Records from 1985 to 2008. Most recent: inspection, 17 July 2008.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 August 2003
Resolved
Remove dead end wires on stbd near batteries.
Due 24 October 2003
Resolved 3 November 2003
Resolution: wires removed
Engineering › Fuel Oil Service System › Piping
Issued 21 August 2003
Resolved
Replace fuel line to generator with approved type.
Due 10 October 2003
Resolved 3 November 2003
Resolution: hard pipe installed
Engineering › Steering Gear System › Hydraulic Hose
Issued 21 August 2003
Resolved
Replace hydraulic steering line. (rusted)
Due 10 October 2003
Resolved 3 November 2003
Resolution: line replaced
Engineering › Steering Gear System › Motor
Issued 21 August 2003
Resolved
Prove proper operation of emergency steering.
Due 21 October 2003
Resolved 20 January 2004
Resolution: emergency steering tested satisfactorily
Stability › Water on Deck › General
Issued 21 August 2003
Resolved
Double clamp port deck drain hose.
Due 21 October 2003
Resolved 4 November 2003
Resolution: clamps provided
Engineering › Diesel Engine (propulsion-direct drive) › Connecting Rod
Issued 21 August 2003
Resolved
Make proper repair to damaged engine throttle cable
Due 21 October 2003
Resolved 4 November 2003
Resolution: throttle cable replaced
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 August 2003
Resolved
remove dead end wiring behind engine
Due 21 October 2003
Resolved 4 November 2003
Resolution: wires removed
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 21 August 2003
Resolved
Determine and make proper repairs to port side source of fuel leak.
Due 21 October 2003
Resolved 4 November 2003
Resolution: leak fixed on tank
Stability › Watertight Integrity › General
Issued 21 August 2003
Resolved
install check valve on shower overboard discharge
Due 21 October 2003
Resolved 4 November 2003
Resolution: valve installed
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 August 2003
Resolved
remove dead end wiring from the forward cabin
Due 21 October 2003
Resolved 4 November 2003
Resolution: wires removed
Electrical › Electrical Distribution System (service) › Cable
Issued 21 August 2003
Resolved
Address melted winch cable
Due 21 October 2003
Resolved 4 November 2003
Resolution: wire replaced
Construction/Loadline › Structures › Manhole
Issued 21 August 2003
Resolved
provide inspection hatch in stbd cabin floor for hull access
Due 21 October 2003
Resolved 4 November 2003
Resolution: hatch installed in deck
Stability › Watertight Integrity › Weathertight Enclosure
Issued 21 August 2003
Resolved
replace dog in port fwd port hole
Due 21 October 2003
Resolved 4 November 2003
Resolution: dog replaced
Stability › Unintentional Flooding › General
Issued 21 August 2003
Resolved
Address 2 open ended hoses in fwd stbd engine room
Due 21 October 2003
Resolved 4 November 2003
Resolution: hoses removed
Construction/Loadline › Structures › Superstructure
Issued 21 August 2003
Resolved
provide extra support for fwd rails and raise lifelines to proper height
Due 21 October 2003
Resolved 4 November 2003
Resolution: proper rails installed
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 21 August 2003
Resolved
provide hand rail for stairway leading to cabin
Due 21 October 2003
Resolved 10 December 2003
Resolution: handrail installed
Construction/Loadline › Structures › Superstructure
Issued 21 August 2003
Resolved
address the width of the passageway leading to the fwd cabin.
Due 21 October 2003
Resolved 10 December 2003
Resolution: Letter submitted to CID was approved, allowing for the width of the passageway leading to fwd cabin to be less than regulations due to the vessel''''s construction.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 21 August 2003
Resolved
remove flanges from aft port handrails.
Due 21 October 2003
Resolved 4 November 2003
Resolution: flanges removed
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 21 August 2003
Resolved
provide 24 adult lifejackets
Due 10 December 2003
Resolved 20 January 2004
Resolution: lifejackets provided
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 21 August 2003
Resolved
provide 1 A-II and 1 B-I fire extinguishers.
Due 10 December 2003
Resolved 20 January 2004
Resolution: proper type and number of extinguishers installed
Communications › Radio Communications › EPIRB
Issued 21 August 2003
Resolved
Properly mount and register EPIRB
Due 10 December 2003
Resolved 20 January 2004
Resolution: EPIRB properly mounted and registered
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 21 August 2003
Resolved
provide the correct size fuel vents
Due 10 December 2003
Resolved 20 January 2004
Resolution: proper fuel vents installed
Engineering › Bilge Water Management System › Pump
Issued 21 August 2003
Resolved
show proper operation of bilge system
Due 10 December 2003
Resolved 20 January 2004
Resolution: bilge system tested sat.
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 21 August 2003
Resolved
mount ships bell outside the pilot house
Due 10 December 2003
Resolved 20 January 2004
Resolution: ships bell properly mounted
Operations/Management › Drills/Instruction › Safety Orientation
Issued 21 August 2003
Resolved
provide cpr/first aid cards
Due 10 December 2003
Resolved 20 January 2004
Resolution: cards provided
Engineering › Fuel Oil Service System › Piping
Issued 21 August 2003
Resolved
properly label emergency fuel shut-offs
Due 10 December 2003
Resolved 20 January 2004
Resolution: shut-offs labeled correctly
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 21 August 2003
Resolved
show proof of proper vessel and crew documentation
Due 10 December 2003
Resolved 20 January 2004
Resolution: proper documentation provided
Lifesaving › Lifefloat › Capacity
Issued 21 August 2003
Resolved
provide proper primary lifesaving arrangements for all persons carried onboard.
Due 10 December 2003
Resolved 20 January 2004
Resolution: lifefloat provided to accomodate all pax
Electrical
Issued 25 November 1985
Resolved
SUBMIT FOR APPROVAL DC CIRCUIT DIAGRAM.
Condition: Unknown
Due 20 December 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past