO2 ALL WARNING LIGHTS, VENTILATION ALL CARGO HOLDS, CO2 WARNING LIGHT #5 CARGO HOLD.TOTAL OF THREE PRES. SW
Condition: Unknown
Due 14 January 1985
Resolved 14 January 1985

Casualty record · 9

14 May 2004Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2076507
7 November 2004Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2251494
9 October 2008Routine · role: Subject to Marine Inspection · activity 3443380
31 May 2014Routine · role: Involved in a Marine Casualty · activity 4878196
2 June 2014Routine · role: Involved in a Marine Casualty · activity 4878122
10 April 2018Routine · role: Involved in a Marine Casualty · activity 6390329
27 August 2018Routine · role: Involved in a Marine Casualty · activity 6542283
10 September 2018Routine · role: Involved in a Marine Casualty · activity 6541106
30 September 2018Routine · role: Involved in a Marine Casualty · activity 6575775
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

PFC. EUGENE A. OBREGON (2004–2008). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.