Records from 2016 to 2026. Most recent: inspection, 20 April 2026.
Inspection history · 20
20 April 2026
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8334114
12 July 2025
Damage Survey · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8183684
12 July 2025
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8190920
14 May 2025
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8111272
29 April 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8123714
9 August 2024
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7897648
20 February 2024
COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7844875
3 May 2023
In-Service Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7671686
17 August 2022
Examination of Repairs · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7431901
17 May 2022
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7431867
19 May 2021
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7193796
1 September 2020
Administrative Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7025124
6 May 2020
Annual Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6946974
14 February 2020
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6912219
14 February 2020
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6921014
16 February 2019
DAPI Audit · Administrative Inspection · In-Service Inspection · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6622256
3 April 2017
Uninspected Other · Examination of Repairs · Construction Oversight · Internal Structural Exam · Initial Construction-Excluding Oversight · Administrative Inspection · Hull Examination · Inclining Experiment
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6116542
29 November 2016
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 6049518
14 April 2016
Administrative Inspection · Examination of Repairs · Drydock Exam · Spot Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 5854013
14 March 2016
Administrative Inspection
Administrative · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 5832774
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 April 2026
Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. MI observed P/S Generators running after test activation of the system. Prior to PAX.
701c
46 CFR 181.420(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2026
Resolution: Received video of proper operation of fireboy.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 20 April 2026
Resolved
A vessel must comply with the applicable requirements for any radio installations as set forth in 47 CFR Part 80. MI observed no GPS data input on VHF-DSC transmitter. Integrate GPS location data to meet the DSC capability requirements.
46 CFR 184.502
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2026
Resolved 21 April 2026
Resolution: Operator provided photos of LAT LONG input in VHF transciever.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 April 2026
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire. MI observed oil soaked rotating machinery guards on both P/S Generators. Secure source of leak.
46 CFR 182.100
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2026
Resolved 5 May 2026
Resolution: Operator provided photos of clean windings. No leak identified. See documents.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 April 2026
Resolved
Electrical equipment on an vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. MI observed main switchboard missing non-conductive matting. Replace.
46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2026
Resolved 21 April 2026
Resolution: Operator provided photo of switchboard matting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 July 2025
Resolved
The OCMI may require that a vessel undergo additional tests and inspection deemed reasonable and necessary to determine the vessel and its equipment are suitable for the service in which they are to be employed.
The vessel experienced a loss of DC power, which caused a loss of propulsion control and DC bridge navigation and safety equipment. All systems must be repaired, inspected, and tested to the satisfaction of the Coast Guard prior to carrying passengers.
46 CFR 176.840
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 July 2025
Resolved 18 July 2025
Resolution: MI attended vessel and inspected repairs made to 12VDC electrical system affecting the port main engine. Verified proper operation of all equipment and gauges. CG-835v deficiency has been cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 14 May 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection and operation of all watertight closures in the hull, decks, and bulkheads. MI observed the watertight door in the machinery space did not seal properly.
46 CFR 176.802(a)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 May 2025
Resolved 14 May 2025
Resolution: O/O sent video of watertight door working properly.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards. MI observed missing protective covers on main fuses for helm and starboard battery installation.
46 CFR 183.200(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 24 May 2025
Resolution: O/O sent photo of covers installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards. MI observed missing protective covers on main fuses for helm and starboard battery installation.
46 CFR 183.200(b)
Action required: 10 - Deficiency Rectified
Due 28 May 2025
Resolved 14 May 2025
Resolution: Covers were installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards. MI observed 01 exposed wire near port main engine solenoid, hanging loose without any type of termination.
46 CFR 183.200
Action required: 10 - Deficiency Rectified
Due 28 May 2025
Resolved 14 May 2025
Resolution: Wire was removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2025
Resolved
Except when individual pumps are provided for separate spaces, individual bilge suction lines must be led to a central control point or manifold and provided with a stop valve at the control point or manifold and a check valve at some accessible point in the bilge line. MI observed check valve for bilge system was not functioning properly and allowing water back into the bilge space.
46 CFR 182.510(c)
Action required: 10 - Deficiency Rectified
Due 28 May 2025
Resolved 14 May 2025
Resolution: Check valve was cleaned and is now operational.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 May 2025
Resolved
In the design of a control, interlock, or indicator circuit, the disconnect device and its connections, including each terminal block for terminating the vessel's wiring, must not have any electrically unshielded or uninsulated surfaces. MI observed the breaker panel in the machinery space had multiple empty circuits that were not blanked off.
46 CFR 183.330(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 24 May 2025
Resolution: O/O sent photos of blanks for panel.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 April 2025
Resolved
Nothing is this subpart limits the marine inspector from conducting such tests and inspections he or she deems necessary to be assured of the vessels seaworthyness.
The vessel must undergo a COast Guard in service inspection to evaluate the condition of the hull and structural members prior to carring passengers.
46 CFR 176.500b(1)iv
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 April 2025
Resolved 30 April 2025
Resolution: In service inspection complete. No issues noted.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 May 2023
Resolved
Except as provided otherwise in this subpart, all electrical equipment including motors, generators, controllers, distribution panels, etc. shall be dripproof protected. Dripproof protected means that equipment and machinery is so constructed or protected that its successful operation is not interfered with when subjected to falling moisture or dirt.
MI identified opening in STBD side of breaker panel in front of STBD main engine.
46 CFR 183.10-10 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2023
Resolved 17 May 2023
Resolution: Received photo of hole in electrical panel being closed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 May 2023
Resolved
Flexible hose may be used provided it is fitted with suitable connection fittings and has a high resistance to saltwater, petroleum oils and vibration.
MI identified dry-rotted fuel line on the Raycor filter for PORT generator.
46 CFR 182.20-40(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2023
Resolved 8 May 2023
Resolution: Vessel representative sent over satisfactory photos of Raycor hoses being replaced with required hose.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 May 2023
Resolved
Provision shall be made by means of plugs, covers, etc., to prevent the admission of air into the space protected.
MI identified multiple ventilation closures for engine room on PORT and STBD that would not close.
46 CFR 181.20-35(a)
Action required: 10 - Deficiency Rectified
Due 3 May 2023
Resolved 3 May 2023
Resolution: Crew was able clean up ventilation closures and all closures were closing properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 May 2023
Resolved
All life preservers and ring life buoys shall be marked with the vessel's name.
MI observed faded vessel name on life ring buoys.
46 CFR 185.30-5(c)
Action required: 10 - Deficiency Rectified
Due 3 May 2023
Resolved 3 May 2023
Resolution: Crew was able to properly and clearly mark life ring buoys with vessel name.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 3 May 2023
Resolved
Penetrations and openings in watertight bulkheads must have a means to make them watertight.
MI observed class I watertight door in engine room not making a complete seal.
46 CFR 171.114(a)(2)
Action required: 10 - Deficiency Rectified
Due 3 May 2023
Resolved 3 May 2023
Resolution: Crew was able to tighten down the dogs on the door creating a proper seal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 May 2023
Resolved
The fixed power bilge pump shall be self-priming and may be driven off the main engine or other source of power. It shall be permanently connected to the bilge main and may also be connected to the fire main.
MI observed E/R bilge suction was unable to pump water due to faulty check valve.
46 CFR 182.25-10(b)
Action required: 10 - Deficiency Rectified
Due 3 May 2023
Resolved 3 May 2023
Resolution: Crew was able to fix the check valve and bilge suction was able to properly pump water.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2021
Resolved
13199 - Flexible hose must be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid. MI observed the fuel line from the filter to the pump on the port main engine was no longer in serviceable condition. - 46 CFR 182.720(e)(iii) - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Replaced fuel line with new - all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 May 2021
Resolved
02108 - Main distribution panels shall be of the dead front type where voltage to ground is in excess of 150 volts A.C. or 250 volts D.C. MI observed a missing cover from the breaker box in the engine room. - 46 CFR 183.10-15(f) - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel represtentative installed distribution blank in open slot - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2021
Resolved
13199 - Installation shall be in accordance with 182.15-15. It (exhaust piping) shall be gas-tight throughout its length. MI observed exhaust gas leak on the port generator. - 46 CFR 182.20-20, 46 CFR 182.15-20 - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel representative replaced exhaust gasket with new and new bolts. Test ran engine - all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 May 2021
Resolved
02108 - At a convenient location, a shore power connection box or receptacle shall be permanently installed and a cable connecting this box or receptacle to the main distribution panel shall be permanently installed. MI observed cable leading from the shore tie to the connection was attached with zip ties. - 46 CFR 183.10-50(a) - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel representative installed metal hangers around shore tie cable that was being held by plastic zip ties - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 May 2021
Resolved
13199 - The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. The flame screens shall consist of a single screen of corrosion resistant wire of at least 30x30 mesh. MI observed missing flame screens on both the port and starboard fuel tanks. - 46 CFR 182.20-35(d) - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel representative installed 30 x 30 mesh on both port and starboard goose neck vents for the fuel tanks - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 May 2021
Resolved
13101 - Provision shall be made by means of plugs, covers, etc., to prevent the admission of air into the space protected. MI observed 02 air intakes missing closures. - 46 CFR 181.20-35 - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel represenative install new vent covers with hinges and latches, verified operation and closure - all sat.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 19 May 2021
Resolved
02105 - All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus. MI observed a hydraulic oil leak from the steering apparatus. - 46 CFR 182.30-1 - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel operator repair steering piping leak by installing new piping and valve - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 19 May 2021
Resolved
09203 - Lighting fixtures shall be constructed in accordance with the requirements of Underwriters' Laboratories, Inc. Standard for Marine Type Electric Lighting Fixtures, Subject 595, or shall bear proper Underwriters' Laboratories, Inc. "Marine Type" label. MI observed 02 lighting fixtures missing protective covers/guards. - 46 CFR 183.10-20(l) - 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 17 June 2021
Resolution: Vessel representative installed new protective globes over existing lights that were missing - all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 May 2021
Resolved
03107 - For each watertight door, an indicator must be installed in the pilothouse and at each other vessel operating station from which the door is not visible. The indicator must show whether the door is open or closed. MI observed an unlabeled indicator light for a watertight door. - 46 CFR 170.270(e) - 10C
Action required: 10 - Deficiency Rectified
Resolved 19 May 2021
Resolution: Corrected on the Spot.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 May 2021
Resolved
10109 - All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Standards for Marine Navigation Lights,” or other standard specified by the Commandant. MI noted the stbd running light did not illuminate. - 46 CFR 183.420 - 10C
Action required: 10 - Deficiency Rectified
Resolved 19 May 2021
Resolution: Corrected on the Spot.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 1 September 2020
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI.
Marine Inspector observed alteration to Potable Water tank. Plans had not been submitted or approved by OCMI.
46 CFR 176.700(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2020
Resolved 23 October 2020
Resolution: Received MSC memo stating that the vessel was under 2% weight displacement after calculations were conducted. Initial Lightship Value in 8/13/2018 was 96.47 LT and Revised Lightship Values - Weight Moment Calcs was 96.09 LT. Cleared def. all SAT
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 29 November 2016
Resolved
Vessel pre-engineered fire fighting system is empty. Refill and have inspected and serviced by a certified fire protection company prior to carrying passengers.
Condition: Improper Installation
Due 9 December 2016
Resolved 13 December 2016
Resolution: Vessel pre-engineered fire fighting system has been refilled, inspected and serviced by a certified fire protection company.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 29 November 2016
Resolved
Not servicable
Condition: Improper/Lack of Maintenance
Due 23 December 2016
Resolved 9 January 2017
Resolution: Confirmed vessel has onboard 169 Adult Type 1 PFD's and 17 Child PFD's.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 29 November 2016
Resolved
Does not have vessel name
Condition: Improper Installation
Due 23 December 2016
Resolved 9 January 2017
Resolution: confirmed vessel has onboard 169 Adult Type 1 PFD's and 17 Child PFD's. Life jackets will be marked with Vessels New Name after change of ownership and pior to obtaining COI
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 November 2016
Resolved
vessel Does not have approved permanent electrical wiring being utilized for lighting in Sewage space.
Condition: Improper Installation
Due 9 December 2016
Resolved 13 December 2016
Resolution: vessel has permanent approved electrical wiring being utilized for lighting in Sewage space.