Records from 2016 to 2026. Most recent: inspection, 3 March 2026.
Inspection history · 17
3 March 2026
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8319175
9 December 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8280128
16 December 2024
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8039636
11 June 2024
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7932619
7 March 2023
Internal Structural Exam · Annual Inspection · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7646710
16 June 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7478972
12 October 2021
Plan Review (Other than "T")
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7331223
14 June 2021
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7224880
1 July 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6998896
28 February 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6917694
10 February 2020
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6905935
9 July 2019
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6744540
22 June 2018
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6452315
26 March 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6449292
6 March 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6367193
12 June 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6173182
15 June 2016
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5908448
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 March 2026
Resolved
Vessels must be equipped with independently driven fire pumps in accordance with Table 95.10-5(a)
Vessel reported fire pump was removed for maintenance. Vessel is authorized to respond to the downed aircraft on the Hudson River following the submitted plan on 3MAR2026. This plan is authorized for the above evolution only.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 6 March 2026
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 16 December 2024
Resolved
When the vessel is underway the EPIRB must be sowed in it's float free bracket with the controls set for automatic activation. During the inspection the HRU unit was expired requiring renewal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2025
Resolved 16 December 2024
Resolution: Cleared via master's statement.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 16 December 2024
Resolved
Each life raft or group of life rafts must be arranged for float-free launching. During the inspection the vessel's life-raft did not have the the required float- free arrangement nor the associated/approved HRU.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2025
Resolved 16 December 2024
Resolution: Cleared via Master's statement
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 December 2024
Resolved
At least one lifebuoy on each side of the vessel shall be fitted with a buoyant lifeline that is at least as long as twice the height where it is stowed above the waterline with the vessel in it's lightest seagoing condition or 30 meters (100 feet) in length, whichever is the greater. All ring lifebuoys have throw lines of insufficient length, are wasted and require renewal. Grab lines, and water light attachment light attachment lines requires renewal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2025
Resolved 16 December 2024
Resolution: Cleared via Master's statement
08 - Alarms › N/A - No Subsystem › Boiler alarm
Issued 16 December 2024
Resolved
Each boiler must be inspected IAW Table 61.05-10. Boiler Hydro (5 years), fire side inspection (2.5) are due for inspection. Schedule attandance as appropriate
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 January 2025
Resolved 18 December 2024
Resolution: MI witnessed a hydro test and conducted a fireside and waterside inspection, sat.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 15 June 2021
Resolved
Prior to operating provide proof that the CO2 cylinders had been properly weighed / serviced as needed. Carbon dioxide cylinders forming part of a fixed fire extinguishing system must be retested, at least, every 12 years.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 June 2021
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 15 June 2021
Resolved
Replace the worn ring boat in rescue boat as each lifesaving appliance must be in working order and ready for immediate use.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 June 2021
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 June 2021
Resolved
Demonstrate the the emergency lights operate as electric
equipment must be inspected at the COI to determine mechanical and electrical condition and performance
(head, officer day room and bridge)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 June 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 15 June 2021
Resolved
Forward port goose neck is missing closing device and needs to be provided with a device to allow closing the opening.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 June 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 June 2021
Resolved
By the next annual inspection provide a provisions to weight the CO2 bottles
Action required: 705 - Other - as specified
Due 15 June 2022
Resolved 22 July 2021
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 15 June 2021
Resolved
First-aid equipment has expired, provide adequate equipment that is not expired
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 June 2021
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 15 June 2021
Resolved
Install diffusers / light covers for the lights in the machine shop main deck as each light must have a guard
where it is not subject to damage.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 June 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 1 July 2020
Resolved
No repairs or alterations affecting the safety of the vessel with regard to hull, machinery or equipment, shall be made without the knowledge of the [name withheld] of alterations shall be approved before work is started unless deemed necessary by the OCMI.
Vessel installed new pressure switch during dry dock to secure the stack ventilation damper.
Submit all drawings and plans, demonstrate proper operation of the system to the attending CG Marine Inspector.
Rectify deficiencies w/in 14 days (22JUL2020).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2020
Resolved 16 July 2020
Resolution: Vessel removed stack vent dampener modification and installed blanks.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 9 July 2019
Resolved
Stowage locations for lifesaving equipment must be marked and if more than one device is stowed in a location, the number of devices stowed must be indicated. Lifejacket storage box not stenciled.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 9 July 2019
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be ready for immediate use. Life raft secure stanchions are not able to be removed which would make it difficult to launch the raft incase of emergency.
Action required: 10 - Deficiency Rectified
Resolved 9 July 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 July 2019
Resolved
Doors under wheelhouse, to void space, are not able to be made weather tight, door gaskets are torn, make doors to void under wheelhouse weather tight missing gasket. Doors in superstructures shall be fitted with doors of steel fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and weather tight when closed
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 August 2019
Resolved 5 September 2019
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Galley, handlingroom (maintenance)
Issued 9 July 2019
Resolved
Label lighting panel L-1-36-1 door to indicate that the disconnect switch is located inside for stove . Numbered switching unit and panel board directory. (a) Each panel board switching unit must be numbered.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 August 2019
Resolved 25 July 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 July 2019
Resolved
Label the watertight door handles and local locations so that the operator will know which direction to turn hand wheel and the indicator to know if the door is open or closed. WTDs are to be designed, constructed, tested, and marked in accordance with ASTM
F 1196
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 August 2019
Resolved 25 July 2019
Engineering › Generator (propulsion-electric) › Circuit Breaker (overload/over current protection)
Issued 22 June 2018
Resolved
The #1 generator over-speed solenoid is remaining energized following trip test. Main machinery shall operate satisfactorily for the service for which they are intended. Operator shall correct by repair or replace, the components necessary for normal functionality and reset of the over-speed trip.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 July 2018
Resolved 3 July 2018
Engineering › Generator (propulsion-electric) › Circuit Breaker (overload/over current protection)
Issued 22 June 2018
Resolved
The #1 generator high temperature alarm is not operating when tested. Main machinery shall operate satisfactorily for the service for which they are intended. Operator shall correct by repair or replace, the components necessary for normal functionality of the high temp water alarm.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 July 2018
Resolved 3 July 2018
Construction/Loadline › Hull › Hull Plating
Issued 6 March 2018
Resolved
1. Complete credit dry dock prior to operation.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 May 2018
Resolution: Credit Drydock & ISE Exams were completed.
Lifesaving › Inflatable Liferafts › Weak Link
Issued 12 June 2017
Resolved
1. Properly install weak link on life raft.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 June 2017
Resolved 16 June 2017
Navigation › Piloting/Steering › Advance/Transfer
Issued 12 June 2017
Resolved
2. Prove proper operation of EOT loss of power alarm.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 July 2017
Resolved 20 June 2017
Communications › Radio Communications › EPIRB
Issued 12 June 2017
Resolved
3. Provide valid EPIRB registration form.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 July 2017
Resolved 12 June 2017