Inspection history · 21
29 April 2026
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8357584
10 December 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8277833
30 April 2025
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8081852
23 April 2024
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7894211
13 December 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7838183
3 May 2023
Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7614366
28 August 2022
Type not recorded
No type recorded · Station New York · USCG Northeast District (CGD-NE) · Activity 7545319
14 April 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7431174
21 December 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7371157
5 April 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7168679
8 May 2020
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6949817
10 December 2019
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6870762
15 April 2019
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6662505
19 March 2019
Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6645374
26 November 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6586454
9 April 2018
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6389514
3 January 2018
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6332057
14 November 2017
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6306742
7 April 2017
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6119956
12 April 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5852193
19 January 2016
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5801087
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 29 April 2026
Resolved
"All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules." Vessel's port side navigational light is inoperable. Restricted to daytime operations and can not operate during times of restricted visibility.
46CFR183.420
Action required: 705 - Other - as specified
Resolved 26 May 2026
Resolution: Recieved photos via email of operating port running light.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 April 2026
Resolved
"... Have fittings of brass or other suitable corrosion-resistant material that comply with NFPA 1963 (incorporated by reference, see 46 CFR 175.600) or other standard specified by the Commandant." Fire hose nozzle adapter was cracked and made of plastic.
46CFR181.320(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 June 2026
Resolution: recieved videos and photos of the new nozzle for the fire hose. Defiency cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 29 April 2026
No resolution recorded
Each window, port hole, and its means of attachment to the hull or deck house, must be capable of withstanding the maximum load from wave and wind conditions expected due to its location on the vessel and the authorized route of the vessel. Broken window outside the wheel house on the port side. Replace window prior to October 31, 2026.
46CFR177.1020
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 April 2025
Resolved
The fixed port bilge pump shall be self-priming and may be driven off the main engine or other source of power. It shall be permanently connected to the bilge main and may also be connected to the firemain. Forepeak bilge suction found IN-OP. Repair prior to carriage of passengers.
46 CFR 182.25-10(b)
OLD T
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 May 2025
Resolution: Video recieved
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 30 April 2025
Resolved
A marine employer whose vessel is involved in a casualty or incident that is, or is likely to become, a serious marine incident... shall comply with the requirements of 4.06 in subchapter A of this chapter. Provide the following documents per Drug and Alcohol Program Audit: MIS Report, 1 hour training for supervisor, alcohol/drug testing devices on board, all crew pre-employment, negative tests for 1 year. New crewman cannot work until test results are received.
46 CFR 185.212
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 May 2025
Resolution: Recieved final stipulation of 1 hour of supervisor training by owner/operator.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 30 April 2025
Resolved
The Coast Guard will issue a medical certificate to a mariner meeting the medical and physical standards for merchant mariners. Master must provide medical certificate as per MMC requirements.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 May 2025
Resolution: Receieved picture from owner/operator with new medical certificate.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 30 April 2025
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry... Six hand red flare distress signals [and] six hand orange smoke distress signals. Vessel must provide proof of additional 3 red and 3 orange flares. Vessel is restricted to Lakes, Bays, and Sounds route until rectified.
46 CFR 180.68(a)
Action required: 705 - Other - as specified
Resolved 2 May 2025
Resolution: Recieved pictures from owner w/ required flares for Coastwise route.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 30 April 2025
Resolved
On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces and all other spaces normally manned by crew members. Vessel public address (PA) system disconnected in superstructure.
46 CFR 184.610
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 May 2025
Resolution: Owner submitted video of PA system in the superstructure functioning.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 April 2024
Resolved
The number of life jackets marked aboard the vessel did not match the number listed on the COI.
"The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits..."
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 28 April 2024
Resolution: Life jacket count was updated to reflect the correct number.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 April 2024
Resolved
Grab line around ring life buoy on the upper deck was found wasted. Must be replaced.
"Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced."
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 28 April 2024
Resolution: Grab line was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 23 April 2024
Resolved
Flex hose near exhaust on Starboard engine was found wasted. Hose needs to be shield from exhaust.
"Protection from mechanical damage shall be specially considered. Protective covering or shields shall be installed to the satisfaction of the OCMI."
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 9 May 2024
Resolution: New hose installed
14 - Pollution Prevention › N/A - No Subsystem › VGP: General
Issued 23 April 2024
Resolved
MSD discharge valve was found not secured. Discharge valve needs to be secured.
"...Padlocking the seacock in the closed position..."
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 28 April 2024
Resolution: MSD Valve was closed and locked.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 April 2024
Resolved
Extension cord under the operating station needs to be removed.
"Flexible or portable cords such as SO,STO and similar types cannot be used for permanently installed wiring"
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 9 May 2024
Resolution: Cord removed
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 23 April 2024
Resolved
Painter line attachment around body of buoyant apparatus was found wasted. Painter line needs to be secured to buoyant apparatus.
"If the life float or buoyant apparatus does not have a painter attachment fitting, a means for attaching the painter must be provided by a wire or line that:(1) Encircles the body of the device;"
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 28 April 2024
Resolution: Painter line was secured to buoyant apparatus.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 23 April 2024
Resolved
Paper navigation charts were found expired. Paper charts need to be updated.
"As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:..."
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 28 April 2024
Resolution: Paper charts were provided showing date is within six months.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 23 April 2024
Resolved
EPIRB hydrostatic release was found expired. Vessel is restricted to 3NM until hydrostatic release unit is renewed.
"Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed."
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 28 April 2024
Resolution: EPIRB hydrostatic release unit has been renewed.
01 - Certificates & Documentation › 012 - Crew Certificates › Record of employment
Issued 23 April 2024
Resolved
Pre-employment testing was not provided for newest crew member. Vessel owner must provide information for pre-employment testing requirements for newest crew member.
"No marine employer shall engage or employ any individual to serve as a crewmember unless the individual passes a chemical test for dangerous drugs for that employer. (b) An employer may waive a pre-employment test required for a job applicant by paragraph (a) of this section if the individual provides satisfactory evidence that he or she has:(1) Passed a chemical test for dangerous drugs, required by this part, within the previous six months with no subsequent positive drug tests during the remainder of the six-month period; or (2) During the previous 185 days been subject to a random testing program required by § 16.230 for at least 60 days and did not fail or refuse to participate in a chemical test for dangerous drugs required by this part.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 24 April 2024
Resolution: O/O provided proof of employee drug testing program for newest employee.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 3 May 2023
Resolved
The owner, managing operator, or qualified servicing facility as applicable shall conduct the following tests and inspections and tests (test required by NFPA 10)
Vessel's portable extinguishers and pre-engineered fire suppression systems past servicing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2023
Resolution: Sat servicing records submitted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 December 2019
Resolved
A HATCH EXPOSED TO THE WEATHER MUST BE WATERTIGHT. THE GASKET ON THE FOREPEAK HATCH WAS IN A CONDITION THAT RENDERRED IT NOT WEATHERTIGHT.
46CFR179.360(a)
Action required: 705 - Other - as specified
Resolved 8 May 2020
Resolution: Attended vessel and verified gasket replacement.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 April 2019
Resolved
Each connection to a conductor must be made within an enclosure. Place all wire connections to float switches within an enclosure.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2019
Resolved 3 June 2019
Resolution: Owner submitted pictures of junction boxes installed in each compartment.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 15 April 2019
Resolved
An adult lifejacket must be carried for each person onboard the vessel. Also, a child sized lifejacket must be provided for each person carried that is smaller than the lower size limit of the adult lifejackets provided. Restricted to 11 children and 51 passengers (adult), and 3 crew.
Updated to increase adult by 24. Total 75 adult pax + 3 crew.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 8 May 2020
Resolution: Operator requested to reduce passenger count on COI.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 April 2019
Resolved
Each survival craft must be in good working order and ready for immediate use. Life floats must be repaired IAW [name withheld] repair kit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2019
Resolved 19 April 2019
Resolution: Used Phenosil silicone sealant.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 26 November 2018
Resolved
Vsl is broadcasting greater than expected vessel length
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2019
Resolved 8 May 2020
Resolution: Vessel provided New AIS information.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 9 April 2018
Resolved
The vessel's pre-engineered fixed firefighting system was serviced but incorrectly placed back in service. Vessel must have servicing company place back into operational readiness and prove proper operation to a USCG Marine Inspector. 46CFR181.420(a)(4)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 April 2018
Resolution: Operator placed the system into the proper configuration.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 9 April 2018
Resolved
Provision must be made for closing all ducts for spaces protected by a fixed fire extinguishing system. Vessel must fabricate and mount closure devices in way of ducts. 46CFR182.465 (h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 13 April 2018
Resolution: Vessel owner fabricated means to secure ducts.
Electrical › Electric Generation Source (service) › Panelboard
Issued 9 April 2018
Resolved
The volt meter and AMP meter are inoperable during generator operation. Vessel must repair or replace. 46CFR183.200(b)/46CFR183.320(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 13 April 2018
Resolution: Vessel owner had marine elctrician repair or replace meters.
Accommodation/Occupational Safety › Occupational Safety › Spark Producing Device
Issued 9 April 2018
Resolved
Vessel needs to install blanks in the electrical panel at the entrance of the engine room to prevent an electrical shock hazard. 46CFR183.330
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 13 April 2018
Resolution: Blanks installed in switchboard.
Documentation › Markings/Placards › Lifejacket Placard
Issued 9 April 2018
Resolved
Vessel must provide a life jacket donning placard for each type of life jacket onboard. 46CFR185.516
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 13 April 2018
Resolution: Donning instructions for each type of PFD has been posted at the PFD stowage locations.
Navigation › Piloting/Steering › US Coast Pilot
Issued 9 April 2018
Resolved
Vessel must provide an updated Coast Pilot and USCG Light List. 46CFR184.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 13 April 2018
Resolution: Vessle owner obtained current publications.
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 9 April 2018
Resolved
Vessel must provide an FCC Marine Operators Permit. 47CFR80.159 (e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 13 April 2018
Resolution: Vessle owner provided current FCC permit.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 7 April 2017
Resolved
Replace worn out retro tape on PFDs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 May 2017
Resolved 12 April 2017
Resolution: Suspect PFDs have had new retro placed on them.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 7 April 2017
Resolved
No alcohol test kits were provided onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 12 April 2017
Resolution: Testing kits provided onboard.
Navigation › Piloting/Steering › Marine Charts
Issued 7 April 2017
Resolved
Vessel needs to have current charts and publications onboard.
Condition: Invalid
Action required: 705 - Other - as specified
Due 19 April 2017
Resolved 19 April 2017
Resolution: New chart provided.
Lifesaving › Lifebuoys › Serviceable
Issued 7 April 2017
Resolved
Vessel must provided new life rings that are properly marked. Vessel is only required on lifering but both onboard were wasted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 12 April 2017
Resolution: New properly marked lifering was provided onboard.